BOROUGH OF POOLE

TRANSPORTATION ADVISORY GROUP

– THURSDAY 30 NOVEMBER 2006

12

REPORT OF ACTING HEAD OF TRANSPORTATION SERVICES

2006/07 CAPITAL PROGRAMME UPDATE

Purpose of Report

To provide an update on progress with delivering the 2006/07 Capital Programme.

The Capital Programme implements schemes which support the Transportation strategy and delivers the targets set out in the Local Transport Plan and Best Value Performance

Plan.

Recommendations

It is recommended that :

Progress with delivery of the 2006/ 07 Capital Programme, as detailed in Appendices A,

B and D be noted.

The virements listed in Appendix C1 be noted and those at C2 be approved.

Background

The Government has developed and agreed with the Local Government Association four shared priorities for the delivery of transport strategy, around which our 2006 – 2011

Local Transport Plan (LTP) has been developed. The four shared priorities are :

Congestion : reducing journey times, assisting economic prosperity, reducing pollution, providing reliable journeys

Accessibility : providing access to services for all, opening up previously excluded areas, assisting mobility, enriching peoples lives

Road Safety : saving lives, reducing injuries, providing reassurance to all users of the highway

Air Quality : providing a healthier environment, improving health, promoting cleaner transport methods

1

4 Programme

4.1 The Transportation Programme is now set out in terms of the shared priorities, but excluding Air Quality as that is not a current issue in Poole. Within each of the main headings, projects have been identified that will help meet LTP targets. A detailed programme is shown at Appendix A. Further information about some of the more significant projects in the programme is listed in Appendix B.

4.2 Members were made aware of possible difficulties with delivering the Programme at the 9

March 2006 meeting of this Group. At that time it was stated that discussions were underway with Bournemouth BC regarding the joint use of a partnering Consultant and

Contractor to assist with delivery. Following an extensive tendering and vigorous assessment programme, Mouchel Parkman have just been appointed to provide assistance to both Poole and Bournemouth. The assessment process involved considering submissions based on both quality and cost. As well as undertaking interviews, visits were made to other Authorities having experience of their service delivery and workshops held, attended by a mix of Poole/ Bournemouth officers and those of the consultant.

4.3 It is anticipated that by partnering with this consultant, who is nationally one of the market leaders for this type of work, will produce the following significant benefits to Poole:

Provides availability of significant levels of additional staff resources to ensure delivery of Capital Programme and other projects.

Can draw upon an organisation which has high level of technical expertise, including considerable experience elsewhere.

Develop strong partnership seeking common aims with Poole and Bournemouth.

4.4 Mouchel Parkman have already commenced work on a feasibility study to look at congestion and road safety issues along Ashley Road.

4.5 In addition to this, a joint contract is about to be let with Bournemouth to undertake minor works, again providing more flexibility i n delivering the Council’s programme.

2

5. Finance

5.1 Overall progress with the financial programme is as follows:

Actual Programme INDICATOR

Scheme

Transportation Services

Tackling Congestion

Delivering Accessibility

Budget

690

586 in Approved Spend to Remaining Proportion

Year Programme October

2006/07 2006/07

£'000 £'000

43

44

2006/07

£'000

733

631

2006

£'000

104

231 of specific

2006/07 Programme

£'000 Spent

629

399

14%

37%

Safer Roads

Maintenance

Fully-developer funded schemes

Original Changes Current

103

5,119

0

133

(2,570)

304

236

2,549

304

28

1,327

51

208

1,222

253

12%

52%

17%

Total 6,498 (2,045) 4,453 1,742 2,711 39%

5.2 A detailed breakdown of the main programme is included at Appendix A.

5.3 As indicated at Paragraph 4.2, resource problems have led to difficulties in delivering the programme. Appointment of the partnering consultant will mean that we have much greater flexibility with the design of schemes, and the future appointment of a term contractor will assist in site implementation. However, the effect of these initiatives will not be realised until 2007/ 08.

5.4 In order to ensure the budget is fully expended it is now proposed that virements to other areas of the programme, and as listed in Appendix C2, be approved. It will be noted that this will include moving £200,000 into the Highway Structural Maintenance area where further priority works have been identified.

6 Developer Funded Schemes

6.1 In addition to the Transportation Capital Programme there are a number of other highway improvements undertaken, using developer funding secured through

Planning Agreements. The majority of these improvements are solely funded in this way, but opportunities for utilising developer funding to part fund LTP funded schemes is taken where possible.

