Skattedirektoratet møtereferat U. Off. Off.l §5 Vedrørende QMS Review Dato 1. november 2006 Referanse PEO Møtedato 01.11.06 kl 11:40 (264 min) Til stede Managing Director (Petter Øgland) Quality Manager (Petter Øgland) Secretary (Petter Øgland) Forfall Møteleder Petter Øgland Referent Petter Øgland Minutes from Board Review of Quality Management System no 44/06 The meeting was conducted according to QP/4 and QP/8. Next Board Review is scheduled for Monday next week. The agenda will be as defined by the minutes from this meeting [this document]. Digital copy of minutes are recorded on server ”h:/Mine Dokumenter/03 Meetings and Reports”. 1 Introduction The reason I’m updating this document is because I want to improve the processes that are relevant for personal quality and efficiency at Helsfyr and to make sure that my superior is happy. My belief is that David Allen’s Getting Things Done (GTD) system should be a good way of improving qualtiy and efficency, but it has to be implemented in a good manner. Research question: How can I achieve improved quality, efficency and satisfaction from my superior (“customer”) by use of the GTD system? In the next section we look at some of the GTD theory, comparing it with other frameworks. Then we have a methods section, and the we present the results from GTD reviews as applied to the PhD process. The results are discussed in the next section, and the final section contains a conclusion and recommentdations for further research. 2 Theory My vision for a good solution is something that follows the principles of Lean Production (or GTD) while also fitting with the ISO 9000 model. møtereferat Side 2 2.1 The GTD system David Allens time management method Getting Things Done (GTD) was published in 2001 and has become increasingly popular as a “back to basics” type of time management approach (ref?). While we have found literature on GTD on the Internet, we are not yet sure to which extent the method has been investigate in a scientific manner. The purpose of this article is to try to investigate GTD by trying to see in which manner it can be used as a framework for managing the process of doing PhD research, and we want to do that by investigating to which extent GTD seems to be compatible with such frameworks as Lean Management (Womack & Jones, 2003) and ISO 9000. Allen (2001) has defined a framework for time management called Getting Things Done (GTD) with focus on process rather than on deadlines and priorities. It is sometimes refered to as an “action management” method (Wikipedia, 2006). The basic ideas look very similar to Lean Management (Womack & Jones, 2003), although we haven’t yet found an formal comparison between the two. Probably we should do both literature research and empirical testing in order to find out how the two approaches meet. 2.2 GTD and ISO 9001:2000 We plan to use parts of the ISO 9001:2000 standard as a framework for doing action research on how to get a PhD. Furthermore we are also interested in John Seddon’s work on applying lean management principles for the service sector. Is it possible to use lean principles for producing a PhD? The key idea here should probably have something to do with following small units of knowledge through the cycle rather than reading batches of books. How would one use such methods for learning about lean thinking? Probably it would have something to do with building small systems that work and then elaborating on those as a method of growing a total system. 2.3 GTD and Deming’s “System of Profound Knowledge” In order to add structure to the approach, we have decided to group the research questions along the four components in Deming’s “System of profound knowledge”, using the theory of knowledge as the starting point for analysis as we are interested in applying the method of action research for producing research papers. 2.4 Quality management system The vision for the system as a whole is represented in the diagram below. møtereferat Side 3 4. Continual improvement of the quality management system 5. Management responsibility 1.Customers 8. Measurement, analysis and improvement 6. Resource management 7.Product realisation 2. Requirements 1. Customers 3. Satisfaction 7. Product Value-adding activity Information flow Figur 1 – The ISO 9000 process model 2.5 Management responsibility 2.5.1 Making priorities with GTD What seems to be a possible lack in GTD is that there is no focus on priorities. Allen explains this as being a part of the method, but it is nevertheless inconsistent with the advice of Koch (1999) unless the GTD either creates a soft 80/20 approach or the weekly reviews can be helpful for doing a statistical 80/20 analysis. 2.5.2 Building theory for improving the quality of business predictions According to Deming (1993), the purpose of management is to make predictions. The data we have collected so far, we have been using for making prediction as to how many items there is in each of the six review folders. Why do we want to predict that? Are there other issues that are more important to predict? The aim of LEAN is to make sure that everything flows as smoothly and flexibly as possible, like water. 