COST SCHEDULE - C-1
2011-12
1 KM OF 11 KV LINE ON VARIOUS SUPPORT
Sl.No.
Particulars
1
2
1
140 Kg., 8.0 Mtrs. long PCC Poles
H-Beams 152 X 152 mm., 37.1 Kg./mtr 11
Mtr. Long
2
3
R.S.Joists 175X85,19.6/mtr,11.0 Mtr long
11 KV 'V' cross-arms with back clamps angle
type 65x65x6 mm
4
5
11 KV Top clamps angle type 65x65x6 mm
Earthing Set (Coil earth as per Drg. No.
G/007 )
6
7
11 KV Pin insulator with Pin
AAAC Conductor Raccoon with 3 % Sag
8
AAAC Conductor rabbit with 3 % Sag
9
Jointing Sleeves suitable for 80/100 Sq.
10 mm.Al. Eq. AAAC conductor
Stay set 16 mm. complete with back clamps,
stay wire 7/3.15 mm. (5.5 kg.stay wire per
11 stay set ) and turn buckles
12 Back filling of poles with boulders.
Concreting of H-Beam @ 0.65 Cmt.per pole
including muffing of pole, @ 0.2 Cmt. per
stay and 0.05 cmt for PCC Pole base
13 padding,RSJ @0.30 cmt per pole
14 Red oxide paint
15 Aluminium paint
16 Anti climbing devices
17 Danger Boards
18 Binding wire and tape
19 M.S.Nuts and Bolts
Total
20 Centages :
Labour & Transportation charges @ 10% of
21 material cost
22 Cost per Km.
H-Beam Using
Raccoon
Conductor Max
Span 70 Mtrs
Amount
Qty.
(Rs.)
5
6
0
0
RSJ
PCC Pole Using (175X85),11.0 Mtr
long Using rabbit
rabbit
Conductor Max
Conductor Max
Span 70 Mtrs
Span 83 Mtrs
Amount
Amount
Qty.
(Rs.)
Qty.
(Rs.)
7
8
7
8
12
17520
0
0
Unit
3
No.
Rate
4
1460
No.
No.
18519
6507
14
0
259266
0
0
0
0
0
0
14
0
91098
No.
No.
712
173
14
14
9968
2422
12
12
8544
2076
14
14
9968
2422
No.
No.
Km.
Km.
135
86
34533
25857
14
42
3.1
0
1890
3612
107052
0
12
36
0
3.1
1620
3096
0
80157
14
42
3.1
0
1890
3612
107052
0
No.
70
6
420
6
420
6
420
Set
No.
677
100
4
2708
0
4
12
2708
1200
4
2708
0
Cmt.
Ltr.
Ltr.
No.
No.
Kg.
Kg.
3050
109
187
218
67
126
69
9.9
2
2
12
14
3
18
30195
218
374
2616
938
378
1242
423299
1.4
2
2
12
12
3
14
4270
218
374
2616
804
378
966
126967
5
2
2
12
14
3
18
15250
218
374
2616
938
378
1242
240186
42330
465629
12697
139663
24019
264205
COST SCHEDULE - C-1 (A)
2011-12
1 KM OF 11 KV LINE ON 152X152mm,37.1 Kg/Mtr. 13 Mtr. Long H-BEAM with Dog
Sl.No.
Particulars
1
2
H-Beams 152 X 152 mm., 37.1 Kg./mtr 13 Mtr. Long
1
11 KV 'V' cross-arms with back clamps angle type
65x65x6 mm
2
11 KV Top clamps angle type 65x65x6 mm
3
Earthing Set (Coil earth as per Drg. No. G/007 )
4
5
11 KV Pin insulator with Pin
AAAC Conductor Dog with 3 % Sag
6
Jointing Sleeves suitable for Rabbit Conductor.Al. Eq.
AAAC
7
Stay set 20 mm. complete with back clamps, stay wire
7/4.0 mm. (8.5 kg.stay wire per stay set ) and turn
buckles
8
Concreting of H-Beam @ 0.65 Cmt.per pole including
muffing of pole, @ 0.3 Cmt. per stay
9
10 Red oxide paint
11 Aluminium paint
12 Anti climbing devices
13 Danger Boards
14 Binding wire and tape
15 M.S.Nuts and Bolts
Total
Labour & Transportation charges @ 10% of material
17 cost
18 Cost per Km.
H-Beam 13 mtr
Using Dog
Conductor Max
Span 50 Mtrs
Amount
Qty.
