Video Game Delivery Project Work Breakdown
Structure
Prepared by: Kushala Kondapally
Date: 11/10/2006
1.0 Initiating
1.1 Determine/assign project manager
1.2 Identify key stakeholders
1.3 Prepare business case
1.4 Identify consultants and prepare them
1.5 Prepare project charter
1.6 Define project goals
2.0 Planning
2.1 Hold project kickoff meeting
2.2 Prepare team contract
2.3 Prepare scope statement
2.4 Prepare WBS
2.5 Prepare schedule and cost baseline
2.5.1 Determine task resources
2.5.2 Determine task durations
2.5.3 Determine task dependencies
2.5.4 Create draft Gantt chart
2.5.5 Review and finalize Gantt chart
2.6 Identify, discuss , and prioritize risks
2.7 Define web site requirements for ABC
2.7.2 Define project requirements to ABC
2.7.3 Define content requirements to ABC
2.7.4 Define system requirements to ABC
2.7.5 Define server owner requirements to ABC
2.8 Define customizations on website designed by ABC
2.8.1 Define Change Requirements
2.8.2 Define compatibility of changes requirement.
3.0 Executing
3.1 Research Plan with collaboration with EdSys
3.1.1 Education system content and like games.
3.1.2 Services provided and partner ship terms review.
3.1.3 Collecting inputs from Edsys.
3.2 Video Game Web site content
3.2.1 Templates and tools
3.2.2 Navigation
3.2.3 payment system collaboration
3.2.4 Search/categories
3.2.5 How to use game and website content
3.3 Site design
3.4 Site construction with Integration from ABC developed website
3.5 Customization of site
3.6 Site testing
3.7 Site promotion
3.8 Site roll-out
4.0 Controlling
4.1 Status reports
5.0 Closing
5.1 Prepare final project report
5.2 Prepare final project walk through and presentation
5.3 Lessons Learned