BENGUET ELECTRIC COOPERATIVE, INC. Alapang, La Trinidad, Benguet NOTICE OF POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time: DATE Monday, September 21, 2015 Tuesday, September 22, 2015 TIME 9:00 am5:00 pm FEEDER 13 AREAS AFFECTED PURPOSE B001110 BC01111 Sectionalizer Agpaoa Drive, Sarok and Sarok BWD, Camp 7 BENECO POWER INTERRUPTION: -Correction of Low Sagging Primary Lines B000993 Sectionalizer Petersville Subdivision, Amparo Heights and parts of Lexber Subdivision, Camp 7 BENECO POWER INTERRUPTION: -Installation of Continuous Neutral -Right-of-Way Vlearing 9:00 am5:00 pm FEEDER 5 Trans Cut-out Engineers Hill and parts of Marcoville, Baguio City BENECO POWER INTERRUPTION: -Correction of Secondary Assembly 9:00 am5:00 pm FEEDER 3 BC05135 Sectionalizer San Carlos Heights, NPC Subdivision and parts of Irisan, Baguio City BENECO POWER INTERRUPTION: -Relocation and Correction of Leaning Primary Pole FEEDER 11 B005208 Trans Cut-out Parts of Anteg-in, Loacan Itogon BENECO POWER INTERRUPTION: -Replacement of undersize Secondary Pole FEEDER 13 BC01413 Sectionalizer Dagsian, Baguio City FEEDER 10 LT04830 Sectionalizer Bineng, La Trinidad Ampucao Line IT02482 Sectionalizer BENECO POWER INTERRUPTION: Sitio Liwliw, Sitio Ud Udan, KIAS, Pinesville Subdivision, PMA, Atok -Replacement of rotten Primary Pole Trail, Bubon FEEDER 11 IT00191 Trans Cut-out 9:00 am5:00 pm 9:00 am5:00 pm 9:00 amWednesday, 5:00 pm September 23, 2015 9:00 am5:00 pm Thursday, September 24, 2015 FEEDER EQUIP'T REF. OF DE-ENERGIZED AREA 9:00 am5:00 pm 9:00 am5:00 pm FEEDER 7 Baguio Gold, Tuding, Itogon Quirino Hill, Dizon Subdivision, Upper/Lower Pinget, Dreamland DIZON RECLOSER Subdivision BENECO POWER INTERRUPTION: -Right-of-Way Clearing -Replacement of Conductor Wire from bare to coated BENECO POWER INTERRUPTION: -Relocation of Primary Pole BENECO POWER INTERRUPTION: -Replacement of rotten Secondary Pole BENECO POWER INTERRUPTION: -Relocation of Primary Pole -Restructuring of Primary Pole -Right-of-Way Clearing EST. EST. NO. OF UNDELIVERED CONS. /UNUSED AFFECTED ENERGY 121 745.0 45 169.0 33 98.0 464 1,892.0 13 34.0 67 187.0 18 98.0 523 8,720.0 13 59.0 432 2,343.0 NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 442-2295/442-6663/444-9201/422-6532/09088657202 APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/Corplan-wesm/comrel/NGCP