GRID OPTIMIZATION OF BORROW PIT METHOD FOR MINING CUT VOLUME CALCULATION Student Name NRP Study Program Directors : : : : Muhammad Iqbal Arifin 3504100052 Geomatic Engineering FTSP-ITS 1. Danar Guruh ST, MT 2. Khomsin ST, MT Abstract Mine coal is a kind of work field that has close relation with volume calculation. Volume calculation is very necessary to define, because it related with total mine cut volume and total coal volume that has take away. Therefore, it needs to determine volume calculation with the best method. In this final project, volume calculation method that used is Borrow Pit method. Volume calculated at two different segments. Data processed by Surpac Vission, Autodesk Land Desktop 2004 and Borrow Pit method. At Borrow Pit method, data processed with various grid size to determine the best result for calculating and measuring mine cut volume. The result shows that 5 m is the most optimal of grid size for calculating mine cut volume. For measuring mine cut volume, the most optimal of grid size will depend on the characteristics of topography that measured. Key Words: Optimization, Borrow Pit, Volume v