6.2 The developer funded programme for 2006/ 07 is listed at Appendix D.

6.3 A number of the schemes are reliant on developers own works reaching thresholds before our works can be commenced or progressed to completion. Both S278 works at Seldown Roundabout and Newfoundland Drive Cycleway Link need developer action in order for progress to be made.

3

6.4 Some schemes, such as Hungerhill Preliminary Works, are long-term schemes being undertaken over a number of years. In many cases the use of funding is not restricted to particular financial years.

6.5 Several schemes have recently been completed and are awaiting final accounts.

Any remaining resources will be reallocated to other schemes.

6.6 Two schemes, Baiter One Way and Bus Improvements - Turlin Road to Boundary, have been affected by significant changes in circumstances and need to be completely reassessed. The scheme proposed for Baiter was rejected following consultation and the changes to Wilts & Dorset bus routes in Hamworthy have left some of the stops proposed for improvement served by only a few late night buses.

STEVE TITE

Acting Head of Transportation Services

Appendix A

– List of schemes in the 2006/ 07 programme

Appendix B – Detail about 2006/ 07 schemes

Appendix C – Virements between budgets

Appendix D

– Developer Funded schemes

Name and telephone number of Officer contact : Graham Spicer (01202) 262072

TAG301106J

4

SHARED PRIORITY

TACKLING CONGESTION

A35

Ashley Cross feasibility study

Commercial Rd/ Station Rd feasibility

Bournemouth Rd/ Richmond Rd feasibility

Bournemouth Rd/ Archway Rd feasibility

Puffin conversion programme

Ashley Road

Ashley Road Feasibility

Ashley Road/ North Road

Ashley Road/ Mansfield Road

Ashley Road/ Richmond Road

Ashley Road/ Alder Road

Parking Amendments

Lindsay Road to Penn Hill

Lindsay Road/ St Aldhelms Road

Lindsay Road/ Leicester Road

Penn Hill signals

Parking/ puffin conversions

Lindsay Rd to Station Rd corridor

Miscellaneous

VMS static signing

Town centre variable message signing

Poole Road/ Bourne Valley Road

Intelligent Transport Systems Study

Strategic Road Network Traffic Man study

Minor ancilliary project works

Code

Major Project Traffic remodelling

TOTAL TACKLING CONGESTION

DELIVERING ACCESSIBILITY

Bus Station Improvements

Bus Facilities

JC0411

JC0619

SW Passenger Transport Information 06/ 07 JC0620

RTI 2002 (additional funding)

JC0251

JC0601

JC0607

JC0617

JC0552

JC6891

JC0551

JC0442

JC0511

JC0512

JC0569

JC0510

JC0609

JC0610

JC0611

JC0612

JC0613

JC0638

JC0614

JC0615

JC0616

JC0602

JC0629

JC0600

RTI initial maintenance

Rail infrastructure

Bus shelters/public trans facilities

Bus stop clearways

School Schemes 06/07 (General)

School Schemes 06/07 - Lilliput First

School Schemes 06/07 - Broadstone First

School Schemes 06/07 - Corfe Hills

20mph Zones outside schools (General)

