KAKINADA MUNICIPAL CORPORATION MUNICIPAL CORPORATION, KAKINADA DEVELOPMENTAL ACTIVITIES S. Aleem Basha Commissioner Municipal Corporation Kakinada INDEX 1 General View : 3 to 4 2. Revenue : 5 to 7 3. Education : 8 4. Engineering : 9 to 13 5 Town Planning : 14 to 31 6 Public Health : 32 7 Mepma : 33 to 35 2 KAKINADA MUNICIPAL CORPORATION GENERAL VIEW (Amount in lakhs and figures in numbers) I. KEY CONTACTS Name of the Special Officer Name of the Commissioner Sri H. Aruna Kumar ,I.A.S. Collector & Special Officer S. Aleem Basha Commissioner II. GENERAL INFORMATION Area (Sq.Km) Population at Present (2011 census) Total No.of House Holds (2011) No.of Municipal Wards No.of Slums Slum Population % of Slum Population on Total Population 31.69 3,25,985 93,373 50 101 1,32,185 41% No.of Urban Health Centers 6 No.of Ayurvedic Dispensaries 4 Municipal High Schools U.P. Schools Primary Schools 14 (All own buildings) 1 ( Own building) 52 (Own buildings) No. of pupil studying in High Schools 6821 No. of pupil studying in U.P. & Primary Schools 4562 No.of Burial Grounds 9 No. of Major Parks 6 No. of Minor parks 22 No.of Vegetable Markets 7 No. of Fish Markets 5 No. of DryFish Markets 1 No. of Open Spaces Available Total Area of Open Spaces No. of Public Toilets Reading Rooms Working 177 101 Acres 52 8 3 II. Water Supply Position Protected Water Supply Reservoirs Quantity of Water required Quantity of water being supplied Percapita Supply Total Installed Capacity of Water Supply No.of House Service Connections General Under Rs. 1200/General Under Rs. 200/No.of Public Stand Posts No. of Hand Bores No. of Water Tankers Length of Pipeline III. ROADS (Length in KMS) CC B.T WBM Gravel Kutcha Total IV. DRAINS (Length in KMS) CC Kutcha Storm Water Drain Total V. STREET LIGHTS 40 Watt Tube lights 70 Watt S.V. Lamps 150 Watt S.V. Lamps 250 Watt S.V. Lamps 150 MH Lamps 250 MH Lamps Center Lighting lights (250 Watt S.V. Lights) Mini High masts 250 Watt M.H Lights High Masts 400 Watt M.H. Total Street lights 15 Nos 60 MLD 44.75 MLD 107 LPCD 44.75 MLD 28672 2361 5572 1,720 1200 KMC Charitable Trust Hired 300 KM 4 Nos 2 Nos 3 Nos. 243 KMs 330 KMs 80 KMs 70 KMs --723 KMs 360 KMs 205 KMs 11 KMs 576 KMs 7453 Nos 42 Nos 2640 Nos 152 Nos 94 Nos 64 Nos 330 Nos 631 Nos 199 Nos 11605 Nos 4 KAKINADA MUNICIPAL CORPORATAION REVENUE SECTION PROFILE No.of Revenue Circles - 5 No.of Revenue Wards - 32 No.of Revenue Blocks - 70 Staff Pattern No of Posts Sanctioned No of Posts filled Revenue Officer -2 2 Revenue Inspectors -5 5 Bill Collectors - 23 21 Senior Assistant -1 1 Junior Assistants -8 5 Working arrangement made for remaining 3 posts with Record Assistants. 5 PROPERTY TAX: No. Private of Buildings Assts Residential NonResidential Partly Residential Total State Government Central Government Rs.in Lakhs 2013- 2014 PROPERTY TAX No. Private Demand Collection Balance of Buildings Assts 50785 804.58 803.03 1.55 4409 553.93 552.77 1.16 6541 521.51 520.69 0.82 61735 1880.02 1876.49 3.53 398 865.74 142.47 723.27 80 76.10 21.20 54.90 Total 478 941.84 163.67 778.17 Covered by Suits 66 317.19 66.37 Grand Total 62279 3160.82 2106.53 Residential NonResidential Partly Residential Total State Government Central Government Rs.in Lakhs 2014-2015 Demand Collection Balance 55628 990.06 816.53 173.53 3558 645.63 554.18 91.45 3269 513.15 461.53 51.62 62455 2148.84 1832.24 316.60 448 920.45 40.94 879.51 80 99.42 8.94 90.48 49.88 969.99 109.60 867.17 1991.72 2153.76 Total 528 1019.87 Court cases/ 251.62 Demolish, 1564 976.77 etc., Grand 1033.32 64547 4145.48 Total VACANT LAND TAX: 2013- 2014 VACANT LAND TAX 2014-2015 No. No. of Demand Collection Balance of Demand Collection Balance Assts Assts Vacant 5417 280.00 185.42 94.58 5474 254.16 98.12 156.04 Land Tax Total 5417 280.00 185.42 94.58 Total 5474 254.16 98.12 156.04 WATER TAX: 2013- 2014 WATER TAX 2014-2015 No. No. of Demand Collection Balance of Demand Collection Balance Assts Assts NonNon23877 514.70 370.84 144.06 27061 465.42 244.05 247.72 Metered Metered Metered --- --- Private 976 105.93 Buildings Government 86 809.64 Buildings Grand 24939 1430.07 Total --- --- 74.78 31.15 132.03 677.61 577.65 852.82 Metered --- --- Private 976 103.27 Buildings Government 86 985.25 Buildings Grand 28123 1357.03 Total --- --- 63.71 39.56 0.73 984.52 73.12 1283.91 6 LEASES: 2013- 2014 No. of Assts Shop Room Markets (including road margins) Slaughter House Avenues Grand Total 125 LEASES No. of Assts Demand Collection Balance 34.22 24.02 10.20 5 120.94 100.78 20.16 1 2.25 2.25 0.00 2 1.36 1.36 1.36 158.77 128.41 31.72 2014-2015 Shop Room Demand Collection Balance 126 54.31 39.66 14.65 5 87.84 87.84 0.00 1 2.26 2.26 0.00 2 1.26 1.26 0.00 145.67 131.02 14.65 Markets (including road margins) Slaughter House Avenues SSC RESULTS AND INFRASTRUCTURE FACILITIES IN MUNICIPAL SCHOOLS 1. No.of Primary Schools : 52 2. No.of Upper Primary Schools : 01 3. No.of High Schools : 14 4. No.of.Teachers working in schools U.P& primary : 203 5. No.of.Teachers working in High schools : 237 6. No.of Students Studying in U.P & Primary Schools : 4562 7. No.of Students Studying in High Schools : 6821 8. water tap connections are provided to all municipal schools for safe drinking water to school children. 9. Recently R.O plants installed in all municipal schools for safe drinking water to school children. 