C.V Personal Information: Name : Khalid Mohamed Osman Ahmed Address : Sudan- Kassala- Al-Katmua Date of Birth : 1972 Martial Status : Marriage Nationality : Sudanese Languages : Arabic – English Qualifications: 1996 Diploma in Civil Engineering (Hydraulics) Sudan University for Science & Technology 2001 Bachelor (Honors) of Engineering in Civil Engineering (Highways & Transport) Sudan University for Science & Technology Professional Expertise: Over 10 years’ experience in Civil Engineering. Highway and road construction, supervision, execution and design; Earth and rockfill dams' construction supervision Courses: 22 to 26-7-2007 Concrete Durability & Repair Quality Excellence Studier Center 16 to 22-6-2006 Quality Management System Requirements (ISO 9000:2001) International Management Development and Technology Center 15 to 21-12-2003 Asphalt mix design & quality control Arab Center for Engineering Studies Computer Application: Primavera. AutoCAD. Microsoft Office (Ward, Excel, PowerPoint). Internet skills. Registration: Sudan Engineering Council Number of registration: )16536 خ.م/ م.س/ ه.(م Memberships: Federation of Sudanese Engineers Languages: Arabic: Mother Tongue. English: Very Good at all skills. Others: Release from national service. Valid driving license Work History From 17 August 2011 up to Date: Senior Embankment Engineer Ministry of Water resources & electricity, Dams Implementation Unit (DIU) Responsibilities: Working on all preparatory and execution works such as: Material Sources Supervision of site investigation of material sources (Borrow Areas and Quarries) Review of geotechnical reports on borrow areas Review of borrow areas exploitation and conditioning construction method statement Supervision of borrow areas exploitation and conditioning methods Review of the material balance sheet Roads: Review of road construction method statement, (material, pavement layers design, geometric design and drainage… etc.) Supervision of road construction Traffic Control Measurement for payment Embankment Dam Construction: Review of dam foundation excavation construction method statement Supervision of Dam foundation excavation works Foundation dewatering Review Geological mapping of rock and soil foundation. Foundation surface treatment( dental concrete, and slush grouting) Grouting Cap concrete structure works (Drawing, method statement and construction) Review of embankment construction method statements Supervision of Trial fills and review of the documenting reports Follow up fill material processing plant installation and commissioning. Supervision of Trial Runs of the two Fill Material Processing Plants, review of reports Review of all QA/QC documents including the ‘Layer Approval System’ Review of shop drawings Study and evaluation of the proposals submitted by the Contractor with respect to geometric and structural design of the dam, filters, drains, upstream slope protection (riprap) Supervision of embankment works Review of dam foundation treatment by rapid impact compaction construction method statement Supervision of dam foundation improvement( densification) by rapid impact compaction method Review of Spillway approach channel and tailrace surface protection construction method statement Follow up and supervise spillway tailrace surface protection Follow up quarried riprap production for surface protection and upstream slope protection River Diversion: Review of river diversion and closure hydraulic model review and evaluation Review of river diversion and closure construction method statement Supervision of river diversion and closure works(closure and cofferdams) Riverbed protection Administration work Participate in the preparation and establishment of the organization chart for earthwork department (duties and responsibilities) setting up earthwork supervisory team Organize and supervise the site engineers to cover all aspect of supervision work and other relevant works Leading site engineers Manage and control all site engineers assigned to the earthwork department Monitor the performance of supervisory site engineers in their respective works Provide the site engineers with all documents related to their duties (drawing, CMS, etc…) Supporting Site Engineers Work on the Engineer’s documentary tasks Prepare the minutes of the weekly embankment progress meeting participate in the weekly inspection for the construction site participate in the project monthly progress meeting assist the Contract department in reviewing and evaluating Contractor's claims and variation order (embankment works only) Review and check measurement sheets for payment Assistant Contracts Division in reviewing and assessing Contractor monthly interim payment application Assistant Contracts Division in the preparation of monthly interim payment certificate Assist Planning department in reviewing and evaluating the progress of the works and propose measures for a deviations Verification of the contractor's commitment to safety requirements and preserving the environment Leading trainees -------------------------------------------------------------------------------------------------------------------------From 31 May 2010 to 17 August 2011: Embankment Engineer & Acting Administrator Engineer Dam Complex of Upper Atbara Project (DCUAP) Sudan Ministry of Water resources & electricity, Dams Implementation Unit (DIU) Responsibilities: Work to fulfill the contractual obligations of the Owner to the other parties (the consultant and contractor) Follow-up the Owner administrative rights of with the Contractor Work to overcome all the administrative obstacles to facilitate work of the team Owner Prepare and present the Administrative Office monthly report Follow-up to the quality of the Embankment works in site Supervise the geotechnical tests Road works include the foundation, sub-base, base , asphalt and culverts