2.6 Resource management From the perspective of action research, the human resource management part of resource management is particularly interesting, as part of the philosophy of ISO 9000 is to make people work more efficiently by doing structural changes. In my case of trying to get a PhD, the result measurements of my efforts could be identified as a part of clause 6.2. Hoyle (2003: 131-132) suggest there are five resource management processes; (1) resource planning, (2) resource acquisition, (3) resourse deployment, (4) resource maintenance, and (5) resource disposal. He uses a diagram to link these processes into a system where there is a flow from resource planning through all processes and back to planning again. I choose to use Hoyle’s model as my vision of the resource management process. møtereferat Side 4 2.7 Product realization 2.7.1 The concept of FLOW There are insights in the concept of ‘flow’ in terms of having clear goals producing a psychological state of happiness. It is apparent that updating this document causes a mild state of flow, but it does not necessarily mean that the process is meaningful. How can we improve the concept of ‘flow’ in a more efficient manner? 2.8 Measurement, analysis and improvement 2.8.1 Building theory as a ‘map’ However, do these ideas constituate a theory? A theory should be like a map. It should be based on (1) collecting data, (2) sorting things out, and (3) making laws that show how the various categories relate to each other. What are the main categories for researching on how to do a PhD? Probably we should use the theory of learning, investigating whether it is better to read books at random than linearly. We also need to measure whether the ISO 9000 idea is useful. We spent on average about half an hour every week on updating this document. Is it worth it? Does it help us improving the management of the PhD process? In what way? 2.8.2 Building GTD as a Complex Adaptive System of independent processes What does the map look like right now? For the moment we assume that spending 30 minutes each week on updating this document to comply with the ISO 9001 requirements, the management of the PhD process will emerge by itself. In other words, our assumption is that starting with nothing and then just audting according to the ISO 9001 requiremet, a management system will emerge by itself. Is this a good strategy? It will obviously take time as there are more than 50 check points, meaning it will take many years before all checkpoints have been assessed if we use the Monte Carlo approach. Are we sure it will converge? Could it be seen as a CAS approach for building management information systems? Allen describes five phases for doing GTD. There are five phases of processing and five phases of project managing. In terms of what seems reasonble to measure, we have the following two: Processing data from inbox (measure time) Weekly review (measure time) In the way we have implemented GTD at SKD in order to fit with the monthly and annual cycles, we could also add the monthly review (measure time) and the annual review (with RN). 2.8.3 GTD and Action Research Action research is a framework for doing research, but it is also a structure for collecting knowledge. As the typical epistemological choice for doing action research consists of understanding knowledge in a pragmatical sense in terms of what creates change, the description of that kind of knowledge is perhaps best understood in terms of an algorithm of some kind. In this way, GTD in itself can be seen as a knowledge structure, and what we would like to research is a refined way of describing the GTD-flowchart to make sure that it will work in the context of doing PhD research. In this respect, it will be necessary to compare the GTD process with the AR process or the research process in general (e.g. Collins & Hussey, 2003). møtereferat Side 5 3 Method According to Morgan (1979) there should be a close link between the chosen research paradigm and methodology. When working in the context of action research, this puts demands both of the chosen theory and methodology. 3.1 General description The purpose of this document is to develop a method for weekly control, making sure the PhD project is on track. We try to achieve this goal by doing introspective research on what we seem to be “unconciously” doing in order to control and improve the research process. We have framed this type of research as action research. The approach is inspired by discussions with Lars Mathiassen. As we have not yet found any literature to support this approach, it seems like relevant research, although we have not yet done sufficent amount of literature research in order to understand the state of the art. In order to get the best results from the research, it is our quality policy to make sure that the process of collecting and analysing data is as efficient as possible. In order to make sure that the research process is under control and improving we will use some statistics in this section to indicate stability and progress. 