10. Running water fecility for toilets provided in all municipal high schools and 18 in primary schools and the remaining balance to be provided. 11. part time sweepers are sweeping of class rooms everyday and maintain hygienic conditions in the school premises 12. Municipal sanitary workers are cleaning of toilets in all municipal schools under the supervision of concerned area sanitary inspectors.. 13. 1117 students passed out of 1203 students appeared and secured 93% of pass in March’2013 S.S.C public examinations. 7 14. 1121 students passed out of 1195 students appeared and secured 94% of pass in March’2014 S.S.C public examinations. 15. The pass percentage increased by 1% comparatively from last year . 16. In this acadamic year 1273 students are to be appeared in March’2015 public examinations. 17. Municipal corporation has provided snacks for 10th class students during extra classes in evening hours. KAKINADA MUNCIPAL CORPORATION BRIEF NOTE ON DEVELOPMENTAL WORKS 1) WIDENING OF MAIN ROAD (NH 216) : Proposal of widening and development of Subash Road (main road) with Center Lighting Foot Paths, Center Dividers drains etc., from II Twon Police Station Junction to Jagannaickpur old bridge with an estimate cost of Rs. 891.00 lakhs i.e., 521.00 lakhs from BPS /LRS funds and Rs. 373.00 lakhs from Municipal General Funds. Work has been completed with an amount of Rs.521.00 lakhs i.e., from II two police station junction to masjid centre and the Government have permitted Kakinada Municipal Corporation to avil Rs. 373.00 lakhs work with general funds for in Phase II work i.e., from Majid Centre to Jaganaickpur Old Bridge. 2) 12th FINANCE COMMISSION GRANTS TOTAL AMOUNT RELEASED : Rs.699.08 Lakhs Amount Utilized : Rs.639.62 Lakhs Balance amount available : Rs. 59.36 Lakhs Letter addressed to the Government and Commissioner & Director of Municipal Administration to purchase to 2 nos Big Tippers and Transfer station for Solid Waste Management from Balance amount of 12th Finance Commissioner Grant. 3) 13th FINANCE COMMISSION GRANT An amount of Rs. 2959.00 Lakhs has been sanctioned to this municipal corporation under 13th Finance Commission Grant up to 2010-11 to 201415. And Rs.1334.62 lakhs has been released from the Government to 8 execute the major works in Kakinada Muniicpal Corporation limits. The works are in Progress. 4) DEVELOPMENTAL SCHEMES 2014-15 MPLADS : No. Estimated Amount Rs. in lakhs Works Sanctioned : 38 218.40 Amount released : 38 78.94 Works completed : 21 62.98 Work in Progress : 10 31.42 To be started : 7 124.00 ACDP(MLA Grant) : No. Amount Rs. in lakhs Works Sanctioned : 87 301.60 Amount released : 87 251.60 Works completed : 65 225.67 Work in Progress : 22 50.00 Non-Plan Grant: An amount of Rs.183.95 lakhs has been sanctioned under Non Plan Grant. 12 No.of road works are proposed and works are completed. 5) PLAN GRANT. An amount of Rs.67.92 lks has been sanctioned under Plan Grant. 4 No.of road works are proposed and works are completed. 6) SPECIAL DEVELOPMENT FUNDS FOR WELFARE & DEVELOPMENT ACTIVITIES : No. Amount Rs. in lakhs Works Sanctioned : 13 210.00 Amount released : 13 187.84 Works completed : 5 137.59 Work in Progress : 1 10.00 9 7) NATIONAL FISHERIES DEVELOPMENT BOARD (NFDB) CONSTRUCTION OF MODERN FISH MARKET AT JAGANNAICKPUR UNDER NFDB: Total amount sanctioned :Rs. 154.80 Lakhs Amount Released :Rs. 139.32 Lakhs Works Completed : Rs.139.32 Lakhs The following new Proposals have been submitted to the NFDB for approval at an estimate cost of Rs.282.35 lakhs Indira Priyadarshini Fish Market :Est.Cost Rs.97.35 Lakhs Kotha Peta Fish Market at Perraju Peta :Est Cost Rs.185.00 Lakhs 8) WORKS EXECUTION WITH MUNICIPAL GENERAL FUNDS Civil Works: Year 2014-15: : No. Estimated Amount Rs. in lakhs Works Sanctioned : 381 3131.72 Works completed : 219 1859.87 Works in Progress : 162 1271.85 Water Supply Works: : No. Amount Rs. in lakhs Works Sanctioned : 25 53.60 Works completed : 20 42.20 Works in Progress : 5 72.34 Sanction of New Tap Connections No. of BPL. Taps Issued : 5750 No. of General Taps Issued : 17550 Year 2014-15: : No. Works Sanctioned : 21 55.00 Works completed : 12 35.70 Works in Progress : 9 19.30 Electrical Works Estimated Amount Rs. in lakhs 10 9) SC & ST SUB PLAN 2013-14 UNDER: An amount Rs.292.33 lakhs sanctioned SC & ST sub plan 2013-14 under Indiramma Kalalu. In that an amount of Rs.286.18 lks for SC sub plan and Rs.2.13lks for ST sub plan. 37 works in SC sub plan and 4 works in ST sub plan were approved by Special Officer, Kakinada Municipal Corporation vide Cr.No. 23, dt.26-06-2013. 30 works are completed and 7 works are in progress. BRIEF NOTE ON WATER SUPPLY IMPROVEMENT SCHEME UNDER APMDP Population as per Census Prospective Design 2026 Ultimate Design 2041 Approved Project Cost Administrative Sanction Govt.AP : : : : : 3.37 Lakhs 3.87 Lakhs 5.08 Lakhs Rs. 186.36 Crores (Excluding Package - III) G.O.Rt.No.703 dt.19-05-2012 of MA&UD Method of Finance: Grant(70%) Laon Component (20%) ULBShare(10%) Total : : : : Rs.130.45 Crores Rs.37.27 Crores Rs.18.63 Crores Rs.186.36 Crores Release: World Bank + State Share Municipal Share Total : : : Rs.16.77 Crores Rs.1.86 Crores Rs. 18.63 Crores Expenditure: Expenditure upto 31-12-2014 on the Scheme Amount deposited to RDO, Kakinada towards Land Acquisition from General Funds : Rs.18.63 Crorers : Rs.9.53 Crores Deliverables of Scheme: Per Capita supply will raise from 105 LPCD to 135 LPCD. Implementation of 24 X 7 water Supply. Additional HSC Expected 25,000 Nos & quality of water supply by laying new pipes. Revenue Details of Water Supply: Existing Revenue from Water Tariff Increase in annual Revenue from Water Tariff Capital Income by way of donations : : : Rs.4.20 Crores. Rs.3.00 Crores Rs. 13.00 Crores 11 Existing Water Tariff: i. Domestic : ii. Metered Connections : Rs. 100.00/month per connections. Rs.30.00per KL Issus & Pending: 1.Land Acquisition at Awa Tank to be finalized. 