Worldwide Purchasing Technical Review Checklist Guidelines Date of Technical Review: ________________________ Prior to Technical Review Meeting: Get with the buyer and get a copy of the Required Quality Information package documentation that is to be submitted by the supplier with their Quote Package to the buyer. Review the Required Quality Information letter (GM1927-4) that is included in the RFQ package for a list of the specific information that is to be submitted. During the Technical Review Meeting: The following categories are provided as a reference to ensure these areas are covered during the Technical Review with the supplier. Use this list as a guideline to ask questions as appropriate during the meeting. Facilities / Program Management / Organizational Structure End of Line / Functional / Compliance Testing ISO/TS 16949 or QS-9000 PPAP and Run at Rate Planning APQP Activity Cpk Key positions filled Explains why organization is effective Sufficient resources to support this program Clear reporting structure Test requirements understood Test Method / Type identified Registered Plan to achieve Certification is understood (if applicable) ISO 14001 Compliance Timeline and major events listed and understood Tracking methods Individuals identified Resources to implement (SQE’s) Corrective Action process used Capability studies Tolerances defined Flow Diagrams/PFMEA/Control Plans PPM GP-11 - Prototype Continuous Improvement Tools/Technology/Measurement Systems Logistics Laboratory Complex System/Sub-assembly Requirements Complete process Depicted Inspection Points Logical Uses AIAG format/symbols Understands & uses GP-11 Tool Timing Charts Gages required GP-8 Terms/Personnel assigned Documented Results Ongoing Uses data drivers (PPM, Downtime, Warranty, etc) Warranty Reduction Plans New Technology In-House Tool Shop Rapid development tools (Stereo-lithography, EDM, etc.) Types of gaging; CMM holding fixture, Variable/Attribute, how many gages Tests laboratory is accredited to perform Capabilities of laboratory R&D Understands performance & testing requirements Testing performed in-house or by third party accredited laboratory January 2004 Drivers identified Root causes identified Individuals identified Methods identified Tracking methods & reviews known Point of shipment in region Supply in Line Sequence (SILS)/Sequence requirement + solution Electronic scheduling capability Packaging/containerization requirements Supply Chain Management for complex flow including Tier 2 Flexibility to schedule variations understood RASIC Chart Sourcing Plant/Process for Sub-contractors Plan to meet broadcast window requirements List of directed buys Facilities Plan Examples of prior experience with complex assemblies. Management plan for subcontractor quality Carry-over parts list Level of integration of sub-contractors Detailed BOM for Complex System/Sub-assembly 1 GM 1927-13 Worldwide Purchasing Technical Review Checklist Guidelines Revision History- January 1, 2004 Changes Section Continuous Improvement January 2004 Change Added Warranty Reduction Plans 2 GM 1927-13