AGENDA MAY 16, 2013 STATE BOARD MEETING JAMES MONROE BUILDING RICHMOND, VIRGINIA TITLE: VIRGINIA COMMUNITY COLLEGE SYSTEM APPROVAL OF 2014-20 SIX YEAR CAPITAL OUTLAY PLAN (III.C.2.a.) BACKGROUND: Each agency and institution of higher education is required to submit a six-year capital outlay plan to the Governor, with updates made to the plan every other year. The first biennium of the plan is the official capital outlay budget request for the institution. The second and third biennium plans are for planning purposes for both the institution as well as the Governor, and serve as a long-term statement of needs. In 2008, the General Assembly passed legislation revising the process for requesting and approving capital projects. The process is designed to improve long-term planning, provide a reliable source of funding for capital outlay needs, and improve budget estimating for projects. The approved legislation requires the Governor to submit updated six-year capital plans each biennium to the General Assembly. It is anticipated that prior to the end of April, the Department of Planning and Budget will issue instructions for submission of updated agency and institution six-year capital outlay plans for consideration in the Governor’s 2014-16 budget, with a May due date. The colleges submitted updated requests for renovation, new construction, and maintenance reserve funding for the 2014-20 six-year planning cycle. The requests have been analyzed by staff and a comprehensive statement of needs has been developed for State Board review and approval. ANALYSIS: The prioritization and six-year plan have been developed based on the following guidance from the State Board: For new construction projects: Requests for new space were required to be space guideline justified in the biennium in which they were recommended. Enrollment was based on the updated three-year annualized growth rate for the specific colleges, a zero rate for colleges with declining enrollments, or where warranted a higher rate for colleges that demonstrated reliable data supporting increased demographic trend data. Achieve 2015 Take Two and Top Jobs 21 priorities were also used as a component of the review and recommendation of priorities. New construction requests with high space needs and justification were prioritized ahead of renovation projects (focus on providing access), and requests for instructional space were considered ahead of administrative support space needs (focus on instruction and learning). Workforce development facilities, when justified, placed high in the priorities as well. 138 For renovation projects: The Facilities Condition Index was one component of setting renovation project priorities. Projects with significant components related to continued operation of the facility, such as heating and cooling systems, electrical systems, and plumbing systems, were placed in higher priorities than requests for aesthetic purposes. Projects for updating laboratories and other instructional facilities, particularly those with large space deficits, were also recommended as higher priorities over projects related to administrative space improvements. Requests submitted by the colleges were reviewed to ensure adequate funding was requested for the BCOM fees, project management costs, inflation, testing, and, when appropriate, asbestos abatement. The projects costs were analyzed against historical cost trends to determine cost reasonableness. Also included are debt financed non-general fund projects that require General Assembly approval to issue debt. Financial feasibility studies for projects requesting debt service issuance in the first biennium have been reviewed for reasonableness and will be submitted to SCHEV in August, 2013. If approved by the General Assembly, approval of the State Board will be required for any student fee increases to service debt payments. This approval process would apply to parking decks, student unions, housing, and any other projects with student fee implications. Top 25 Projects: In order to better advocate for capital funding needs across the VCCS, a listing of the top 25 projects can be presented to outside stakeholders (money committee staff, Council of Presidents, etc.) to convey a comprehensive understanding of system-wide capital resource needs during the budget development and approval process. The “Top 25” project listing includes the following: A new science building on the Chesapeake Campus of Tidewater Community College to address enrollment growth, access, and STEM education. Replacement of original 1970s-era “prototype” buildings that have exceeded their useful lives at Eastern Shore (currently funded as a renovation project) Germanna, and Thomas Nelson Community Colleges. The construction of a dedicated distance learning education support facility at Northern Virginia Community College. The development of an integrated advanced manufacturing design, production and credentialing center at New River Community College. The potential expansion of educational programs in regions impacted by changing demographic growth and demands at Northern Virginia Community College. It is anticipated that DPB will require only the 2014-16 biennium requests to be submitted for consideration for inclusion in the Governor’ budget and the Commonwealth’s capital implementation plan. Attached for your review is a prioritized list of space- and program-justified projects for the 2014-16 biennium with a total 139 estimated value of $XXXXXXXX. The total estimated value of all projects for the 201420 six year capital planning period is $XX billion. However, final budgets will not be established until projects are funded and budgets agreed to by the Commonwealth’s Six-Year Capital Outlay Plan Advisory Committee. Maintenance Reserve Projects: In addition to capital project requests, the colleges also requested projects to add to the VCCS maintenance reserve plan in 2014-16. A maintenance reserve project is a major repair to or replacement of plant, property, or equipment that is intended to extend its useful life. Each maintenance reserve project usually costs between $25,000 and $1 million. It is anticipated that up to $20 million in new maintenance reserve requests will be submitted to DPB for validation. However, validation by DPB does not constitute a funding commitment from the General Assembly. RECOMMENDATION: It is recommended that the State Board for Community Colleges approve the proposed VCCS 2014-20 Six-Year Capital Outlay Plan list of projects and authorize the Chancellor, or his designee, to make necessary adjustments to project scopes, budgets, and justifications to ensure a compliant and complete submission to the Department of Planning and Budget, including any necessary follow up and revisions. Any significant changes as a result of DPB review shall be reported to the State Board. RESOURCE PERSONS: Ms. Donna VanCleave Vice Chancellor for Administrative Services (804) 819-4695 dvancleave@vccs.edu Mr. Bert Jones Associate Vice Chancellor for Facilities Management Services (804) 819-4906 bjones@vccs.edu Mr. William M. Johnson Assistant Vice Chancellor for Budget and Planning Services (804) 819-4912 wjohnson@vccs.edu 140 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description Construct a 76,000 gross square feet academic building on the Chesapeake Campus to support instruction in the science and engineering disciplines. This project will respond to current and future enrollment demands by providing contemporary science laboratories, preparation rooms, and offices for Chemistry, Biology, Natural Sciences, Geology, and Physics curricula. In addition, the project will provide much needed space for the campus’ Engineering and Engineering Technologies curricula. 2014-16 TCC-C 1 New Construction Construct Science and Engineering Building (CN6) 2014-16 ESCC 2 ImprovementsInfrastructure Repairs 2014-16 NVCC-W 3 ImprovementsInfrastructure Repairs Replace Phase I, Academic and Administration Construct a 47,000 gross square feet building to replace main Academic and Administration Building. The replacement building will have Building modernized classrooms and science and technical laboratories, and will provide continued access to higher education services for the Northampton and Accomack communities of the Eastern Shore in support of increased degree completions especially in the STEM areas. The existing 42,843 gross square feet building was completed in 1974, and although minor alterations of selected areas of the existing building have been completed over the years, neither extensive nor major renovations have been completed to comply with current building codes and standards. Renovate Seefeldt Building and Replace Renovate the Seefeldt Building and replace the building envelope. The renovation is intended to be an in-kind renovation and replacement Building Envelope of existing facilities. This project will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework, and replacement of all major building components. The Seefeldt Building, totaling 141,465 gross square feet, was constructed in two phases in 1978 and 1990. The building envelope for Phase I construction is stucco on metal studs, and the building envelope for Phase II construction is Exterior Insulation and Finish Systems (EIFS) wall panels. 2014-16 CVCC 4 ImprovementsInfrastructure Repairs Renovate Amherst and Campbell Hall Renovate 54,042 gross square feet in Amherst Hall (1968) and 19,550 gross square feet in Campbell Hall (1975) to improve existing building systems and reconfigure interior spaces to support modern academic classrooms, science laboratories, and faculty offices. The renovation will repurpose the existing space to better meet enrollment demands for higher education access in the Central Virginia community college service region. This project will address ADA Accessibility and Life Safety Code compliance issues, upgrade building system components, and provide better utilization of the available space for classrooms, labs, and faculty offices. 2014-16 TNCC-H 5 ImprovementsInfrastructure Repairs Replace Diggs, Harrison, and Moore Halls 2014-16 VHCC 6 ImprovementsOther Renovate Library and Learning Resource Center 2014-16 VCCS 7 Improvements-Life Umbrella Request: Improve Life Safety Safety Code Systems Replace 60,181 gross square feet in Diggs, Moore, and Harrison Halls on its Hampton Campus. The current systems such as plumbing, HVAC, electrical, fire alarm, roof, wall and floor systems, finishes, ceilings, flooring, casework and all major building components are all well past their expected life cycle and require replacement. Given the age and condition of the existing building, demolition of existing facility is the most financially beneficial solution. New construction will allow for a building that fully meets all new codes and requirements including, energy codes, accessibility codes and design standards which are particularly difficult to meet when renovating one of these original community college buildings. Renovate 39,540 gross square feet in the library and learning resource center. This project will improve existing life safety, HVAC systems, and interior finishes and fixtures, and will extend the useful life of the building, allowing the college to better meet the demands for higher education access in the Virginia Highlands community college service region. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. Classrooms are currently used primarily for the Health Information Systems Certificate Program, the AAS in Computer Information Technology, as well as math and nursing courses. Capital umbrella request to improve life safety systems at various colleges, including but not necessarily limited to Dabney S. Lancaster, Mountain Empire and New River Community Colleges. Projects include the installation of sprinklers to non-sprinklered buildings, relocation of fire sprinkler pumps and upgrades to fire alarm enunciation and monitoring systems. 2014-16 VCCS 8 ImprovementsEnergy Efficiency Umbrella Request: Improve Major Mechanical Capital umbrella request to improve heating, ventilation and air conditioning systems at various colleges, including but not necessarily Systems limited to Mountain Empire and Virginia Western Community Colleges. Projects include major improvements to existing mechanical, electrical and plumbing systems, extending connections to central plant systems, and the replacement of aged hydronic piping systems between campus buildings. VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 1 of 11 141 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description Replace 65,000 gross square feet D. French Slaughter Building at the Locust Grove Campus. The current systems such as plumbing, HVAC, electrical, fire alarm, roof, wall and floor systems, finishes, ceilings, flooring, casework and all major building components are all well past their expected life cycle and require replacement. Given the age and condition of the existing building, demolition of existing facility is the most financially beneficial solution. New construction will allow for a building that fully meets all new codes and requirements including, energy codes, accessibility codes and design standards which are particularly difficult to meet when renovating one of these original community college buildings. Renovate 37,400 gross square feet in Buchanan Hall (1968) and 33,000 gross square feet in Tazewell Hall (1975). This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. 