UniSpec II 072712 SECTION 01255 (01 2613) - REQUEST FOR INFORMATION PART 1 - GENERAL 1.1 SUMMARY A. 1.2 Section Includes: 1. Requests for Information (RFI) procedures. DEFINITION A. Requests for Information: A formal online process used during the construction phase to facilitate communication between the Contractor, the Owner’s Construction Manager (CM) or the Mechanical Construction Manager (MCM), and the Professional of Record (POR) with regard to requests for additional information and clarification of the intent of the Contract Documents (Drawings and Specifications). B. Professional of Record (POR): The Architect of Record (AOR) or the Civil Engineering Consultant (CEC) C. Architect of Record (AOR): The prime consultant in charge of overall design and coordination of the project. The AOR will be the administrator for all construction RFIs classified as “BLDG”. D. Civil Engineering Consultant (CEC): The Registered Engineer in responsible charge of the civil design for the project. The CEC will be the administrator for sitework RFIs classified as “SITE”. E. Owner’s Construction Manager (CM): The Owner’s building and sitework Construction Manager for the Project. F. Mechanical Construction Manager (MCM): The Walmart Mechanical (HVAC, Refrigeration and BAS) construction manager for the Project. 1.3 REQUEST FOR INFORMATION SUBMITTAL A. Submit requests for information for conditions requiring clarification of the Contract Documents on Owner’s Construction RFI website as designated by Owner. (www.bldgportal.com, enter username and password, select Construction RFI). POR will not respond to requests for information unless this format is utilized and all appropriate information is provided. Faxed or emailed RFIs will not be reviewed B. Do not use Request for Information process during bidding phase. For questions during bidding phase, refer to Invitation to Bid issued by Owner’s Contract Administrator. C. Submit in accordance with procedure as follows: (See Process Flow Chart at the end of this Section) 1. Subcontractors, manufacturers, and suppliers shall submit request for additional information and clarification to Contractor. 2. Contractor shall contact Owner’s CM or MCM, as applicable, with requests for additional information or clarification. Owner’s CM or MCM will not accept requests for information or clarification submitted directly from subcontractors, manufacturers, or suppliers. 3. Owner’s CM or MCM will provide response to Contractor or will direct Contractor to submit a formal Request for Information. a. Submit a formal RFI only if authorized by the Owner’s CM or MCM. Submittal to Construction RFI website signifies authorization has been given. b. Generate Requests for Information by one source per project. c. Submit one request for information per website entry. 4. POR will review formal requests from Contractor and provide response within 3 working days. 5. POR’s response shall not be considered as a Change Order or Change Directive, nor does it authorize changes in the Contract Sum or Contract Time. 01255-1 Shrewsbury, MO – 3061-00 08/19/13 D. 1.4 Scheduling, Costing, and Owner Provided Equipment Coordination: Direct to the Owner’s Construction Manager. PENALTY FOR FAILURE TO FOLLOW PROCEDURE A. 1.5 A $250 administrative cost will be assessed to the Contractor for each Request for Information submitted which does not follow the procedure specified above. REIMBURSEMENT FOR ARCHITECTURAL AND ENGINEERING FEES A. The Contractor shall be charged administrative costs and professional fees incurred by Owner for additional Architectural and Engineering services associated with the correction of completed Work which is not in accordance with the Contract Documents. See Article 10 of the General Conditions of the Contract for Construction for provisions relating to Correction of Work. PART 2 - PRODUCTS Not Used. PART 3 - EXECUTION Not Used. END OF SECTION 01255-2 Shrewsbury, MO – 3061-00 08/19/13 Subcontractor, manufacturer, supplier, or other party submits request for information to Contractor. Contractor contacts Owner’s Mechanical Construction Manager (MCM) with request for information. MCM will provide response or authorize Formal RFI. Owner’s Mechanical Construction Manager provides response to Contractor. HVAC/REFRIGERATION/ BAS REQUEST FOR INFORMATION PROCESS FLOW CHART SUPERCENTER, SAM’S CLUB, AND NEIGHBORHOOD MARKET Owner’s Mechanical Construction Manager authorizes Contractor to submit formal Request for Information to Owner’s Construction RFI website. Construction RFI website Contractor submits Request for Information to Professional of Record (POR) on Owner’s Construction RFI Website POR notifies appropriate consultant for response on Owner’s Construction RFI Website Consultant answers RFI on Construction RFI Website Contractor issues response to subcontractor, manufacturer, supplier, or other party. POR issues response to Contractor on Construction RFI Website 01255-3 Shrewsbury, MO – 3061-00 08/19/13 Subcontractor, manufacturer, supplier, or other party submits request for information to Contractor. Contractor contacts Owner’s Construction Manager (CM) with request for information. CM will provide response or authorize Formal RFI. Owner’s Construction Manager provides response to Contractor. REQUEST FOR INFORMATION PROCESS FLOW CHART SUPERCENTER, SAM’S CLUB, AND NEIGHBORHOOD MARKET Owner’s Construction Manager authorizes Contractor to submit formal Request for Information to Owner. Construction RFI website Contractor submits Request for Information to POR on Owner’s Construction RFI Website. POR notifies appropriate consultant for response on Construction RFI Website. Consultant answers RFI on Construction RFI Website. Contractor issues response to subcontractor, manufacturer, supplier, or other party. POR issues response to Contractor on Construction RFI Website. 01255-4 Shrewsbury, MO – 3061-00 08/19/13