DRAFT minutes of the SHINE collaboration board 31 October 2007 Agenda 1. Establishing institutes’ representatives, proxies and quorum NB: Decision was taken to remove Bari/Milano from the list, as agreed with these groups. Future collaboration remains open. Twenty (20) institutes were present, represented or connected out of 24 (a record showing great dedication of SHINE collaborators). Quorum was reached. See Table 1 below. 2 Minutes of the last meeting Minutes were approved without modifications 3 Adoption of the agenda Agenda was approved without modification 4. Spokesperson report and matters arising from the collaboration meeting (Marek) The official collaboration account for NA61-SHINE has been created: T299561. NA61 owes about 50 kCHF to the NA49 account. All common fund operations will be moved to NA61 account. The actual version of the MOU needs corrections and approval by the Collaboration Board. It needs update of promises from Coll. Institutions. MOU should be accepted/signed by CERN as well as by all representatives. Action: DRAFT MOU to be distributed to the collaboration board. (Alain) Once the MOU is agreed, we will be able to sign the transfer of detector ownership. Marek emphasized that the collaboration is geographically dispersed which means that we need very efficient communication between groups. Working groups will need to be established. Software, and hardware meetings using EVO already take place every week. A list of responsibilities taken was established at the end of the collaboration meeting. (see Table 2 below) An interactive collaboration web-page is needed. The previous version based on Magnolia software was not accepted by CERN because of security. Another solution will need to be found. Action Grzegorz Stefanek 5 Financial status of the experiment (Peter Seyboth, Marek) The sum of expenses in 2007 amounts to 244.6 kCHF while contributions according addendum1 is 264kCHF. Contributions from Polish and Swiss groups have been agreed by funding agencies, but not released yet, but the payment is a matter of weeks. Operations expenses planned for 2008 amount to 181 kCHF, not including the big upgrades (TPC readout and PSD). The income for 2008 according to the addendum1 is 120kCHF. To cover this, it was proposed to increase of CF contributions from 5kCHF to 7KCHF per institution. The polish groups objected since they had submitted a grant application foreseeing a contribution 5kCH per institute. It was pointed out that the cost of IT resources is very high (93 kCHF) and that other cheaper solutions could be sought. The final decision on common fund contributions was postponed pending clarification of IT resources. (Action Boris Popov to follow this up) The reduction of IT resources costs will be discussed during regular software meetings. The final decision for short and long term storage strategy will also be needed; the need for a safe repository of SHINE data at CERN was emphasized and agreed. There was a discussion concerning pool rental fee (13kCHF for 2008). We have bought 70% of the total in 2007. However maintenance costs will be unavoidable in 2008 since most electronics will belong to us. Even in 2007 plenty of electronic units are property of coll. institutions and we will have to pay for repair them from our fund. Negotiations concerning payment of CF have to remain exceptional, and be handled by the CB chair and the SHINE spokesperson in view of approval by the CB. 2008 TPC upgrade Total estimated cost was updated recently to 486 kCHF. Planned grant applications by Budapest, Swiss groups, Karlsruhe and KEK total up to 543 kCHF, although rate of success is quite uncertain. Half of the funding needs to be available by April 2008. Sandro and Zoltan pointed out that we will need money several other areas e.g. DAQ of PSD, TOF, etc. The TPC upgrade is technically on tight schedule but on track for completion in 2008. 2008 PSD expenses PSD estimated cost is 1114 kCHF with 2008 cost around 760kCHF Suggested grant application should provide enough money but they should be submitted a.s.a.p. because time is short. Moscow representative suggested that cost of APDs could be probably reduced by 20%. Marek’s general remark is that PSD is technically under control but it needs more time for production. The present status of accounts was reviewed by Peter Seyboth. FP7 application was not well received by selection board: this committee is not entitled to support data taking. Private contacts were made to appeal. This network would be very useful for travel arrangements. 6 Collaboration bylaws (prepared by Peter Seyboth, enclosed) The CB began reading of the document. The main comments were as follows: - we have to add Technical Coordinator (Detector Coordinator) in Organisation Overview paragraph because of possible conflict of interests during voting the proxy cannot be given to Spokesperson, CB chair, or their deputies. - boards were clarified by Marek, Phys. Board for data taking and publications, Detector Board which work on hardware and Software Board - A proposal by Sandro to have spokesperson election by all members of collaboration was not accepted by the Coll. Board. - Wojtek mentioned the need to clarify the membership in NA61 collaboration: the definition will be the list of NA61 authors maintained by the spokesperson. - Marcello suggested that a representative of students attend the Coll. Board. The CB endorsed this proposal. On proposal of Alain, Marcello was asked to organize this election among the students. - It was agreed that conference presentations should be send to all members of coll. at least 1 week before conference. For new results, or on request of