(Rs.)
5
6
20
437720
Unit
3
No.
Rate
4
21886
No.
No.
No.
No.
Km.
712
173
135
86
46621
60
60
20
60
3.1
42720
10380
2700
5160
144525
No.
70
6
420
Set
1052
6
6312
Cmt.
Ltr.
Ltr.
No.
No.
Kg.
Kg.
3050
109
187
218
67
126
69
14.8
8.4
8.4
12
12
3
36
45140
916
1571
2616
804
378
2484
703846
70385
774230
COST SCHEDULE - C-1 (B)
2011-12
1 KM OF 11 KV LINE ON 152X152mm,37.1 Kg/Mtr. 13 Mtr. Long H-BEAM with AB Cable
Sl.No.
Particulars
Unit
Rate
1
2
3
4
1
H-Beams 152 X 152 mm., 37.1 Kg./mtr 13 Mtr. Long
No.
2
3
Suspension clamp assembly including pole clamps
Earthing Set (Coil earth as per Drg. No. G/007 )
Dead end clamp /Anchor clamp assembly including
brackets, pole clamps
11 KV Arial Bunch Cable
(i) 3x95+1x80 sq mm
Sets
No.
6
Cable Straight through joint kits suitable for 95 sqmm
Sets
7
Cable end termination kits suitable for 95 sqmm
Stay set 16 mm. complete with back clamps, stay wire
7/3.15 mm. (5.5 kg.stay wire per stay set ) and turn
buckles
Concreting of rail supports @ 0.65 Cmt.per pole
including muffing of pole, @ 0.3 Cmt. per stay
Red oxide paint
Aluminium paint
Anti climbing devices
Danger Boards
M.S.Nuts and Bolts
Total
Labour & Transportation charges @ 10% of material
cost
Cost per Km.
No.
4
5
8
9
10
11
12
13
14
16
17
Sets
Km.
21886
119
135
440
366537
7666
4311
Set
5
Amount
(Rs.)
6
20
437,720
15
23
1,785
3,105
8
3,520
1.05
384,864
3
22,998
2
8,622
4
2,708
9
27,450
15
15
23
23
35
1,635
2,805
5,014
1,541
2,415
906,182
Qty.
677
Cmt.
Ltr.
Ltr.
No.
No.
Kg.
3050
109
187
218
67
69
90618
996,800
COST SCHEDULE - C-2
2011-12
11 KV D.P.STRUCTURE ON PCC POLES
(TO BE SUPPLEMENTED TO EVERY 1.6 KMS.OF 11 K.V. LINE)
Sl. No.
Particulars
1
1
2
140 Kg., 8.0 Mtrs. long PCC poles
D.C.cross- arm of ISMC channel of 100 X 50 X 6 mm.
suitable for 4' centre DP
11 KV strain set with hard ware
11 KV Pin Insulator with G.I.Pins
Horizontal and cross bracing 4' centre with set of four
back clamps
Stay set 16 mm. complete with back clamps, stay wire
7/3.15 mm. (5.5 kg.stay wire per stay set ) and turn
buckles
Concreting of PCC pole @ 0.3Cmt.and @ 0.2 cmt.
per stay .
Earthing Set (Coil earth as per Drg. No. G/007 )
Red oxide paint
Aluminium paint
Anti climbing devices
Danger Boards
M.S.Nuts and Bolts
Total
Labour & Transportation charges @ 10% of material
cost
Cost per D.P.
2
3
4
5
6
7
8
9
10
11
12
13
15
16
Unit Rate (Rs.)
PCC pole
Amount
Qty.
(Rs.)
5
6
2
2920
3
No.
4
1460
Set
3078
1
3078
Set
No.
304
86
6
2
1824
172
Set
2596
1
2596
Set
677
6
4062
Cmt.
3050
1.8
5490
No.
Ltr.
Ltr.
No.
No.
Kg.
135
109
187
218
67
69
1
0.6
0.6
2
1
6
135
65
112
436
67
414
21372
2137
23509
COST SCHEDULE - C-2 (A)
2011-12
11 KV D.P.STRUCTURE ON VARIOUS SUPPORT
(TO BE SUPPLEMENTED TO EVERY 1.6 KMS.OF 11 K.V. LINE)
Sl. No.
