AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257 TO: ALL AT&T INSTALLATION SUPPLIERS Date: 12/08/14 EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract Submitter’s Name: Ed Williamson TP: TP76300 Subject: Reference Material Section: A Subsection: Table A-2 Subsection: N/A Action: Add: Modification: Delete: Section Title: Introduction Section Title: Table A-2 Subsection Title: N/A Prior to Change: Table A-2 – references in ATT-TP-76300 Reference Title ATT-TP-76900 AT&T Installation Testing Requirements ATT-TP-76911 AT&T E911 Requirements NFPA 701 UL 214 ASTM D1048-81 ASTM D1048-88a National Electrical Code ATT-801-601-900 AT&T Alarm Standards Practice ATT-812-000-032 Common Systems Through Penetration Fire stopping Requirements ATT-TP-76202 Lumicool Lighting Fixture EF&I Methods and Procedures ATT-TP-76416 Grounding and Bonding Requirements for Network Facilities ATT-C-98022-71 SNET Building Ground System (AT&T East) ATT-W-98023-31 Building Ground & Equipment Ground System (AT&T East) ED-97729-11 Protective Grounding Systems for Central Office Equipment Quality Assurance Programs Major Safety Violation Program ATT 800-000-101 Anchoring Requirements Quality Assurance Programs Standards of Conduct Page 1 of 3 AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257 ATT-TP-76306 Electrostatic Discharge Control Post Change: Table A-2 – references in ATT-TP-76300 Reference Title ATT-TP-76900 AT&T Installation Testing Requirements ATT-TP-76911 AT&T E911 Requirements NFPA 701 UL 214 ASTM D1048-81 ASTM D1048-88a National Electrical Code ATT-801-601-900 AT&T Alarm Standards Practice ATT-TELCO-IS-812-000-032 Common Systems Through Penetration Fire Stopping Requirements ATT-TP-76202 Lumicool Lighting Fixture EF&I Methods and Procedures ATT-TP-76416 Grounding and Bonding Requirements for Network Facilities ATT-C-98022-71 SNET Building Ground System (AT&T East) ATT-W-98023-31 Building Ground & Equipment Ground System (AT&T East) ED-97729-11 Protective Grounding Systems for Central Office Equipment Quality Assurance Programs Major Safety Violation Program ATT-812-000-713 Anchoring Requirements Quality Assurance Programs Standards of Conduct ATT-TP-76306 Electrostatic Discharge Control ATT-TP-76305 Cable and Wire Installation and Removal Requirements – Cable Racks and Raceway ATT-TP-76305-001 SNFA – Equipment Removal and Cable Mining Standards ATT-TP-76402 Raised Access Floor Engineering and Installation Page 2 of 3 AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257 Requirements ATT-TP-76408 Auxiliary Framing and Bracing Requirements ATT-TP-76409 Network Facility – Cable Rack Requirements ATT-TP-76416-001 Grounding and Bonding for Network Facilities – Design Fundamentals BSP 800-000-102MP Equipment Framework and Cable Design Requirements BSP 800-068-150MP Equipment Framework Support Requirements BSP 800-068-151MP Storage Unit Bracing Requirements BSP 800-006-152MP Floor Stanchion Supported Cable Rack System Requirements Questions relative to this IRCN should be addressed to Serena Kwong at 510-796-1097 Serena Kwong Associate Network Process and Quality Manager sk5945@att.com Access the TP's on the Extranet Site - https://ebiznet.sbc.com/sbcnebs Concurred Area Mgr Eng Network Quality Implementation Eng & Common Systems (Mike Cassidy) Date: 12-08-14 Principal-Network Design Engineer (SME) (Ed Williamson) Date: 12-04-14 Release Approved Associated Network Process & Quality Manager (Serena Kwong) Page 3 of 3 Date: 12-08-14