2014-16 GCC-LG 9 ImprovementsOther Replace Locust Grove Campus Building 2014-16 SWVCC 10 ImprovementsOther Renovate Buchanan and Tazewell Halls 2014-16 TCC-VB 11 ImprovementsOther Renovate and Expand Princess Anne Building 2014-16 NVCC-M 12 New Construction Construct Extended Learning Support Building Construct or acquire through capital lease a 75,000 gross square feet facility to house distance education infrastructure and offices, including large server rooms and learning assessment centers, for the Extended Learning Institute (ELI). Space is needed for extensive ELI testing centers; other support functions such as internship, co-op, and career placement centers; and administrative services for the Adult Career Pathway program, as well as dual enrollment functions. 2014-16 NRCC 13 ImprovementsOther Construct/Renovate Rooker Hall for Advanced Construct a 53,000 gross square foot addition to Rooker Hall to create an Advanced Manufacturing and Credentialing Center for both Manufacturing and Credentialing Center integrated and focused education, training and credentialing. This project will also provide for the renovation of 12,600 gross square feet (AMCC) of existing space in Rooker Hall. The Center will relocate and expand into contiguous spaces for the critical programs of automotive technology, instrumentation and control automation, welding, machining technology, CADD, and simulation technologies. Included in the Center will be critical lab spaces that are shared by these programs and the Workforce Development Division of the College. 2014-16 JTCC-C 14 2014-16 NVCC-M 15 2014-16 PVCC 16 Renovate and expand the Princess Anne Building on the Virginia Beach Campus. This project will add approximately 13,000 gross square feet to the existing building, for a total of 36,800 gross square feet. This project will provide additional space for classrooms and college support services, and will retrofit existing business office space to serve other purposes. Renovate Bird Hall and Nicholas Center and Construct Addition to Nicolas Center Renovate 37,350 gross square feet in Bird Hall and 26,000 gross square fee in Nicholas Center and construct a 20,000 gross square feet addition to Nicholas Center to improve programmatic function, increase classroom and class lab utilization, and enhance the quality of academic, administration, and public service facilities the Chester Campus. ImprovementsInfrastructure Repairs Renovate Howsman, Colgan, and Power Tech (MT) Buildings Renovate 127,500 gross square feet in Howsman (1980), Colgan Hall (2002) and 39 year old Power Technology (MT) building to provide modern general purpose academic instruction and support spaces. The renovation will improve existing library, computer labs, classroom, science, automotive technology and vocational specialty labs to better meet enrollment demands for higher education access in the Northern Virginia region. New Construction Construct Student Success & Learning Resources Center Construct a 45,000 gross square feet one-stop student success and learning resource center. All student support functions, including registrar, admissions, financial aid, career services, advising, counseling, testing, student organizations, bookstore, dining and lounge, and a large multi-purpose room would be housed in the facility along with the learning resource center. Space for student organizations is currently non-existent. Also, there is no community space (student union) for students to gather. An information commons model will be used with this project, which will provide a pedagogically-designed and student-centered environment that promotes active learning and collaboration, which are integral keys to student success VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 2 of 11 142 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description 2014-16 BRCC 17 ImprovementsOther Renovate Houff Student Center Renovate 15,000 gross square feet of the Houff Student Center to create space for student services operations. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. The project will provide increased Library study space, an expanded tutoring center, an expanded testing center, and a renovated cafeteria servery. 2014-16 PHCC 18 ImprovementsOther Renovate A.L. Philpott Technical Center Renovate A. L. Philpott Technical Center (1985, with an addition in 1995). This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. Currently, classrooms, labs, and offices for Applied Science and Engineering Technology programs are housed in the building. 2014-16 VWCC 19 ImprovementsInfrastructure Repairs Renovate Brown Library to Learning Resource Renovate Brown Library (1969). This project will reconfigure and reprogram the library to a modern, high tech, electronic media and Center learning resource center for students. Renovations would enable the college to combine its library, distance learning, instructional technology, media services, and learning resource functions into a modern learning commons. 2014-16 PDCCC-F 20 Improvements-Life Renovate and Enhance Franklin Campus Safety Code Renovate 53,107 gross square feet in the only higher education academic instructional building on the Franklin Campus. This project will modernize existing classrooms, science and technical laboratories to extend the life of the building. The renovation will extend the useful life of the building and will improve life safety and building support systems to better meet enrollment demands for higher education in Franklin county. 2014-16 NVCC-AL 21 New Construction Construct Phase IV Academic Building & Demolish Old Tyler Academic Building Construct a 70,000 gross square feet Phase IV general academic building on the Alexandria Campus and demolish the Tyler Academic Building (1960). This project will include constructing classroom, computer lab, and faculty office spaces. The Tyler Building is a former elementary school building acquired from the City of Alexandria in 1981 that was adapted for use as an academic building. Upon completion of the Tyler Building Replacement project, authorized in the 2008-2010 Biennium and scheduled for completion in 2014, the existing Tyler Building will be torn down. 2014-16 DSLCC 22 Acquisition Study and Acquire Lexington Area STEM-H Facility Conduct study and then acquire (through capital lease or alternative financing) a new center to serve the residents of Lexington, Buena Vista, Rockbridge County and northeastern Botetourt County. The most growth in population is occurring in this part of the DSLCC service area. The college seeks to expand offerings in program areas based in science, technology, engineering, mathematics, and healthcare, commonly referred to as “STEM-H”. 2014-16 TCC-VB 23 New Construction Construct New Academic Building Engineering and Applied Technologies Construct a 60,000 gross square feet academic building to support instruction in emerging technologies and the core academic disciplines on the Virginia Beach Campus. This project will accommodate classrooms and labs for emerging technologies such as bio-informatics, simulation and medical equipment repair, geospatial technologies, and metrology & sensor technologies. It will also provide classrooms for the core courses in general education, computer labs, and faculty offices. 2014-16 NVCC-L 24 Acquisition Acquire Property, Western Loudoun County Campus Acquire approximately 50 acres in Western Loudoun County on which to construct a new campus in one of the fastest growing suburban areas in the United States. This growth is reflected in the rapid increase in enrollment at the Loudoun Campus, located in the eastern portion of the county. The College has no presence west of the Loudoun Campus. In order to provide services to the residents of the western areas, and to relieve pressure on the current Loudoun Campus, it is necessary to construct a new campus in an area proximate to Leesburg. VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 3 of 11 143 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description 2014-16 PHCC 25 ImprovementsOther Renovate Stone Hall Building Renovate 31,517 gross square feet in Stone Hall (1974) to include improvements to classrooms, faculty offices and a large multipurpose room. The renovation will improve ADA accessibility, fire and life safety systems and building heating, ventilation and air conditioning systems. The project will extend the useful life of the building to meet the demands for higher education access in the Patrick Henry service region. 2014-16 RCC 26 ImprovementsEnergy Efficiency Renovate Academic/Administration Building Phase II Renovate select areas within the existing 108,800 gross square feet academic and administrative building complexes on both the Warsaw and Glenns campuses. This will constitute Phase II of a comprehensive renovation and revitalization of the existing campus and will include replacement of the existing roof and improvements to building HVAC systems. The project will extend the useful life of the campuses and ensure continued access to higher education services for the Northern Neck. 2014-16 WCC 27 ImprovementsInfrastructure Repairs Renovate and Expand Fincastle Hall Renovate and expand Fincastle Hall (1968) to improve existing academic classrooms, nursing and science laboratories and improve building support systems. The 22,000 gross square feet addition will house state of technology laboratory spaces for biology, chemistry, nursing simulation, medical tech/respiratory therapy, radiography and physical therapy and a dedicated Workforce Development Center. The renovation will extend the useful life of the building and will improve life safety and building support systems to better meet enrollment demands for higher education in the Wytheville community college service region. 2014-16 PVCC 28 New Construction Renovate and Construct Addition: Workforce Development Center Renovate the existing 10,000 gross square feet building and construct an 11,000 gross square feet expansion of the Stultz Workforce Center for Business and Career Development. The design of the building will be to accommodate flexible space for industrial programs, community space that can be used for conferences and converted into classrooms, and an advanced computer lab specially designed for the Intelligence Community. 2014-16 VWCC 29 ImprovementsInfrastructure Repairs Renovate Business Science Building Renovate the 44,300 square foot 3-story Business Science building constructed in 1988 that houses computer labs, distance learning classrooms, business technology classrooms, the college's centralized server and network hub supporting internet technology services, mission critical technology labs, an auditorium, and small campus food court. A full renovation would improve adjacency and technology in academic program space for these high tech studies. 2014-16 TCC-C 30 New Construction Construct Library/Student Services Center 2014-16 VWCC 31 ImprovementsInfrastructure Repairs 2014-16 NVCC-AL 32 Acquisition Construct a 75,000 gross square feet building to accommodate a new Library and Student Services Center on the Chesapeake Campus. In addition, this project will provide handicapped accessible space, and new technology in electronic media (open computer labs, interactive labs, and study areas). A significant portion of the building with be a Student Services area that provides a “one-stop” approach for Enrollment & Records, Financial Aid, Counseling & Advising, Business Office, etc. The expansion will allow the campus to better serve the current 16,000 annual students and future enrollment growth. This project is program justified and is a significant component of the campus master plan and the college’s “shared vision” developed with the City of Chesapeake. Renovate Fishburn Hall Renovate 26,200 gross square feet in Fishburn Hall (1968) main administration building. Currently the building houses offices for human resources, the foundation, marketing, workforce development, accounting, payroll, institutional effectiveness, vice president for financial services, vice president for academic affairs, and the college president. The adjacencies of these functions in the existing building are poor and do not enhance productivity. Except for minor cosmetic improvements the building has not been renovated. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. Acquire Capital Lease for Administrative Office Acquire capital lease for 95,000 gross square feet of office space to house the staff of the Brault Building (recently vacated for major Support Space renovation), the Pitney Bowes Rental Space, and other offices and facilities housed in rental space near the Annandale Campus. Due to academic programmatic needs most administrative staff previously housed in Brault will not be returning to the building, and need to be housed elsewhere, as do other staff currently in rental space. VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 4 of 11 144 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description 2014-16 SWVCC 33 ImprovementsOther Renovate Davis Hall Renovate 45,536 gross square feet in Davis Hall (1988), which is the Mining Engineering Building. This project will include an upgrade of the teaching laboratories, classrooms, and support space needed to provide modern state of technology instruction to students. Renovations of classrooms will encompass the "smart classroom" concept that will allow students and faculty to take advantage of new teaching methods and technologies. The existing high-bay room presently used for diesel engine repair may have a second floor added to reclaim unused existing volume to provide 4,750 square feet of additional classroom space. 2014-16 TCC-VB 34 New Construction Construct Regional Workforce Development Center Construct a 75,000 gross square feet Regional Workforce Development Center on the Virginia Beach Campus to accommodate classrooms, laboratories, seminar rooms, and specialized training spaces in support of efforts to provide a better-trained labor force in the Hampton Roads region. Approximately 10,000 square feet of the facility would be used to provide purpose-built space for an executive conference center, a type of facility that does not exist in this part of Virginia Beach. 