AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257
TO: ALL AT&T INSTALLATION SUPPLIERS
Date: 12/08/14
EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract
Submitter’s Name: Ed Williamson
TP: TP76300
Subject: Reference Material
Section: A
Subsection: Table A-2
Subsection: N/A
Action: Add:
Modification:
Delete:
Section Title: Introduction
Section Title: Table A-2
Subsection Title: N/A
Prior to Change:
Table A-2 – references in ATT-TP-76300
Reference
Title
ATT-TP-76900
AT&T Installation Testing Requirements
ATT-TP-76911
AT&T E911 Requirements
NFPA 701
UL 214
ASTM D1048-81
ASTM D1048-88a
National Electrical Code
ATT-801-601-900
AT&T Alarm Standards Practice
ATT-812-000-032
Common Systems Through Penetration Fire
stopping Requirements
ATT-TP-76202
Lumicool Lighting Fixture EF&I Methods and
Procedures
ATT-TP-76416
Grounding and Bonding Requirements for
Network Facilities
ATT-C-98022-71
SNET Building Ground System (AT&T East)
ATT-W-98023-31
Building Ground & Equipment Ground System
(AT&T East)
ED-97729-11
Protective Grounding Systems for Central Office
Equipment
Quality Assurance Programs
Major Safety Violation Program
ATT 800-000-101
Anchoring Requirements
Quality Assurance Programs
Standards of Conduct
Page 1 of 3
AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257
ATT-TP-76306
Electrostatic Discharge Control
Post Change:
Table A-2 – references in ATT-TP-76300
Reference
Title
ATT-TP-76900
AT&T Installation Testing Requirements
ATT-TP-76911
AT&T E911 Requirements
NFPA 701
UL 214
ASTM D1048-81
ASTM D1048-88a
National Electrical Code
ATT-801-601-900
AT&T Alarm Standards Practice
ATT-TELCO-IS-812-000-032
Common Systems Through Penetration Fire
Stopping Requirements
ATT-TP-76202
Lumicool Lighting Fixture EF&I Methods and
Procedures
ATT-TP-76416
Grounding and Bonding Requirements for
Network Facilities
ATT-C-98022-71
SNET Building Ground System (AT&T East)
ATT-W-98023-31
Building Ground & Equipment Ground System
(AT&T East)
ED-97729-11
Protective Grounding Systems for Central Office
Equipment
Quality Assurance Programs
Major Safety Violation Program
ATT-812-000-713
Anchoring Requirements
Quality Assurance Programs
Standards of Conduct
ATT-TP-76306
Electrostatic Discharge Control
ATT-TP-76305
Cable and Wire Installation and Removal
Requirements – Cable Racks and Raceway
ATT-TP-76305-001
SNFA – Equipment Removal and Cable Mining
Standards
ATT-TP-76402
Raised Access Floor Engineering and Installation
Page 2 of 3
AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-257
Requirements
ATT-TP-76408
Auxiliary Framing and Bracing Requirements
ATT-TP-76409
Network Facility – Cable Rack Requirements
ATT-TP-76416-001
Grounding and Bonding for Network Facilities –
Design Fundamentals
BSP 800-000-102MP
Equipment Framework and Cable Design
Requirements
BSP 800-068-150MP
Equipment Framework Support Requirements
BSP 800-068-151MP
Storage Unit Bracing Requirements
BSP 800-006-152MP
Floor Stanchion Supported Cable Rack System
Requirements
Questions relative to this IRCN should be addressed to Serena Kwong at 510-796-1097
Serena Kwong
Associate Network Process and Quality Manager
sk5945@att.com
Access the TP's on the Extranet Site - https://ebiznet.sbc.com/sbcnebs
Concurred
Area Mgr Eng Network Quality
Implementation Eng & Common Systems
(Mike Cassidy)
Date: 12-08-14
Principal-Network Design Engineer (SME)
(Ed Williamson)
Date: 12-04-14
Release Approved
Associated Network Process & Quality Manager
(Serena Kwong)
Page 3 of 3
Date: 12-08-14