2.Land Alienation and Rehabilitation of Encroaches at AWA tank KAKINADA MUNICIPAL CORPORATION Name of Work: Comprehensive water supply Service Improvements in Kakinada Muncipal Corporation APMDP STATUS REPORT Sl. No. 1 2 3 Item Name of the Firm Estimate cost of work Rupees in Lakhs Agreement Amount Rupees in Lakhs 4 Agreement no and Date 6 Date of Completion 7 Present Stage of Work Pacakge - I M/s GKC projects limited, Hitech city,Hyderabad. Pacakge - II M/s. Megha Engineering Infrastructure Limited, Hyderabad Rs.2439.30 Rs.12525.24 Rs 2091.74 Rs.8243.43 3201/E3/APMDP/ P-I/2010/2013-14 dated 14-05-2013 18 months Construction of 500KL ELBR & Pump House at Aratlakatta-are under progress Total Bare Pipe MS Pipe 7.972KM received. Inlining & Guiniting under progress. 1.92 km laid. Pacakg e - III 3201/E3/APMDP/ P-II/2010/2013-14 dated 11-12-2013 24Months 40MLD WTP- in progress. (50%completed) 1500MS pipe/1000MS pipe15.3km, supplied 2.90km laying 140mts completed. 800-250 dia pipe16.50km. laid4.74km. ELSR’s10nos. 7nos. in progress. Overall % completed-30% Pacakge - IV M/s Abhiram Infra projects Private limited, Hyderabad. LAND AQUIS ATION TO BE FINALI SED FOR CONST RUCTI ON OF SUMM ER STORA GE TANK AT AWA TANK THIMA PURAM (VILLA GE). Rs.3286.71 Pacakge - V TENDERS TO BE CALLED FOR FLOW METERS Rs.385.22 Rs.2851.41 3201/E3/APM DP/P-1V/2010 /2013-14 dated 14-05-2013 24 months Total HDPE pipes of different diameters supplied 71.490km and laid 61.10km against 192km of agreement. Overall 35% work completed and balance is in progress. 12 BRIEF NOTE ON TOWN PLANNING SECTION 1. Profile:- Name of the Corporation : Kakinada Municipal Corporation Name of the Commissioner : Sri S. Govinda Swamy (FAC) Name of the Special Officer : Sri H. Aruna Kumar, I.A.S., Area : 31.69 Sq.kms Population (Urban) (as per 2011 Census ) : 3,25,985 No. of Divisions : 50 No.of Slums : 101 No. of Notified Slums : 63 No.of Non Notified Slums : 38 Slum Population : 1,32,185 % of Slum Population : 40.47 % 2. Staffing Pattern: - Technical Staff Sanctioned Posted A) Deputy City Planner 1 1 B) Assistant City Planner 1 1 C) Town Planning Supervisors 5 4 D) Town Planning Building Overseas 6 4 E) Town Surveyor (Deputation from Survey & Land Records) 1 F) Tracer 1 1 Clerical Staff A) Superintendent 1 B) Senior Assistant 4 Class IV Staff A) Attenders 11 6 B) Chainmen at Town Surveyor 1 1 3. Disposal of Building Applications: The Government has issued “The Andhra Pradesh Building Rules- 2012 ”, in its G.O. M.S. No. 168 M.A. (M) Dt.07-04-2012 which is applicable to Municipal Corporations and the Master Plan zoning Regulations approved in G.O. M.S. No. 389 M.A. Dt. 10-09-75. SI.No. Year 1 2012 No.of B.A.’s. received 585 2 2013 611 No.of B.A.’s. approved 541 551 Amount collected Rs. in lakhs 139.04 123.42 13 3 2014 746 673 294.09 4. Advertisement Tax : Sole Right for Collection of Advertisement Tax was entrusted to I – Catch Communications, Hyderabad on Tender – Cum Auction basis for a period of 3 years @ Rs. 45.56 lakhs per annum w.e.f. 1-04-2012 vide C.R. No. 153 Dt. 28-01-2010. 2013-14 & 2014-2015 The Advertisement tax collected departmentally. No.of Hoardings - 343 No.of Non-Hoardings - 1013 Total No.of Advertisement Boards - 1356 Demand Amount Collected Rs. in lakhs Balance to be Collected Rs. in lakhs 2010-2011 45.56 45.56 Nil 2011-2012 45.56 42.07 6.90 2012-2013 45.56 45.56 Nil 2013-2014 106.00 92.40 14.31 2014-2015 98.00 13.50 84.50 Year 5. Temporary Road Margin Occupation (TRMO) 232 No. of Temporary Road Margin Occupations (buddies) are existing in Kakinada Municipal Corporation. The Demand will be fixed as per the size of the Buddy. 5. Temporary Road Margin Occupation (TRMO) 232 No. of Temporary Road Margin Occupations (buddies) are existing in Kakinada Municipal Corporation. The Demand will be fixed as per the size of the Buddy. Amount Collected SI.No. 1 Year 2011-2012 (Rs. in lakhs) 2 2012-2013 1.65 3 2013-2014 1.21 1.51 6. Master Plan : At present the Building approvals are being accorded as per the Master Plan approved in G.O. M.S. No. 389 M.A. Dt. 10-9-75. But 35 years of time was passed after sanctioning of Master Plan. During this period, Industrial, Educational and Commercial Scenario of the city was entirely changed due to inmigration of population into city due to educational facilities available and for employment. Under section 8 (1) of Andhra Pradesh Town Planning Act.1920 it is responsibility of the Municipal council to prepare, publish and submit to State Government for the sanction of a 14 General Town Planning Scheme (Master Plan) in respect of all the lands within the Municipality and in