Follow up site installation (pontoon bridges, fill material plant, lab, crusher offices, labor camps, workshops, clinics, water supply ,sewage system and electrical supply…etc. ) Review contractor and consultant reports Follow-up The Contractor monthly quality control reports Follow-up quantities of materials required for Dam Embankment Construction. Road works include the foundation, sub-base, base and pipe culvert. Supervision of Setit belly Bridge construction (bored pile, piers and installation and launching of the bridge deck Follow-up and verification of the arrival of the equipment and material to the site according to the contract and schedule -------------------------------------------------------------------------------------------------------------------------First of October up to 31 May 2010: Site Engineer Ministry of Irrigation &Water resources, Dams Implementation Unit (DIU) Merowe Dam Project Seconded from Dams Implementation Unit to Lahmeyer International (Germany) Consulting Engineers. Responsibilities: Supervising the quality of the works performed by the Contractor, CCMD Joint Venture, for the construction of all aspects of the Embankment dams, including: Foundation excavation and Foundation surface treatment; Construction of concrete plinth and concrete face slabs; Perimeter joints, vertical joints and water stops; Parapet wall construction; ECRD, CFRD and DYKES embankment works such as the core and rockfill and filters Upstream slope protection; Road works include the foundation, sub-base, base , asphalt and culverts; Setting up and maintaining ECRD fill quality records Contractor road shop drawing review; Asphalt road Construction Method Statement review; Supervision of earthworks and concrete works for box culverts of Merowe irrigation Canal project Prepare the minutes of the weekly embankment progress meeting -------------------------------------------------------------------------------------------------------------------------From 1st of April 2005 to 6th -June-2006: Asphalt Engineer & deputy of Project manager Kassala-Hua highway rehabilitation Project Serial for Roads and Bridges Responsibilities: Borrow Area Exploitation Aggregate Crushing plant production supervision of Asphalt batch plant production Quality Control of asphalt mix design Asphalt pavement construction Highway shoulder construction Daily &monthly reports Interim payment application preparation -------------------------------------------------------------------------------------------------------------------------From 1st -November-2004 to 30-January-2005: Embankment Construction Engineer Um Ruaba- Abu Gubaiha Road Project Sudan Pile for Roads & Bridge Responsibilities: Barrow Area exploitation arrangement& controlling Resources allocation. Site works arrangement &controlling Office works daily and monthly report Deputizing Resident Engineer -------------------------------------------------------------------------------------------------------------------------From 15-October-2003 up to 29-January-2005: Material Engineer Khartoum State roads and Bridges Construction& Environmental Lab Center Responsibilities: Soil investigation for Highway structure design Structure design of highway preparation of material and Construction specification Material & construction quality control Concrete mix design Hot- Asphalt Mix Design -------------------------------------------------------------------------------------------------------------------------19-8-01 to 20-9-03. Site Engineer Khartoum center Roads & Terminal Khartoum Center Development Authority Responsibilities Preparation of Geometric and Structure Design of Roads Preparation of Specification & Bill of Quantities Follow and supervise all works executed by the contractors Make the necessary change and amendments in the design of the roads Solve all Problems facing the contractors while programming their jobs Checks & approve the contractor's interim certificate -------------------------------------------------------------------------------------------------------------------------01-06-2002 to 31-07-2002 Site Engineer DAR CONSULT-Khartoum Development Authority Merowe – Dam road Responsibilities Review of geometric design drawings and alignment Review of cut and fill volume Review of road different layers quantities Review specifications Review and check of materials sources Review and check hydraulic and structure design of drainage structure (box and pipe culvert). Handing over the site and borrow areas to the contractor Verification of the efficiency of materials testing lab, Follow-up and verification of the arrival of the equipment and material to the site according to the contract and schedule -------------------------------------------------------------------------------------------------------------------------From 07-06-1998 to 12-08-2001 structure site Engineer MAAWIL- ENG. Khartoum Responsibilities Management of the machinery, manpower and material associated with the construction process. Determination and monitoring of the method of construction. Preparation of the construction schedule Leading the construction team Supervising the execution of construction work Erection and installation of reinforcement. Formwork installation Supervising and controlling of pouring process. Reporting of all activity at site Fresh Concrete testing Preparation of interim payment application -------------------------------------------------------------------------------------------------------------------------From 03-02-1997 to 25-08-1997 TAKA ENGINEEING Kassala Responsibilities Executive Engineer Kassala state radio building (Skeleton building) Khatmiyya secondary School (Brick buildings) Supervision of the execution construction work, Reinforcement preparation and fixing, Formworks, concrete Mixing and concreting Brick work Referees: Available on request.