20mph Zone - St Aldhelms School

20mph Zone - Springdale First

School scheme-Haymoor/Ashdown

Canford Heath/ Longspee Schools 20mph

JC0421

JC0354

JC0420

JC0495

JC0621

JC0608

JC0605

JC0606

JC0622

JC0603

JC0604

JC0563

JC0567

BUDGET

£75,000.00

£150,000.00

£50,000.00

£2,000.00

£0.00

£0.00

£49,515.00

£8,998.00

£17,598.00

£8,060.00

£10,256.00

£586.00

£733,127.00

£15,000.00

£13,114.00*

£7,000.00

£7,000.00

£64,000.00*

£15,000.00

£38,000.00*

£40,000.00*

£40,000.00*

£120,000.00*

£2,000.00*

£150,976.00

£77,000.00

£15,706.00

£0.00

£11,497.00

£1,300.00

£24,621.00

£8,928.00

£7,243.00

£8,400.00

£25,000.00

£6,000.00

£2,933.00

£40,000.00

£31,000.00

£8,844.00

£16,444.00

APPENDIX A

NOT ALLOCATED

£68,852.86

£130,909.45

£38,886.24

£2,000.00

£12,356.59

£76.00

£46,392.65

£16,071.72

£11,618.00

£6,179.61

£7,218.80

£586.00

£628,820.28

£15,000.00

£13,114.00

£7,000.00

£7,000.00

£60,647.20

£15,000.00

£36,000.00

£38,000.00

£38,000.00

£112,919.78

£2,000.00

£146,938.00

£66,378.93

£74.00

£1,702.76

£13,547.40

£157.00

£25,032.15

£8,928.00

£6,457.00

£4,209.79

£15,657.70

£5,658.80

£2,877.00

£34,045.03

£2,985.34

£373.34

£2,180.27

SPENT TO DATE

£3,352.80

£2,000.00

£2,000.00

£2,000.00

£7,080.22

£6,147.14

£19,090.55

£11,113.76

£12,356.59

£76.00

£3,122.35

£25,069.72

£5,980.00

£1,880.39

£3,037.20

£104,306.72

£4,038.00

£10,621.07

£15,780.00

£1,702.76

£25,044.40

£1,143.00

£411.15

£786.00

£4,190.21

£9,342.30

£341.20

£56.00

£5,954.97

£33,985.34

£8,470.66

£14,263.73

5

SHARED PRIORITY

Code

DELIVERING ACCESSIBILITY cont.

Turlin Moor Community Schools 20mph zone JC0568

Round Harbour route JC0534

Cycling/ Walking (General)

Cycling /Walking - Darbys Corner Cycleway

JC0623

JC0635

Cycling/ Walking - Waterloo Rd cycleway

Cycling - Bourne Valley Greenway

JC0631

JC0634

Community Transport Strategy Development JC0632

Cycling/ Walking - Adastral Rd Puffin

Rights of Way Improvement

Improved Lighting of Pedestrian Routes

JC0630

JC0624

JC0160

JC0163 Work Travel Plan

Sandbanks rd cycleway

Waterloo Rd/ Sopers Lane cycle/ped fac.

