PBN and the Cockpit Workshop Regulatory and Certification Forum EASA Guidance Material Bryan Jolly ATM Rulemaking Officer/PBN Project manager, 18th October 2012 Content Current Regulations Next Steps in Regulation development Air OPS Airworthiness Currently Applicable Regulations • Annex III to Council Regulation (EEC) No 3922/91 (EU-OPS) http://eur-lex.europa.eu/en/index.htm 3 Operational Approval • An operator shall ensure that an aeroplane operated in areas, or through portions of airspace, or on routes where navigation performance requirements have been specified, is certified according to these requirements, and, if required, that the Authority has granted the relevant operational approval. EU-OPS 1.243(a) Operational Approvals Required from NAA ! 4 EASA requirements PBN operations EASA / JAA RNAV 10 AMC 20-12 RNAV 5 (B-RNAV) AMC 20-4 RNAV 1 (P-RNAV) JAA TGL 10 RNP APCH (LNAV) AMC 20-27 RNP APCH (LNAV/VNAV) AMC 20-27 RNP APCH (LPV) AMC 20-28 RNP AR AMC 20-26 http://easa.europa.eu/agency-measures/certification-specifications.php AMC 20- material • Contents of AMC 20-27: 1. Purpose 2. Background 3. Scope General information. 4. Reference Documents 5. Assumptions 6. RNP-APCH Airworthiness Criteria 7. Functional Criteria 8. Airworthiness Compliance Airworthiness Criteria. 9. AFM/POH 10. RNP-APCH Operational Criteria incl. appendices 2, 3, 4 and 5 Operational Criteria. 11. Availability of Documents General information. 6 Future PBN Operational Approvals Issues •Note the number of PBN applications is increasing, •Requesting and obtaining a SPA constitutes an additional administrative task, especially for non-commercial operators What are the Safety gains? 7 PBN Approvals Objectives Transpose the operational criteria from AMC 20-4, AMC 20-5, AMC 20-12, AMC 20-27 AMC 2028 into Part-SPA; 8 What Next - Airworthiness Develop applicable Certification Specifications (CS-ACNS) • interoperability requirements, resulting from the SES implementing rules • Safety requirements deemed necessary to ensure the safe operation of the aircraft in the given volume of airspace. • Will replace the AMC 20 series • Developed to included required Nav Spec’s for worldwide operations 9 10