3.2 Population and sampling procedures Although we are studying our own process we would like to think of the general population being people applying GTD for doing administrative work in general, although we are sampling data only from our own work. In order to answer the question about how to implement GTD we need to sample data from how we have implemented GTD so far and then carry out experiments by tinkering with the process in order to see whether it is possible to make improvements. As there should be a weekly review within the GTD system, we sample data from the folders on a weekly basis, as a part of this weekly review. We sample data by counting elements in the six folders defined by Allen, and also do weekly ISO 9001 audits where we measure the maturity of the system according to the ISO 9004 scale as a way of trying to achieve systematic improvements. 3.3 Research instruments In our case we would like to consider the SPC diagrams as our research instruments. The diagrams are supposed to give a statistical description of the stability of the processes, and thus need to be calibrated whenever it is reason to believe that the processes have changed. 3.4 Data collection The diagrams below show the amount of data we go through each week (or every second week), and how much time we spend on data collection. møtereferat Side 6 Inbox (size) UCL = 173 AVG = 126 LCL = 79 Proc. inbox (min) LCL = -0,6 44 40 35 25 23 21 19 17 15 44 38 32 28 25 22 19 16 13 7 10 4 1 0 13 50 11 100 9 150 7 200 5 400 350 300 250 200 150 100 50 0 250 AVG = 1,5 UCL = 3,6 One problem with the mailbox for week 22. Otherwise the process seems to be stable. 3.5 Data analysis The audit plan: 55 51 41 31 54 42 55 25 35 51 11 2 10 51 10 2 14 6 28 49 (30.07.06) (07.08.06) (21.08.06) (04.09.06) (18.09.06) (02.10.06) (16.10.06) (01.11.06) 27 38 37 30 9 22 14 1 36 26 42 50 2 34 26 24 37 52 29 13 35 53 19 22 50 6 25 42 3 25 40 18 53 7 20 47 54 34 19 37 50 34 51 7 50 1 8 34 30 12 28 17 41 37 37 55 32 41 42 47 28 35 30 35 53 54 24 24 10 4 44 6 1 33 49 29 43 28 12 13 The audit results will be presented in chapter 5.1. 4 Results We try measure the size of the six files defined according to the GTD methodology. 4.1 Control diagrams All six diagrams are controlled in the same manner. The first observation was done on week 33. Previous data are related to other processeses. møtereferat Side 7 @Calender/T-File UCL = 23,1 40 34 28 25 22 19 16 13 7 10 @File UCL = 23,1 AVG = 12,4 LCL = 1,7 @NextAction List UCL = 24,0 AVG = 12,3 LCL = 0,6 @Project List UCL = 25,8 40 34 AVG = 12,0 LCL = -1,8 @Someday/M.be UCL = 25,9 AVG = 12,0 LCL = -1,8 @Waiting For UCL = 20,7 40 34 28 25 22 19 16 13 7 10 4 1 40 34 28 25 22 19 16 13 10 7 80 70 60 50 40 30 20 10 0 4 80 70 60 50 40 30 20 10 0 28 25 22 19 16 13 7 10 4 1 40 34 28 25 22 19 16 13 10 7 80 70 60 50 40 30 20 10 0 4 1 4 AVG = 12,4 LCL = 1,7 80 70 60 50 40 30 20 10 0 1 1 40 34 28 25 22 19 16 13 10 7 80 70 60 50 40 30 20 10 0 4 1 80 70 60 50 40 30 20 10 0 AVG = 14,3 LCL = 7,9 4.2 Resource management The structure below follows the structure of Hoyle as described in chapter 2.6. 4.2.1 Resource planning The planning process is integrated in the GTD system, meaning that we do little planning beyond having a process that means we show up at Helsfyr every 14 days. This means we have about 4 hours a week in order to get work done, where most of this work is realted to adminsitrative duties. More detailed predictions are given in the SPC diagrams in chapter 4.2.4 below. 4.2.2 Resource aquisition Acquisition consists mainly of buying books from amazon. We use the “waiting for” folder in GTD to make sure that we are reminded of books that don’t show up in time, and we also register books on a separate plan. The “waiting for” SPC diagram above and the checklists and SPC diagram in the separate plan show that the resource acquisition process is managed. møtereferat Side 8 4.2.3 Resource deployment As books arrive at home, we either bring them to Helsfyr or to Blindern or keep them at home. In all three cases we have elements of an archive to make sure we know how many books we have and what the exact titles are. 350 8 7 6 5 4 3 2 1 0 300 250 200 150 100 50 0 42 44 Books at Helsfyr UCL = 291 AVG = 132 LCL = 0 42 44 Fully registered books 4.2.4 Resource maintenance Days LCL = 0 AVG = 7 UCL = 15 120 10 100 8 80 6 60 4 40 2 20 44 38 28 25 22 19 16 13 10 Minutes LCL = 0 12 0 7 1 44 38 0 28 0 25 50 22 100 5 19 10 16 150 13 200 15 10 20 7 250 4 300 25 1 30 4 As I understand Hoyle, resource maintenance relates to the resources used during production (order fulfilment). In my case this corresponds to the diagrams below, that I use to monitor, control and predict time and cost for doing the weekly reviews. AVG = 18 UCL = 57 0 2005 Days (avg) LCL = 3,68 2006 AVG = 7,18 UCL = 10,68 2005 Min (avg) LCL = -20 2006 AVG = 47 UCL = 114 Resource maintenance also corresponds to the monthly reports I fill out for my superior, so that he can see that I’m spending the right amout of resources on doing the PhD research. 