Technical input into LTP2

Pinecliff rd/Branksome chine crossing

JC0531

JC0566

JC0412

JC0530

Town centre pedestrian signing

Lower High st paving

Blandford Rd/ Ashmore Avenue puffin

Shore Rd Environmental enhancements

JC0532

JC0533

JC0565

JC0200

TOTAL DELIVERING ACCESSIBILITY

SAFER ROADS

Town Centre North & Longfleet Road JC0625

George roundabout

Ashley Road

Ashley Cross Area

Dorset Way/ Canford Way

Ringwood rd/ Herbert ave

General Road Safety measures

Wimborne rd/ Dorchester rd traffic signals

Speed Indicator Devices (SID) signs

Local Traffic Calming Schemes

JC0626

JC0627

JC0628

JC0440

JC0443

JC0492

JC0540

JC0570

JC0493

JC0462

JC0074

Dorset Way Footbridge security

Speed Camera Installation

TOTAL SAFER ROADS

MAINTENANCE

Highways

B/fwd - to be allocated

Principal Roads

Non - Principal Roads

JC45%/55%

Unclassified Roads

Street Lighting

Street Light Column Replacements 06/07

JC40/50%

JC47%

JC0292

BUDGET

£35,121.00

£24,199.00*

£46,000.00

£5,000.00

£2,347.00*

£4,017.00

£5,058.00

£2,711.00

£65,472.00

£25,000.00

£7,470.00

£13,200.00

£235,595.00

£944.00

£10,000.00

£4,000.00

£30,000.00

£23,000.00

£25,000.00

£14,500.00

£29,000.00

£17,600.00

£17,429.00

£3,000.00

£67,306.00

£23,691.00

£8,417.00

£39,842.00

£8,383.00

£11,310.00

£17,643.00

£1,904.00

£630,523.00

£30,723.00

£123,960.00

£157,538.00

£1,296,042.00

£100,000.00

SPENT TO DATE

£1,832.15

£1,000.00

£2,000.00

£61.88

£10,852.11

£3,709.24

£58.12

£124.44

£8,230.15

£27,868.09

£286.31

£25.00

£4,000.00

£55.16

£779.34

£2,080.00

£5,604.38

£10,148.58

£8,323.29

£5,846.66

£50,650.12

£2,418.03

£32,522.33

£12,635.20

£1,509.60

£231,097.81

£33,444.04

£48,715.80

£846,065.62

£44,527.47

APPENDIX A

NOT ALLOCATED

£33,288.85

£23,199.00

£44,000.00

£5,000.00

£2,347.00

£3,955.12

£5,794.11

£2,711.00

£61,762.76

£24,941.88

£7,345.56

£4,969.85

£207,726.91

£657.69

£9,975.00

£0.00

£30,000.00

£22,944.84

£24,220.66

£14,500.00

£26,920.00

£11,995.62

£17,429.00

£3,000.00

£57,157.42

£15,367.71

£2,570.34

£10,808.12

£5,964.97

£43,832.33

£5,007.80

£3,413.60

£399,425.19

£30,723.00

£90,515.96

£108,822.20

£449,976.38

£55,472.53

6

MAINTENANCE

Bridges

Code

Bridge Maintenance 06/07

Steady State Preventative Measures

Poole Bridge Substructure Investigation

Canford Main bridge

CANFORD BRIDGE EXCEPTIONAL SCHEME JC0633

Bridge condition indicators

JC0463

Creekmoor bridges

Poole lifting bridge - nosings

JC0145

JC0240

JC0341

JC0465

JC0636

JC0637 Gravel Hill embankment

Car Parks

Structural Maintenance Appraisals JC0192

Repairs to Town Centre car parks

Improvements to Quay Visitors MSCP

Access to Quay Visitors MSCP

UNALLOCATED

Miscellaneous

Transportation Asset Management Plan

TOTAL MAINTENANCE

JC0490

JC0561

JC0564

JC0513

OVERALL TOTAL

BUDGET

£101,000.00

£74,717.00

£18,531.00

£10,293.00

£150,000.00

£19,929.00

£133,717.00

£100,000.00

£37,000.00

£27,999.65

£27,892.35

£125,168.00

£7,250.00

£6,000.00

£38,201.00

£2,548,900.00

£4,148,145.00 £1,690,301.11

SPENT TO DATE

£60,413.46

£460.89

£40,254.34

£272.27

£133,084.94

£9,765.22

£50.40

£11,883.19

£11,312.15

£37,090.96

£7,250.00

£42,437.74

£1,327,028.49

APPENDIX A

NOT ALLOCATED

£101,000.00

£14,303.54

£18,991.89

£29,961.34

£150,000.00

£19,656.73

£632.06

£90,234.78

£36,949.60

£16,116.46

£16,580.20

£88,077.04

£0.00

£6,000.00

£4,236.74

£1,221,870.51

£2,457,842.89

* Due to difficulties in resourcing these programmes it is proposed that budget virement be undertaken to other priority areas of the programme where delivery can be achieved. For details of virements see Appendix C2.

7

APPENDIX B

TACKLING CONGESTION

As identified within the draft Local Transport Plan, the first priority for improvements along the Primary Transport Corridor across the conurbation will be the main Poole to

Bournemouth route.

Traffic movements along this E-W corridor are not just confined to the main A35 but also to the alternative routes of Ashley Road and Station Road/ Penn Hill/ Leicester

Road/ Lindsay Road. The programme was developed taking account of the main points of congestion but also recognising that early delivery will be more achievable in some areas rather than others.

While the main emphasis of the design in this category will be congestion, improvements will also be sought in the other priority areas of Accessibility and Safer

Roads. The measures for Ashley road are a particular example of this, with congestion also contributing towards potential air quality problems.

Ashley Cross (£15,000)

To study the feasibility of enlarging the Commercial Road/ Parr Street/ Britannia Road junction to relieve congestion. The study is programmed for the final quarter of this year.

Commercial Road/ Station Road (£13,114)

A feasibility study for improving traffic flow at the junction is programmed for the last quarter of this year. Possible options include a new signalised junction.

Bournemouth Road/ Richmond Road (£7,000)

To study the feasibility of enlarging the junction, and in widening the westbound approach to create a bus lane.

Bournemouth Road/ Archway Road (£7,000)

Feasibility study required to look at widening Bournemouth Road into the footway so that a bus lane can be incorporated. Bus priority may be incorporated into the signals.

The study is to be considered in association with the study at Penn Hill, currently out to consultation.

Puffin conversion programme (£64,000)

As part of our programme of enhancing facilities for pedestrians, and in reducing traffic delays, it is proposed to replace pelican type signals on the A35 with “Puffin” technology. As detectors on Puffin signals monitor movement of pedestrians over the crossing they can permit traffic to flow as soon as pedestrians are clear. The advantage for slower pedestrians is that they are allowed as much time as they need to cross. Design work is progressing. Quotations are being sought from Siemens for the necessary signal equipment.

8

Ashley Road/ North Road ( £38,000 )

Ashley Road/ Mansfield Road (£40,000)

Ashley Road/ Richmond Road (£40,000)

Improvements at these junctions have now been combined into an overall feasibility study for Ashley Road, between Alder Road and North Road. This study will be undertaken by our new partnering Consultant, Mouchel Parkman.

The Brief has asked the consultant to consider operation of each of the signalised junctions, with a view to improving traffic flow. But they will also be attempting to improve facilities for pedestrians and cyclists along this popular route.

