list of assessment fees

advertisement
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
No.
Qualification
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Tailoring NC II
Pattern Making (COC)
Sewing (COC)
Dressmaking NC II
Pattern Making (COC)
Sewing (COC)
Footwear Making NC II
Upper Making (COC)
Lasting (NC II)
Finishing Touches (COC)
Machining NC II
Security Services NC II
Security Services NC I
Driving NC II
Applicant Provided Vehicle
AC Provided Vehicle
Driving NC III
Applicant Provided Vehicle
AC Provided Vehicle
Auto Engine Rebuilding NC II
Automotive Body Painting/Finishing NC II
Automotive Body Repairing NC II
Motorcycle/Small Engine Servicing NC II
Automotive Servicing NC II
By COC:
Conduct Diesel Tune-Up
Conduct Gas Tune-Up
Service Engine Component
Service Automotive Electrical Component
Service Underchassis Component
Service Power Train
Building Wiring Installation NC II
Carpentry NC II
Masonry NC II
Project 1 – Lay and plaster bricks/CHB
Supplies
&
Materials
300.00
50.00
250.00
320.00
50.00
300.00
500.00
200.00
200.00
200.00
500.00
100.00
100.00
Assessor’s
Fee
TOTAL
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
400.00
150.00
350.00
420.00
150.00
400.00
600.00
300.00
300.00
300.00
600.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00
100.00
300.00
500.00
300.00
100.00
600.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
200.00
400.00
600.00
400.00
200.00
700.00
75.00
85.00
55.00
50.00
50.00
300.00
400.00
500.00
400.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
175.00
185.00
155.00
150.00
150.00
400.00
500.00
600.00
500.00
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
17
18
19
20
21
22
23
Project 2 – Install pre-cast baluster and handrail
Plumbing NC II
Heavy Equipment Operation NC II (on-site)
Animation Production NC II
By COC
Raise Poultry
Raise Swine
Raise Small Ruminants
Raise Large Ruminants
Horticulture NC II
By COC
Conduct Pre-Horticulture farm operations
Produce Vegetable Crops
Produce Fruit Bearing Crops
Perform Post Harvest Operations in Major Tropical
Fruits
Perform Post Harvest Operations in Low Land and
Semi-Temperate Crops
Aqua Culture NC II
By COC
Conduct Pre-Aquaculture Activities
Prepare and Maintain Aquaculture Facilities-Ponds
Prepare and Maintain Aquaculture Facilities-Tanks
Prepare and Maintain Aquaculture Facilities-Pens
and Cages
Operate Fish Nursery
Perform Fish or Shrimp Grow Out Operations
Food Processing NC II
By COC
Process Food by Curing, Salting & Smoking
Process Food by Fermenting & Pickling
Process Food by Sugar Concentration
Package Finished/Processed Food Products
RAC Servicing
RAC Window Type Air-conditioning/Domestic Refrigeration
NC I
RAC PACU/CRE NC II
Transport RAC NC II
By COC
400.00
500.00
100.00
100.00
500.00
600.00
200.00
300.00
300.00
300.00
100.00
100.00
100.00
100.00
300.00
400.00
400.00
400.00
100.00
200.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00
300.00
300.00
300.00
200.00
100.00
300.00
250.00
100.00
350.00
200.00
200.00
200.00
200.00
100.00
100.00
100.00
100.00
300.00
300.00
300.00
300.00
200.00
200.00
400.00
100.00
100.00
100.00
300.00
300.00
500.00
200.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
300.00
200.00
200.00
200.00
200.00
100.00
300.00
200.00
100.00
300.00
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
24
25
26
27
28
29
Install Transport RAC Units
Service and Maintain RAC Units
Troubleshoot Transport RAC System
Recover and Recycle Refrigerant in Transport RAC
System
Repair and Retrofit Transport RAC System and
Accessories
Perform Testing & Commissioning Transport Airconditioning & Refrigeration
Commercial Cooking NC II
By COC
Prepare and Bake Pastry Products
Prepare and Cook Hot Meals
Prepare and Cook Cold Meals
Bartending NC II
By COC
Clean Bar Areas
Operate Bar
Prepare & Mix Cocktails and Non Alcoholic Drinks
Provide Wine Service
Housekeeping NC II
By COC
Provide Housekeeping Services
Laundry Linen & Guests Clothes
Provide Butler Service
Food and Beverage Servicing NC II
By COC
Provide Link Between Kitchen & Service Areas
Provide Food & Beverage Service
Provide Room Services
Tour Guiding Servicing NC II
By COC
Research Information Relevant to Tour Itinerary
Management Arrangement for Visitors
Accompany and Guide Visitors in Accordance with
Tour Itinerary
Travel Services NC II
By COC
Book Travel Related Reservation
50.00
50.00
50.00
50.00
100.00
100.00
100.00
100.00
150.00
150.00
150.00
150.00
50.00
100.00
150.00
50.00
100.00
150.00
300.00
100.00
400.00
100.00
100.00
100.00
400.00
100.00
100.00
100.00
100.00
200.00
200.00
200.00
500.00
50.00
50.00
400.00
400.00
250.00
100.00
100.00
100.00
100.00
100.00
150.00
150.00
500.00
500.00
350.00
50.00
50.00
50.00
200.00
100.00
100.00
100.00
100.00
150.00
150.00
150.00
300.00
100.00
100.00
100.00
100.00
100.00
150.00
100.00
200.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
200.00
