The Smart Energy Design Assistance Center (SEDAC) Retro-Commissioning Service Provider Request for Qualifications RFQ-SEDAC003 Sponsored by the Illinois Department of Commerce and Economic Opportunity Managed by the University of Illinois at Urbana-Champaign In Partnership With The 360 Energy Group, LLC Last Updated: December 2014 RFQ-SEDAC003 Page 1 of 17 BACKGROUND Illinois Energy Now (IEN) is an energy efficiency program administered by the State of Illinois that provides millions of dollars in rebates to public facilities that make large-scale equipment improvements which reduce electricity and natural gas usage. The Smart Energy Design Assistance Center (SEDAC) is sponsored by the Illinois Department of Commerce and Economic Opportunity (DCEO) and is managed by the University of Illinois at Urbana-Champaign (UIUC) in partnership with the 360 Energy Group, LLC (360EG) (Project Team). UIUC offers its substantial experience assisting the building industry—architects, engineers, contractors, builders, manufacturers, and consumers—to design and construct buildings that are technologically advanced and energy efficient. The 360EG lends experience in market transformation and program management. The Smart Energy Design Assistance Center (SEDAC) manages the Illinois Department of Commerce & Economic Opportunity’s (DCEO) IEN Public Sector Retro-Commissioning (RCx) Program. The purpose of DCEO’s Public Sector RCx Program is to help public sector clients (including units of local government, K-12 school districts, community colleges, public universities, and state agencies) identify controls, scheduling, and operations-related energysaving improvements that will have an estimated total payback of 1.50 years or less. The end result: significant energy and demand savings that, in many cases, also improve occupant comfort and productivity. The RCx analysis is fully funded by Illinois Department of Commerce & Economic Opportunity (DCEO), in partnership with Ameren Illinois, Commonwealth Edison, Nicor Gas, North Shore Gas, and Peoples Gas. As part of the program, each participating clients must commit to spending at least $10,000 towards implementing the measures selected from those recommended by the RCx analysis, arrange for implementation in a timely manner, attend meetings, and assist RCx service providers in acquiring facility information. ILLINOIS ENERGY NOW PUBLIC SECTOR RETRO-COMMISSIONING Illinois Energy Now RCx services are conducted exclusively by either SEDAC staff or preapproved RCx service providers who have been trained in program protocols and participation processes. Last Updated: December 2014 RFQ-SEDAC003 Page 2 of 17 PROJECT ELIGIBILITY Eligibility for the Public Sector Retro-Commissioning Program is limited to public buildings that: Receive electrical delivery service from Ameren Illinois or ComEd, regardless of their choice of supplier. Public buildings receiving natural gas from Ameren Illinois, Nicor Gas, North Shore Gas, or Peoples Gas may also be eligible for inclusion of natural gas savings measures. Are at least 5 years old and have a building size of at least 150,000 (conditioned) square feet* Have a functioning building automation system and the client agrees to provide BAS access to the RCx provider. Have an energy use index (indices) showing a potential to produce significant electrical and natural gas savings through RCx * Newer and/or smaller buildings with a high energy savings potential may be considered. To be considered for the program, applicants must: submit a program notice of interest (NOI) form and application provide energy bills for 1 to 2 years present up-to-date as-built drawings Successful applicants must express agreement to: commit funding (minimum $10,000) to participate in the process commit staff time to assist in intensive data collection, analysis, and verification begin implementation of measures in Year 1 (ending May 31st) upon receipt of RCx plan, implement at least $10,000 worth of selected measures within 10 months, or by March 31st, of Year 2, whichever deadline arrives first Last Updated: December 2014 RFQ-SEDAC003 Page 3 of 17 RETRO-COMMISSIONING PROCESS The RCx program is an 18-24 month program. As part of the program, SEDAC will assign a qualified Retro-Commissioning Service Provider (RSP) to conduct the retro-commissioning analysis at no cost to the customer. The RCx Service Provider will perform a building assessment to diagnose problems and identify a range of RCx measures that will have an estimated combined simple payback of 1.5 years or less based on electric and natural gas savings. Once the recommendations are received, the facility owner must select retro-commissioning measures to implement and will have 10 months (or until March 31st, whichever deadline arrives first), from receipt of recommendations, to implement at least $10,000 of agreed upon measures. After the measures are implemented, the RCx expert will revisit the site to verify measures have been completed and will re-evaluate facility trending data. The Public Sector RCx Program consists of four major stages. 