Attachment W1 - 17V Task Group Status Report 1

advertisement
API C2 / SC 17
SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS
API 17V SAFETY SYSTEMS
TASK GROUP STATUS
JANUARY 2013
API 17V SAFETY SYSTEMS
STATUS REPORT
1.
INTRODUCTION
The API 17V task group’s scope of work is to develop a document (RP or
specification) to cover safety systems in the subsea environment. This follows on
from discussions between API and BSEE in 2011 where a need was identified for a
document to cover subsea pumping, gas lift, production control etc, for the areas not
currently covered by API 14C.
2.
PREVIOUS REPORTED STATUS
The group has met on three separate occasions (August, September and October
2011) to discuss the scope of the document, draft a table of contents and prepare an
initial schedule. The group has made initial good progress, but end of year
commitments impacted the final meeting.
The group has a working table of contents and needs to identify a small working
group with a larger reading group to review the output.
Current Status
A working group comprising George Ardoin (Chevron), Richard Barratt (GE),
Christopher Curran (BP), Christy Lan (BSEE), William St George (ExxonMobil) and
Marc YOung (Xodus) have prepared a first draft which is focused on the process
components has been issued to the reading group in June 2012. The group has also
met with API 14C Chairman to ensure we have visibility on the changes being made.
This draft has been issued to the reading group for comment.
3.
MEMBERSHIP
Name
William St George
Don Wells
Christy Lan
Stephen Martinez
Christopher Curran
Dan Pesek
Ronnie Garza
Steve Mansfield
Pete Fisher
Paul Drouet
Company
ExxonMobil
Hess
BSEE
BSEE
BP
Aker Solutions
Technip
J P Kenny
Atkins
Aker Solutions
E-mail
william.f.stgeorge@exxonmobil.com
Don.wells@hess.com
Christy.lan@bsee.com
Stephen.martinez@bsee.com
Christopher.curran@bp.com
Dan.pesek@akersolutions.com
rogarza@technip.com
Steve.mansfield@jpkenny.com
Pete.fisher@bp.com
Paul.drouet@akersolutions.com
-1-
January 2013
API 17V SAFETY SYSTEMS
STATUS REPORT
Name
Brian Skeels
Ryan Chladek
Dave Micheletti
David Morgan
Karl Schnakenburg
Jimmy Hashem
Richard Meronek
Nicholas Dee
George Ardoin
Dave Harrold
Richard Barratt
Peter Stark
Wanda Parker
4.
Company
FMC
ExxonMobil
ExxonMobil
Cameron
BHP Billiton
Halliburton
Aker Solutions
Shell
Chevron
FMC
GE
Stone Energy
WJP Enterprises
E-mail
Brian.skeels@fmcti.com
Ryan.d.chladek@exxonmobil.com
David,michelettie@exxonmobil.com
David.morgan@c-a-m.com
Karl.schakenburgh@bhpbilliton.com
Jimmy.hashem@halliburton.com
Richard.meronek@akersoiutions.com
Nicholas.dee@shell.com
George,ardoin@chevron,com
Dave.harrold@fmcti.com
Richard.barratt@ge.com
starrkpr@stoneenergy.com
wanda.parker@wjpenterprises.com
UPDATED TARGET DATES FOR DELIVERABLES
TABLE 4-1: MILESTONE TARGET DATES
Milestone Targets
Completion Date
5.
Form working group
January 2012
Table of Contents
February 2012
Draft for review by reading group
End 1H 2012
Final Draft
End 1H 2013
MAJOR ISSUES
None
6.
ANTICIPATED NEW WORK ITEMS
 Finalize draft for issue by end 1H 2013
7.
PLANS FOR FUTURE MEETINGS
Plan to continue monthly meetings in 2013, starting in January with the working
group.
-2-
January 2013
API 17V SAFETY SYSTEMS
STATUS REPORT
8.
RESOURCE NEEDS
None.
-3-
January 2013
Download