4.2.5 Resource disposal Sometimes I need the books at Blindern or at home rather than at Helsfyr. The systems and diagrams mentioned in section 4.2.2 and 4.2.3 are used for monitoring and control. møtereferat Side 9 4.3 Summary of problems The table below represents a Pareto analysis of the problems recorded from the SPC diagrams above. Process 3.1 Meetings cost 3.2 Meetings frequency 4.6 @Waiting For 4.1 @Calender/Tickler File 4.2 @File 4.3 @NextAction List 4.4 @Project List 4.5 @Someday/Maybe 3.4 Processing inbox 3.3 Inbox TOTAL 2004-y 0 0 0 0 0 0 0 0 0 0 0 2005-y 3 2 0 0 0 0 0 0 0 0 5 2006-y 11 4 3 2 2 2 2 2 1 0 28 Total 14 6 3 2 2 2 2 2 1 0 33 So far there seems to be an initial tendency of an increasing level of errors. In time this level should stabilize and we should be able to make a SPC chart. 5 Discussion As mentioned in section two, we want to use ISO 9001:2000 as a theoretical framework, and in this section we want to discuss to which extent the current approach is consistent with ISO 9001:2000 and what can be done in order to improve the situation. 5.1 An overview of the significant findings of the study We chose to use the ISO 9001 audit results as a way of summarizing the main findings. The audits have been selected according to the audit plan in chapter 3 with the following audit results: Clause no ISO 9001:2000 title 4 1 Quality management system 2 General requirements 4.1 4.2 4.2.1 3 Documentation requirements 4 General Documented practice within the main document. The quality management system for running the weekly control is described in section three. There is, however, not listing of processes and how the processes relate to each other. Quality policy and quality objectives are implied in the experiment, but there is no explicit reference to the words “quality policy” or “quality ISO compliant 0 ISO capability 0 0 0 0 0 0 0 møtereferat Side 10 4.2.2 4.2.3 4.2.4 5 Quality Manual 6 Control of documents 7 Control of records objectives”. Chapter 3 There are procedures QP/1 ? This document is stored systematically. Score Clause no ISO 9001:2000 title 5 8 Management responsibility 9 Management commitment 5.1 5.2 10 Customer focus 5.3 11 Quality policy Documented practice within the main document. We have written proof for top managements commitment to making sure the COBOL software complies with the COBOL standard through the “strategisk plan for bruk av IT i Skatteetaten” (chapter 4.3.1), the top management signatures on the preface of the COBOL standard, and we are now also trying to establish a routine were top management gets more involved in each cycle by controlling the annual evaluation report before it gets published. As the customers in the case of standardizing COBOL software seem to be the programmers themselves, it is not quite clear how we should interpret the issue of customer satisfaction (see also checkpoint 8.2.1). 15.10.06: The aim of the quality policy should be to create a vision for the work to be done. In the case of running a GTD system, the purpose is obviously to improve efficiency and reduce stress, so the vision (quality policy) should be to make a QMS that is compliant with the leanprinciples of GTD and the requirements of ISO 9001. As it is presently somewhat unclear how to be more formal and use measurements for 0 0 0 0 0 0 0,00 0,00 ISO compliant 0 ISO capability 0 0 0 0 0 0 1 møtereferat Side 11 creating or updating the quality policy, we find it difficult to see how we can go beyond ISO 9004 maturity level 1. In order to meet the requirements of ISO 9001, we should perhaps say something about the vision of the experiment in the introduction to chapter three. 5.4 5.4.1 5.4.2 5.5 5.5.1 Another approach may perhaps be to think of the research question as the vision, or perhaps seeing the research question as a way of coming closer to the vision of the system. From this perspective, we would expect to see chapter one as the place to search for the quality policy. 12 Planning Although the basic issues seem to be okay, we need to investigate planning a bit further. 13 Quality objectives COBOL software should comply with the internal COBOL standard. Explicit quality objectives are described in the standard. There is a measurement program developed to make sure that the quality objectives are being met. 14 Quality management Updates of this document are system planning discussed in chapter 5 and 6. In later issues, it will be important to make references to this table and produce SPC statistics to make sure that the quality management system as actually becoming better with each annual iteration. 15 Responsibilty, authority Responsibility, authority and and communication communication looks okay, but we need more measurements in order to make sure the processes are improving. 