its vicinity. Further as per rule 23 of Rules made under Andhra Pradesh Town Planning Act.1920, the preparation of a General Town Planning Scheme under section 8 shall be taken in consultation with the Director of Town & Country Planning, Andhra Pradesh, Hyderabad. The least bidder M/s Aarvee Associates, Hyderabad entrusted with the work of preparation of Master Plan for the Kakinada City with a Vicinity area of 5 kms around the City (37 Villages) with an amount of Rs. 21,50,000/- in the year 2012. Consultant submitted inspection report in four volumes and physical work completed. Introductory meeting is conducted on 23-02-2012 with all Government Officials in 5 km of this Corporation are by the agency at Municipal Corporation meeting hall. Consultant has submitted study area base map on 12-06-2013. As per the instruction of the Hon’ble District Collector and Special Officer three consecutive meetings were held on 16th , and 21st July-2014 and 17th September – 2014 with all stake holders on revised Master Plan to take action for finalization on draft Master Plan. Consultant has submitted existing land use plan on 31-12-2014. Draft Master Plan under preparation it will be completed on 1st week of March-2015. 7. Master Plan Road Widening: Master Plan of the Kakinada city was sanctioned in the year 1975 vide G.O.M.s.No. 389 M.A. dt. 10.9.75. In recent time, some of the roads rapidly developed with commercial activity and became much congested with vehicular traffic which emerged the need of widening of some such important roads. In view of the above, the following important Master Plan roads were proposed to widen immediately in co-ordination with R & B Department. 1] Main Road from II Town Police Station to Jagannaickpur old Bridge (NH216) Existing 60’-0” wide road to be widened to 80’-0” wide road. 2] Jagannadhapuram Bridge to Munsif Junction (Main Road) 3] From Fire Station ( Salipeta Girls High School) Center at Salipeta to Municipal Office Center. Existing road to be widened to 50’-0” wide road. 4] Cinema Road from Gandhi Statue at Y.S.R. Flyover to Ananda Bharathi Grounds (R & B Road). 5] Ramasomayajulu Street between Jawahar Street and Vallabhai Street (Cinima Road) to a width of 40’-0” 6] Road from Cinema Road to Jawahar Street (Krishna Murthy Street) to a 15 width of 40’-0” 7] Road behind JNTU stadium to a width of 80’-0” Survey work was already completed and property wise statement is also prepared. A meeting with all the effected site/building owners was conducted to extend their cooperation for widening of above said roads. The details of the above said roads are as follows. :- 1.Main road from II Town Police Station to Jagannaickpur Bridge :A detailed survey was conducted on widening of road as per Master Plan. The length of the said road is 2.6 km. Number of properties effecting in road widening is 436, Among 436 properties, 143 members were already surrendered the effected portions to the Municipal Corporation on free of cost at the time of sanction of building permissions. A meeting was conducted with all the building owners to extend their co - operation is widening of road. Some of the property owners already given their written consent. The Regional Deputy Director of Town & Country Planning, Rajahmundry has approved road development plan vide RDP No. 3/12/R for Phase – I to a length of 1.35 km. As per the approved RD Plan the Corporation has widened the road in Phase – I.The Remaining Road widening work under progress in phase-II i.e., from Masjid Junction to Jagannaickpur Bridge. SI. No. Phase - I From II Town Police Station to Mosque Center Phase - II From Mosque Center to Jagannaickpur Bridge Total 1 No.of Properties 196 242 438 2 No. of Properties removed 191 62 253 3 No.of Properties to be removed 5 180 185 4 No. of Properties covered in the Court Cases 5 96 101 16 2. Jagannaickpur old Bridge to Karnamgari Junction It is a old builtup area and part of NH216 and heavy traffic passing through this road. Therefore there is a need to widen the said road. As per sanctioned Master Plan of Kakinada city the road is proposed to widen to a width of 50’-0” a road development plan was also approved by the Director of Town & Country Planning, Andhra Pradesh, Hyderabad in Road Development Plan no. 5/02/R. There are 161 no. of properties effecting in the said road widening. The existing width of the above road is 30’-0” to 35’0”. Survey work also completed for widening of the said road. Marking was done as per approved Road Development Plan. But as per approved Road Development Plan some of properties effecting to a larger extent to some other properties due to fixation of better alignment but the owner of such properties requesting to fix alignment in such a manner to widened road equally on both side. At the stage the widening work was temporarily stopped to take a decision for change of alignment as requested by the owner and to get revised Road Development Plan from the Regional Deputy Director of Town and Country Planning, Andhra Pradesh, Rajahmundry. 