1. Application Phase 2. Planning, Investigation, and Recommendation (PIR) Phase 3. Implementation Phase 4. Verification Phase For more information about these stages, please see RCx Application at: http://rcx.sedac.org Last Updated: December 2014 RFQ-SEDAC003 Page 4 of 17 THIS REQUEST FOR QUALIFICATIONS The purpose of this request for qualifications is to compile a list of Pre-Qualified RetroCommissioning Service Providers (RSPs) that will serve SEDAC clients as outlined in the program description described. RSP ROLES AND RESPONSIBILITIES The RSP is expected to be the lead individual responsible for performing SEDAC RCx analyses and will be the prime contact in facilitating communications with the client and SEDAC. This individual will be responsible for identifying potential retro-commissioning measures as well as determining energy savings estimates and calculations. While the RSP is allowed to have nonapproved company team members assist with the RCx analysis, the RSP must be the sole individual responsible for the RCx work product and be the prime contact with the client and SEDAC. Moreover, if other non-approved individuals are working on the project their role must be clearly outlined in the RSP’s scope of work for the project or be presented as an amendment to the RSP’s approved scope of work. Last Updated: December 2014 RFQ-SEDAC003 Page 5 of 17 WHO MAY APPLY Prospective SEDAC RSPs must have experience with building retro-commissioning projects with an emphasis on energy efficient practices. Specifically, SEDAC is looking for individuals and firms that possess the requisite knowledge to identify and analyze controls, scheduling, and operations-related tune-ups and adjustments that improve the efficiency of existing public buildings’ operating systems by either returning them to intended operation or design specifications or by enhancing their efficiency per current practices. SEDAC looks for the following minimum qualifications in the potential retro-commissioning service providers: RSPs must have retro-commissioning experience (minimum three (3) retrocommissioning projects required) with an emphasis on identifying energy efficiency improvements. (Individuals that lack direct Retro-Commissioning experience, but have a thorough combination of experience commissioning mechanical systems per ASHRAE Guideline Zero, designing mechanical systems, and performing energy auditing involving breadth and complexity of systems that may be encountered in a retro-commissioning project, will be considered). RSPs must have a leadership experience and have been involved in managing a project team, being a prime client contact and have facilitated communication between various team members. RSPs must have prior experience in calculating energy savings through spreadsheet calculations using weather bin method. Energy modeling experience, while not required, is highly desired. RSPs must have experience with performing site visits to interview staff, assess equipment, and identify opportunities. RSPs must have experience with using data loggers and analyzing the trend results. RSPs must have experience working with building automation systems and setting up trends on them. RSPs must have experience in conducting full-building energy assessments (i.e. lighting, HVAC, building envelope, controls, etc.) and be capable of performing a SEDAC Level 2 Energy Assessment. Through an expanded scope of work, the RSPs may be required to conduct a SEDAC Level 2 Energy Assessment to complement the Retro-commissioning study. Last Updated: December 2014 RFQ-SEDAC003 Page 6 of 17 STATEMENT OF WORK From responses to this RFQ, SEDAC will select a list of on-call experts who will be retained with a contractual agreement through 360EG on behalf of the SEDAC Project Team. Should more than one individual from a company wish to participate, each must submit a separate response to this solicitation. The Project Team will receive copies of all documents developed with the support of the program, including RSP Manual, RCx Plan Template, RCxM Workbook, Customer Selection Form, and RCxM Measure Checklist. Parties who represent specific manufacturers, favor one manufacturer over another, or have conflicts of interest, are not eligible to participate in this program. PROPOSAL FORM Individuals wishing to participate as a SEDAC RSP should be an approved SEDAC Design Assistance Expert. Concurrent applications for DAE and RSP will be accepted. A potential RSP must submit a statement of qualifications describing their expertise to provide required services. Responses should include the following items: Proposal Part 1: Application Attachment A – Application Cover Sheet All proposals must include the attached application form as a cover sheet. Attachment B - Qualifications Check List Please check off your capabilities, qualifications, and energy modeling programs that you are proficient in. Attachments C, D, and E - Tables of Building Retro-Commissioning, Commissioning, LEED Commissioning, and Energy Assessment Projects Please populate the attached form with details regarding completed projects that emphasize the applicant’s experience and abilities. Attachment F - Schedule of Billing Rates Outline fully loaded hourly and daily rates. Include