2014-16 LFCC-M 35 New Construction Construct STEM-H Academic Building, Main Campus Construct a 40,000 gross square feet STEM-H academic instruction building on the Middletown Campus to accommodate the rapid growth the college has experienced in the past four years and allow for the expansion or creation of programs in the STEM-H areas. 2014-16 TNCC-H 36 New Construction Construct Academic Student Services Building Construct a 70,000 gross square feet academic student services building to house classrooms, offices, gathering spaces, food service, book store, registration, financial aid, testing, and a 300-seat seminar/multi-purpose room. All administrative support, academic support, student support, veterans support, student activities, auxiliary services, dining, book store, and a large gathering area will be included to create a true one stop shop for students. 2014-16 PVCC 37 ImprovementsOther Renovate Main Academic Building Renovate 16,000 gross square feet in the main academic building. This project will follow the construction of a proposed new Student Success and Learning Resource Center and will involve the conversion of vacated student services and auxiliaries program space and the current learning resource center to primarily instructional space. 2014-16 VHCC 38 ImprovementsInfrastructure Repairs Renovate Occupational Technical Building Renovate 21,789 gross square feet in the Occupational Technical Building (1994). The existing building has a 2-pipe HVAC system, which must either heat or cool the entire building. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. 2014-16 JSRCC-V 39 New Construction Acquire/Construct New Varina Campus J. Sargeant Reynolds Community college proposes the establishment of new campus center in the Varina District of Henrico County. The initial development would include construction of a Phase-1 academic building(80,000 gross square feet) and an associated central plant facility (15,00 gross square feet). Initial development will include a 80,000 GSF, multi-story academic building will support STEM learning, including biology and chemistry labs, as well as general education class rooms, academic support (including faculty and administrative offices) to support delivery of academic instruction at the center. 2014-16 SSVCC-D 40 ImprovementsInfrastructure Repairs Renovate Vacated Student Services/LRC Space- Renovate the existing Learning Resource and Student Service space vacated by the construction of the new LRC Building into faculty and Main Building classroom space. Convert the LRC into a Nursing Lab and a Cosmetology Lab. Convert the student lounge area into a student-learning lab and a bookstore. Convert the Drafting/CAD Lab into a general-purpose classroom. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 5 of 11 145 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description 2014-16 TCC-C 41 ImprovementsOther Renovate/Retrofit Pass Building Renovate 52,275 gross square feet in the Pass Building on the Chesapeake Campus. This project will renovate/retrofit existing classrooms, laboratories, and faculty offices. The renovation will allow the campus to better serve the current 16,000 annual students and future enrollment growth. 2014-16 TCC-N 42 ImprovementsOther Renovate Walker Building Renovate 45,000 gross square feet in the Walker Building on the Norfolk Campus. This project will expand the college’s Culinary Arts Program by renovating/retrofitting existing classrooms, laboratories, preparation & support spaces, and offices that support the program, and improve classroom usage and efficiency for the Norfolk Campus. 2014-16 BRCC 43 New Construction Construct Alternative Energies Programs Building Construct a 40,000 gross square feet academic building to house instructional space for alternative energy workforce needs. The scope includes modernized facilities to support existing programs like Automotive Technologies and Information Systems Technologies, as well as emerging transfer oriented disciplines and programs such as wind technology, alternative fuel development technologies, agricultural engineering related technologies and general purpose classrooms and specialized laboratories. 2014-16 NVCC-M 44 New Construction Construct STEM Academic Building Construct a 60,000 gross square feet general academic building on the Manassas campus. The Manassas Phase IV building will house classrooms, labs, and offices. The facility will support the expansion of the science, technology, engineering and mathematics initiative. This is consistent with the mission of the Manassas Campus, which is geared towards high technology. 2014-16 TCC-P 45 New Construction Construct Academic Building for Building Technologies and Visual Arts Center Construct a 60,000 square-foot academic building to support instruction in visual arts, building technologies and other technologies on the Portsmouth Campus. This project will accommodate classrooms and labs for renewable and alternative energy technologies, modeling & simulation, and commercial & residential construction. It will also provide classrooms and studios for the core courses in the 2D and 3D visual arts. 2014-16 JTCC-C 46 Renovate and Expand Facilities/Warehouse Building Renovate and expand existing 4,800 gross square feet in facilities operations and central receiving/warehouse facilities on the Chester Campus. This project will add approximately 5,200 gross square feet to the existing building, for a total of 10,000 gross square feet and will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. 2014-16 SSVCC-C 47 ImprovementsInfrastructure Repairs 2014-16 VHCC 48 ImprovementsOther Renovate Vacated Student Services/LRC Space- Convert the vacated learning resource center and student service area into classroom, lab space, faculty offices and expanded bookstore Main Building space. The Learning Resource Center would be converted to a nursing lab and the current nursing lab, Room C-11, would be converted into a chemistry lab, which is now combined with a biology lab. The student lounge area would be converted into a tutoring center and an expanded bookstore. The current bookstore space would be converted to faculty offices. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. Renovate Mechanical Technology Building Renovate 12,890 gross square feet in the Mechanical Education Building (1970). Currently, the building houses the machine shop, classrooms for math and music, as well as the central mechanical plant for the three original buildings. Electrical and HVAC systems were upgraded about six years ago. VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 6 of 11 146 VCCS 2014-20 Six-Year Capital Outlay Plan State Board for Community Colleges Prioritization 2014-16 Biennium Biennium College Proposed Project Type Priority Capital Project Description Renovate 20,000 gross square feet in Russell Hall to provide space to meet student and community service needs in the Health Technologies programs. This project will renovate space for biology, chemistry, physics, and anatomy labs, classrooms, and faculty office space and will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. 2014-16 SWVCC 49 ImprovementsOther Renovate Russell Hall 2014-16 TCC-N 50 New Construction Construct New Library/Student Services Center Construct a 75,000 gross square feet building to accommodate a new Library and Student Services Center on the Norfolk Campus. In addition, this project provides for handicapped accessible space, and new technology in electronic media (open computer labs, interactive labs, and study areas)academic support spaces, and academic support offices to support existing and projected enrollments. Also, the project will provide space for “one-stop” student services including Enrollment & Records, Financial Aid, Counseling & Advising, Business Office, etc. 2014-16 NVCC-AL 51 ImprovementsInfrastructure Repairs Renovate Bisdorf Phase II w/Student Success Center Renovate Bisdorf Phase II (1980). The building systems and interiors are at the end of their useful lives. The renovation will consist of rehabilitation of classrooms, offices, labs and mechanical and electrical systems. This project will be a comprehensive renovation that will include reconfiguration and modernization of all spaces, new finishes, ceilings, flooring, casework and replacement of all major building components. This project will also construct a 60,000 gross square feet Student Success Center behind the Phase II renovation project, linking the two buildings together. It will house offices, classrooms, assembly spaces and other space for student activities. 2014-16 JTCC-C 52 New Construction Chester Campus Parking Deck Construct a 350-parking space, three-level parking structure on the Chester Campus. The structure will serve the parking needs associated with the construction of the Science Building project and the addition to the Nicholas Center. The parking structure will not be built until at least one of these building construction projects is approved and funded. Revenues to build this structure will be generated by a proposed increase in the student parking fee. 2014-16 JSRCC-G 53 New Construction Construct Automotive Storage Building Construct a 4,800 square foot pre-engineered metal automotive storage building on the Western (Goochland) Campus. This preengineered metal building will be designed as required to meet the needs of the college. 2014-16 JSRCC-D 54 Acquisition Acquire Lease/Purchase Option (Biotech Parking Garage) Acquire lease/purchase of two (2) levels of parking (or 149 parking spaces) within the Biotech 8 - Parking Garage at the conclusion of a ten (10) year lease. This will provide the college with guaranteed supplemental parking to meet the demands of increased student enrollment figures. 2014-16 BRCC 55 New Construction Construct Parking Garage Construct a 207-parking space parking deck and an adjacent 36-parking space parking lot on the Weyers Cave Campus. The college is a 65acre landlocked campus with privately owned property to the North and South, Interstate Highway 81 to the East, and U.S. Route 11 to the West. Required student parking can be accommodated by continuing to pave over large tracts of the college's property or building a parking garage that takes better advantage of the footprint of the acreage used for this purpose. 55 $1,166,394,100 VCCS 2014-20 Six-Year Capital Outlay Plan 2014-16 Biennium State Board for Community Colleges Prioritization Page 7 of 11 147 VCCS 2014-20 Six-Year Capital Outlay Plan Capital Projects by College 2016-18 Biennium Biennium College Capital Project 2016-18 BRCC Construct Business Programs Building 2016-18 BRCC Construct Parking Lot 2016-18 CVCC Construct Allied Health Center 2016-18 GCC-F Construct Phase I Stafford County 2016-18 GCC-F Construct Phase 1 Parking Garage Stafford Site 2016-18 GCC-F Construct Academic Building IV and Maintenance Building Fredericksburg Area Campus 2016-18 GCC-F Construct Phase IV Parking Garage Fredericksburg Campus 2016-18 JSRCC-P Construct New Academic (STEM) Building 2016-18 JSRCC-P Construct Warehouse 2016-18 JSRCC-P Construct Parking Structure I 2016-18 JTCC-C Construct Chester Campus Science Building 2016-18 JTCC-M Renovate and Expand Midlothian Facilities/Warehouse Building 2016-18 LFCC-F Construct STEM-H Academic Building FC 2016-18 LFCC-F Construct Maintenance Facility FC 2016-18 MECC Construct New Learning Resources Center and Renovate Robb Hall 2016-18 MECC Construct Covered Walkway 2016-18 NRCC Construct Amphitheater 2016-18 NRCC Renovate Martin Hall, One -Stop-Shop 2016-18 NRCC Construct Pre-Engineered Metal Building 2016-18 NRCC Construct Covered Walkways 2016-18 NVCC-AL Create Arlington Center with Arlington County Schools 2016-18 NVCC-AL Construct AL Support Services Building 2016-18 NVCC-AL Repair Dawes Avenue Parking Deck 2016-18 NVCC-AL Renovate Bisdorf I 2016-18 NVCC-AN Renovate and Expand Warehouse 2016-18 NVCC-AN Renovate CT Academic Building 2016-18 NVCC-AN Renovate CC Academic Building 2016-18 NVCC-L Construct LO Phase IV Academic Building 2016-18 NVCC-L Construct Support Services Building 2016-18 NVCC-L Construct Workforce Development Center 2016-18 NVCC-L Acquire Land for a New Campus 2016-18 NVCC-L Construct Phase I, New Campus 2016-18 RCC-G Construct Science Technology Engineering Math Academic Building 2016-18 RCC-W Construct Student Commons Building 2016-18 SWVCC Renovate King Community Center 2016-18 TCC-C Construct New Regional Center for Transportation and Logistics VCCS 2014-20 Six-Year Capital Outlay Plan 2016-18 Biennium 148 Capital Projects by College Page 8 of 11 VCCS 2014-20 Six-Year Capital Outlay Plan Capital Projects by College 2016-18 Biennium Biennium College Capital Project 2016-18 TCC-N Renovate Martin Building 2016-18 TCC-N Construct Joint-Use Technology High School 2016-18 TCC-VB Construct New Parking Garage 2016-18 TCC-VB Expand and Renovate Pungo Building 2016-18 TCC-VB Renovate Lynnhaven Building 2016-18 TCC-VB Construct District Facilities Maintenance/Warehouse 2016-18 TNCC-H Renovate and Expand Griffin and Wythe Halls 2016-18 TNCC-H Construct Academic Science Building 2016-18 TNCC-HT Construct Parking Lot Phase II, Historic Triangle Campus 2016-18 TNCC-HT Construct Academic Building, HT Campus 2016-18 VHCC Renovate and Expand the Nursing Education Building 2016-18 VHCC Renovate Instructional & Student Center - Phase 2 2016-18 VWCC Construct Mail/Shipping/Receiving Operations and Warehouse 2016-18 VWCC Construct Culinary Arts Center 2016-18 VWCC Renovate