3. Road from Municipal Corporation office to Salipeta Municipal Girls High School (Ungarala vari street) :It is an important connection road between Cinema road and Jawahar Street, since a Flyover Constructed over the Sambamuthy Nagar Railway level crossing, heavy traffic passes through the road. The existing width of the road is 33’-0” to 40’-0”. As per Master Plan it is to be widen to 50’-0” the length of the road is 0.350km. There are 19 properties effecting in the widening of said road. Already 5 property holders handed over affected portions to the Municipal Corporation on free of cost at the time of building approvals. A detailed survey was already conducted. A road development plan was approved by the Regional Deputy Director of Town & Country Planning, Rajahmundry vide RDP No. 1/2012 /R which revises the RDP No. 7/87, previously approved by the Director of Town & 17 Country Planning, Andhra Pradesh, Hyderabad. A detailed discursions were done with the property owners by the Kakinada Municipal Corporation, since the road was under the control of this Corporation. Some of the property owners removed them selves the structures effected in road widening. 3. Road behind JNTU Stadium :It is in Ramanayyapeta area with a length of 0.600km. While constructing the drain along the said road by the Engineering Section of this corporation, the then District Collector & Special Officer of this corporation instructed to construct the drain after widening the said road as per the Master Plan. The existing width of the road is varied from 30’-0” to 60’-0”. The proposed width of the road as per Master Plan is 80’-0”. The detailed survey was conducted and particular of properties were listed out. There are 37 properties effecting in the said road widening. A meeting was conducted with all the property owners and widening will be commenced. 4.Road from Anandhabharathi Ground to Gandhi Statue at YSR Flyover:The Y.S.R. Flyover was recently constructed and major stretch of the road was widened while constructing the said Flyover. But the above said stretch from Anandhabharathi Ground to Gandhi Statue at YSR Flyover was not taken up at that time. Because of its importance in Traffic Point of view and all the inward R.T.C. buses to the city passes through this road, there is a necessity to widen the said road to 80’-0” wide as per Master Plan. The existing width of road is 55’-0” and length is 220’-0” and having 35 properties on both sides to the proposed road for widening. The detailed Survey will be conducted shortly for widening of the said road . 5. Widening of Ramasomayajulu Street between jawahar Street and Vallabhai Street (Cinima Road) It is important connection between jawahar street and vallabhai street in traffic point of view and due its importance in commercial activity and also approach to the corporation office. As per the sanctioned master plan of the city, the width of the said road is 40’-0”. But as on ground the stretch between main road and cinema road is to a 18 width of 40’-0” and the stretch between main road and jawahar street is only 32’-0” wide. The Total length of the said road is 0.31 km. The road is under control of the Municipal Corporation. Survey work was already completed. There are 32 properties in this road and 5 property holders already handed over the road widening portion to this corporation. The detailed sketches were prepared to submit it to the Regional Deputy Director of Town & Country Planning, Rajahmundry for approval of road development plan. 6.Road from Cinema Road to Jawahar Street (Krishna Murthy Street) :It is an important connection road between Cinema road and Jawahar Street, since a Flyover Constructed over the Sambamuthy Nagar Railway level crossing, heavy traffic passes, through the Krishna Murthy road. The existing width of the road is 26’-0” to 33’0”. As per Master Plan it is to be widen to 40’-0” the length of the road is 0.325 km. There are 37 properties effecting in the widening of said road. The road was under the control of Kakinada Municipal Corporation. A meeting was already conducted with all the property owners in the road. The Regional Deputy Director of Town & Country Planning, Rajahmundry has approved Road Development Plan vide RDP No. 1/2012/R The details of the properties are collecting and schedule of properties affected in road widening are prepared. Widening of said road under progress. Most of the owners of the properties effected in road widening were came forward to give their written consent to handover to Kakinada Municipal Corporation on free of cost and some were already handed over with a condition to issue TDR certificate as per G.O.M.s.No. 168 dt. 07-042012. 8. Layout Open spaces : There are 177 approved Layouts in the City. Among the said layouts in some of the layout open spaces previously constructed School buildings and some other buildings such as Community Halls, Dispensaries, etc., Details of the Layout open spaces are as follows. In addition to above layouts, there are 20 EWS layouts were in the city. 19 S. No 1 Total No. of open spaces Total extent of open spaces (in Ac.s) No.of Open Spaces Occupied,if any (Encroachment) No. of open spaces protecte d No. of open spaces not protected 169 102.563 6 111 58 LIST OF LAY OUT OPEN SPACES Location SI.No L.P. NO. Extent of Open Space in Acs 1 Sri Nagar 14/52 4.16 2 Sree Ram Nagar 38/56 0.45 3 Atchutharama Nagar Godarigunta 185/58 0.800 4 Dwaraka Gardens T.S. No.16 & 13 Ward - 2, Block No - 4 8/60 0.90 5 Janaki Ramaiah Nagar 63/61 0.17 Jayendra Nagar 230/62 1.30 Jayendra