Gold Hill Mesa Proposed TND Zone and Concept Plan Project Description and Justification October 14, 2002 Gold Hill Mesa is an in-fill development opportunity at the southeast corner of US Highway 24 and 21st Street. The approximately 210 acres site formally was a gold processing facility known as the Golden Cycle Mill. The mill operated from 1906 to 1949 and processed approximately fifteen million tons of ore from Cripple Creek and Victor area gold mines. That process created tons of waste products known as mine tailings. These mine tailings are still present today on the site and present one of the challenges to its development. However, the site is still a very unique opportunity for infill within the City of Colorado Springs that can revitalize the area, create jobs, shopping, and homes within a short walk to shopping, schools, regional and local parks, and the downtown area. The development approach is one that emphasizes the pedestrian, focuses on creating community, and can meet a wide range of housing needs for the growing population. The Gold Hill Mesa property is seeking a rezoning of the currently zoned PUD and R-5 areas to be rezoned to the newly created Traditional Neighborhood Development (TND) zone district. In support of that request, a concept plan has also being submitted for review. The Gold Hill Mesa project emphasizes community by ensuring a mix of land uses and amenities are within walking distance of a majority of residents. The architecture and urban design also plays an important role in the creation of community. Front porches, human scale design, detailed streetscapes, connectivity and other elements all come together to create a quality place. Environmental Analysis: The mine tailings that are present on the site require that the development proposal take a sensitive approach. Gold Hill Mesa owners have been working with the Colorado Department of Public Health and Environment (CDPHE) in the submission and approval of a Voluntary Clean-up Application (VCUP). A VCUP is a process authorized by the State of Colorado and the Environmental Protection Agency to have landowners create a plan that would mitigate the environmental concerns for a property with known contaminants. For Gold Hill Mesa, this process has been ongoing with the initial submittal for a VCUP occurring on June 6, 2000 with additional information being given to CDPHE on August 30, 2000, June 12, 2002, and September 10, 2002. Copies of these submittals have been included with our applications. A Geologic Hazard Evaluation has also been submitted for your review. This report follows the standard City format and has also been coordinated with the VCUP application. Gold Hill Mesa Project Description and Justification Land Use Analysis: The focus of the project is to create a village that is walkable by the residents and provides a unique neighborhood character. The result of this vision actually created two distinct areas: the commercial / mixed-use village near the intersection of US Highway 24 and 21st Street and a primarily residential village on top of the mesa focused along Lower Gold Camp Road/Fountain Boulevard. Residential Areas: As an urban area in-fill site, the proposed development responds to the proximity to downtown with a variety of housing types in an urban, pedestrian oriented pattern. Interconnected streets and land uses allow for a sensitive design that incorporates 1,800 dwelling units into the entire 210-acre site. Housing types range from apartments over retail and offices uses, multi-family apartments and lofts, rowhouses / townhomes, duplexes and triplexes, and single family detached homes. The neighborhoods are further focused on pocket parks and open space that provide recreational opportunities and are linked with other parks throughout the project and the area. Parks and Open Space: Thirty-two acres of parks and open space are provided on the site. A swath of open space is provided along Fountain Creek, which parallels US Highway 24. The open space creates a trail link opportunity with the proposed Midland Trail and the rest of the trail network of the City. This site also presents an opportunity for pedestrian movement through the project to Bear Creek Regional Park and Gold Camp Neighborhood Park. A central park is located in the center of the residential area on the Gold Hill Mesa property. This 3.8-acre park anchors the small community center and commercial area providing focus for the residential area on top of the mesa. Small pocket parks provide additional focus for the individual neighborhoods. Open space trail tracts link all of these parks together providing a multitude connection. Access through the open space surrounding the smoke stack links the residential neighborhoods to the commercial village in the northwest corner of the site. Streets: With the TND Zone District are street standards and cross-sections that are consistent with this style of development. Narrower widths, parking along the sides, detached sidewalks, and interconnectedness are important to success of traditional neighborhoods. Gold Hill Mesa allows for all of these elements to come together to create this pedestrian friendly environment. Two primary access points are proposed from 21st Street at Broadway Street and Villa de Mesa Drive. Additional access points are proposed from 21st Street at other locations. Two primary access points are also proposed from Lower Gold Camp Road/Fountain Boulevard with other access as permitted. Access from US Highway 24 is also proposed at 14th Street. By having access at 14th Street, some of the pressure that exists today and with the future development of Gold Hill Mesa could use an alternate route to US 24. Page 2 of 3 Gold Hill Mesa Project Description and Justification Architecture and Urban Design: The architecture proposed for Gold Hill Mesa is traditional in its design allowing for a wide variety of styles while reinforcing the overall design characteristics of the project. Design character sketches and images are provided that illustrate the intent of the housing types. The architecture reinforces the streetscapes on the project and establishes a sense of place. The existing smoke stack will be preserved in order to provide a glimpse of the previous life of the site and the history of the area. Signage and lighting will be consistent with the architectural character of the project and will be detailed with future development plans. Commercial Village: The Commercial Village located at US Highway 24 and 21st Street is a mixed-use center with a wide array of shopping, office, and residential uses. Retail uses anticipated might included a grocery store, restaurants, book stores, a hotel, a movie theater, many small retail outlets, and potentially a larger store for regional shopping opportunities. Offices and other employment opportunities are expected in this village center as well. Several types of residential uses are also proposed ranging from apartments over retail and office space, live-work units, rowhouses, and apartments. This mix will create a dynamic village area with a true sense of community. The following reports and supporting documents are also provided for review and comment: Traffic Report Drainage Report Geologic Hazard Analysis Voluntary Clean-up Application to CDPHE Master Utility Plan Conceptual Grading Plan \\Server\Projects\Gold Hill\Gold Hill\Admin\Applications\GHM description.doc Page 3 of 3