100.00
100.00
50.00
100.00
100.00
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
30
31
32
33
34
35
36
37
38
Issues Air Sea Land Tickets and Multi-Purpose
Documents
Administer Billing and Settlement Plan
Front Office Services NC II
By COC
Receive and Process Reservation
Operate Computerized Reservations System
Provide Accommodation Reception Services
Conduct Night Audit
Provide Club Reception Services
Provide Porter Services
Baking/Pastry Production NC II
By COC
Prepare Bakery Products for Pattisiers
Prepare and Present Gateaux, Tortes and Cakes
Prepare and Display Petits Fours
Computer Hardware Servicing NC II
Medical Transcription NC II
Household Services NC II
Portfolio Assessment (HSW)
Health Care Services NC II
Caregiving NC II
By COC
Provide Support & Care to Elderly & People with
Special Needs
Provide Support & Care to Infants Toddlers/Children
Hairdressing NC II
By COC
Perform Pre and Post Activities
Perform Hair Color
Perform Hair Bleaching
Perform Hair and Scalp Treatment
Perform Haircut
Perform Hair Perming
Hairdressing NC III
By COC
Perform Creative Hairstyle
Perform Hair straightening
Supervise Beauty Care Activities
50.00
100.00
150.00
50.00
100.00
100.00
100.00
150.00
200.00
300.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
400.00
200.00
250.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
250.00
250.00
250.00
350.00
250.00
400.00
100.00
300.00
350.00
150.00
100.00
250.00
150.00
500.00
100.00
100.00
250.00
600.00
100.00
300.00
300.00
250.00
100.00
300.00
500.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
200.00
400.00
400.00
350.00
200.00
400.00
600.00
300.00
300.00
100.00
100.00
100.00
100.00
400.00
400.00
200.00
150.00
150.00
150.00
250.00
150.00
300.00
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
Beauty Care NC II
By COC
Perform Pre and Post Activities
Perform Hand Spa
Perform Foot Spa
Perform Manicure and Pedicure
Perform Body Scrub
Perform Body Bleaching
Perform Body Massage
Beauty Care NC III
By COC
Perform Hair Removal
Apply Make-Up
Perform Creative Nail Design
Apply Facial Treatment
Supervise Beauty Care Activities
Agricultural Crops NC I
Agricultural Crops NC III
Animation NC III
Airduct Servicing NC II
Automotive Body Painting/Finishing NC I
Automotive Body Painting/Finishing NC III
Automotive Servicing NC I
Automotive Servicing NC III
Automotive Servicing NC IV
Barangay Health Services NC II
Biomedical Equipment NC II
Carpentry NC III
Consumer Electronics NC II
Consumer Electronics NC III
Consumer Electronics NC IV
Construction Painting NC II
Construction Painting NC III
Emergency Medical Services NC II
Fish Capture NC I
Fish Capture NC II
Gas Metal Arc Welding NC I
Gas Metal Arc Welding NC II
Gas Welding NC I
500.00
100.00
600.00
100.00
200.00
200.00
100.00
300.00
300.00
200.00
500.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
200.00
300.00
300.00
200.00
400.00
400.00
300.00
600.00
200.00
200.00
100.00
200.00
100.00
200.00
200.00
300.00
200.00
300.00
300.00
350.00
200.00
200.00
300.00
250.00
300.00
300.00
300.00
300.00
200.00
300.00
300.00
300.00
300.00
400.00
500.00
400.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
300.00
300.00
200.00
300.00
200.00
300.00
300.00
400.00
300.00
400.00
400.00
450.00
300.00
300.00
400.00
350.00
400.00
400.00
400.00
400.00
300.00
400.00
400.00
400.00
400.00
500.00
600.00
500.00
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
East Service Road, South Superhighway, Taguig City
LIST OF ASSESSMENT FEES
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
Gas Welding NC II
Gas Tungsten Arc Welding NC II
Heavy Equipment (Mechanical) NC II
Horticulture NC III
Ice Plant Refrigeration Servicing NC III (On-site)
Instrumentation and Control Servicing NC II
Machining NC I
Masonry NC I
By COC
Prepare masonry materials
Perform basic masonry works
Massage Therapy NC II
Mechatronics Servicing NC II
Plumbing NC I
Plumbing NC III
By COC
Perform complex & multi-storey plumbing
Install hot potable chilled water piping
Draft plumbing design
Pyrotechnics NC II
Slaughtering Operations NC II
Submerged Arc Welding NC I
Submerged Arc Welding NC II
Shielded Metal Arc Welding (SMAW) NC I
Shielded Metal Arc Welding (SMAW) NC II
Shielded Metal Arc Welding (SMAW) NC III
Shielded Metal Arc Welding (SMAW) NC IV
Flux Cored Arc Welding (FCAW) NC I
Flux Cored Arc Welding (FCAW) NC II
500.00
600.00
300.00
200.00
300.00
300.00
400.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
600.00
700.00
400.00
300.00
400.00
400.00
500.00
400.00
500.00
250.00
400.00
400.00
550.00
100.00
100.00
100.00
100.00
100.00
100.00
500.00
600.00
350.00
500.00
500.00
650.00
300.00
400.00
550.00
500.00
250.00
400.00
500.00
400.00
500.00
600.00
600.00
500.00
400.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
400.00
500.00
650.00
600.00
350.00
500.00
600.00
500.00
600.00
700.00
700.00
600.00
500.00
Download