Nagar 1.04 6 Jayendra Nagar 230/62 0.98 Jayendra Nagar 230/62 0.71 7 Pratap Nagar Road 193/64 0.32 8 Dwaraka Gardens S.No.18/1P, Ward No.2 Block.5 113/65 0.24 9 Dairy Form Center(North) Mpl Employees LayoutT.S No.134/3 54/66 0.37 10 Pallam Raju Nagar T.S. NO.1996/1 98/66 0.22 20 11 Venkateswara Nagar Behind ESI 133/67 0.44 12 Sambamurthy Nagar T.S. No.137, Block 11, ward - 2 142/67 0.25 13 Indrapalem Police Station Road 63/69 0.38 14 SBI Bank Colony,Ramanayyapeta 18/70 0.7 15 Vidya Nagar, Ramanayya Peta 30/70 0.53 16 Durgaiah Thota 56/70 0.225 17 Mpl Employees Layout Dairy Form Junction 56/71 0.8 18 Bhaskar Nagar Mpl Layout S.No.2258 AND 2256/2B 9/73 0.73 19 100 Buildings Center 65/75 0.7 20 Narasanna Nagar Z.P.Guest House 5/76 .1.48 21 S.B.I. Colony Ramanayyapeta 97/77 0.39 22 Chaganti Vari Street 61/78 0.04 23 Treasury Colony 68/78 1 24 Gazetted Officer's Colony Santhi Nagar 110/78 1.26 25 Vidya Nagar, F.C.I. Colony Ramanayya Peta 30/79 0.13 26 Krishna Nagar, Bank Colony Ramanayyapeta 57/79 0.18 27 C.T.O. Colony Ramanayyapeta 81/79 0.22 28 Near 100 Building Center 304/79 0.707 29 Nagavanam 20/79 0.060 30 Nagavanam(near) 7/80 0.057 31 Sambamurthy Nagar T.S. No. 835/6P, ward - 2, Block - 20 57/80 0.11 21 5/81 (EWS.) 0.12 Rajeswari Nagar 29/81 0.279 34 S.B.H.Colony 97/81 0.210 35 Siddhartha Nagar 98/81 0.63 36 A.P.Govt. Employees Housing SocietyRamanayyapeta 104/81 0.30 37 Rajendra Nagar 208/81 0.230 38 Andhra Bank Employees Colony 292/81 0.190 39 Revenue Colony 421/81 1.72 40 Near Bala Yogi House West Panchayathi Boundary 483/81 0.2 41 R.T.C. Colony Ramanayyapeta 490/81 0.88 42 Thota Subba Rao Nagar 2/82 0.30 43 Durga Vidyut Nagar Ramanayyapeta 30/82 0.66 44 Ramanayyapeta S.No.104/3 P 41/82 0.10 45 New C.T. Colony Ramanayyapeta 120/82 0.20 46 Bhavani Nagar 181/82 1.05 47 Near Sambamurthy NagarT.S. No. 835/6P, ward - 2, Block 20 182/82 0.2 48 Near Sowjanya Nagar Suryarao Peta (V) 212/82 0.24 32 Sanjay Nagar 33 22 49 Ramanayyapeta Near Vaidya Nagar 313/82 0.86 50 Bank Colony (SBI officers Colony) 314/82 0.660 51 Rangayya Naidu Street back side of Annadana Samajam 338/82 0.16 52 S.No.126/P and 128/6 362/82 0.29 53 Friends Colony Ramanayyapeta 519/82 0.71 54 Gowthami Nagar T.S.No.138/4P Ward No-2, Block - 11 542/82 0.45 55 R.R. Nagar 557/82 2.11 56 Pallam Raju Nagar 593/82 0.88 57 Near Madhura Nagar 117/83 0.150 58 Old Bus Stand Area 131/83 0.66 59 Kakatiya Nagar 190/83 1.09 60 New C.T. Colony Ramanayyapeta 259/83 0.17 61 Sastry Nagar Godarigunta 428/83 1.42 62 Vinayaka Nagar Ramanayyapeta 529/83 0.20 63 Gaigolupadu Junction (Near Dr.Rahim) 540/83 0.250 64 West side of Treasury Colony 81/84 0.26 65 Vidyut Nagar 314/84 0.130 66 Pallam Raju Nagar 437/84 0.21 23 67 Kotha Kakinada T.S. No.55 574/84 0.27 68 Pallam Raju Nagar 731/84 0.75 69 Postal Colony 732/84 1.88 70 Suresh Nagar 8/85 2.98 71 Behind Sports StadiumRamanayyapeta 22/85 0.47 72 Sambamurthy Nagar 5th Street Godarigunta 194/85 0.19 73 Suresh Nagar 365/85 0.37 74 G.P.T.Staff Layout 380/85 Ac.0.307 75 R.T.C. Colony Ramanayyapeta 392/85 0.74 76 Pallam Raju Nagar 495/85 0.23 77 Budampeta @ Sarvaraya Tex tiles 592/85 0.095 78 R.S. No.192/3P of Suryarao Peta 628/85 0.104 79 Godarigunta (Near 3 Temples) 654/85 0.37 80 S.No.2254/4 of Suryarao Peta 73/86 0.075 81 5 Buildings Centre 74/86 0.587 82 Near Bhavani Nagar Suryarao Peta 99/86 0.152 83 Rajendra Nagar (Arunodaya Marg) 159/86 0.100 84 Boat Club Back sideRamanayyapeta 332/86 0.11 85 Thagaraju Nagar Suryarao Peta 342/86 1.54 24 86 R.S.No.170/6P of Ward No.29 of Ramanayya Peta Vydanagar Co-operative Society 419/86 0.240 87 Ayodya Nagar 483/86 0.17 88 Godarigunta (Near 3 Temples) 510/86 0.36 89 Sambamurthy Nagar 5th Street 49/87/EWS 1.44 90 J.Ramarao Peta T.S.No.1822/P, 1855/P & T.S.No's.1853,1817,1818 Division No.20 51/87 Ac.2.59 91 Muggu peta 53/87/EWS 0.14 92 Near 3 Temples ,Godarigunta,Suryaraopeta 58/87 EWS 1.55 93 Padmanaba nagar T.Sno.542 65/87/EWS 0.18 94 South side of Treasury Colony 167/87 0.049 95 Pallam Raju Nagar 224/87 3.07 96 Sarada Nagar Colony S.No.96/8, 97/1 284/87 0.374 97 Behind Chaitanya College Hostel Godarigunta T.S. No.46/2B (P) 355/87 0.153 98 Vidyut Nagar (Nansi Street) 359/87 0.100 99 Godarigunta Junction S.No.52/1C (Part) 417/87 0.375 100 Lalitha Nagar 432/87 0.710 101 Kunthi Devi Peta 3/88/EWS 0.198 25 102 Bala Venkateswara Nagar Sambamurthy Nagar S.No.2217 103 5/88 (EWS) 0.419 Yallavari Doddi T.S.No.222/6 to 9 13/88/EWS 2.61 104 Mahalaxmi Nagar (Behind slaughter House) S.No.224/6 to 13, 230/2 19/88/EWS 2.14 105 Recharla Peta 30/88 0.44 106 Kunti Devi Peta 49/88/EWS 0.109 107 Peetala Tank T.S.No.1267 & 1208/P 50/88/EWS 0.545 108 Dummula Peta EWS 54/88 EWS 0.73 109 T.S.No.129/5 & 130/A Ward No.2 Block No-10 190/88 0.056 110 Behind Stadium Ramanayyapeta 7/89 0.42 111 Rajeswari Nagar(west) 29/89 0.260 112 Vidyut Nagar 56/89 0.630 113 Pallam Raju Nagar 59/89 0.250 114 Satya Devi nagar 78/90/EWS 0.250 115 Behind Chaitanya Hostel Godarigunta 108/90 0.180 116 Godarigunta (Near 3 Temples) 118/90 0.220 117 Pallam Raju NagarS.No.130/2C (P) 134/90 0.450 118 Godari gunta 162/90 0.120 119 Tohoti Peta 172/90 UPHS 0.080 26 120 L.B.Nagar South(venkatachalapuram) 21/91 (26/50 16/76 108/84 1/89) 0.150 121 Apex Colony,suryaraopeta 52/91 0.700 122 Padma Nagar 62/91 0.710 123 Kalara Pakalu T.S. No.294/1, Ward - 2, Block - 17 80/91 0.330 124 Rajeswari Nagar (North) 87/91 0.110 125 Pallam Raju Nagar 130/91 0.240 126 Pallam Raju Nagar S.No. 130/1C 137/91 0.156 127 Radha Nagar 147/91 0.330 128 Near Sasikanth Nagar Suryarao Peta 148/91 0.100 129 Near Sasikanth Nagar Suryarao Peta 151/91 0.173 130 Ayodya NagarT.S. No.128/P 153/91 0.420 131 Near R.T.C. Colony Ramanayyapeta 192/91 0.460 132 Near V.S.L.College 224/91 0.340 133 Srividya Colony S.No.18/1C P,20/1A P & 20/1C P 1/92 (A & B) 2.136 134 S.No.195 P, 196 P, 157 P New Gaigolapadu 40/92 1.380 135 Near V.S.L.College 66/92 3.000 136 Near Santhanpuri Colony Godarigunta 100/92 0.500 137 Kotha Kakinada 6/93 (EWS) 1.120 138 R.S.No.220/3P, 4bp, 5bp, 219/6B, 221/Bp, 4p, 5p 59/93 1.230 27 139 MekanarayanammaThota 111/93 1.550 140 Near Sasikanth Nagar Suryarao Peta 133/93 0.176 141 Janaki Ramaiah Nagar 118/94 0.366 142 Sowjanya NagarSuryarao Peta 151/A/94Comprehensive layout open spaces 0.960 143 Sasikanth Nagar Suryarao Peta 9/95 1.270 144 Near Rajeswari Nagar 103/95 0.126 145 Rajeswari Nagar(North) 3/96 0.062 146 L.B.Nagar South 46/96 0.112 147 Radha Nagar (40 Buildings) 58/96 0.066 148 S. Atchutapuram Sarpavarama and Indrapalem Grampanchayathi S.No.70P, 77P, 78P, 148, 149, 152p, 153, 154, 155, 156, 157, 158p, 159 to 163 and 166 82/96 8.239 149 Near Sowjanya Nagar Suryarao Peta (V) 77/98 0.225 150 Dairy form Layout W.No.2 B.No.10, 44 & 48 & T.S.No.133/8F, 2038/2, 1966/3, 6 , 9, 10, 1967P, 1968P & 1984/3 122/98 1.940 151 Datta Sai Nagar 123/98 0.400 152 L.B.Nagar South 36/99 0.047 153 Near 40 BuildingsGodarigunta 63/99 0.210 154 Annamma Tank T.S.No.979/1(p) Division No.22 1/R/98 EWS 0.950 155 EWS W.No.8, B.No.6, T.S.No.40/P of Yetimoga Cyclone Center in Jagannaickpur 1/99 KMC 0.410 28 156 Gaigolupadu 27/99 0.150 157 Near 40 Buildings Godarigunta 121/99 0.300 158 Near 40 Buildings Godarigunta 68/2000 0.237 159 Sivareddy Nagar Jagannaick Pur 90/2000 0.330 160 Pydah Vari Layout 58/2001 0.459 161 Ramanaiahpeta (Ideal College north) 22/2002 0.038 162 Stadium back side Ramanayyapeta 4/2003/R 0.070 163 R.S.No.157/27P of Ramanayya Peta House Sites 49/2003/R1 0.047 164 Suryarao Peta House sites and T.S.No.52/1CP, B.No.8W2 of Suryarao Peta 42/2004 0.126 67/2004/R 0.100 31/2005/R 0.798 Near Bhupathi Nagar,Suryaraopeta Lakshmi Narayana Nagar 165 166 167 Ramanaiahpeta (Ideal College north) 20/2006 0.225 168 Ideal College(Behind) 30/2006 0.099 169 Srividya Colony,Beside of Tennis Court 29/2011/R 0.124 Total 102.563 9. Town Planning Income: Income through the Town Planning Section from different sources of in Previous 3 years is as follows Income SL.No. Year 1 2012-2013 143.93 2 2013-2014 191.76 3 2014-2015 (upto Jan -2015) 312.07 (Rs.in Lakhs ) This is submitted for kind perusal and for information. KAKINADA MUNICIPAL CORPORATION PUBLIC HEALTH 29 ACTIVITIES TAKEN UP Swatchata Karyakramam: Commissioner instructed Sanitary Inspectors to inspect Hotels & Food Courts to maintain Hygienic conditions and safe drinking water and good toilet facility. Already conducted meetings separately to the Hoteliers Restaurants & Fish and Meat vendors. Intra-city activities : i) Regulation of stray cattle movement ii) Prohibiting burning of garbage, leaves other waste. iii) Constitution of vigilance squads to prevent littering of waste, transportation of waste in covered conditions etc. iv) Not to throw any solid waste in the neighbor hood, on the streets, open spaces, into the drains or water bodies. Ban on Plastic Carry Bags : Inspections at Market Places and Rythu Bazar, Hotels and street vendors to ban plastic less than 40 microns thickens and collected Rs. 45,000/as penalties SCIENTIFIC DISPOASAL OF WET GARBAGE : In Kakinada Municipal Corporation initiated one organic compost plant which is situated in revenue colony, Sambamurthynagar. Regularly one Tata Ace use to be collect wet garbage (organic) from Hotels, Rythu Bazars. This collected garbage made it into tiny particles through pulverize then we add saw dust and put into plastic trays. There is an automatic sprinkler system to wet the product periodically. Then we transfer this organic material into coir lined compartments. With in Two weeks we are getting quality organic compost. Presently we are using this compost in our Municipal Parks. Nearly 10 tons of organic compost is ready to sale for horticulturists and interested Citizens @ 5/- per K.g. 30 IKP –URBAN (MEPMA) Government have established a Mission called Mission for Elimination of Poverty in Municipal Areas(MEPMA). The activities takeup under the above programme are called INDIRA KRANTHI PADHAM (IKP-URBAN). It is for implementation of social mobilization activities in all the municipal areas in the state. It is a project for implementing poverty elevated programmes for urban poor by forming self help groups to women and other venerable people in the urban slums. The following activities are taken by the Kakinada Municipal Corporation : FORMATION OF SHGS In Kakinada Municipal Corporation 101 slums area identified in which 6144 Groups have been formed by the urban poor women up to 31-03-2015. It is stated that all the concerned Cos were instructed to take action for forming Self Help Groups in the slums with 100 % coverage of Urban Poor under proactive reforms for the year15-16. During the financial year 2014-15 