Particulars
Unit Rate (Rs.)
H-Beam 13 mtr
long
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
2
H-Beams 152 X 152 mm., 37.1
Kg./mtr 13 Mtr. Long
H-Beams 152 X 152 mm., 37.1
Kg./mtr 11 Mtr. Long
RSJ 9.3 Mtr long 175x85
mm,19.6 mtr
D.C.cross- arm of ISMC
channel of 100 X 50 X 6 mm.
suitable for 4' centre DP
11 KV strain set with hard ware
11 KV Pin Insulator with
G.I.Pins
Horizontal and cross bracing 4'
centre with set of four back
clamps
Stay set 16 mm. complete with
back clamps, stay wire 7/3.15
mm. (5.5 kg.stay wire per stay
set ) and turn buckles
Concreting of H-Beam & R S
Joist @ 0.65 Cmt.per pole
including muffing of pole,and
@ 0.3 cmt. per stay .
Earthing Set (Coil earth as per
Drg. No. G/007 )
Red oxide paint
Aluminium paint
Anti climbing devices
Danger Boards
M.S.Nuts and Bolts
Total
Labour & Transportation
charges @ 10% of material
cost
Cost per D.P.
H-Beam 11 mtr
long
H-Beam 13 mtr
long
3
4
5
Amount
(Rs.)
6
No.
21886
2
43772
No.
18519
No.
8038
Set
3078
1
3078
1
3078
3
Set
304
6
1824
6
1824
No.
86
2
172
2
Set
2596
1
2596
Set
677
6
Cmt.
3050
No.
Ltr.
Ltr.
No.
No.
Kg.
Amount
(Rs.)
6
5
2
16076
9234
3
9234
6
1824
6
1824
172
3
258
3
258
1
2596
1
2596
1
2596
4062
6
4062
6
4062
6
4062
2.5
7625
1.2
3660
2.5
7625
1.2
3660
135
1
135
1
135
1
135
1
135
109
187
218
67
69
1.6
1.6
2
1
6
174
299
436
67
414
64655
1.6
1.6
2
1
6
174
299
436
67
414
53956
3
3
2
1
18
327
561
436
67
1242
72139
3
3
2
1
18
327
561
436
67
1242
40478
Qty.
5
2
5
Amount
(Rs.)
6
2
43772
RSJ 9.3mtr long
for take-off DP at
S/s
Amount
(Rs.)
6
Qty.
1
DP FOR DCSS
Qty.
Qty.
37038
6465
5396
7214
4048
71120
59351
79353
44526
Sl.
No
.
Particulars
COST SCHEDULE C-3(A)
11/0.4 KV OUT DOOR SUB-STATION
Unit
16 KVA Transformer
25 KVA Transformer
1
2
3
1 Transformer 11/0.4 KV (Conventional) No.
Qty.
4
1
2 (i) 140 Kg., 8.0 M. long PCC poles
No.
2
(ii) R.S.Joists 175X85,19.6/mtr,11.0
No.
Mtr long
3 D.C.cross-arm of 100 X50X 6 mm. 8'
Set
1
centre
4 11 KV Strain set with hardware
Set
3
5 11 KV D.O. fuse and lightening
No.
1
arrestors mounting D.C. crossarm(100 X 50 X 6 mm.) 2 Sets for
Distribution Box mounting
6 11 KV D.O. fuse unit(one set of 3
Set
1
nos.)
7 Transformer clamping set 50X50 X6
Set
1
mm Angle
8 Stay set 16 mm. (complete painted)
Set
4
9 Concreting of RSJ supports @ 0.5
Cmt. 1.8
cmt & PCC pole @ 0.05 cmt. per
(1:3:6)
pole and @ 0.3 cmt. per stay
10 Transformer belting with 50 X 50 X 6
Set
1
mm.angle with two cross fixing
channels
11 Transformer mounting cross-arm 100
Set
1
X 50 X6 mm. channel
12 AAA Conductor Rabbit for Jhumpar
Mtr.
30
13 Danger board
No.
1
14 Earthing set as per circular
Set
1
No.Discom/EZ/WS/1516 Dt. 17.03.08
& approved Drg.
15 Anti climbing devices
No.
2
16 Red oxide paint
Ltr.