16 Responsibility and Responsibilty and authority authority follows the usual structure of 0 0 0 0 0 0 0 0 0 0 møtereferat Side 12 5.5.2 5.5.3 5.6 5.6.1 5.6.2 5.6.3 IT/SYS. The research scientist is currently responsible for monitoring and analysis as this is part of the experiment. 17 Management As the Research Scientist representative (Øgland) is situated in a staff position under the IT manager general (Nybø), the research design is sufficient for making the position of the research scientist meeting the requirement of “management representative”. 18 Internal communication Not much communication is needed. All communication is done in writing and supplied with interviews if anything unusual is registered by the SPC diagrams. 19 Management review The document itself looks like a good way of doing and documenting the management review, but as this has not yet been done in a formal manner, we need to wait and see whether it will work as expected. 20 General By using this document, we have a process for doing management reviews on an annual basis. The review will be documented in ELARK (in compliance with 4.2.4) and all relevant parts of ISO 9001 will be addressed. 21 Review input A draft version of this document is used as input 22 Review output When this document has been signed by management, it functions as review output. Score Clause no ISO 9001:2000 title Documented practice within the main document. 6 23 Resource management 01.11.06: At the moment, all requirements seem to be met, although some processes are still at level 1. More measurements and deeper reading of Hoyle is needed. 0 0 0 0 0 0 0 0 0 0 0 0 0,00 0,07 ISO compliant 1 ISO capability 1 møtereferat Side 13 6.1 24 Provision of resources 6.2 25 Human resources 6.2.1 26 General 6.2.2 27 Competence, awareness and training 01.11.06: As shown in chapter 4.2, when it comes to managing books and managing time, there are processes in existence. In both cases there are SPC diagrams, but as not all books have been fully archived in the system and the cost of weekly reviews is not yet stable, we assume that the maturity is on level 2. 01.11.06: As 6.2.1 and 6.2.2 are accepted, 6.2 should be acceted as well. 01.11.06: The purpose of the human resources clause is to make sure that we have competent people. I certainly consider myself competent for doing the tasks provided for me by my superior, i.e. being a quality management researcher and getting a PhD. The fact that I was accepted at the PhD course at UiO should be sufficient proof at this stage. In this spring I managed two exams out of two (100%). This autum I also hope to do two exames out of two, but I’m not yet sure what to measure for this clause. I could perhaps measure the number of complaints I get from my superior. Last year I got one complaint (annual appraisal). This year there have been no complaints so far. 01.11.06: I’m now getting the PhD training for becoming a better research scientist, doing even better work than I did as a quality manager. a) Necessary competance: PhD b) Provide training: PhD program c) Awareness. ok d) maintain appropriate records of education, training, skills: 1 2 1 1 1 1 1 2 møtereferat Side 14 home page at UiO + CV + SKD archives + RN folder with copies of all exams. As required in ISO 9001, it is the organization (SKD + UiO) who have defined the PhD standard, and I try to comply with that. 6.3 6.4 28 Infrastructure 29 Work environment Competence, awareness and training should be measured based on the number of academic articles I manage to publish per year. This year I have only publised at IRIS 29, but it is better than the previous year when I had none. In order to move up to level 3, I need to be able to plot diagram showing annual improvement or stability. 01.11.06: Helsfyr provides me with an office and a place to have my books. I do not have access to all the relevant databases, but I have access to the Internet and I have access to relevant journals at Blindern. I have access to COBOL statistics, and through negotiations I should probably be able to get access to all the kind of relevant data that I should need. Currently I do not measure the infrastructre appart from the fact that I get COBOL data whenever I ask for it. In order to move up to level 2, I should be more specific about what to measure. 01.11.06: The only work environment I need as an office, book shelves, a computer, access to the internet and access to the organization where I’m about to conduct the experiments. I’m not sure how to measure this, although I’ve previously filled out “health environment 1 1 1 1 møtereferat Side 15 security” forms, in order to explain that everything is okay. Score Clause no ISO 9001:2000 title 7 7.1 30 Product realization 31 Planning of product realization 7.2 7.2.1 7.2.2 Documented practice within the main document. 