Project name Management plan (component) Project Name – Management Plan Tips for completing templates – Every section of the template should be addressed. If the section is not relevant to the project, use ‘not applicable to this project’. This enables the project manager to tailor the documentation to the needs of the project, while ensuring the knowledge areas of project management have been addressed. – While deleting the guidance box streamlines the appearance of the document it is also useful to save a version with all guidance intact. This allows you to review the guidance again if any changes are required to the document, following review by other parties. – Information can be presented in table form. – This document should be managed in accordance with the Department of Transport and Main Roads Recordkeeping Policy. – It could be useful to refer to a completed management plan as an example of how to complete this document. – Templates should be completed in a language that is: – clear and easy to understand – pleasant to read – well-punctuated and grammatically correct. To delete this guidance text box, double click mouse in the left margin then press delete. Department of Transport and Main Roads Component OnQ template Page 2 of 14 Project Name – Management Plan Document control sheet Action statement Date Name Position Action required Due date (Review/Endorse/Approve) Version history Version no. Date Changed by dd/mm/yyyy Nature of amendment Initial draft. Prepared by Title Branch/District Division/Region Location Version no. Version date Status DMS ref. no. Name Job title Branch/District Division/Region Floor, street, city 0.1 dd mmmm yyyy Initial Draft / Consultation Draft / Approved Document / Minor Revision / Major Revision DMS reference number File/Doc no. File number/document number Contact for enquiries and proposed changes If you have any questions regarding this document or if you have a suggestion for improvements, please contact: Project manager: Insert Project Manager's name here Phone: Insert phone number here Department of Transport and Main Roads Component OnQ template Page 3 of 14 Project Name – Management Plan Management plan approval In signing this approval: I agree that the document meets the standard required for the management plan. Overall project manager Name Position Signature Date Component sponsor Name Position Signature The following officer has endorsed this document. Date Name Position Signature Date Add further names as required Department of Transport and Main Roads Component OnQ template Page 4 of 14 Project Name – Management Plan Contents Executive summary .................................................................................................. 7 1 Introduction .................................................................................................. 8 1.1 Purpose of this document .............................................................................. 8 2 Overall project .............................................................................................. 8 2.1 Project name and description ........................................................................ 8 2.2 Project customer ............................................................................................ 8 2.3 Project sponsor .............................................................................................. 8 2.4 Project manager............................................................................................. 9 2.5 Objectives ...................................................................................................... 9 2.6 Scope............................................................................................................. 9 3 Component project ...................................................................................... 9 3.1 Project purpose .............................................................................................. 9 3.1.1 Background and current situation ............................................................................ 9 3.2 Objectives .................................................................................................... 10 3.3 Scope of project ........................................................................................... 10 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 In scope ..................................................................................................................10 Out of scope ...........................................................................................................10 Related projects ......................................................................................................10 Constraints .............................................................................................................11 Urgency ..................................................................................................................11 Assumptions ...........................................................................................................11 3.4 Risks ............................................................................................................ 11 3.5 Broad strategy.............................................................................................. 11 4 Project control............................................................................................ 11 4.1 Integration management .............................................................................. 11 4.2 Scope........................................................................................................... 12 4.3 Time management ....................................................................................... 12 4.4 Cost management........................................................................................ 12 4.5 Quality management .................................................................................... 12 4.6 Human resource management .................................................................... 12 4.7 Communication management ...................................................................... 13 4.7.1 4.7.2 4.7.3 Reporting structure .................................................................................................13 Internal communication ...........................................................................................13 External communication..........................................................................................13 4.8 Risks and issues management .................................................................... 13 4.8.1 4.8.2 Risk ........................................................................................................................13 Issues .....................................................................................................................13 Department of Transport and Main Roads Component OnQ template Page 5 of 14 Project Name – Management Plan 4.9 Procurement management .......................................................................... 14 5 Operational issues ..................................................................................... 14 6 Project performance measurement .......................................................... 14 Department of Transport and Main Roads Component OnQ template Page 6 of 14 Project Name – Management Plan Executive summary – The executive summary is mandatory. – Outline the strengths and weaknesses of the options considered and summarise key justification for the recommended option. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 7 of 14 Project Name – Management Plan 1 Introduction 1.1 Purpose of this document Type here 2 Overall project 2.1 Project name and description Enter the name and description of the overall project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.2 Project customer – Accountable for ensuring the stated benefit(s) of the project to the business have been measured and achieved. – Enter the name of the project customer. To delete this guidance text box, double click mouse in the left margin then press delete. Insert name 2.3 Project sponsor – Accountable for representing the organisation that is delivering the project. – Enter the name of the project sponsor. To delete this guidance text box, double click mouse in the left margin then press delete. Insert name Department of Transport and Main Roads Component OnQ template Page 8 of 14 Project Name – Management Plan 2.4 Project manager – Appointed by the project sponsor to manage the project (and responsible for preparing this document). – Enter the name of the project manager. To delete this guidance text box, double click mouse in the left margin then press delete. Insert name 2.5 Objectives A statement of what the overall project is expected to achieve including potential benefits based upon the current state of knowledge and understanding. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 2.6 Scope Statement of what is in and out of scope for the overall project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3 Component project 3.1 Project purpose 3.1.1 Background and current situation – Provide a brief history to bring the reader up to speed on the subject matter of the component project including a brief history. – Describe here the current situation and the problems along with their associated impacts on internal and external stakeholders. – This section should describe the history of the component project. It should include details of: – Who initiated the component project and how it was initiated. – Identify the impact of problems or issues over time. – Describe any other initiatives carried out previously to address related issues. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 9 of 14 Project Name – Management Plan 3.2 Objectives A statement of what the component project is expected to achieve including potential benefits based upon the current state of knowledge and understanding. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.3 Scope of project 3.3.1 In scope – This defines the component project boundaries. – The scope outlined in any previous document should be confirmed here or updated as necessary. – List all items that are included in the scope of the component project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.3.2 Out of scope – List identified items that will not be delivered as part of this component project. – This is most important as it specifies items that will not be undertaken as part of the component project. – This assists in managing or avoiding scope creep. – The importance of individual out of scope items should be mentioned. – Such items may pose significant risks to the project if they are not done at all by others. – This may create risks for the project that need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.3.3 Related projects List any related projects or proposals affecting this component of the project (whether past, current or planned) and their relationship to this component. Such projects may pose significant risks to the project if they are not done at all by others or not completed in time. This may create risks for the project that need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 10 of 14 Project Name – Management Plan 3.3.4 Constraints Restrictions that will limit the way the objective is to be achieved (describe anything that might impact on the successful development or implementation of the component project). This may include restrictions on budget or funding, political issues, limited resources to work on the overall project, timing constraints or constraints on the implementation of the outcomes of the project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.3.5 Urgency Identify the urgency of the component project stating reasons. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.3.6 Assumptions List all assumptions made in producing this document. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.4 Risks Identify the risks associated with the component project development and implementation. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 3.5 Broad strategy Discuss the broad strategy to deliver the project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4 Project control 4.1 Integration management Describe how the various elements and their impacts on each other will be controlled to achieve successful project outcomes. In particular review impacts on time, cost and scope. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 11 of 14 Project Name – Management Plan 4.2 Scope Describe how changes to scope will be managed. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.3 Time management Describe how changes to time and resources will be managed. Refer to an attached project schedule breaking the project into activities displaying start, finish, internal resources, external resources and major milestones. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.4 Cost management Describe how changes to costs will be managed. Refer to an attached budget estimate breaking the project into activities displaying the estimated costs for internal resources and external resources. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.5 Quality management Describe what quality systems are being used to manage the project. If the standard corporate systems are being used, document any changes or modifications specific to the project. This could include quality plans, project specific work instructions, safety or environmental management. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.6 Human resource management – Describe the approach to be taken with the deployment of internal and external resources. – Provide a component team organisation structure and describe roles and responsibilities. – Provide details of any project specific training required. Refer to a responsibility matrix (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 12 of 14 Project Name – Management Plan 4.7 Communication management 4.7.1 Reporting structure Detail the reports for the component. These should be largely determined by the project manager of the overall project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.7.2 Internal communication Describe the communication processes for the component project. They should be developed in consultation with the project manager of the overall project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.7.3 External communication Describe the communication processes for all external parties. Refer to a detailed consultation and communications plan (if required). They should be developed in consultation with the project manager of the overall project. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.8 Risks and issues management 4.8.1 Risk – Describe how the project will manage risks. – Refer to an attached risk plan showing identified risks, severity, likelihood and mitigation actions. (Actions should be included in the component project schedule). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 4.8.2 Issues – Describe how the component project will manage issues. – Refer to an attached listing of issues. To delete this guidance text box, double click mouse in the left margin then press delete. Type here Department of Transport and Main Roads Component OnQ template Page 13 of 14 Project Name – Management Plan 4.9 Procurement management Describe how external goods and services will be procured (if required). To delete this guidance text box, double click mouse in the left margin then press delete. Type here 5 Operational issues Identify any known operational issues created by this component. To delete this guidance text box, double click mouse in the left margin then press delete. Type here 6 Project performance measurement Detail how the performance of the component will be measured during the project’s life. An example table format is shown below. To delete this guidance text box, double click mouse in the left margin then press delete. Responsibility Success Measurement method KPI Target When all information has been put into this document and the guidance text boxes have been deleted, it will be necessary to reformat the document. To update the table of contents: – Right click mouse in the table of content, ‘click update fields’. – Click on ‘update entire table’, then click ‘ok’. (This will update the table of contents to show the new page numbers). To delete this guidance text box, double click mouse in the left margin then press delete. Department of Transport and Main Roads Component OnQ template Page 14 of 14