Deviation Request Suppliers to complete areas with asterisk (*) Key Fields *Deviation Number: DEV- - *Equipment/System Type Deviation Point: Job Number: Deviation Initiator Standard Customer: Custom *Supplier: *PO Number: Internal: *Quantity affected: Comments: Audit: *Deviation Type Labor: Material: Process: Dimension: Specification: *Identification Customer/Supplier/Internal: Business location: Originator: Phone: Description: WT Part No.: Procedure/Work Instruction & Revision: Drawing No./Purchase Specifications, Revision & Date: Date: Email: CAR No.: Serial No / LOT No.: Work Order/Job No.: Test Specification/Method, Revision & Date: Effective Date: Final Date: *Deviation Request Details *Reason for Deviation / Root Cause / CAR Records (check all that apply) Documents (check all that apply) Inspection Check Sheet Process Flow Diagram Operator Instructions Lot Control Sheet Other: Other (define): Other (define): Other: Other: JSA Other: ******Attach copies of updated records and/or documents with highlighted changes****** SAP Change Document No.: TBD Revision: Page 1 of 4 Deviation Request Update Production Order BOM (Bill of Materials) Item(s) to Remove: Yes No Item(s) to Add: Training Acknowledgment (if required) Signature of trained personnel: 1st Shift Supervisor: 2nd Shift Supervisor: 3rd Shift Supervisor: Other personnel: Approvals (Manager or designee) Required Signature Approved Signature Quality Manager (required): Customer Service: M / E Engineering Manager: Manufacturing Manager: Materials Manager: Purchasing Manager: Project Manager: General Manager: Research & Development: Date: Date: Date Date: Date: Date: Date: Date: Date: Email this request and supporting documents to the Buyer listed on the PO. INSTRUCTIONS FOR COMPLETING DEVIATION REQUEST Document No.: TBD Revision: Page 2 of 4 Deviation Request 1. General The Deviation Request is used by the Customer or Supplier or internal Evoqua facility to document a request for a product or process deviation or change to the process which was originally approved by Evoqua. Upon completion, this form is to be sent to the Evoqua Buyer listed on the PO for processing. 2. Instructions Suppliers are to complete all fields marked with an asterisk [*] Key Fields *Deviation Number i. Suppliers follow this format for deviation number: DEV-Supplier Name-date of deviation ii. Evoqua – follow this format for deviation number: DEV-EWT Plant#-date of deviation Deviation Point – The point in the overall process where deviation will occur Job Number – SAP Project Number *PO Number – Purchase Order Number *Quantity affected – if applicable *Equipment/System Type – Standard or Custom product or process *Deviation Initiator – Source of the Deviation request *Deviation Type – Identify the part of manufacturing/fabricating the Deviation effects *Identification Customer/Supplier/Process – Name of entity or requesting Deviation Date – Date when the Deviation Request is filed Business location of Requestor Originator – Person filing the Deviation Report Phone – Originator’s phone number Email - Originator’s email address Description – Brief description of request CAR No – Enter the CAR No if one is issued WT No – Evoqua part number effected Serial No / LOT No, - Serial or Lot number of part effected Procedure/Work Instruction & Revision – Entry required for Internal Deviation requests only Work Order/Job No. Drawing No./Purchase Specifications, Revision & Date Test Specification/Method, Revision & Date Effective Date – Date when the accepted Deviation will start Final Date - Date when the accepted Deviation will end *Deviation Request Details – Fully describe the requested deviation from the current requirement/specification or process. *Reason for Deviation / Root Cause / CAR – Fully describe the reason for the deviation and the Root Cause. Also identify the corrective actions to be taken to prevent a similar deviation in the future, if applicable. Records - (check all that apply or add record if not listed) Documents - (check all that apply or add document if not listed) SAP Change – Identify changes required in SAP for this deviation Document No.: TBD Revision: Page 3 of 4 Deviation Request Training Acknowledgment (if required) - Personnel associated with process deviation must sign off when trained Approvals (Manager or designee) – Signature of managers approving this specific Deviation request Document No.: TBD Revision: Page 4 of 4