04.09.06: What is the product? If we consider this document as the product, then the methods chapter in section three shows how we update the document each week and try to improve the way we are getting things done. Perhaps we should think of the GTD algorithm as the product, as this is a research process and the product should the be knowledge. In that case we could say that quality objects, test requirements etc should be described in chapter three. So far, however, chapter three is not up to date, although we use SPC for monitoring time, cost and quality of process (ISO 9004). We have not yet defined ways to monitor the quality of product (quality of algorithm). 32 Customer-related The programmers have processes themselves designed the COBOL standard, so they have themselves made the specifications to be met. 33 Determination of When making the original requirements related to the standard and updating the product standard, I gave some additional feedback to make sure that the standard was “operationally defined” (appropriate for generating measurement) and also that it seemed consisted with international advice on programming in general and COBOL programming in particular. 34 Review of requirements The programmers used the to the product procedure in “hefte 1” for making 1,00 1,29 ISO compliant 0 0 ISO capability 0 1 0 0 0 0 0 0 møtereferat Side 16 7.2.3 7.3 7.4 7.5 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 and updating the standard. 35 Customer The update of the standard was communication done by a committee of programmers who then communicated the ideas to the rest of the programmers. 36 Design and development Does not apply. The process consists of standardizing the COBOL software. Perhaps one could see the updates of the COBOL standard as design and development, and there are written procedures for how to to that, but we choose not to focus on that aspect at the moment. 37 Purchasing Not applicable, at least not if we think of purchasing from some external supplier. 38 Production and service provision 39 Control of product and Control of production seems to service provision correspond with how the experiment is designed in chapter 3. 40 Validation of processes Not yet clear how to interpret for production and service this. There are no written provision procedures on how to standardize COBOL software, and there seems to be no reason why such procedures should be written. 41 Identification and 21.08.06: The six files of the traceability GTD systems are used for keeping track of every item to be processed. 42 Customer property 02.10.06: Sometimes I need to handle customer property in terms of borrowing books or material from TJG or others, and I may also handle intellecutal property in terms of discussing issues with people that need to be handled with confidenciality. Although I use the GTD system for handling books, there is no explicit procedure or mature practice indicating how this should be done. 43 Preservation of product Software is always in the same 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 møtereferat Side 17 7.6 44 Control of monitoring and measuring devices place. The COBOL measurement program was updated when the COBOL standard was updated. Score Clause no ISO 9001:2000 title Documented practice within the main document. 8 45 Measurement, analysis and improvement 46 General Much is in place, but we need to focus more on customer satisfaction and internal audits. a) There is a measurement system for checking software compliance with the COBOL standard. (stable process, capability = 3). b) These tables in appendix B are used for measuring how the quality system fits with ISO 9001:2000. (initial process, capability = 1). c) These tables in appendix B are also used for measuring how the quality management system improves in compliance with ISO 9004:2000. (initial process, capability = 1). Customer satisfaction and internal audit has not been sufficiently established. Monitoring and measurement of product and process should be sufficient. As the programmers themselves are the customers to the standardization process, it is unclear how we should measure customer satisfaction. Perhaps we should ask programmers to rotate and report whether they feel comfortable with the new COBOL software they now have to deal with? This discussion section is used for checking whether the experiment is carried out in compliance with ISO 9001:2000 or not. It is not possible to make 8.1 8.2 47 Monitoring and measurement 8.2.1 48 Customer satisfaction 8.2.2 49 Internal audit 0 0 0,07 0,20 ISO compliant 0 ISO capability 0 0 0 0 0 0 0 0 0 møtereferat Side 18 8.2.3 50 Monitoring and measurement of processes 8.2.4 51 Monitoring and measurement of product the audits independent, as this is a one-man company. The time charts and SPC diagrams all show that we are monitoring and measuring processes. Action is taken in compliance with the principles of SPC. 07.08.06: There are three types of processes/products: (1) Writing articles, (2) reading books/articles, and (3) administrative processes like writing this weekly document. 