If the feasibility study identifies options for improvement it is the intention to report these to a meeting of the Group early in the new year. A consultation exercise and a detailed design would then follow. It is unlikely that any physical work could be undertaken in this financial year and so it is intended to vire some of these budgets to other areas of the programme

– See Appendix C2.

Ashley Road/ Alder Road (£120,000)

A new signalised junction is proposed, incorporating bus priority facilities. Some kerb re-alignment may be necessary. It is expected that we will only have time for our partnering consultant to undertake a feasibility study this year and so the majority of this budget will be vired to other areas of the programme.

– See Appendix C2.

Lindsay Road/ St Aldhelms Road (£75,000)

There is a separate Report about this scheme elsewhere on this agenda.

Lindsay Road/ Leicester Road (£150,000)

Approval has previously been given by this Group to proceed with signalisation of the junction. Works commenced on 14 October and should be completed by Christmas.

Penn Hill signals (£50,000)

A preliminary report about possible improvement to this junction was considered by

12 October 2006 TAG. Approval was given to undertake a consultation exercise with local stakeholders. Consultation documents were delivered to local residents and businesses. As well as that, details of possible options for improvement were exhibited at (a) the Alderney, Branksome East and West, and (b) the Canford Cliffs and Penn Hill Area Committees being held in November. Options being considered included making Archway Road and North Lodge Way one way to reduce pressure on the existing 5 arm junction. A further report will be submitted to TAG in the New Year.

9

Town Centre Variable Message Signing (£49,515)

Work to replace 5 No. Poole Bridge status signs with electronic signs is just about to start on site. In addition to showing real time information about Poole Bridge status these signs can be used to provide a range of driver information on events including weekly market, Quay closures, Park & Ride and other Town Centre information. The signs will be erected in Holes Bay Road, Broadstone Way, Towngate Bridge, New

Orchard and Blandford Road. Completion is expected by the end of March 2007.

Intelligent Transport Systems Study (£17,598)

Continuing the study of new technology for management of traffic within the conurbation, over the longer term.

DELIVERING ACCESSIBILITY

Bus Station Improvements (£150,976)

Poor condition of existing bus station is seen as one of the major obstacles to increased use of public transport in the Borough.

Improvements needed include :

Repairs and painting to canopy and columns.

Partial glazing of canopy.

Improved lighting

Replacement/repainting of street furniture

Replacement of paving

Landscaping

A full Report was considered at a meeting of this group on 14 September 2006. A tripartite agreement for construction, maintenance and funding is to be developed with

Grosvenor Estates and Wilts & Dorset buses. Work is expected to commence early in the new year. In addition to art based exhibitions, joint information boards will be displayed before Christmas in the Dolphin Shopping Centre advising the public of likely disruption.

School 20mph zones

– Broadstone First (£25,000)

A priority list for introducing 20mph zones outside schools was approved at the 14

April 2005 TAG. This scheme, which involved introducing traffic calming measures in

Tudor Road, was completed during the school summer holiday.

School 20mph zones – Springdale First (£31,000)

This scheme, which involved introducing traffic calming measures in Lewesdon Drive, was completed during the school summer holiday. The 20mph zone covers parts of

Lewesdon Drive, Wynne Close, Cheam Road, Silverdale Close and Gladelands Way

10

School 20mph zones – St Aldhelms (£40,000)

Following objections to proposals for traffic calming which involved the use of speed cushions the scheme is being re-assessed to identify alternative measures to the vertical deflections previously proposed.

School Schemes

– Corfe Hills (£6,000)

Continuation of programme of improvements outside schools, particularly where part of School Travel Plan. A 5 year prioritised implementation plan was presented to TAG in April 2004. This project will involve the improvement of the footpath which passes behind the school and links Roman Road with Higher Blandford Road. It is proposed to undertake drainage and surface improvement to the footpath. Works are expected to commence in December.

School Schemes – Springdale First

Associated with the 20mph zone works mentioned above the opportunity was also taken to install two sets of refuges in Springdale Road. As well as assisting the journey to and from school the refuges have had a speed reducing effect on traffic using Springdale Road.

School Schemes

– Lilliput First (£8,400)

This scheme, which was completed during the October half term, involved the improvement of the footpath/ (RoW) linking Anthonys Avenue and Lilliput Road. It will improve the journey to school for pedestrians.

Sandbanks Road Cycleway – Elgin Road to Evening Hill (£67,306)

This scheme is proposed to link the existing National Cycleway Network (NCN) route at Sandbanks Road/ Elgin Road through to Evening Hill. A cycleway in this location has been sought by cycling groups and the public, reflecting high levels of leisure cycling along this length, with particular concern over young and vulnerable cyclists within family groups. A workable scheme was approved by the 12 October meeting of

TAG and works are expected top commence early in the new year.

