BSC Mechanics Alan Bell, Rob Knegjens & Mark Hashimoto PMT Box Positions & Mounting • Proposed position of PMT boxes…. • Brackets need to allow some movement for alignment with magnetic field BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 2 PMT Box brackets - proposal Coordinates: X = 1.3m-1.7m Y = 1.4m-1.7m Z = 11.3m-12.3m Will place PMTs in a B field of 100 – 170Gauss* ~ < 1° * * based on simulations BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 3 PMT box volume magnetic field BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 4 PMT Box Modifications - proposal • ‘Cables’ in per box… – – – • Optical fibres LED drive RG58 coax cable x 1 HV Cable ‘Cables’ out per box… – RG58 coaxial signal cables x 9 Radial HV connector 10 x BNC connectors on opposite face for signal outs & LED drive in Optical fiber bundles BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 5 HF Grooves – seeking approval • • • Minimum acceptable bending radius of fibers = 60mm. Dmitry’s drawings based on 80mm radius. Allows pairs of optical fiber groups to exit HF face separated spatially. – • • Cherenkov radiation concerns Is 10cm separation enough? What particles/jets do we expect in this region (z = ±10.9m)? BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 6 Other tasks • Once PMT box positions have been approved by BRM group… – Get clearance from HF Group – Write up detailed work package & present to Martin Gastal – Accurately measure optical fiber lengths required and prepare fibers for installation – Calculate Nitrogen pipe lengths & paths. Order pipe & fittings from Christoph Schaefer – Detailed path of cable (pipe) trays submitted to Martin Gastal – Lay extra HV cable on nearside of HF via HF cable tray – STILL going round in circles with Radiall connectors. CERN Stores and Precimation (Suisse) are not communicating. – Contacting Precimation France. BSC Mechanics - Alan Bell. Mark Hashimoto, Rob Knegjens 7