2
17 Aluminium paint
Ltr.
2
18 11 KV Lightning arrestors
No.
3
19 M.S.Nuts and Bolts
Kg.
14
20 Meter cum protection box for 16/25
No.
1
KVA DTR
21 16 Sq.mm. XLPE insulated Single
Mtr.
80
core Unarmoured cable
Rate
(Rs.)
5
47938
Amount
(Rs.)
6
47938
Qty.
1460
-
2011-12
63 KVA Transformer
Amount
(Rs.)
9
41313
Qty.
7
1
Rate
(Rs.)
8
41313
2920
2
-
1460
-
3247
3247
1
304
1117
912
1117
2268
100 KVA Transformer
10
1
Rate
(Rs.)
11
73484
Amount Qty.
(Rs.)
12
13
73484
1
14
87033
Amount
(Rs.)
15
87033
2920
-
0
2
0
9507
0
19014
2
9507
19014
3247
3247
1
3247
3247
1
3247
3247
3
1
304
1117
912
1117
3
3
304
1117
912
3351
3
3
304
1117
912
3351
2268
1
2268
2268
1
2268
2268
1
2268
2268
1925
1925
1
1925
1925
1
1925
1925
1
1925
1925
677
3050
2708
5490
4
1.8
677
3050
2708
5490
4
1.8
677
3050
2708
5490
4
1.8
677
3050
2708
5490
1925
1925
1
1925
1925
1
1925
1925
1
1925
1925
3035
3035
1
3035
3035
1
3035
3035
1
3035
3035
26
67
2877
780
67
2877
30
1
1
26
67
2877
780
67
2877
30
1
1
26
67
2877
780
67
2877
30
1
1
26
67
2877
780
67
2877
218
109
187
494
69
20611
436
218
374
1482
966
20611
2
2
2
3
14
1
218
109
187
494
69
20611
436
218
374
1482
966
20611
2
2
2
3
14
-
218
109
187
494
69
-
436
218
374
1482
966
-
2
2
2
3
14
-
218
109
187
494
69
-
436
218
374
1482
966
-
13
1040
120
13
1560
-
-
-
-
-
-
Rate
22 L.T. Distribution box suitable for 63
KVA transformer (without TPN
switches) with MCCB on incoming
and PF units on outgoing side
23 50 Sq.mm.,single core XLPE
insulated un-armourered aluminium
conductor cable
24 70 Sq.mm.,single core XLPE
insulated un-armoured aluminium
conductor cable
25 150 Sq.mm.,single core XLPE
insulated un-armoured aluminium
conductor cable
26 L.T. Distribution box suitable for 100
KVA transformer (without TPN
switches) with MCCB on incoming
and PF units on outgoing side
27 11 KV A.B. switch
28 Three phase 20-80 Amps.with L.S. &
TOD Facility with box
29 LT CT operated 3 Phase 4 W Static
energy meter with CT & Modem
30 HT tape for covering LT bushing
including winding and blower heating
31 Total
33 Labour & Transportation charges @
10% of material cost
34 Cost per sub-station
No.
-
-
-
-
-
1
11891
11891
Mtr.
-
-
-
-
-
80
34
2720
0
0
0
Mtr.
0
0
0
0
0
40
43
1720
80
43
3440
Mtr.
-
-
-
-
-
0
0
0
40
86
3440
No.
-
-
-
-
-
-
-
-
1
14530
14530
Set
No.
1
5690
1
5690
5690
5690
6203
1
5690
1
5690
6203
0
0
0
1
13423
13423
25
750
30
25
750
No.
mtr
30
0
30
25
750
30
25
750
108776
10878
102671
10267
147330
14733
179894
17989
119654
112938
162063
197883
COST SCHEDULE D-1
( 2011-12)
L.T.LINES 3 PHASE 5 WIRE ON RSJ SUPPORTS USING AERIAL BUNCHED XLPE CABLE
Sl.
No.
Particulars
Unit
Rate
(Rs.)
3
No.
4
8038
5
20
6
160760
7
20
8
160760
7
20
8
160760
No.
326
20
6520
20
6520
20
6520
No.
No.
No.
No.
336
437
22
66
20
20
20
60
6720
8740
440
3960
20
20
20
60
6720
8740
440
3960
20
20
20
60
6720
8740
440
3960
No.