Target for forming Self Help Groups fixed for Kakinada Municipal Corporation is 97 as against 148 Self help groups were formed up the end of March,2015. SHG BANK LINKAGE : In the financial year 2014-15 , out of 6144 SHGS, 1481 SHG have been benefited financial assistance of Rs6014.77 lakhs by achieving 100 % target..During the present financial year 2014-15. PAVALAVADDI : To inculcate the habit of regular repayment of loans and to reduce interest burden to Self Help Groups the Pavalavaddi was released to Self Help Groups as detailed below: YEAR 2014-15 AMOUNT RELEASED 149.00 Lakhs AMOUNT DISBURSED 149.00 Lakhs 31 VADDILENI RUNALU : The Government of Andhra Pradesh introduced Vaddi Leni Runalu Scheme from 01.01.2012 to reduce entire interest burden to Self Help Groups.The Kakinada Municipal Corporation taken steps and collecting entire data of Vaddi leni Runalu for eligible groups and preparing proposals so as to submit consolidated report to Mission Director, MEPMA,A.P.Hyderabad for release of Vaddileni runalu. TOTAL NO.OF SHGS 6144 NO.OF SHGS 2108 AMOUNT 108.00 INSURANCE: In the year 2012-13 all the SHG,s and their family members were covered under JBY ,The total 45 deaths were reported so far of which 29 claimants were beneficed with immediate relief @ Rs.5000/- the remembering amount were under the process with LIC under progress for settlement. ABHAYA HASTAM RENEWALS YEAR NO.OF SHGS NO.OF SHG MEMBERS RENEWALED 2014-15 170 1650 Targt 1600 Identified 1659 Trained 402 ESTP: Self Employment Program : URBAN SELF EMPLOYMENT PROGRAMME : In the Financial year 2011-12 targets were fixed for providing Self Employment to the Urban Self Employed youth in Kakinada Municipal Corporation is 161 units. We have surpassed the target and 180 Units were financed through various banks in setting up petty trades . During the financial year 2012-13 as per the instructions of Mission Director,MEPMA,Hyderabad all the beneficiaries have to be identified from the Self Help Groups and their family members. The target has been fixed 32 for present financial year 2012-13 is 159 units out of which 70 units were sanctioned. Target 429 Applications received 854 Sanctions Grounded 156 80 Pensions : Social Security Pensions distributed during the month of 32015. Pensions particulars are forwarded here under: Type of Pension OAP WIDOW PH ABH OTHERS TOTAL No of Pensioners 740 6287 2055 53 23 16,302 Amount 90,42,000 75,63,000 29,95,000 6,64,000 26,000 2,02,90,000 Commissioner(FAC), Municipal Corporation, Kakinada. 33 EDUCATIONAL INSTITUTIONS : SCHOOLS: Sl. No. School Type Primary Schools Upper Primary Schools High Schools 01 Municipal Schools 52 01 14 02 Government Schools 01 00 03 03 Private Aided Schools 12 11 09 04 Private Unaided Schools 51 45 49 05 Tribal Welfare Schools 01 00 01 06 Social Welfare Schools 00 00 00 07 APSW Residential Schools 00 00 01 117 57 77 COLLEGES: Sl. No. School Type Government Private / Aided 01 Junior Colleges 03 18 02 Degree Colleges 02 09 03 Post Graduate Colleges 01 05 04 ITI 01 02 05 Polytechnic Colleges 02 00 06 Engineering Colleges 01 01 07 Teacher Training Institutions 00 06 08 B.Ed Collecges 00 04 09 Law Colleges 00 01 10 Medical Colleges 01 00 11 Dental Colleges 00 00 12 Residential Junior College 00 01 11 47 34 CINEMA THEATERS LIST: Sl.No. Theaters Name 01 Sri Priya 02 Padama Priya 03 Geet 04 Sangeet 05 Anand 06 Anjali 07 Veerkamal 08 Chanikya 09 Chandra Gupta 10 Tirumal 11 Devi Multiplex 12 Sri Devi Multiplex 13 Rukmuni Multiplex 14 Mayuri 15 Satyagowri 16 Laxmi 35 WATER BODIES Sl. No Survey No. Location Extent of Site in Acs. 1 2 3 4 01 84/1 02 1009/1 03 1163 04 Santha Cheruvu 5.352 Ramaraopeta 37.60 Pindala Cheruvu 1.200 R.S.No.82/1 of Ramana- Ramanayyapeta Pithpuram Rao yyapeta 28.33 05 1817 Near J. Ramaraopeta Jagannaickpur 2.3699 06 1072 Near M.S.N. Charties (Dobhi Khana) 2.1099 07 979/1 Annamma Tank 2.0745 Roads: Sl. No 1 2 Category R & B Roads in Municipal Corporation Limits ELSR's Name of the Item No/Length Kakinada to Rajahmundry (State Highway) 4 km KANF Road Ramachandra Puram 3 km Sarpavaram Junction to Turangi (National Highway) 8 km Town Hall to Dairy Form Junction 1.50 km Sarpavaram Junction to Madavapatnam 1.50 km Sarpavaram Junction to Vakalapudi 1.20 km Wharf Road 1.44 km Cinema Road 4.31 km --- 15 nos 36 S.No. Name of Market Location I Vigitable Markets 1. Pedda Market 2. Kothapeta Market 3. Ramanayyapeta Market 4. Gandhinagar Market 5. Jagannadhapuram Market Raitu Bazars Santhacheruvu Near R.T.C.Complex Ramanayyapeta Gandhinagar Jagannadhapuram 1. R.T.C.Complex Near R.T.C.Complex 2. Gandhinagar Gandhinagar Fish Markets 1. Pedda Market 2. Kothapeta Market 3. Ramanayyapeta Market 4. Gandhinagar Market 5. Jagannadhapuram Market Santhacheruvu Near R.T.C.Complex Ramanayyapeta Gandhinagar Jagannadhapuram II I KAKINADA MUNICIPAL LIMITS HOSPITALS LIST S.No. GOVERNMENT HOSPITAL No. 1 GOVERNMENT GENERAL HOSPITAL, KAKINADA 1 2 FIRST REFERRAL UNIT, KAKINADA 1 3 POST PARTUM UNIT, KAKINADA 1 URBAN FAMILY WELFARE CENTER, KONDAIHPALEM, KAKINADA URBAN FAMILY WELFARE CENTER, JAGANNADHAPURAM, KAKINADA 2 4 5 6 UHC - RECHERLAPETA 7 UHC - GODARIGUNTA UHC - SURYANARAYANAPURAM UHC - SANJAYNAGAR 8 9 10 11 12 13 14 UHC - MUTHANAGAR UHC - YETIMOGA ICDS, KAKINADA HIGH AND EQUIPEMENT OTHER PRIVATET HOSPITALS TOTAL 6 1 1 72 85 37