Craig Hall for Student Services 2016-18 VWCC Construct Addition to Center for Science and Health Professions 2016-18 VWCC Construct Exercise Science and Wellness Center 2016-18 VWCC Construct IT Sciences and Technology Building 2016-18 WCC Renovate Campuswide 55 $1,154,551,000 VCCS 2014-20 Six-Year Capital Outlay Plan 2016-18 Biennium 149 Capital Projects by College Page 9 of 11 VCCS 2014-20 Six-Year Capital Outlay Plan Capital Projects by College 2018-20 Biennium Biennium College Capital Project 2018-20 BRCC Construct Automotive Technology Program Building 2018-20 BRCC Improve Facilities Infrastructure 2018-20 GCC-F Construct Academic Building V Fredericksburg Area Campus 2018-20 GCC-F Construct Phase V Parking Garage Fredericksburg Campus 2018-20 GCC-LG Construct Allied Health Addition Locust Grove Campus 2018-20 LFCC-M Renovate Paul Wolk Resource Center MC 2018-20 LFCC-M Renovate Fairfax Hall Phase II MC 2018-20 MECC Renovate Robb Hall 2018-20 NRCC Renovate Administrative Wing - Godbey Hall 2018-20 NRCC Expand & Renovate Edwards Hall 2018-20 NRCC Construct Exterior Art & Sculpting Gallery 2018-20 NVCC-AL Renovate Engineering Academic Building 2018-20 NVCC-AL Construct Alexandria Phase V Academic Building 2018-20 NVCC-AN Construct Student Union/Student Success Center 2018-20 NVCC-AN Construct Annandale Replacement Greenhouse 2018-20 NVCC-L Construct LO Phase V Academic Building 2018-20 NVCC-L Construct Phase I New Campus Reston 2018-20 NVCC-L Renovate Loudoun Waddell Academic Building 2018-20 NVCC-L Construct Phase II, New Loudoun Campus 2018-20 NVCC-M Construct MA Workforce Development Center 2018-20 NVCC-S Construct Phase II Medical Education Campus 2018-20 NVCC-W Construct WO Phase IV Academic Building 2018-20 NVCC-W Construct WO Phase V Academic Building 2018-20 RCC-G Construct Student Commons building Glenns 2018-20 RCC-W Construct Campus Access Ring Road on Warsaw Campus 2018-20 RCC-W Construct Healthcare Technology and Science Academic Building Warsaw 2018-20 SWVCC Renovate Armory 2018-20 SWVCC Install Emergency Generator 2018-20 TCC-C Renovate Whitehurst Building 2018-20 TCC-C Relocate Observatory Program / Great Dismal Swamp Education Center 2018-20 TCC-N Renovate Andrews Building 2018-20 TCC-VB Renovate Virginia Beach Building 2018-20 TCC-VB Construct Academic Building (P) 2018-20 TNCC-H Construct Academic Health and Wellness Center 2018-20 TNCC-H Renovate and Repair Exterior and Interior of Hastings Hall 2018-20 TNCC-H Construct Auto Lab Expansion, Maintenance and Warehouse Buildings VCCS 2014-20 Six-Year Capital Outlay Plan 2018-20 Biennium 150 Capital Projects by College Page 10 of 11 VCCS 2014-20 Six-Year Capital Outlay Plan Capital Projects by College 2018-20 Biennium Biennium College Capital Project 2018-20 TNCC-H Construct Prominent Entry Portals and a Monument Sign 2018-20 VWCC Renovate Enclosed Pedestrian Corridor/Bridge 2018-20 VWCC Relocate Overhead Utilities Underground 2018-20 VWCC Construct Surface Parking Lot (#16) 2018-20 VWCC Construct VWCC Parking Garage 41 $710,185,188 VCCS 2014-20 Six-Year Capital Outlay Plan 2018-20 Biennium 151 Capital Projects by College Page 11 of 11 TITLE: PROPOSED CHANGES TO VCCS POLICY MANUAL SECTION 10.0.1.3a TO REFLECT APPROPRIATION ACT LANGUAGE (III.C.2.b) BACKGROUND: Language in the state Appropriation Act requires that: “Expenditures for land acquisition, site preparation beyond five feet from a building, and the construction of additional outdoor lighting, sidewalks, outdoor athletic and recreational facilities, and parking lots in the Virginia Community College System shall be made only from appropriated federal funds, Trust and Agency funds, including local government allocations or appropriations, or the proceeds of indebtedness authorized by the General Assembly.” This restriction does not apply to other institutions of higher education. As a result, the colleges must obtain non-general funds to support even a small addition to an existing building. The present language places an additional burden on our colleges and localities. Many localities do not fund the building costs at the colleges. The colleges must raise funds from another source or, in some cases, use student fees to support these costs. The VCCS has and will continue to raise this issue with state government officials and attempt to remove this restriction. However, VCCS Policy Manual language regarding funding sources for sitework is inconsistent with and, in fact, more restrictive than the language in the Appropriation Act. It is recommended that Section 10.0.1.3a be modified to mirror the language as it is found in the Appropriation Act and give the VCCS the maximum flexibility allowed under the current requirements. The following changes to Section 10.0.1.3 of the VCCS Policy Manual are recommended: 10.0.1.3 General Policies for Funding, Construction, and Maintenance of Site Development and Parking and Other Nongeneral Fund Projects (SB) a. The political subdivision(s) sponsoring and being served by the community college shall provide sufficient land for the initial establishment of the college, additional campuses and future expansion, acceptable to the State Board. Expenditures for site preparation beyond five feet from a building, and the construction of additional outdoor lighting, sidewalks, outdoor athletic and recreational facilities, and parking lots shall be made only from appropriated Trust and Agency funds, including local government allocations or appropriations, or the proceeds of indebtedness authorized by the General Assembly. These include surveys, borings for parking areas and roads, grading, utilities to within five feet of the building, storm drainage, roads, parking facilities, sidewalks, landscaping, seeding, and outdoor facilities for physical education and recreation. (Excavation costs for basements, footings, and trenches for utility lines within or under the building extending five feet outside the building are part of the building costs.) 152 a. Expenditures for land acquisition, site preparation beyond five feet from a building, and the construction of additional outdoor lighting, sidewalk, outdoor athletic and recreational facilities, and parking lots in the Virginia Community College System shall be made only from appropriated federal funds, Trust and Agency funds, including local government allocations or appropriations, or the proceeds of indebtedness authorized by the General Assembly. RECOMMENDATION: It is recommended that the State Board for Community Colleges approve these changes to the VCCS Policy Manual § 10.0.1.3a. RESOURCE PERSONS: Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services (804) 819-4917 bjones@vccs.edu 153 TITLE: BLUE RIDGE COMMUNITY COLLEGE HOUFF STUDENT CENTER ADDITIONS SCHEMATIC DESIGN APPROVAL PROJECT CODE: (260-17987) (III.C.2.c) BACKGROUND: Blue Ridge Community College requests design approval for additions to the Houff Student Center. The legislature appropriated design funding for 40,000 square feet of academic and student service space. The Building Committee considered a new building as well as an addition to the Houff Student Center. They determined that the best solution was to construct additions on both the south and north sides of the Houff Student Center. Adding to the Houff Student Center takes advantage of the student service spaces presently in the building, and allows new laboratories to be close to the present Science Building. Adding to both the south and north sides minimizes intrusion into the new parking lot and loss of needed parking spaces. The south entrance will be a new gateway to the campus from the new parking lots on the south side of the campus. Student service spaces will be located on the first floor in the south addition, where students will encounter them as soon as they enter the building. General academic spaces are on the second floor of the south addition and both floors of the north addition. New chemistry laboratories are on the third floor of the south addition. VCCS Policy 10.0.0.4.i and k requires State Board approval of schematic designs for new construction. This project is anticipated to go to bid in the spring of 2014 and be completed for fall semester 2016. It will be funded by proceeds from bonds on which the state will pay the debt service (Chapter 3, 2012-14). LOCAL COLLEGE BOARD: The Local College Board approved the design at its March 13, 2013 meeting. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, §10.0.0.4 i and k, it is recommended that the State Board for Community Colleges approve the Blue Ridge Community College, schematic design for additions to the Houff Student Center. RESOURCE PERSONS: Dr. John Downey President Blue Ridge Community College 540-453-2248 downeyj@brcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 154 155 156 157 158 159 TITLE: CENTRAL VIRGINIA COMMUNITY COLLEGE AUTHORIZE RENOVATE STUDENT CENTER SCHEMATIC DESIGN APPROVAL Project Code: A2260-132 (III.C.2.d) BACKGROUND: Central Virginia Community College requests State Board approval of a VCCS defined Capital Project to renovate the existing Student Center, located in Amherst Hall. The Student Center has not had any major improvements since 1995. The intent of this project is to completely renovate the Student Center (approximately 8,400 square feet) to make it more student friendly and to provide a pleasant atmosphere for students to congregate, study, eat and relax. Virginia A&E, an AE firm in Forest, is currently in the process of preparing the design documents for this project. Construction is anticipated to begin in early summer of 2013. The projected construction cost is estimated to be approximately $528,000. The total project cost, including AE fees, new furnishings & equipment, contingency and miscellaneous costs is $685,000. This project will be paid for with Local Funds. Adequate funds are available to cover the cost of this project. LOCAL COLLEGE BOARD: The Local College Board reviewed and approved this project on April 25, 2012. RECOMMENDATION: In accordance with Virginia Community Colleges Policy Manual, §10.0.0.4 i, it is recommended that the State Board for Community Colleges approve the Central Virginia Community College, Renovate Student Center project, as a VCCS defined Capital Project. It is further recommended that the State Board approve the Schematic Design, as submitted. RESOURCE PERSONS: Dr. John Capps, Jr. President Central Virginia Community College 434-832-7601 capps@cvcc.vccs.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 160 161 162 163 164 TITLE: JOHN TYLER COMMUNITY COLLEGE MIDLOTHIAN CAMPUS PHASE III BUILDING PROJECT CODE : (260-17992) and PARKING GARAGE PROJECT CODE: (260-17942) SCHEMATIC DRAWING REVIEW (III.C.2.e) BACKGROUND: During the 2012-14 Session of the General Assembly, Funds were appropriated for the design and construction of the Midlothian Phase III Building, and a Parking Garage for John Tyler Community College’s Midlothian Campus was authorized. Clark Nexsen of Norfolk, VA was retained to prepare the design documents for this project, and to provide construction administration services as well. The Midlothian Phase III Building will be located in the Northwest quadrant of the campus core, northwest of existing Building A and opposite Hamel Hall, facing the campus green. The proposed facility is a new three story academic building of approximate 70,000 gross square feet. This facility will include additional academic classrooms, faculty/staff offices, a “black box” teaching theater, student services and testing space, and a small food services area. The proposed parking deck design is a 350 space deck adjacent to a new entry off of Woolridge Road. This entry will be tied into the Midlothian Campus vehicular system by the extension of the existing campus loop road. The deck has four levels and is 123,484 total square feet. The parking deck is nestled into the steep grade to minimize the visual impact from the campus building. A bridge connection is located at the SW corner, allowing pedestrians to experience the newly defined campus quad. The overall budget for JTCC-Midlothian Campus Phase III Building and Packing Deck project will cover construction, A/E fee, project inspection, contingency and miscellaneous other costs. Construction Management at Risk delivery method for construction has been approved for use by this project. This project has been approved by the Art and Architectural Review Board at its April 2013 meeting. LOCAL BOARD APPROVAL: The Local College Board will review the schematic design at their May, 2013 meeting. The State Board will be apprised of any concerns raised by the Local Board. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, § 10.0.0.4 i, it is recommended that the State Board for Community Colleges approve the John Tyler Community College Midlothian Campus schematic drawings, as submitted. 165 RESOURCE PERSONS: Dr. Marshall W. Smith, President President John Tyler Community College (804) 706-5014 msmith@jtcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 166 167 168 169 170 TITLE: LORD FAIRFAX COMMUNITY COLLEGE FAUQUIER CAMPUS MASTER PLAN UPDATE PROJECT CODE: NP298-001 (III.C.2.f) BACKGROUND: At its January 17, 2013, meeting, the State Board for Community Colleges made a decision to postpone the approval of the LFCC Fauquier campus master plan. The board members desired more information regarding discussions with the county to create safer traffic patterns at the campus and a discussion of how to create a second exit from the campus. Two emergency access points that can be constructed in the short term have been identified. VDOT's 6-Year Plan includes engineering to upgrade the intersection at US Rt. 29 business and bypass to an interchange, but actual construction may be a decade or more in the future. A second entrance that doesn't send traffic back through this intersection will have to await future development of properties to the north and east of the campus. LFCC is in continuing dialog with Fauquier County to assure this will be considered when development plans for these properties are submitted. LFCC has had discussions with the County and a path of travel that leads through the adjacent landfill has been identified for use in extreme conditions. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, §,10.0.0.4 e it is recommended that the State Board for Community Colleges approve the updated Lord Fairfax Community College Master Plan for the Fauquier campus. RESOURCE PERSONS: Dr. Cheryl Thompson-Stacy President Lord Fairfax Community College 540-868-7101 cthompson-stacy@lfcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 171 Fauquier Campus: The Fauqu uier Campus is located on Route 29 / 15 5 just on the outskirts of tthe town of W Warrenton VA A. The State owned camp pus consists o of approximattely 52 acres is highly visib ble from Routte 29/15 (particularly from the n northbound d direction), a h heavily traveleed artery which bypasses the town of Warrento on and conneccts Interstate e 66 with Culp peper and Chaarlottesville. Currently thee campus facilities consist off two buildinggs – an originaal barn renovated as a smaall conferencee space, and a multi‐functtion academic building constructed in 19 999, as well aas considerabble at‐grade parking. Signifficant buildab ble n inward focus land area exists for devvelopment either with a sttrong presencce on Rt. 29/15 or with an m the highways. away from 172 Fauquier Campus Analysis The Fauquier Campus – located just on the outskirts of Historic Warrenton VA – has a distinct rural character and tradition that are important to the community and the college. These characteristics are best represented on campus by the existence of a barn which has been converted for conference space and the expansive open space that exists as a forecourt to the building upon approach by car. The existing multi‐function academic building constructed in 1999, including the associated site plan and landscaping, creates a memorable and pleasing experience for users and visitors as they approach the campus, arrive by car and walk to building entrances. There is a surplus of available parking. The campus property configuration and topography present challenges to planning for growth without impacting the expansive open space which defines the present campus experience. Opportunities for development exist most readily to the west of the existing Academic Building and to the north of the parking. The area to the west creates the view opportunity from northbound Rt. 29 / 15; and defines the approach and arrival experience by car as well as the sense of openness on the campus. The area to the north of the parking, although having natural qualities and access to a public recreation trail network, is remote from the existing approach and arrival sequence, as well as from the existing buildings. In addition, that area exhibits topography which although manageable, is not ideal for development. 173 In general, the existing configuration of the campus property creates challenges because the land area available for development is not consolidated. The two large areas referenced above are connected by a relatively narrow zone (current parking lot) constrained by both topography and dimension. This configuration is exacerbated by the current limitations of vehicular access to the property. Access to the campus property by car is limited to Lord Fairfax Drive, via one intersection at Rt. 29/15 just north of the campus. From this intersection, Lord Fairfax Drive is shared for approximately .25 miles by traffic servicing the adjacent residential neighborhood to the north and the Stafford County landfill facilities to the south. College Street connects Lord Fairfax Drive to the campus proper and existing parking. In the future, the single intersection at Rt 29/15 will also serve traffic accessing the County‐ owned Stafford Property to the east. The Stafford Property is being master planned to include a variety of facilities for the County including maintenance for the Department of Recreation and Parks, offices for General Services, fleet services, etc. Sharing the intersection with Rt. 29/15 and a portion of the Lord Fairfax Drive among all of these uses is a long term challenge because of VDOT limitations on providing additional connections to Rt. 29/15. The length of the portion of the roadway that is shared, however, will depend upon final County planning conclusions and the precise location where landfill and Stafford Property traffic is segregated from LFCC traffic. Among the challenges that exist by virtue of the above is that College Street is the only point of access to Lord Fairfax Drive for all existing parking. 174 The College has been in ongoing communication with the County regarding vehicular access and the long term plans for the Stafford Property. Among the issues of interest to the College are: Possible Identification of an alternative access point to the landfill site from a location other than the existing intersection of Rt. 29/15 and Lord Fairfax Drive. Exploration of optional roadway configurations from what is currently shown on the master plan for the Stafford Property – configurations that minimize the mixing of campus and landfill / county property traffic along Lord Fairfax Drive. Careful consideration of adequate intersection spacing, signage and signaling, and the ability to screen unpleasant views associated with the landfill. Seeking connectivity and uses for the Stafford Property that are mutually beneficial to the County and the College. In addition, the College is committed to exploring future property acquisitions that will address the above referenced issues – seeking to create a more consolidated land area and perhaps establish a second vehicular access. As a mitigating strategy, this master plan proposes the creation of two emergency vehicular egress routes from the existing parking – creating a “relief” from complete dependence on College Street. One of these routes takes advantage of proposed pedestrian pathways designed to accommodate cars and emergency vehicles resulting in an emergency egress connection to Travelers Way near the northwest corner of Wolk Hall. The design of a major campus pedestrian path to accommodate vehicles when necessary (via removable bollards) is common, and will support campus maintenance and service as well as fire /emergency access. The second relief point is proposed at the existing County access road that connects College Street to the main landfill access road at the southeast corner of the existing campus parking area. 175 Fauquier Campus Goals: Honor and sustain the rural / agrarian character of the campus by preserving and enhancing open space – particularly the front lawn forecourt to the existing architecture. Celebrate the barn as an iconic campus element. Locate the first new building to take advantage of the existing surplus of parking; the need for an assembly space in close proximity to that parking and the existing buildings; and the opportunity to “frame” the view of the iconic barn. Create an outdoor room (small quadrangle) just south of the existing academic building – a space that currently functions as a social and recreational node for students. Otherwise, continue the pattern of development characterized by a perimeter of buildings along a “front lawn” – but with convenient parking and appropriate pedestrian pathways. Improve the approach / arrival / entrance sequence for users and visitors by developing the open space landscape with planting, pathways and amenities that enhance the campus experience from the car and on foot. Address the landfill as a negative edge. Seek traffic conflict mitigations and locate buildings and trees and other planting to limit exposure and obscure views to and from important places on campus. 176 Fauquier Near Term Master Plan (15‐20 years) 177 Fauquier Long Range Master Plan (30‐35 years and beyond) 178 TITLE: LORD FAIRFAX COMMUNITY COLLEGE MIDDLETOWN CAMPUS STUDENT CENTER UTILITY EASEMENT (III.C.2.g) BACKGROUND: The Lord Fairfax Community College Foundation is constructing a new student center on the Foundation property adjacent to the Middletown Campus which they will lease to the College. The State Board approved the lease proposal at its July 2012 meeting. A utility easement is required to extend a water line from the existing water main serving the Science Building and Corron Center. The attached site plan shows the approximate location. All utilities are being installed with future connections for LFCC's next academic building in mind. All costs associated with the easement will be borne by the Foundation. VCCS Policy Manual, §10.0.0.4.l, requires State Board approval for any other commitment which would have substantial impact on the real property of the VCCS. The student center is presently under construction, and is anticipated to be completed in December 2013. LOCAL COLLEGE BOARD: Local Board approval isn't necessary for utility easements. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, § 10.0.0.4 I, it is recommended that the State Board for Community Colleges approve the water line utility easement for the Lord Fairfax Community College Middletown Campus Student Center to the City of Winchester on. RESOURCE PERSONS: Dr. Cheryl Thompson-Stacy President Lord Fairfax Community College 540-868-7101 cthompson-stacy@lfcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 179 180 181 TITLE: MOUNTAIN EMPIRE COMMUNITY COLLEGE SCHEMATIC DESIGN APPROVAL SECOND ENTRANCE ROAD AND EASEMENT PROJECT CODE: 260-17394 (III.C.2.h) BACKGROUND: Mountain Empire Community College requests schematic approval for the design of a second entrance road to the campus, and granting necessary easements to VDOT for the construction and maintenance of this road. The Legislature appropriated $1,859,000 in local funds to construct a second entrance road to the MECC campus in 2006. A traffic study and preliminary layout were prepared. In May 2010 Wise County transferred $2,100,000 to VDOT to design and manage construction for this project. VCCS Policy Manual, § 10.0.0.4 k, requires State Board approval for any activity which would substantially affect the appearance of a campus. VCCS Policy Manual, §10.0.0.4 l, requires State Board approval for any other commitment which would have substantial impact on the real property of the VCCS. The project has been bid. Construction is anticipated to start soon. LOCAL COLLEGE BOARD: The Local College Board approved the design at its Sept. 20, 2011 meeting. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, § 10.0.04 k & l, it is recommended that the State Board for Community Colleges approve the schematic design of the second access road to Mountain Empire Community College, and granting necessary easements to VDOT for the construction and maintenance of this road. RESOURCE PERSONS: Dr. James Scott Hamilton President Mountain Empire Community College 276-523-4130 jhamilton@me.vccs.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 182 183 184 TITLE: NORTHERN VIRGINIA COMMUNITY COLLEGE ANNANDALE CAMPUS CW BUILDING PRINT SHOP RELOCATION PROJECT CODE: A2260-138 (III.C.2.i) BACKGROUND: Northern Virginia Community College requests State Board approval of a VCCS defined Capital Project to renovate the CW Building (i.e. College Warehouse Building) on the Annandale Campus to accommodate the college’s Print Shop, currently housed in the Brault Building. Relocation of this Print Shop is required in conjunction with the Brault Building Renovation and Expansion project, a Capital Project currently in the final stages of design. Relocation of the Print Shop must occur, prior to commencing construction on the Brault Building. The CW Building is an ideal location for the Print Shop, because it has a significant amount of open floor space, a Loading Dock, and is easily accessible to delivery trucks, all necessary features for the shop’s operation. Cole and Denny, an AE firm in Alexandria, Virginia, has been retained to prepare the design documents for this project. The majority of the work involves changes to the mechanical, electrical and fire protection systems in the CW Building. With construction scheduled to commence on the Brault Building this summer, the timing of the Print Shop move is very important to the overall schedule. The estimated cost of construction is approximately $600,000. The total project cost, including AE fees, moving expenses, contingency and miscellaneous related costs is anticipated to be in the neighborhood of $700,000. Funding for this project is being provided from Higher Education Operating Funds. LOCAL COLLEGE BOARD: The Local College Board reviewed and approved this project at its March 11, 2012 meeting. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, § 10.0.0.4 i, it is recommended that the State Board for Community Colleges approve the “CW Building Print Shop Relocation” project, as a VCCS defined Capital Project. RESOURCE PERSONS: Dr. Robert G. Templin, Jr. President Northern Virginia Community College 703-323-3101 rtemplin@nvcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 185 TITLE: NORTHERN VIRGINIA COMMUNITY COLLEGE LOUDOUN CAMPUS VET TECH BUILDING FACADE IMPROVEMENTS & FENCE SCHEMATIC DESIGN APPROVAL PROJECT CODE: 260-A3260-034 (III.C.2.j) BACKGROUND: Northern Virginia Community College requests State Board for Community Colleges approval of the Schematic Design for improvements to the façade (viz. east elevation) of the original Vet Tech Building on the Loudoun Campus. This project also provides for the installation of a new screen fence at the rear courtyard of this structure. The original Vet Tech Building, a prefabricated metal building, was constructed in 1976 and currently houses laboratory, surgery and office space for the Veterinary Technology Program. This structure has a shallow pitch gable roof and vertical ribbed metal panel walls and is painted tan with brown eaves and trim. An addition, completed in 2010, more than doubled the size of the original Vet Tech building. The new addition features ribbed white panels and large planes of window walls, which contrasts sharply with the original building and emphasize the age of the original structure making it appear tired and dated. This project will knit the two portions of this building together by a new free standing façade in front of the original building. This new façade will have a horizontal-ribbed metal panel structure similar to that of the original building but in a contrasting green color. The Loudoun Campus currently has many buildings that incorporate metal panels in their design. The current Vet Tech building is an assemblage of building masses which are all clad in metal panels and consistent with the campus vernacular. Existing utility services will remain in their current locations and will be accessed for servicing and maintenance through a gate in the new façade. The project requires the relocation of concrete sidewalks, building signage and one young tree. It is proposed that the kennel building be painted in the same green color as the new façade to tie the multiple buildings together, and reduce glare in the courtyard. The final change proposed as part of this project is the installation of a new screening fence north and west of the rear courtyard, connecting the existing dog run fence and the north east corner of the building. The purpose of the new fence is to provide screening and security for students and staff and to provide a larger exercise area for animals. It will be a 6’ chain link fence and contain black privacy screening. The proposed screening will be continuous across the back of the site. The projected cost of this project, including construction, AE fees, contingency and miscellaneous related costs is approximately $250,000. Funding for the design and construction of this project will be provided entirely from operating budget funds. LOCAL COLLEGE BOARD: 186 The Local College Board will review this project at their next regularly scheduled meeting. RECOMMENDATION: In accordance with Virginia Community College System Policy Manual, §10.0.0.4.k, it is recommended that the State Board for Community Colleges approve the schematic design for the Vet Tech Building Façade Improvements and Fence project, as submitted. RESOURCE PERSONS: Dr. Robert G. Templin, Jr. President Northern Virginia Community College (703) 323-3101 rtemplin@nvcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 187 188 TITLE: NORTHERN VIRGINIA COMMUNITY COLLEGE ANNUAL BUILDING PERMIT AUTHORITY ACTIVITY REPORT – CALENDAR YEAR 2012 (III.C.2.k) BACKGROUND: Northern Virginia Community College requests approval of the renewal of its annual building permit authority as provided for by the Virginia Uniform State Building Code (VUSBC) and the Department of General Services Building Permit Policy for Construction, State Owned Buildings and Structures. Construction involving buildings or structures in the Commonwealth of Virginia must conform to the requirement of the Virginia Uniform Statewide Building Code (VUSBC). The Department of General Services, acting through the Division of Engineering and Buildings (DEB) is the State Building Official and is responsible for the enforcement of the VUSBC and issuance of Building Permits for construction on State property. The DGS/DEB Building Permit Policy for Construction of State Owned Buildings & Structures allows for an agency or institution to obtain an annual building permit for certain repair, remodeling and improvement projects can be performed at the agency level by agency forces or by contracting with minimal risk to public safety. The agency representative designated on the annual permit shall be responsible to the State Building Official for review & approval of documents, issuance of a project permit, and inspection of the work for conformance with VUSBC requirements. The policy also requires submittal of an annual report listing the permitted projects undertaken during the previous year. At its September 1999 meeting the State Board granted authorization to Northern Virginia Community College to obtain an annual building permit. The Board also directed that a copy of the required annual report be submitted to the VCCS Facilities Management Services (FMS) office for review and subsequent presentation to the State Board. Due to the length of the report, a copy of the Northern Virginia Community College Annual Report for calendar year 2011 will be on file in the FMS office and made available upon request. Northern Virginia Community College requests State Board approval to renew its annual permit authority for an additional year per §10.2.0.0.d of VCCS Policy. LOCAL BOARD APPROVAL: The Northern Virginia Community College’s local advisory board will review the Annual Report at its next regularly scheduled meeting. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, §10.2.0.0.d, it is recommended that the State Board for Community Colleges approve the renewal of the annual building permit authority held by Northern Virginia Community College as authorized by the State Building Official. The authorization is contingent upon satisfying all applicable requirements of the State and State Board Policy. 189 RESOURCE PERSONS: Dr. Robert G. Templin, Jr. President Northern Virginia Community College 276-223-4769 rtemplin@nvcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services (804) 819-4917 bjones@vccs.edu 190 191 192 193 TITLE: SOUTHWEST VIRGINIA COMMUNITY COLLEGE NEW CAMPUS-WIDE SIGNAGE PROJECT CODE: 260-A3260-032 (III.C.2.l) BACKGROUND: Southwest Virginia Community College (SWVCC) requests approval to replace existing wooden signs on campus that are 30 or more years old and deteriorating. New signs will be modular signs made of metal, which will allow the text to be updated without replacing the entire sign. The new signs will enhance the appearance of the campus and provide for better direction and identification of campus buildings and offices. SWVCC plans to install two main entrance directory exterior signs, 19 building and directional exterior signs, and interior signage in six campus buildings. All old signs except the main entrance and King Community Center signs will be removed. VCCS Policy 10.0.0.4.k. requires State Board approval for any activity which would substantially affect the appearance of a campus. The new signage is scheduled to be procured and installed the summer of 2013. Estimated cost is $72,000, and will be funded by grant funding. LOCAL COLLEGE BOARD: The Local Board approved the change in signage during their September 25, 2012 meeting. RECOMMENDATION: In accordance with the Virginia Community College Policy Manual, § 10.0.0.4 k, it is recommended that the State Board for Community Colleges approve the new signage for Southwest Virginia Community College. RESOURCE PERSONS: Dr. J. Mark Estepp President Southwest Virginia Community College 276-964-2555 Mark.Estepp@sw.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 194 Existing Signs to be Replaced 195 Signs at Other Colleges that are Similar to the Proposed Signs 196 TITLE: TIDEWATER COMMUNITY COLLEGE PORTSMOUTH CAMPUS MASTER SITE PLAN UPDATE PROJECT Code: 260-17397 (III.C.2.m) BACKGROUND: Tidewater Community College requests approval of a proposed update to the master plan for the Fred W. Beazley Portsmouth Campus. The TCC Local Advisory Board and State Board for Community Colleges approved the original master plan for the relocated Portsmouth Campus and acquisition of its 35-acre site at their November 2005 meetings. The new campus was developed generally in accordance with that plan and opened with its original four buildings for the spring 2010 semester. The original master plan for the campus did not include a student center for the campus. In its 2006 session, the General Assembly appropriated non-general funds to construct a student center at the Portsmouth Campus. And the State Board approved TCC’s business plan to support development of a student center at each of its four campuses at the May 2007 meeting. The original master plan provided for an easily accessible, pedestrian-friendly campus that would serve as an anchor for a new business park and residential community in the newly named Victory section of Portsmouth. The design provided a highly visible and identifiable campus environment that links the traditions of higher education with the promise of education as an act of optimism that will withstand the test of time. This update to the master plan accommodates a revised campus program that includes a student center in addition to the academic and support space originally proposed. This document accommodates the student center building, as well as associated revisions to the program of the remaining two buildings from the original master plan. This modification, along with design changes that occurred during development of the initial four buildings resulted in a need for an update to the campus master plan to address the overall campus layout, pedestrian and vehicular circulation, organization of open spaces, and utility routing. This master plan update addresses the following goals and objectives. 1. Identification of existing buildings and future building sites on the campus and their relationship to other buildings with respect to infrastructure circulation and visual compatibility. 2. Development of traffic and parking strategies for the campus that provides ease of access/egress to the campus and accommodates current and future parking needs. 3. Expansion of a road and utility infrastructure that adequately supports the student center and subsequent phases of campus development. The first phase of the campus opened for the spring semester of 2010 with capacity for an oncampus regular session enrollment of 2,028 FTES. It consists of 188,000 gross square feet of space in three academic buildings and a central plant/facilities building, including approximately 20,000 gross square feet of space provided by Portsmouth Public Schools. The master plan update reflects alterations to the selected site for the student center and subsequent building phases. The student center is under construction as a single building of 59,353 gross square feet. 197 The eventual build-out of the campus property will provide approximately 410,000 gross square feet of instructional and support space and 2,800 to 3,200 parking spaces in a combination of surface and structured parking. It will serve 4,254 on-campus regular session FTES. The original concept for the campus was for buildings to be located to frame a central quad, which would visually tie to the central open space and pond in the adjacent Victory Village development. The location of the future buildings is intended to create a secondary, less formal, open space and frame the ponds along Greenwood Drive with a precedent being set by the student center building. Vehicular circulation and access to parking (predominately located on the east side) are restricted to the perimeter of the campus. The campus is intended to support the partnership between TCC and the City of Portsmouth and become a focal point for the new Victory community. The master plan update will be presented to the state’s Art & Architectural Board on May 3, 2013. LOCAL BOARD APPROVAL: The Tidewater Community College Local Advisory Board will consider the master plan update for the Portsmouth Campus at its May 14, 2013, meeting. RECOMMENDATION: In accordance with Virginia Community College System Policy Manual, §10.0.0.4 e, it is recommended that the State Board for Community Colleges approve the update to the master site plan for the Fred W. Beazley Portsmouth Campus of Tidewater Community College as presented. RESOURCE PERSONS: Dr. Edna V. Baehre-Kolovani President Tidewater Community College (757) 822-1050 EKolovani@tcc.