0 0 1 2 0 0 In order to make things as simple as possible, we start by focusing on (3). In the weekly process of updating this document, this document in itself is the product. We are monitoring the process by focusing on time and resources in chapter 3. In the graphs at the bottom of chapter 5 we measure to which extent this document compiles with the requirements of ISO 9000. Currently (07.08.06), the compliance is 0.53, but measuring the compliance in itself means that this particular checkpoint should be safe. 8.3 52 Control of nonconforming product With respect to the maturity of the process, the monitoring is systematic (weekly) and there are some minimum data of improvement available in the ISO 9000 and ISO 9004 graphs, but not sufficient for saying that the process has reached maturity level 3. We assess the maturity level to be 2. It is not quite clear how we should interpret the concept “non-conforming product” here. What we are investigating is whether the standardization process is stable or not. Non- møtereferat Side 19 8.4 53 Analysis of data 8.5 54 Improvement 8.5.1 55 Continual improvement conforming product in such a context should correspond to too much improvement, too little improvement or other unexpected phenomena. Analysis of data is done by the use of SPC diagrams and Pareto charts. There is currently no focus on customer satisfaction, as the concept of the customer is somewhat unclear in this context (i.e. the programmers themselves), but analysis of data provide information related to conformity to product requirements (COBOL standard) and characteristics and trends of processes and products as opportunities for preventive action. As the programmers themselves are the software suppliers, analysis providing information related to suppliers equals analysis related to products and processes. 18.09.06: There are elements of continuous improvement, as can be seen on the ISO 9001 and ISO 9004 charts, but there is little evidence of improvement being done due to corrective of preventive actions yet. The only corrective and preventive actions in this case must be how we respond to this ISO 9001 assessment. 16.10.06: We have now been using the ISO 9004 maturity measurements for almost three months, and despite this obviously being a good idea as we by this approach indirectly make sure the effectiveness of the QMS is being improved by use of (a) quality policy, (b) quality objectives, (c) audit results, (d) analysis of data, (e) corrective and preventive actions, and (f) management reviews, we have measured no improvement on 0 0 0 1 1 1 møtereferat Side 20 the ISO 9004 chart between week 27 and week 40. In order to be on ISO 9004 maturity level 2 “reactive approach” we need to have established a “problem- or corrective-based systematic approach with minium data on improvement results available”. Thus in order to move from level 1 to level 2 we need the ISO 9004 graph to be indicating improvement. 8.5.2 56 Corrective action 8.5.3 57 Preventive action 30.07.06: We want to measure annual improvement with respect to some indicator measuring results divided by costs. So far the main focus has been on measuring costs (minutes in chapter 3). It is too early to identify a total indicator for measuring continual improvement, but as an early indicator we use the ISO 9004 maturity indicator. So far there are no formal procedures for corrective actions, although corrections are carried out in order to improve the system. So far there are no formal procedures for preventive actions, although the system is continuously being improved in order to make it more efficient. Score Clause no ISO 9001:2000 title Opportunities for improvement. 4 Quality management system 5 Management responsibility We need to rewrite chapter 3 while looking at the requirements in ISO 9000 to make it quite evident that the design of experiment is consistent with the ISO standard. This should be made explicitly clear. The most important issue to address is probably the 0 0 0 0 0,15 0,31 ISO compliant 0,00 ISO capability 0,00 0,00 0,07 møtereferat Side 21 7 Product realization 8 Measurement, analysis and improvement 6 Resource management management review. We need to do a deeper analysis on the clauses related to production (7.5) to see how we should refer to the production flowchart in chapter 3.4. We should figure out how to measure customer satisfaction, how to do internal audits, and construct efficient formal procedures for corrective and preventive actions. We need to investigate whether there are some procedures that make certain that all new personnel get training in how to comply with the COBOL standards. Score 0,6 0,5 0,4 0,3 0,2 0,1 0 0,07 0,20 0,15 0,31 1,00 1,29 0,24 0,37 1 0,8 0,6 0,4 0,2 0 26 27 28 34 35 36 37 38 40 42 44 27 28 34 ISO 9001:2000 35 36 37 38 40 42 44 ISO 9004:2000 The purpose of the diagrams is to document how the way we are doing weekly updates is gradually getting more and more compliant with the ISO 9000 framework. 