47
40
1880
0
40
1880
0
40
1880
Km.
171798
1.05
180388
ii) 3 X 25 + 1 X 16 + 1 X 35 sq.mm.
Km.
80382
1.05
84401
iiI) 3 X 35 + 1 X 16 + 1 X 35 sq.mm.
Km.
80415
0
1.05
84436
1
2
1 175X85 mm.19.6 kg/mtr. ,9.3 Mtr. long
RSJ supports
2 A.B Cable hanging clamps/ tension
clamps (Galvanized) as per enclosed
Drawing
3 Suspension Clamp
4 Dead end Clamp
5 Clamp for nuetral
6 Piercing connector Type-I for single
phase/three phase
7 Piercing connector Type-II
8 1100 Volts Grade Aerial bunched
XLPE Cable including 5 % sag
i) 3 X 50 + 1 X 16 + 1 X 35 sq.mm.
Using 1100
Using 1100
Using 1100
Volts Grade A.B. Volts Grade A.B. Volts Grade A.B.
Cable 3 X 25
Cable 3 X 35
Cable 3 X 50
Sq.mm.
Sq.mm.
Qty. Amt (Rs.) Qty. Amt (Rs.) Qty.Sq.mm.
Amt (Rs.)
9 Stay set 16 mm (complete)
Set
10 Concreting of stay and for poles @ 0.2 Cmt.
cmt. per stay and @ 0.3 cmt. for pole (1:3:6)
677
3050
12
8.4
8124
25620
12
8.4
8124
25620
12
8.4
8124
25620
11 Nuts and bolts
12 Earthing set(coil earth as per drawing
no. G/004)
13 Dist. Box for housing 5 No. 10Amps
MCCB including accessories for fixing
with pole suitable for AB XLPE Cable
Kg.
Set
69
135
30
5
2070
675
30
5
2070
675
30
5
2070
675
No.
2112
20
42240
20
42240
20
42240
Total
15 Labour & Transportation charges @
10% of material cost
16 Total cost per Km
448137
44814
352150
35215
352185
35218
492951
387365
387403
COST SCHEDULE D-2
( 2011-12)
L.T.LINES 3 PHASE 5 WIRE ON 140 KG,8 MTR LONG PCC POLE USING AERIAL BUNCHED XLPE CABLE
WITH MAXIMUM SPAN OF 50 METERS
Sl.
No.
Particulars
1
2
1 140 Kg.,8.0 Mtr. long PCC Support
A.B Cable hanging clamps/ tension
2 clamps (Galvanized) as per enclosed
Drawing
3 Suspension Clamp
4 Dead end Clamp
5 Clamp for nuetral
Piercing connector Type-I for single
6
phase/three phase
7 Piercing connector Type-II
1100 Volts Grade Aerial bunched XLPE
Cable including 5 % sag
8
i) 3 X 50 + 1 X 16 + 1 X 35 sq.mm.
ii) 3 X 35 + 1 X 16 + 1 X 35 sq.mm.
ii) 3 X 25 + 1 X 16 + 1 X 35 sq.mm.
9 Stay set 16 mm (complete)
10 Back filling of pole pit with boulder
Concreting of stay and for poles @ 0.2
11
cmt. per stay and @ 0.3 cmt. for pole
12 Nuts and bolts
Earthing set(coil earth as per drawing no.
13
G/004)
Dist. Box for housing 5 No. 10Amps
14 MCCB including accessories for fixing
with pole suitable for AB XLPE Cable
Total
Labour & Transportation charges @ 10%
15
of material cost
16 Total cost per Km
Unit
Rate
(Rs.)
Using 1100 Volts
Using 1100 Volts
Using 1100 Volts
Grade A.B. Cable 3 X Grade A.B. Cable 3 X Grade A.B. Cable 3 X
50 Sq.mm.
25 Sq.mm.
35 Sq.mm.
Qty.
Amt (Rs.)
Qty.
Amt (Rs.)
Qty.
Amt (Rs.)
3
No.
4
1460
5
20
6
29200
7
20
8
29200
7
20
8
29200
No.
326
20
6520
20
6520
20
6520
No.
No.
No.
336
437
22
20
20
20
6720
8740
440
20
20
20
6720
8740
440
20
20
20
6720
8740
440
No.
66
60
3960
60
3960
60
3960
No.