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor Facilities Management Services Virginia Community College System (804) 819-4917 BJones@vccs.edu 198 Fred W. Beazley Portsmouth Campus Original Master Plan 199 Student Center Fred W. Beazley Portsmouth Campus Updated Master Plan 200 Fred W. Beazley Po ortsmouth h 3-D View w of Upda ated Maste er Plan (Lookiing Northwes st) 201 Fred W. Beazley Portsmou uth 3-D Vie ew of Upd dated Masster Plan 202Southe (Loo oking east) TITLE: VIRGINIA WESTERN COMMUNITY COLLEGE SIGNAGE FOR THE CENTER FOR SCIENCES AND HEALTH PROFESSIONS PROJECT CODE: 260-A3260-003 (III.C.2.n) BACKGROUND: Virginia Western Community College requests design approval for new signs for the Center for Science & Health Professions (CS&HP) building which is nearing completion. The signs will have lettering applied to brick and metal pylons which complement the design of the CS&HP building. VCCS Policy 10.0.0.4.k requires State Board approval for any activity which would substantially affect the appearance of a campus. Construction is planned for the summer of 2013, so the signs will be completed in time for fall semester classes. Estimated project cost is $200,000, which will be funded from money that VWCC has set aside for site work. LOCAL COLLEGE BOARD: The Local College Board approved the design April 16, 2013. RECOMMENDATION: In accordance with Virginia Community College System Policy Manual, 10.0.0.4.k, it is recommended that the State Board for Community Colleges approve signage for the Center for Science & Health Professions at Virginia Western Community College. RESOURCE PERSONS: Dr. Robert H. Sandel President Virginia Western Community College 540-857-7311 rsandel@virginiawestern.edu Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia Community College System (804) 819-4917 bjones@vccs.edu 203 204 205 206 TITLE: VIRGINIA COMMUNITY COLLEGE SYSTEM SWAM REPORTING (III.C.3.a.) BACKGROUND: Pursuant to the request of the Facilities Committee of the State Board for Community Colleges an itemization of SWaM participation is attached for review. RESOURCE PERSONS: Mr. Robert B, Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia’s Community Colleges (804) 819-4917 bjones@vccs.edu 207 SWAM February 2013 Dollars $ 2,215,409.08 Percent of Invoice Small Women Minority $ 652,730.88 $ 160,082.55 $ 0 29.5% 7.2% 0.0% Total SWAM $ 812,813.43 36.7% Total Invoice March 2013 Percent of Invoice Total Invoice Dollars $ 12,803,112.04 Small Women Minority $ 2,694,593.81 $ 753,617.79 $ 211,381.25 21.0% 5.9% 1.7% Total SWAM $ 3,659,592.85 28.6% 208 TITLE: VIRGINIA COMMUNITY COLLEGE SYSTEM COLLEGE CONSTRUCTION PROJECTS REPORT (III.C.3.b.) BACKGROUND: Pursuant to the request of the Facilities Committee of the State Board for Community Colleges, a list of all active Community College Construction Projects and their status is provided. RESOURCE PERSONS: Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia’s Community Colleges (804) 819-4917 bjones@vccs.edu 209 State Board Local Funding Report COLL Project Number Project Name Funding Source Fund Amt Status SBCC Approval CVCC A2260-132 Renovate Student Center Student Fees $585,000.00 Initiation 1/17/2013 CVCC NP292-001 Master Plan & Site Utility Plan HE/0300 $63,000.00 Design $648,000.00 * DCC A2260-004 Generator - Regional Center for Advanced Technology (RCATT) & Wyatt Buildings HE/0300 $200,000.00 Design DCC A2260-037 Elevator Modernization (Wyatt & Temple Buildings) HE/0300 $160,000.00 Design DCC A2260-041 Hawkings Building Parking Lot Auxiliary Parking DCC A2260-130 EIT Precision Machining Lab Expansion HE/0300 $60,000.00 Design $100,000.00 Design $520,000.00 ESCC NP284-002 Phase I Building Facility Assessment (Study) TA/0700 $30,000.00 Design $30,000.00 GCC A2260-006 Student Pavilion (Design Only) HE/0300 $65,000.00 Design GCC A2260-007 Monumental Campus Signage (Design Only) HE/0300 $75,000.00 Design GCC NP297-001 Renovate Locust Grove, Programming Study HE/0300 $25,000.00 Design GCC NP297-004 Interior Wayfinding Signage HE/0300 $200,000.00 Construction $365,000.00 JSRCC A1260-137 Renovate Student Commons (Goochland) HE/0300 JSRCC A2260-038 Gazebo HE/0300 Friday, April 19, 2013 $187,000.00 Construction $55,000.00 Design Page 1 of 10 210 COLL Project Number Project Name Funding Source Fund Amt Status JSRCC A2260-081 Academic Support Center Relocation HE/0300 $85,000.00 Design JSRCC A2260-082 Outreach & Recruitment Office Relocation HE/0300 $65,000.00 Initiation JSRCC A2260-083 Burnette Hall Commons Renovation HE/0300 $350,000.00 Initiation JSRCC NP283-002 Temporary Buildings E & F Demolition (Parham) HE/0300 $40,000.00 Design JSRCC NP283-003 Tennis Court and Baseball Field Repairs TA/0700 $35,000.00 Initiation JSRCC NP283-004 Brick Paver Patios HE/0300 $90,000.00 Initiation SBCC Approval $907,000.00 JTCC A2260-127 Godwin Hall HVAC Lab HE/0300 $80,000.00 Design * JTCC A3260-026 Industrial Technology Lab Renovation GF/0100 $400,000.00 Design * JTCC NP290-012 Courtyard Repairs TA/0700 $65,000.00 Initiation JTCC NP290-015 College-wide Parking/Road Reseal and Stripe TA/0700 $175,000.00 Initiation JTCC NP290-016 Partition Replacement N102 HE/0300 $125,000.00 Initiation JTCC NP290-017 Moyar and Hamel Hall Paint & Carpet HE/0300 $35,000.00 Initiation JTCC NP290-018 Moyer Hall Stairwell Lighting Replacement HE/0300 $48,000.00 Initiation JTCC NP290-019 Chester Testing Center Relocation HE/0300 $32,270.00 Initiation $960,270.00 LFCC A2260-085 Storage Building Addition HE/0300 LFCC A2260-098 Fauquier Parking Lot Repair Project TA/0700 Friday, April 19, 2013 $65,000.00 Construction $110,000.00 Design Page 2 of 10 211 COLL Project Number Project Name Funding Source Fund Amt Status * LFCC A3260-011 Nursing Lab HE/0300 $50,000.00 Design * LFCC A3260-012 Door Access HE/0300 $275,000.00 Design * LFCC A3260-013 Library Quiet Room Wall HE/0300 $90,000.00 Design * LFCC A3260-025 Server Room Air Conditioning HE/0300 $35,000.00 Initiation LFCC NP298-001 Master Plan HE/0300 SBCC Approval $0.00 Design $625,000.00 MECC A0260-009 Stair Terrace Auxiliary $415,700.00 Construction MECC A2260-025 Solar Training Roof Local & Grant MECC A2260-093 Parking Behind Phillips-Taylor Hall Auxiliary $250,000.00 Design MECC A2260-119 Parking Lot A & B Improvements Auxiliary $82,000.00 Design MECC A2260-134 Firing Range Improvements TA/0700 $35,000.00 Design 5/19/2011 $20,000.00 Design $802,700.00 NRCC 17905-001 New Access Road 50% Local 50% Pulaski County $1,738,700.00 Design * NRCC A3260-017 Exterior Electronic Entrance Sign TBD $0.00 Design *NRCC A3260-030 Martin Hall Fab Lab TBD $0.00 Initiation * NRCC NP275-001 Master Plan TBD $0.00 Initiation 11/20/2003 $1,738,700.00 NVCC 05260-053 Fire Alarm System Replacement (Alexandria Campus) Friday, April 19, 2013 HE/0300 $204,000.00 Construction Page 3 of 10 212 COLL Project Number Project Name Funding Source Fund Amt NVCC A0260-002 Springifield Medical Center Electric Room Cooling System HE/0300 $55,000.00 Design NVCC A0260-033 CE Building Fire Alarm System Retrofit (Annandale) HE/0300 $39,993.00 Construction NVCC A0260-042 Interior Renovations (Medical Education Campus) HE/0300 $99,860.00 Design NVCC A0260-083 Vehicle Maintenance Training Shop (Alexandria Campus) HE/0300 $119,142.00 Design NVCC A0260-085 Howsmon Hall - Interior Renovations: Lecture Hall 216, Second Floor Corridors & Kitchen 303 (Manassas Campus) HE/0300 $440,142.00 Construction NVCC A0260-109 Plaza Reconstruction CF/CC Buildings (Annandale) (Design Only) HE/0300 $81,000.00 Design NVCC A1260-026 Bisdorf Communications Closet HE/0300 $22,686.00 Design NVCC A1260-027 CC Building Theater Renovations, Annandale HE/0300 $750,000.00 Design NVCC A1260-032 Bus Stop Shelter, Woodbridge PRTC NVCC A1260-036 MT Building -Automotive Exhaust Fan and Louvers (Manassas) HE/0300 $35,000.00 Design NVCC A1260-048 CN and CS Window Replacement HE/0300 $224,633.00 Design NVCC A1260-065 Seefeldt Building: Elevator Upgrade (Woodbridge) (Design Only) HE/0300 $78,372.00 Design NVCC A1260-066 CE Building: Renovate Forum (Annandale) (Design Only) HE/0300 $99,424.00 Design NVCC A1260-067 Bisdorf Building Roof Access Security (Alexandria) (Design Only) HE/0300 $31,401.00 Design NVCC A1260-072 Seefeldt Building Phase I Roof Replacement (Woodbridge) (Design Only) HE/0300 $35,285.00 Design NVCC A1260-092 Greenhouse Boiler and Enclosure (Loudoun) HE/0300 Friday, April 19, 2013 Status SBCC Approval 7/21/2011 5/17/2012 $0.00 Construction $175,000.00 Construction Page 4 of 10 213 COLL Project Number Project Name Funding Source Fund Amt NVCC A1260-093 Cooling Tower Dunnage, Med. Ed. Campus HE/0300 $140,000.00 Construction NVCC A1260-117 CG Plaza Renovation TA/0700 $950,000.00 Construction NVCC A1260-120 Howsmon Hall Reception Desk (Manassas) HE/0300 $14,500.00 Design NVCC A1260-125 Engineering (AE) Building A HVAC Upgrade, Alexandria (Design Only) HE/0300 $109,200.00 Design NVCC A1260-129 Air Compressor Upgrade (Alexandria) HE/0300 $5,000.00 Construction NVCC A2260-008 Parking Lot & Site Lighting (Woodbridge) HE/0300 $450,000.00 Construction NVCC A2260-021 Bulkhead Replacement (Woodbridge) HE/0300 $550,000.00 Design NVCC A2260-031 CG Bookstore Reuse (Annandale) (Design Only) HE/0300 $66,000.00 Design NVCC A2260-032 CW Building, Remodeling (Annandale) HE/0300 $175,000.00 Design NVCC A2260-040 Campus Site Lighting (Manassas) HE/0300 $150,000.00 Construction NVCC A2260-043 CG Building Restroom Renovations, Annandale HE/0300 $358,999.00 Design NVCC A2260-049 Bookstore, Manassas Barnes & Noble $400,000.00 Construction NVCC A2260-073 Cooling Tower Replacement, Bisdorf Building HE/0300 $450,000.00 Design NVCC A2260-100 CG Building HVAC Upgrades (Design Only) HE/0300 $65,782.00 Design NVCC A2260-101 CG Student Lounge Renovation (Annandale) (Design Only) HE/0300 $66,705.00 Design NVCC A2260-102 Hot Water Heater Replacement (Med Ed) (Design Only) HE/0300 $11,661.00 Design NVCC A2260-109 Construct New Campus Access (Loudoun) TA/0700 Friday, April 19, 2013 Status $600,000.00 Design SBCC Approval 11/14/2011 3/22/2012 5/17/2012 Page 5 of 10 214 COLL Project Number Project Name Funding Source Fund Amt NVCC A2260-124 Howsmon Stairwell Renovation (Manassas) (Design Only) HE/0300 $23,500.00 Design NVCC A2260-129 Cooling Tower & Support Structure Replacement, Tyler Building HE/0300 $125,000.00 Design NVCC A2260-138 CW Building Print Shop (Annandale) HE/0300 $700,000.00 Design NVCC A2260-139 Police Station Renovation, Howsman Hall HE/0300 $205,000.00 Design NVCC A2260-140 Police Station Renovation, Bisdorf Hall HE/0300 $180,000.00 Design NVCC A2260-142 CM Cooling Tower Replacement HE/0300 $237,000.00 Design NVCC A2260-143 Culvert Replacement, Loudoun HE/0300 $150,000.00 Design NVCC A3260-007 C-Container Storage Area GF/0100 $40,000.00 Design * NVCC A3260-008 Beauregard Garage Repairs TA/0700 $275,000.00 Design * NVCC A3260-009 ATT Cell Tower Demo Tower Owner * NVCC A3260-010 CI Building Demolition, Annandale HE/0300 $15,360.00 Initiation * NVCC A3260-020 CBG Roof Replacement, Annandale HE/0300 $90,000.00 Design * NVCC A3260-029 LC Learning Resource Center Entry HE/0300 $10,000.00 Initiation * NVCC A3260-034 Vet Tech Building Façade Improvements and Fence, Loudoun HE/0300 $250,000.00 Design NVCC AP280-001 Campus Site Lighting, Alexandria HE/0300 $80,000.00 Design NVCC AP280-002 CF Water Intrusion at Ramp (Annandale) HE/0300 $58,700.00 Design NVCC AP280-003 Upper Plaza CT and CN Exterior Railing Replacement, Annandale HE/0300 $75,000.00 Design Friday, April 19, 2013 Status SBCC Approval $0.00 Initiation Page 6 of 10 215 COLL Project Number Project Name Funding Source Fund Amt Status * NVCC AP280-006 Bisdorf Building, Room 147 Reconfiguration HE/0300 $7,775.00 Construction * NVCC AP280-007 Bisdorf Building, Room 427 Reconfiguration, Alexandria HE/0300 $10,300.00 Construction * NVCC AP280-008 CT 351 Stand Alone AC, Annandale HE/0300 $20,000.00 Design * NVCC AP280-009 CM Building Art Studios Sink Replacement, Annandale HE/0300 $25,000.00 Design * NVCC AP280-010 CA Building Conference Room Reconfiguration, Annandale HE/0300 $8,229.00 Construction NVCC NP280-002 Schlesinger Traffic Circle Renovation, Alexandria TA/0700 $159,000.00 Construction NVCC NP280-003 Loudoun Campus Satellite Center Study HE/0300 $150,000.00 Design NVCC NP280-005 LR Bldg - Police Office HVAC, Loudoun HE/0300 NVCC NP280-006 Chiller Replacement, CE Building HE/0300 $360,000.00 Design NVCC NP280-007 CM Building Art Studio Casework Modification HE/0300 $36,500.00 Design * NVCC NP280-009 Toe Drain at Dam Project, Woodbridge HE/0300 $274,000.00 Design * NVCC NP280-010 Tree Removal Project at Dam, Woodbridge HE/0300 * NVCC NP280-011 Utility Project TA/0700 SBCC Approval $8,732.00 Construction $40,000.00 Construction $3,000.00 Initiation $10,670,881.00 PDCCC A2260-051 Library Renovation-Franklin Hall HE/0300 $75,000.00 Design PDCCC A2260-052 Monument Sign HE/0300 $70,000.00 Design $145,000.00 PHCC A2260-015 Emergency Generators HE/0300 Friday, April 19, 2013 $265,000.00 Design Page 7 of 10 216 COLL Project Number Project Name Funding Source Fund Amt Status PHCC A2260-016 Street Lights HE/0300 $165,000.00 Construction PHCC A2260-017 ADA Compliance HE/0300 $267,000.00 Construction PHCC A2260-018 LRC Renovations HE/0300 $109,000.00 Construction SBCC Approval $806,000.00 * RCC A3260-016 Welding Lab Project HE/0300 $30,000.00 Design * RCC A3260-016 Welding Lab Project capital project 16533-003 * RCC A3260-031 Facilities Warehouse Fire Alarm Installation, Glenns and Warsaw HE/0300 $25,000.00 Initiation RCC NP278-002 Workforce Interior Surface Upgrades, Warsaw HE/0300 $35,000.00 Initiation RCC NP278-003 IV Labs Interior Surfaces Upgrades HE/0300 $20,000.00 Initiation * RCC NP278-004 Chinn House Condition Assessment HE/0300 $12,000.00 Design * RCC NP278-005 Facilities Building Vinyl Siding Replacement, Warsaw HE/0300 $10,000.00 Initiation * RCC NP278-006 Window Shutters Replacement, Chinn House, Warsaw HE/0300 $15,000.00 Initiation * RCC NP278-007 Office Suite #151 Upgrade, Glenns HE/0300 $28,000.00 Design $140,085.00 Design $315,085.00 SWVCC A1260-116 Tazewell Hall Auditorium Riser Fed Dept Labor Grant $50,000.00 Design * SWVCC A3260-032 New Campus-Wide Signage Grant $72,000.00 Design $122,000.00 TCC A2260-045 IT Room Upgrades (VB) HE/0300 Friday, April 19, 2013 $450,000.00 Design Page 8 of 10 217 COLL Project Number Project Name Funding Source Fund Amt Status TCC A2260-046 IT Room Upgrades (N) HE/0300 $350,000.00 Design TCC A2260-047 IT Room Upgrades (CH&VAC) HE/0300 $100,000.00 Design TCC A2260-107 VBLRC Campus Pedestrian Connector TBD $550,000.00 Design TCC A2260-115 Martin Building Chiller and Boiler Replacement HE/0300 $400,000.00 Design TCC A2260-116 HVAC Replacement Phase I, Pass Building, Chesapeake HE/0300 $766,000.00 Construction TCC A2260-121 Green Building 6th floor renovation HE/0300 $350,000.00 Design TCC A3260-004 Way Finding Signage HE/0300 $125,000.00 Design * TCC A3260-014 Martin Building – Chilled Water Installation HE/0300 $200,000.00 Design * TCC A3260-015 Renovate Student Lounge for New Geology Labs TBD $300,000.00 Design SBCC Approval 11/15/2012 3/21/2013 $3,591,000.00 TNCC A2260-090 Install Air Conditioning in Auto Lab HE/0300 $140,000.00 Construction $140,000.00 VCCS A0260-003 Seismic