5.2 A consideration of the findings in light of existing research studies A relevant comparison would be the research I am doing at home, but it would be more interesting to look at published research, indicating the state of the art when it comes to designing quality management systems for single-person organizations. So far, I have not found anything on this. 5.3 Implications of the study for current theory I have the book by ISO on ISO 9001 for small organizations (Pronorm, 2003), and I have the book by Tricker (2005). Neither of these books seem to emphasize the importance of the maturity level of the quality management group should be on the same level or a higher level than the processes the quality management group try to improve. Seddon (1999) questions whether the ISO 9000 framework is consistent with “lean management” and the Deming philosophy of quality management. What we would like our study to show is that not only is the ISO 9000 framework compliant with Lean Management, møtereferat Side 22 but it also provides a good framework for installing Lean Management in small organizations, such as single-person organizations. 5.4 A careful examination of findings that fail to support the hypothesis The main challenge so far, is that the data in the ISO 9004 does not really tell us anything yet, beyond the fact that the maturity level we found during week 27 still seems to be the best estimate for the actual maturity level of the QMS. 5.5 Limitations of the study that may affect the validity or generalisation of the results Beyond the fact that we are studying ourselves, the main challenge for validity and generalisation at the moment is that we haven’t done a sufficient ISO 9004 analysis in order to say whether the QMS is improving or not. Perhaps the approach would have worked better if we started by setting all unverified control points equal to zero rather than just assigning random numbers as given from a previous assessment of a different QMS. 5.6 Recommendations for further research If we look at the benchmark table at the bottom of chapter 5.1, we see that the clauses related to chapter four in ISO 9001 are the ones with the lowest score. This should indicate that this is perhaps the area were we are in most need for more knowledge. However, as we are still have not made a complete assessment of the QMS, it may perhaps be more wise to focus on chapter eight. 5.7 Implications of the study for professional practice or applied settings For the professional practice of designing, implementing and maintaining quality management systems, we believe that our main idea is that the quality management function should be on a ISO 9004 maturity level that is higher than the ISO 9004 maturity level of the organization as such. We believe the following algorithm may be a simple way of achieving this: 1. Start by installing GTD and apply SPC for weekly reviews 2. Use the ISO 9000 framework for doing QMS assessments as part of the weekly review 3. Document the process as if it were a research project, researching ISO 9001 quality management systems, by using the ISO 9004 theory and research questions. It is furthermore important to be selective when doing the ISO 9004 assessments, starting with the processes that relate to the administrative processes of doing audits. 6 Conclusion So far we have not described the GTD algorithm in its original form nor have we described how we believe it should look like in order to enhance performance. However, we seem to be progressing in a nice way. The concepts do not seem to be quite clear yet, but they look better than they did half a year ago. Further research must be carried on, however, in terms of completing the ISO 9001 assessment and then gradually move on to improve the framework by applying Lean Management principles and Deming principles to the GTD process, continuously evaluating the process according to the ISO 9004:2000 standard. møtereferat Side 23 References Allen, D. (2001) Getting things done, New York. Collis, J. & Hussey, R. (2003). Business Research: A practical guide for undergraduate and postgraduate students. Second Edition, Palgrave Macmillan: New York. Deming, E.W. (1993). The New Economics. Second Edition. MIT Press: Massachusettes. Hoyle, D. (2003). ISO 9000:2000 – An A-Z Guide. Butterworth-Heinemann: Oxford. ISO (2000). Quality Management Systems – Requirements (ISO 9001:2000), Geneve. Koch, R. (1999). Le principe 80/20: Faire plus avec moins, Les Edition de L’Homme: Paris. Morgan (1979). … Murdaugh, B. (2005). Getting Things Done with Gmail, http://spaceagewasteland.com/gtd%20with%20gmail.pdf (accessed 2 October 2006). Pronorm (2003). NS-EN ISO 9001 for små virksomheter. Pronorm AS: Lysaker. Seddon, J. (1997). In Pursuit of Quality: The Case Against ISO 9000, Oak Tree Press: London. Tricker, R. (2005). ISO 9001:2000 for Small Businesses. Third Edition. Elsevier: London. Wikipedia (2006). Getting Things Done, http://en.wikipedia.org/wiki/Getting_things_done (accessed 2 October 2006). Womack, J.P. & Jones, D.T. (2003). Lean Thinking: Banish waste and create wealth in your corporation, Free Press Business: New York.