Bus Facilities (£77,000)

To continue with the programme of raising kerbs at bus stops, to assist the disabled, and the provision of more bus shelters. Raised kerbs have already been provided in

Creekmoor Lane and Upton Road. It is proposed to install new shelters at stops in

Birds Hill Road, Seldown Bridge, Longfleet Road, Constitution Hill Road,

Longmeadow Lane, Creekmoor Lane, Ringwood Road and Wimborne Road.

SW Passenger Transport Information Travel Line (£15,706)

Ongoing funding towards regional “Traveline” public transport information system.

11

Cycling/ Walking

– Darbys Corner (£30,000)

Feasibility studies are currently being undertaken to assess whether cycle facilities can be provided around this gyratory.

Cycling/ Walking – Waterloo Road (£23,000)

Feasibility studies are currently being undertaken to assess whether cycle facilities can be provided along Waterloo Road, between Fleets Corner and Darbys Corner.

Cycling/ Walking

– Bourne Valley Greenway (£25,000)

The need to improve the footpath linking Dalling Road and Winston Avenue has been requested by those accessing St Aldhelms School on many occasions. In fact the route does form part of the Bourne Valley Greenway and so is also used by cyclists.

The condition of the path is in a poor state and so the opportunity is being taken to widen the route in places and provide a more consistent surface. The works are expected to commence in December and care will need to be taken to ensure minimal effect on wildlife.

Cycling/ Walking

– Adastral Road puffin (£29,000)

Work to install this puffin, near to Adastral Square, will commence when the Lindsay

Road/ Leicester Road woks have been completed.

Rights of Way Improvement (£17,600)

A detailed programme has been developed based on Rights of Way Improvement

Plan, formulated as part of Local Transport Plan.

SAFER ROADS

Continuing a programme of engineering measures aimed at casualty reduction.

Schemes are prioritised based on injury accidents over 3 year period either at specific locations, corridor, or area based.

Town Centre North & Longfleet Road (£35,121)

The junctions are being looked at on Wimborne Road, between Tatnam Road and

Fernside Road, taking into account the possibility of installing cycle lanes here in the future. It is also the intention to carry out minor changes to the hospital car park exit in

Longfleet Road. Although the right turn out of this car park is banned, due to safety issues, it is largely ignored.

George Roundabout (£24,199)

Apart from minor modifications in this area, treatment of safety problems will await the outcome of consultations regarding possible redevelopment to the Town Centre

North.

12

Ashley Road (£46,000)

Associated with other studies of this Primary Transport corridor it is proposed that road safety issues be dealt with at the same time. However, and as detailed elsewhere in this Report, investigation of problems on this corridor were delayed due to resource problems. This work will now be picked up by our partnering Consultant,

Mouchel Parkman.

Ashley Cr oss Area (£5,000)

Associated with other studies of this Primary Transport corridor it is proposed that road safety studies be considered, for implementation in 2007/ 08.

Local Traffic Calming Schemes (£25,000)

A traffic calming scheme for Alexandra Road was approved at 14 September TAG.

Implementation of the scheme, which involves use of horizontal deflections, will start on site shortly and be completed before the end of the financial year.

Speed Indicator Device (SID) Signs (£65,472)

Approval to a programme of installation of these was approved at the 25 May meeting of this Group. Tenders were sought for the work and a Contractor has now been appointed. Installation of permanent signs in Lindsay Road, Penn Hill Avenue, Lilliput

Road, The Avenue, Canford Cliffs Road, North Road, Constitution Hill Road, Lulworth

Avenue, Sopers Lane, Springdale Road, Higher Blandford Rd, Wallisdown Road,

Alder Road, Winston Avenue and Danecourt Road, is due to commence in January.

In addition SID signs have recently been installed in Leicester Road and Culliford

Crescent.

MAINTENANCE

Highway Maintenance (£1,608,263)

Ongoing programme of major reconstruction and resurfacing schemes, surveyed and prioritised in accordance with nationally developed techniques to maintain highway assets in most cost effective way.

13

Principal Roads

A scheme of major strengthening and carriageway resurfacing has been completed on the approaches to Poole Bridge.

Non-Principal Classified Roads

Kerb/ footway reconstruction and carriageway resurfacing is underway in Ashley

Road, between Layton Road and Library Road. Works are planned in Ringway Road

(Bond Road to Constitution Hill Road) and Western Road (Pinecliff Road to Ravine

Road).