47
40
1880
40
1880
40
1880
0
0
1.05
12
20
0
0
84401
8124
2000
Km.
Km.
Km.
Set
No.
Cmt.
(1:3:6)
Kg.
171798
80415
80382
677
100
1.05
12
20
180388
0
0
8124
2000
3050
3.4
10370
3.4
69
30
2070
Set
135
5
No.
2112
20
0
12
20
0
84436
0
8124
2000
10370
3.4
10370
30
2070
30
2070
675
5
675
5
675
42240
20
42240
20
42240
1.05
303327
207340
207375
30333
20734
20737
333660
228074
228112
COST SCHEDULE D-3
2011-12
L.T.LINES 1 PHASE 3 WIRE ON PCC SUPPORT USING AERIAL BUNCHED XLPE CABLE
WITH MAXIMUM SPAN OF 67 METRES FOR RURAL AREA
Sl.
No.
Particulars
1
2
1 140 Kg.,8.0 Mtr. long PCC Support
2 A.B Cable hanging clamps/ tension clamps
(Galvanized) as per enclosed Drawing
3 Suspension Clamp
4 Dead end Clamp
5 Clamp for nuetral
6 Piercing connector Type-I for single
phase/three phase
7 Piercing connector Type-II
8 1100 Volts Grade Aerial bunched XLPE
Cable including 5 % sag
i) 2 X 35 + 1 X 16 sq.mm.
ii) 2 X 25 + 1 X 16 sq.mm.
9 Stay set 16 mm (complete)
10 Back filling of pole pit with boulder
11 Concreting of stay and base pad for poles @
0.2 cmt. per stay and @ 0.05 cmt. for base
pad
12 Nuts and bolts
13 Earthing set(coil earth as per drawing no.
G/004)
14 Dist. Box for housing 5 No. 10Amps MCCB
including accessories for fixing with pole
suitable for AB XLPE Cable
Total
16 Labour & Transportation charges @ 10% of
material cost
17 Total cost per Km
Unit
Rate
(Rs.)
Using 1100 Volts
Using 1100 Volts
Grade A.B. Cable 2 X Grade A.B. Cable 2 X
35 Sq.mm.
25 Sq.mm.
Qty.
Amt (Rs.)
Qty.
Amt (Rs.)
3
No.
No.
4
1460
326
5
15
15
6
21900
4890
7
15
15
8
21900
4890
No.
No.
No.
No.
336
437
22
66
15
15
15
45
5040
6555
330
2970
15
15
15
45
5040
6555
330
2970
No.
47
30
1410
0
30
1410
0
Km.
Km.
Set
No.
Cmt.
(1:3:6)
51621
49069
677
100
3050
1.05
9
15
2.55
54202
0
6093
1500
7778
1.05
9
15
2.55
0
51522
6093
1500
7778
Kg.
Set
69
135
22.5
4
1553
540
22.5
4
1553
540
No.
2112
15
31680
15
31680
146440
14644
143760
14376
161084
158136
Sl.No
.
1
2
3
4
5
6
7
8
9
10
11
12
COST SCHEDULE FOR 1 NO. SLP CONNECTION
Unit Ref. of
Qty Rate (Rs) Amount (Rs)
Schedule
MS Angle 50x50x6 mm.
Kg. SOR
9
44.00
396.00
wooden Board 12"x18"
No. Market
1
60.00
60.00
Shackle insulator
No. SOR
2
10.00
20.00
Shackle Hard ware
No. SOR
2
31.00
62.00
GI Earthing Bolt 75x12mm
No. SOR
1
15.00
15.00
PVC insulated 1100 Volt grade cable 2.5 Sq.mm (Two core) Mtr. SOR
30
24.00
720.00
for Service line
GI wire 10 SWG
Kg. SOR
2
52.70
105.40
Brass Holder for Bulb
No. Market
1
20.00
20.00
On/Off piano switch
No. Market
1
20.00
20.00
16 Amp Kit Kat fuse unit
No. SOR
2
20.00
40.00
Nails (Kili) 4 inches
Kg. Market
0.25
40.00
10.00
40 Watt Bulb (Pilot Lamp)
No. Market
1
15.00
15.00
1483.40
Labour Charges + Transportation Charges 10% of material
148.00
cost
Total
1631.40
Say Rs.
1632