the speaker, a rehearsal will be organized. The board agreed to reconvene on 6 November for further reading of the document 7. planning of meetings and activities Beam request in 2008 July/August 7 days acces for TPC read-out electronic installation August/Sept 5 days of beam for PSD, DCS and TPC read-out upgrade test Oct 1 – Nov 15 45 days of beam for T2K Collaboration Meetings The proposed date May 14-17 2008 at CERN, although we have to wait for final decision concerning T2K meetings. There was a proposition of 3 coll. meeting per year (Sandro suggestion) but it was not clear if that’s really needed. Peter suggested more frequent Technical Coll. meetings. There was also a proposition to organize a meeting for TPC upgrade in January/February if that not collide with QM08 and NA49 Analysis Meeting. Collaboration board meeting: Next will be 6 November 11:00 am for Further reading of Bylaws This was achieved and a new version of the Bylaws were issued. Reading of MOU Detector ownership and responsibility transfer Collaboration officers These three points were not achieved yet – we decided to report this discussion to our next meeting, 30 November 2007 14:00 EVO . Table 1 -- list of representation and proxies for the SHINE CB on 31-Oct-2007 Institute Contact Present Athens Apostolos Panagiotou Apostolos.Panagiotou@cern.ch Dieter Röhrich dieter.rohrich@fi.uib.no Antonio Ereditato Antonio.Ereditato@cern.ch X Bergen Bern U. X X Represented by Peter Seyboth Marek Gazdzicki Marcello Messina Marcello Messina Marcello.Messina@cern.ch Budapest Cape Town Cracow Gyorgy Vesztergombi veszter@rmki.kfki.hu Jean Cleymans cleymans@qgp.phy.uct.ac.za Zbigniew Majka ufmajka@cyf-kr.edu.pl X -- -- X Roman Planeta Roman Planeta JINR-Dubna Georgi Melkumov melk@mail.cern.ch X Frankfurt IKF Rainer Renfordt renfordt@ikf.uni-frankfurt.de Wolfgang Rauch Wolfgang.Rauch@cern.ch -- Alessandro Bravar Alessandro.Bravar@physics.unige.ch Ralph Engel ralph.engel@ik.fzk.de Grzegorz Stefanek Grzegorz.Stefanek@pu.kielce.pl Feodor Guber guber@al20.inr.troitsk.ru Jacques Dumarchez Jacques.Dumarchez@cern.ch In Kwon Yoo yoo@pusan.ac.kr Dimitar Kolev dkolev@phys.uni-sofia.bg Grigory Feofilov feofilov@hiex.phys.spbu.ru Roy Lacey roy.lacey@stonybrook.edu Takashi Kobayashi takashi.kobayashi@kek.jp Wiktor Peryt peryt@if.pw.edu.pl Wojtek Dominik Wojtek.Dominik@fuw.edu.pl Ewa Rondio Ewa.Rondio@fuw.edu.pl X K. Kadija kadija@joshua.irb.hr Alberto Marchionni alberto.marchionni@cern.ch Frankfurt FH Geneva U. Karlsruhe, FZ Kielce INR Moscow Paris VI-VII Pusan U. Sofia U. Saint Petersburg U. Stony Brook IPNS KEK Warsow UTech Warsaw U. Warsaw SINS Zagreb, Rudjer Boskovic Inst. Zurich ETH -- X X Michael Unger X X X Alexandr Ivashkin Blondel X Seyboth X Bravar X -- -- X Present X Present X Present X Joanna Stepaniak -- -- X Present 20/24 Missing: Frankfurt, Capetown, Stony-Brook, Zagreb Quorum 20/24 Table 2 list of tasks agreed in the end discussion of the collaboration meeting on 31-10-2007 ---------------------------------------------------------------------------------------------------Software tasks --------------------------Reconstruction chain for the 2007 data: --------------------------------------Modifications to be introduced by November 11, 2007 ................................................... -"missing" four pad-rows in the VTPC1 (probably related to the introduction of GTPC) - Zoltan -cluster finder (dipt): -commissioning of the 256/GTPC version - Grzegorz -removal of the single time slice clusters - Grzegorz -running options - Tanja -commissioning of the GTPC version - Boris -momentum fit (r3d) options (no-outlier removal, no multiple scattering for the calibration runs) - Tanja -vertex fit strategy/options (vtx) - Tanja Long term maintenance: ...................... -cluster finder (dipt) - Grzegorz -mini-clients -vdrift -bpd -tpc_errors -the rest, clean-up - -tracking (MPAT, PATREC) - Grzegorz -fitting (vtx, r3d) - Tanja -TOF-L/R - Vadim -TOF-F - Nicolas/Sebastien QA software: ------------ Tanja Toni Antoni Agnieszka -modification of OM (introduction of TOFs) - Sebastien/Nicola -root-based event display - Michael -new top-view -eye-scan version of "x3d" Software management/releases --------------------------- - Wiktor - Boris/Ferenc - Boris/Grzegorz DST production/bookkeeping -------------------------- - Boris/Sasha Sadovskyi ROOT/analysis classes --------------------- - Anselemo Simulation software ------------------- - Nicola/Sebastien Data base --------- - Tanja ------------------------------------------------------------------------------------------------------------------------------------Calibration: -----------Production needed for the successive calibration steps will be done by Boris --------------------- geometry, vdrift (ready by Nov. 18) - Tanja - magnetic field (ready by Nov. 30) - Agnieszka - residual corrections (ready by Dec. 14) - Maciek - preliminary dE/dx calibration (ready by Jan. 15) - Zoltan/Sebastien/Nicolas - TOF geometrical and tof calibrations - Vadim+... (TOF-L/R) - Nicola/Sebastien (TOF-F) (ready by April 1) - final dE/dx calibration (ready by April 1) - Nicolas/Sebastien/Zoltan - TPC point stat. errors (ready by Feb. 30) - Antoni - potential point param. (ready by Feb. 30) - Tanja --------------------------------------------------------------------------------------------------------------------------------------------Analysis: --------(first preliminary results to by ready by May 15) - cross section normalization - Claudia/Anselmo/Alberto - pions and kaons TOF/dEdx - Vadim (TOF-L/R) - Nicolas/Sebastien - Boris/Paris - pions/kaons dE/dx - pions (h- - (K-,pbar) - Michael/Florin/Magda - Tomek - K0s - Michal/Tanja