Unclassified Roads

Carriageway strengthening works have been completed in Winspit Close, Parkside

Road, Inverness Road, Western Avenue (Bury Road to Western Road), Branksea

Avenue and Delph Road. Surfacing works have been completed in Spur Road,

Harbour View Close, Approach Road, Goliath Road and Martello Road (Bury Road to

Canford Cliffs Road). Further works are programmed for St Aldhelms Road, Woking

Road, Vale Road, Canford Cliffs Avenue, Beresford Close, Haig Avenue, North Lodge

Road, Guest Avenue and Seacombe Road.

Street Lighti ng Column Replacements (£100,000)

Ongoing programme of replacement of structurally defective columns, prioritised on basis of risk assessment. Replacement costs approximately £1,000 per column.

The majority of the work carried out so far is for emergency repairs to defects that are discovered by SEC as they carry out routine and non-routine repairs to the street lighting stock. 68 lamp columns and 114 bracket units have been replaced / are scheduled to be replaced due to structural defects.

Ongoing emergency repairs make it difficult to allocate work to columns that are on our 'to do' list. If expenditure continues in line with current patterns, we are projecting that our entire budget will be exhausted by repairing emergency defects only. A

Structurally Defective Replacement Programme was issued to SEC last year containing a list of lamp columns that need to be replaced due to structural defects.

Based on emergency repairs and outstanding repairs from the replacement programme, we are projecting a tot al spend of £120,000 for this financial year. To cover this, a virement of a further £20,000 from elsewhere in the programme is proposed at Appendix C2.

Bridge Maintenance (£101,000)

It is anticipated that this budget will be allocated to parapet replacements, possibly on the Oakdale Bridges.

14

Steady State Preventative Measures (£74,717)

Works to replace handrails on Poole Bridge have now been completed.

Canford Bridge Exceptional Scheme (£150,000)

A full Report about progress with this scheme is included elsewhere on this Agenda.

Creekmoor Bridges (£133,717)

The work on Creekmoor Bridges, Upton Road involved lining the existing concrete culvert with a custom made GRP section to strengthen the existing structure. The works are now complete.

Poole lifting bridge

– nosings (£100,000)

Work to renew the steel nosings at the end of each lifting leaf, replacement of the concrete infill to the steel deck and waterproofing of the whole deck was completed in

October.

Gravel Hill emba nkment (£37,000)

Cracking in the carriageway and footway on Gravel Hill has been investigated by technical consultants to determine possible causes and a course of remedial action. It is expected that a more detailed investigation and design will be necessary in order to determine levels of funding required. It is possible that this may form an exceptional bid for funding to GOSW.

CAR PARKS

Improvements to Quay Visitors MSCP (£125,168)

Improvements to the entrances and exits have now been completed.

Repairs to Town Centre car parks (£27,892)

Essential waterproofing to Shopping Centre 2 car park was programmed to be carried out 30 October to 19 November 2006.

Structural Maintenance appraisals (£28,000)

This budget covers the need to undertake regular structural inspections of the multistorey car parks, and to undertake limited, but essential, structural repairs where the need is identified.

15

APPENDIX C

C1. Budget virements undertaken to date

CODE

FROM

SCHEME

AMOUNT

JC0610 Commercial Rd/ Station Rd feasibility

JC6891 VMS static signing

JC0569 Minor ancillary project works

JC0569 Minor ancillary project works

JC0520 SMS Mobile Phone link to RTI

JC0620 SW Passenger Transport Information 06/07

JC0562 Winston Avenue school scheme

JC0562 Winston Avenue school scheme

JC0624 Rights of Way Improvement

JC0624 Rights of Way Improvement

JC0624 Rights of Way Improvement

JC0431 Investigate 20mph outside schools

JC0623 Cycling/ Walking (General)

JC0623 Cycling/ Walking (General)

JC0623 Cycling/ Walking (General)

JC0623 Cycling/ Walking (General)

JC0602 Ashley Rd/ Alder Rd

JC0631 Cycling/Walking (Waterloo Road cycleway)