Activity Array Erection: TNCC, TCC PDCC VCCS A1260-053 VCCS - System Office Renovations 15th & 17th Floors $0.00 Construction $0.00 VHCC A1260-118 Parking Lot Improvements TA/0700 $640,000.00 Construction VHCC A1260-123 Cadaver Lab Grant $110,000.00 Construction VHCC A2260-026 Alumni Clock Alumni & Local Business 11/18/2011 $30,000.00 Design $780,000.00 Friday, April 19, 2013 Page 9 of 10 218 COLL Project Number Project Name Funding Source Fund Amt Status VWCC A1260-009 Sidewalk to Parking Lot #8 HE/0300 VWCC A1260-012 Business Science Parking Lot (Design Only) TA/0700 VWCC A1260-033 Brown Library Renovation - Phase 2 HE/0300 and Student Fees VWCC A2260-094 New Electrical Circuit for Robotic Device HE/0300 VWCC A2260-133 Student Life Center (Sitework) Student Activity $600,000.00 Design VWCC A3260-003 Signage Project HE/0300 $200,000.00 Design SBCC Approval $120,000.00 Construction $49,645.00 Design $615,000.00 Construction 5/19/2011 $6,000.00 Construction $1,590,645.00 WCC A1260-018 Breezeway Construction-Bland, Carroll and Fincastle Halls HE/0300 $191,860.00 Construction WCC A2260-027 Grayson Hall Welding Lab HE/0300 $209,800.00 Construction WCC A2260-030 Grayson Hall Computer Lab & Bathroom Improvements VCBA/0817 (capital) WCC A2260-030 Grayson Hall Computer Lab & Bathroom Improvements HE/0300 $306,000.00 Construction WCC A2260-141 Bland Hall ARC Renovation HE/0300 $21,000.00 Construction $92,444.00 Construction $821,104.00 TOTAL Friday, April 19, 2013 $25,578,385.00 Page 10 of 10 219 TITLE: VIRGINIA COMMUNITY COLLEGE SYSTEM STATUS REPORT ON CAPITAL OUTLAY PROJECTS (III.C.3.c.) BACKGROUND: Pursuant to the request of the Facilities Committee of the State Board for Community Colleges, a list of all active Capital Outlay Projects and their status is provided. RESOURCE PERSONS: Mr. Robert B. Jones, RA, CBO, VCCO Associate Vice Chancellor for Facilities Management Services Virginia’s Community Colleges (804) 819-4917 bjones@vccs.edu 220 Virginia's Community Colleges Capital Outlay Status Report Sorted by College Updated 4/22/2013 Line Item Funded Funding * Comp. Date College Project Name Phase Projected Comp. Date of Phase Funding Supplement Estimate Comments Notice to Proceed issued Jan. 3, 2012, exterior walls constructed, curtain wall being installed, mechanical & electrical rough-in. A/E contract being prepared, schematic design sessions underway. BRCC Student Recreation Center Construct Aug-13 $ 10,698,000 BRCC Construct new Academic Building Design May-14 $ 626,556 CVCC Construct Occupational Program Building, Culinary Arts Closeout Mar-13 $ 1,778,000 DSLCC Renovate Warren and Scott Halls Construct May-13 $ 6,607,967 GCC Parking Garage, Fredericksburg Construct May-13 $ 5,941,000 GCC Academic Services Building Construct Jun-13 $ 23,300,000 JSRCC Renovate Burnette Hall Closeout May-13 $ 9,626,000 JSRCC Workforce Training & Technical Center Closeout May-13 $ 8,857,200 JSRCC Improvements to Downtown Campus Construct May-13 $ 11,900,000 JTCC Chester Library Renovation Closeout Jun-13 $ 3,112,000 JTCC Chester 2nd Entrance Closeout Jun-13 $ 1,446,000 JTCC Midlothian Phase III Building Design Dec-13 $ 1,657,156 JTCC LFCC MECC MECC NRCC Midlothian Parking Deck Renovate Main Academic-Administration Hall - Middletown Renovate Dalton-Cantrell Hall Construct second access road Replace HVAC Design Initiation Construct Bid Phase Closeout Dec-13 Apr-13 May-13 May-13 Apr-13 $ $ $ $ $ 6,829,000 500,000 11,200,000 2,100,000 1,439,000 Occupancy Permiit obtained 8/16/2012. All punchlist items completed and final retainage has been released to contractor. AE submit closeout docs to VCCS. Construction for Original Scope of Work is complete. Additional work on entrances to adjacent parcels is on hold. AE contract issued 03/13. Schematic Design approved by AARB 4/13. Schematic Design submitted to BCOM 4/13. See JTCC Midlothian Phase III Building. A/E contract being prepared, pre-planning meetings with college scheduled for April 2013. Changes in porches will delay completion about 2 months - BCOM needs to reinspect Wise County is funding this project, and VDOT is managing design and construction. Final review of project punchlist in progress. A few issues left to final resolution NVCC Annandale Campus, Phase VI Closeout Jun-13 $ 34,356,000 Construction complete & building occupied. Complete Furnishings & Equipment purchases. NVCC Loudoun Campus, Phase III Construct Jun-13 $ 37,046,029 NVCC Manassas Campus, Phase III Construct Jun-13 $ 31,640,998 NVCC Annandale Campus, Renovate Cafeteria Design TBD $ 1,550,000 NVCC Manassas Campus, Improvements: Access Road Design TBD $ 400,000 NVCC Construct Higher Education Center, Loudoun Campus Bid Phase Apr-13 $ 14,381,600 NVCC Construct Phase III Academic Building, Woodbridge Campus Construct May-13 $ 35,639,109 NVCC Construct Support Services Building, Woodbridge Construct May-13 $ 3,016,830 NVCC Expand Brault Building, Annandale Design Apr-13 $ 13,405,567 NVCC Replace Tyler Academic Building, Alexandria Bid Phase Jun-13 $ 40,225,996 NVCC Renovate Reynolds Academic Building, Loudoun Campus Design Jun-14 $ 894,362 NVCC Workforce Development Center, Woodbridge Design May-13 $ 23,298,823 PDCCC Major Mechanical Renovation, Hobbs Campus Construct Nov-13 $ 3,442,000 PHCC Learning Resources Center and West Hall Renovation Initiation May-13 $ 3,439,300 PHCC Motorsports/Workforce Development Center Acquisition TBD $ 9,452,000 RCC Classroom and Laboratory Renovation, Glenns and Warsaw Closeout Jun-13 $ 10,500,000 221 Project complete. Reimburse college for Equipment Purchases. Certificates of Use & Occupancy received for Scott & Warren Halls. Punch-list complete. Process final construction change order & release final payment to contractor. Construction complete with exception of "Sun Screens" at Stairtower. Contractor awaiting delivery of materials. Temporary Certificate of Use & Occupancy received - January 8, 2013. Permanent Certificate of Occupancy (Phase III Academic Building) received - December 3, 2012. Remedial work in progress to address "noise level" in Science Labs. Renovated area in Phase I, re-occupied - January 6, 2013. Final Documentation received for request for Certificate of Occupancy. As-built Drawings missing information. A/E to revise and resubmit. Certificate of Occupancy Issued February 4th, 2013. Communication between the VCCS and the Associate representing the Surety continues to resolve final issues. The project continues to remain at 99% complete. A meeting was held April 12 with Surety to discuss outstanding Items that need to be completed. Surety working on resolving those issues. Phase 5A Completed and Substantial completion inspection by BCOM completed April 8, 2013. Phase 5 approximately 90% complete. Certificate of Occupancy - LR Building received August 2012. Additions to Vet Tech Building & Science Building complete & occupied. Complete "Punch-list" items. Movebable Furnishings & Equipment purchases currently underway. Construction complete. Certificate of Occupancy received January 2012. Barnes & Noble to complete "fit-out" of Bookstore - June 2013. Complete Moveable Furnishings & Equipment purchases. Pre-planning Study completed. Overall project scope currently under review. Pending VDOT funding for intersection at State Route 234 Revised Working Drawings currently in final review at BCOM. Receive bids - April 2013. Construction approximately 90% complete. Interior finishes, ceilings, flooring, installation of casework currently in progress. Complete construction of "Connecting Bridge" and sitework at Plaza - July 2013. Temporary Certificate of Use & Occupancy received June 2012. Remedial asphalt work (i.e. "Punch-list item) to be completed simultaneous with paving of Phase III Parking Lot. BCOM Working Drawing Review in progress. Advertise for bids - May 2013. College in progress of vacating building. Final BCOM Working Drawing Review in progress. Issued Plans to CM firm for "pricing" - March 2013. Receive initial Bid (i.e. Guarranteed Maximum Price) May 2013. Negotiate final price. Submit Schematic Design Documents to BCOM for review - September 2013. Complete BCOM Review - May 2013. Issue Plans to CM firm for pricing - May/June 2013. Project progressing on schedule. Project at 40% Complete $ 4,749,700 Initial Phase of project complete. Sub-project to refurbish existing elevator and address HVAC issues in "West Hall", currently under consideration. Request to modify project scope to include possible "acquisition & renovation" of suitable facility, in lieu of constructing new facility on the Main Campus, approved. Available options currently being reviewed. Repair of feature walls complete Dec 2012. RCC to complete equipment purchase. Virginia's Community Colleges Capital Outlay Status Report Sorted by College Updated 4/22/2013 Line Item Funded Funding Comp. Date College Project Name Phase Projected Comp. Date of Phase Funding Supplement Estimate Comments CO-2 requesting authorization of full funding approved by DPB 10/10/2011. Construction Contract award complete with Notice to Proceed issued 11/9/2012. Constrcution is 18% completion. 3 weeks behind schedule. Building is in use. State Fire Marshal has given final approval. Will apply for final CO once all paperwork is in hand. SsVCC Student Services/LRC Building Daniel Campus Construct May-14 $ 13,095,039 SWVCC Renovate Russell Hall Closeout May-13 $ 9,645,000 TCC Phase I, Regional Health Prof.Ctr, VAB Campus Closeout Aug-11 $ 21,360,000 TCC Construct Norfolk Campus Student Center Closeout May-13 $ 17,595,000 TCC Construct Academic Building, Chesapeake Campus Construct Apr-13 $ 28,012,000 TCC Construct Learning Resource Center - Phase 1, VAB Campus Construct Mar-13 $ 43,549,000 TCC New Construction: Construct Student Center, VAB Campus Construct Jun-13 $ 24,370,000 TCC New Construction: Construct Student Center, CC Tidewater Construct Jul-13 $ 20,753,000 TCC Renovate Bayside Building, VAB Campus Initiation Mar-13 $ 1,722,155 TCC New Construction: Construct Student Center, PC, Tidewater Construct May-13 $ 18,396,000 TNCC Acquire Hampton III Bldg. (Phase II Improvements) Closeout Aug-11 $ 2,707,000 TNCC Renovate Hampton III Building (Phase III Renovation) Closeout Aug-11 $ 8,033,000 VWCC Construct New Science and Technology Building Construct Apr-13 $ 23,117,000 VWCC Construct Exterior Multi-Use Plaza Construct Apr-13 $ 2,000,000 Certificate of Occupancy issued Construction almost complete. A settlement agreeement with the AE is being finalized. A subcontractor claim for additional mechanical work is being evaluated. Construction almost complete VWCC Renovate & Expand Student Life Center Construct Apr-14 $ 7,542,000 Building permit issued, demolition and steel fabrication in progress VWCC Renovate Anderson Hall Initiation May-13 $ 1,036,050 WCC Wm. F. Snyder Auditorium Closeout Jun-13 $ 1,536,080 Design funding appropriated, feasibility study for renovation vs. demolition underway Project complete and buidling occupied. As builts docs were received from AE. VCCS complete CO-14. WCC Walking and Biking Trail Closeout Jun-13 WCC Upgrade Electrical Systems-Phase III Replace Fire Alarm Systems Campuswide Initiation Apr-13 $ TOTAL Certificate of Occupancy issued - closeout underway LEED Silver Awarded. Still awaiting College to provide Security Policy for Access Contol system for resubmittal to BCOM for Final CO. BCOM Substantial Completion Inspection Scheduled for April 25, 2013 Temporary Certificate of Use & Occupancy received April 2013. Building commissioning is underway. Construction continues to progress according to schedule. Substantial completion is scheduled for June 2013. Construction continues to progress according to schedule. Schematic design is proceeding. Construction Progressing on Schedule. Interior finishes are starting. Project is at 88% Complete. Substantial Completion is scheduled for May 30th. Certificate of Occupancy issued $800,000 Construction complete. VCCS received closed out docs from AE. VCCS to complete CO-14. 2,566,000 Constrcution of Project Phase I and Phase II completed and CO-14 for Phase I & II submitted. VCCS received closed out docs from AE. Initiation of Phase III-Fire Alarm Replacement Campuswide approved by BCOM/DPB 3/13. $ 618,140,817 $ 4,749,700 System-wide Projects Funding Comp. Date College Notes: Project Name Phase Projected Comp. Date of Phase Funding NRCC TCC-N,C SWVCC VWCC VWCC WCC Major Mechanical Campuswide (ESCO) Major Mechanical - Lighting (ESCO) Buchanan Hall Plumbing Replacement Major Mechanical - Exterior Envelope Repair (ESCO) Emergency Lighting & Life Safety Alterations Structural Repair - Grayson Hall Closeout Closeout Construct Closeout Construct Complete Feb-13 Feb-13 Jan-13 Feb-13 May-13 $ $ $ $ $ $ 4,761,100 3,368,031 355,000 1,791,344 550,000 - VCCS Americans with Disabilities Act Improvements Various Various $ 4,000,000 Total System-wide Projects $ 14,825,475 Grand Total $ 628,966,292 Supplement Estimate Comments Awaiting Final Resolution of outstanding issues Final Documentation received - Final closeout in progress Plumbing work completed Oct. 2012, related door replacements anticipated Jan. 2013. Final Documentation received - Final closeout in progress Change order issued for hard-wired access controls instead of wireless This project was incooprated into the WCC-Snyder Auditorium Addition and is complete. Project is being completed in eleven phases systemwide. Phase 1 is under construction. Phases 2 and 3 bids over budget and under redesign. Phase 4 contract award in progress. $ 4,749,700 Funding: Within budget. Costs may exceed funds available. Costs will exceed all available funding. Comp. Date: On schedule. Facility may not be ready in time to hold scheduled classes. Facility will not be ready in time to hold scheduled classes. 222