any differing rates for travel time and discounts for volume. The proposed rate must be your most favorable rate offered. Attachment G – RCx Service Provider Program Prohibitions Please read and sign the attached form. Attachment H - Professional References for RCx Projects A minimum of three (3) professional references directly related to building retrocommissioning projects with an emphasis on energy efficient practices. Last Updated: December 2014 RFQ-SEDAC003 Page 7 of 17 Proposal Part 2: Biography and Summaries Statement of Qualifications Please include a statement of qualifications that addresses the following: o Capabilities and specific experience in Retro-Commissioning process with focus on energy efficiency. o Availability for and interest in responding to specific tasks on short order. Paragraph Summary A one paragraph summary of qualifications which, if this proposal is approved, will be made available to all SEDAC Program customers and posted on the program website located at http://www.sedac.org. Curriculum Vitae of Expert A standard curriculum vitae including professional experience, publications, membership in professional organizations, education, and any other relevant experience should be attached. It should emphasize the applicant’s experience with green building methods or sustainable design with an emphasis on energy efficient practices. Incomplete applications will be REJECTED. ANNOUNCEMENT NAME AND IDENTIFIER All communications concerning this Request for Proposals should refer to SEDAC RetroCommissioning Service Provider RFQ and the RFQ identifier RFQ-SEDAC003. Please refer to the title and identifier in all correspondence and telephone calls to SEDAC Program contacts. DEADLINES SEDAC reviews incoming applications on a quarterly basis. Application deadlines are January 1st, April 1st, July 1st, and October 1st. REVIEW CRITERIA Proposals will be evaluated based on the following parameters: Item (a) 60% Experience (based on information in Attachments B, C, D, and E) 40% Cost-effectiveness (Attachment F) and References (Attachment H). To be considered, an RSP must receive a score of 70 or higher. SEDAC reserves the right to disqualify candidates who are substantially lacking in one of the categories despite obtaining a score of 70 or higher. Last Updated: December 2014 RFQ-SEDAC003 Page 8 of 17 DISCLAIMER The Project Team does not assume any responsibility or liability of any nature with respect to consulting services, or make any warranty with respect to the services provided by program personnel. By submitting an application to the Project Team, the applicant waives all claims against the Project Team or any member thereof and releases the Project Team or any member thereof from liability of any nature for errors, omissions, or negligence arising out of or connected with the services of program personnel. The Project Team or any member thereof shall not be deemed principal, agent, partner, joint-venturer, or consultant with respect to the project. In no event shall the Project Team be liable to any party in excess of the pre-negotiated fees with a pre-qualified outside design assistance consultant, if any are used for this project. NOTICE The SEDAC Project Team reserves the right to terminate this solicitation without prior notice. Issuance of this RFQ does not constitute an award commitment on the part of the SEDAC Project Team. Service Providers will be subject to periodic reporting and evaluation requirements. SUBMITTAL INSTRUCTIONS Please submit the completed Retro-Commissioning Service Provider Application Form via email or fax to: RFQ- SEDAC003 RFQ@sedac.org (fax) 312.264.2379 FOR FURTHER INFORMATION Questions may be directed to: Brock Auerbach-Lynn, 360EG SEDAC Project Manager 773-236-8901 office brock@SEDAC.org Last Updated: December 2014 RFQ-SEDAC003 Page 9 of 17 RETRO-COMMISSIONING SERVICE PROVIDER APPLICATION Attachment A: Application Cover Sheet Please complete and submit this form with your proposal and supporting documents. Response to RFQ- SEDAC003 Date of Application: Name Title: Organization: Address: Office Phone: Cell Phone: Fax: E-Mail: ______________________________________________________________________________ Website: Geographic Availability: Signature: Last Updated: December 2014 RFQ-SEDAC003 Page 10 of 17 Attachment B: Qualifications Check List Retro-Commissioning Process Experience: Utility Bill Analysis with Weather Regression Deploying and Analyzing Data from Data Loggers Setting up Trends in Building Automation System Developing Excel-based Energy Calculators Using Energy Modeling Software Cost Estimating and Economic Analysis Analysis of Lighting Measures Analysis of HVAC Measures Report Development Measurement and Verification of Savings Calculations and Energy Modeling Software Proficiency: Excel-based Weather Bin Calculations eQuest Trane Trace Carrier HAP IES EnergyPlus Other: ____________________________________ Professional Qualifications: LEED Accredited Professional Licensed Stationary Engineer Engineer In Training (EIT) Energy Manager in Training (EMIT) Licensed Professional Engineer (PE) Certified Energy Manager (CEM) PE License is valid in