JC0550 Canford Road/ Ringwood Road experimental

JC0330 Creekmoor Traffic calming

JC0633 Canford Bridge exceptional scheme

JC0614 Ashley Road/ North Road

JC0615 Ashley Road/ Mansfield Road

JC0616 Ashley Road/ Richmond Road

CODE

£1,886 JC0552

£2,235 JC0569

£115 JC0350

£196 JC0266

£17 JC0569

£294 JC8000

£1,243 JC0621

£628 JC0268

£2,000 JC0606

£1,000 JC0604

£1,400 JC0608

£933 JC0622

£29,000 JC0630

£11,500 JC0160

£48,000 JC0631

£14,500 JC0632

£30,000 JC0635

£25,000 JC0634

£98 JC0569

£157 JC0569

£3,017,000

£5,000 JC0638

£5,000 JC0638

£5,000 JC0638

C2. Budget virements now proposed

CODE

FROM

SCHEME

JC0613 Puffin conversion programme

JC0614 Ashley Road/ North Road

JC0615 Ashley Road/ Mansfield Road

JC0616 Ashley Road/ Richmond Road

JC0602 Ashley Road/ Alder Road

JC0610 Commercial Road/ Station Road feasibility

JC0629 Parking amendments

JC0440 Dorset Way/ Canford Way

JC0626 George roundabout

JC0633 Canford Bridge exceptional scheme

TOTAL

AMOUNT

£5,000

CODE

£30,000

£30,000

£30,000

£100,000

£3,000

£2,000

£2,347 JC0492

£20,000 JC0292

£24,214 JC0341

£246,561

TO

SCHEME

Lindsay Rd to Station Rd corridor

Minor ancillary project works

Mountbatten Arms

Gravel Hill cycleway

Minor ancillary project works

SW Passenger Transport Information 05/06

School Schemes 06/07 (General)

School Schemes 05/06

School Schemes 06/07 (Corfe Hills)

20mph Zone – Springdale First school

School Schemes 06/07 (Lilliput First)

20mph Zones outside schools (General)

Cycling/ Walking (Adastral Rd puffin)

Improved Lighting of pedestrian routes

Cycling/Walking (Waterloo Road cycleway)

Community Transport strategy development

Cycling/Walking (Darbys Corner cycleway)

Bourne Valley Greenway (St Aldhelms section)

Minor ancillary project works

Minor ancillary project works

REPROFILED to 2007/08 and 2008/09

Ashley Rd Feasibility (North Rd to Alder Rd)

Ashley Rd Feasibility (North Rd to Alder Rd)

Ashley Rd Feasibility (North Rd to Alder Rd)

TO

SCHEME

Structural Maintenance programme

Structural Maintenance programme

Structural Maintenance programme

Structural Maintenance programme

Structural Maintenance programme

Structural Maintenance programme

Structural Maintenance programme

General Road Safety measures

Street Lighting Column replacements 06/07

Canford Main Bridge

16

APPENDIX D

DEVELOPER FUNDED SCHEMES

SCHEME

S278 Asda development

S106 Cabot Lane

S106 B & Q Willis Way

S106 Fleets Lane/Willis Way

Sec 278 Macdonalds Alder Rd

Sec 106 Haven Rd

S106 Arne Avenue

S278 Seldown Roundabout

Wimborne Rd cycle lane

Longfleet Rd cycle lane

Baiter one way

Magna Rd RTL

Herbert Ave Puffin

54 Coy Pond Rd

Pedestrian Crossing points

Pitwines bus improvements

Town centre cycling

Norrish Rd Car Park

Bus improvement Turlin rd to boundary

Cycle parking Banks rd

Walking Field Lane

Longfleet rd new footway

Newfoundland drive cycleway link

Bus shelters various sites

Traffic signs Seldown Bridge

Town centre accessibility enhancements

Prelim work Hungerhill

Garland Rd/Joliffe Rd

Loading bay, Sandbanks

Woodlands Avenue

Shapwick Rd Rail crossing

Route 8Bus Stop Survey

Totals

Budget profile

2006/2007

£1,231

£9,600

£2,439

£5,152

£2,000

£8,776

£8,305

£2,073

£16,000

£71,178

£7,449

£1,000

£3,987

£20,114

£2,000

£5,651

£4,600

£17,186

£17,591

£8,357

£330

£2,232

£14,103

£5,732

£4,539

£25,000

£7,500

£12,905

£0

£859

£16,545

£0

£304,435

Actuals to Oct

2006/2007

£17,981

£734

£16

£284

£1,208

£888

£687

£8,745

£6,803

£4,980

£2,028

£6,949

£51,268

Remaining programme

2006/2007

£12,905

£16

£859

£16,545

£284

£1,231

£8,392

£2,439

£5,152

£2,000

£7,889

£5,651

£4,600

£17,186

£390

£8,357

£330

£2,232

£14,103

£5,732

£4,539

£25,000

£6,766

£8,305

£1,387

£7,255

£64,375

£2,469

£1,000

£3,987

£18,086

£4,949

£253,167