the following states: __________________________________ Other: ____________________________________________________________ Last Updated: December 2014 RFQ-SEDAC003 Page 11 of 17 Attachment C: Table of Building Retro-Commissioning Projects Project Name City, State Year Completed Building Area (2003) (200,000 SF) (Any Town Public Works) Any Town, IL Last Updated: December 2014 RFQ-SEDAC003 Project Scope of Work Chilled Water Reset Demand Controlled Ventilation Hot Water Pump VFD Static Pressure Reset Corridor Occupancy Sensors Role and Area of Responsibility Analyzed Data Trends Obtained by a Subcontractor Identified RCx Measures Performed Energy Efficiency Calculations Conducted Verification Services Page 12 of 17 Attachment D: Table of Commissioning and LEED Commissioning Projects Project Name City, State Year Completed Building Area Energy-Efficiency Related Scope of Work (2008) (225,000 SF) EAp1: Fundamental Commissioning of Building Energy Systems EAp2: Minimum Energy Performance EAc1: Optimize Energy Performance EAPc8: Demand Response (Some Town School) Any Town, IL Last Updated: December 2014 RFQ-SEDAC003 Role and Area of Responsibility Conducted Site Visits Worked with Design Engineer to Ensure Compliance with LEED Requirements Verified Mechanical Equipment Start-Up Page 13 of 17 Attachment E: Table of Energy Assessment Projects Project Name City, State Year Completed Building Area (2003) (200,000 SF) (Any Town Public Works) Any Town, IL Project Scope of Work Role and Area of Responsibility ASHRAE Level III Energy Audit with focus on Rooftop Unit replacement and outdoor lighting Performed Site Visit Identified ECRMs Developed Energy Calculations Performed Economic Analysis Wrote the Report Presented to Client Last Updated: December 2014 RFQ-SEDAC003 Page 14 of 17 Attachment F: Schedule of Billing Rates I hereby apply for membership in the Illinois Energy Now Public Sector Retro-Commissioning Program that is managed by SEDACI understand my responsibility to provide my RetroCommissioning clients with my best professional advice on helping clients identify and save energy through Retro-Commissioning. I understand that my fees, up to $___________ /hour for a maximum of $____________ /day, will be invoiced to the 360EG. I confirm that this is my most favorable rate. I have attached the following: 1. 2. A brief (1 or 2 paragraph) “bio” that may be forwarded to the client upon request. A confidential tabulation, using the attached form, of projects for which I have had responsibility. This may not be published or released without my permission. Signed: Last Updated: December 2014 Date: _________________________. RFQ-SEDAC003 Page 15 of 17 Attachment G: RCx Service Provider Program Prohibitions The Illinois Energy Now Public Sector Retro-Commissioning program is designed with intent of NOT providing unfair advantage for Service Providers for obtaining follow-up work. The retro-commissioning service provider applicant and the firm he or she represents at the time of signing this document will not negotiate separate agreements to provide additional services on the same project outside the scope of this retro-commissioning service: The provider will not be involved in developing engineering design, drawings, blueprints, bid documents, except if performed as a part of executing contract with SEDAC; The provider will not “stamp” engineering design drawings or otherwise assume the responsibilities of the applicant’s design team; The provider will not be involved in sale or other provision of equipment that deals with building systems or components that can be affected by retro-commissioning, energy efficiency, or energy conservation. The provider will not perform any further retro-commissioning work, or work that can be perceived as retro-commissioning, for a given project. The applicant and retro-commissioning service provider that the applicant represents at the time of signing of this document may assist in developing bid documents as a part of scope of work under SEDAC contract. The applicant and retro-commissioning service provider that the applicant represents at the time of signing of this document may participate in competitive open bidding for additional work for the same project. The restrictions listed above do not apply if the project is publicly bid. Signed: Date: _________________________ Last Updated: December 2014 RFQ-SEDAC003 Page 16 of 17 Attachment H: Professional References for RCx Projects The professional references listed below must be directly related to RCx and Commissioning Projects. References from multiple organizations are preferred. Applications submitted without professional references may be rejected without further consideration. 1. Reference Name: Company Name: Project Name(s): Phone: Email: Relationship with listed reference / additional notes: 2. Reference Name: Company Name: Project Name(s): Phone: Email: Relationship with listed reference / additional notes: 3. Reference Name: Company Name: Project Name(s): Phone: Email: Relationship with listed reference / additional notes: Please add another sheet for additional references. Last Updated: December 2014 RFQ-SEDAC003 Page 17 of 17