ALPHA INTEGRATION, INC. APPLICATION DATA SHEET Customer Name: Contact Name: Date: Contact Tel #: Contact Email: Customer RFQ #: Alpha Quote #: Alter. Contact: Project Name: Program Name: Prepared By: ex. This form is intended to be a central source of information for the project. If the RFQ has the detail, please skip the section and make note that the RFQ covers it. The better the information is transferred, the better and faster the proposal process is. Section A – Quote / Contractual Specifics Quote: type F.O.B.: Due: Target Price: Expected Install Date / Lead Time: Our proposal should include: Other Pricing Breakdowns: Other (specify) Parts: Layout – 2D One Price Components Supplied Detailed RFQ Attached Layout – 3D Robot Simulation Station-by-station Pricing Ass’y Supplied Tooling and Capital Comp. and/or Ass’y to follow Drawings: G.D. & T. Attached G.D. & T. to follow CAD Data Attached drawing of plant floor included in R.F.Q. Floor Space Restrictions: Equipment Standards: None R&M: Customer Std. Attached MOST study None Available CAD Data to follow CAD Attached Use Alpha Standards No Requirements Item Is an extended warranty required? If yes, describe below. Does the customer have standard payment terms? If yes. Does the customer have their customer’s commitment on the project? Is the project funded? - > Budget Is there any capability requirement that must be met? If yes, describe. Does the customer have any automation currently? Does the customer have staff trained to maintain automation equipment? Has the customer addressed the upstream and downstream processes? Are part design changes possible to facilitate automation? Y/N/NA N/A N/A N/A N/A N/A N/A N/A N/A N/A Specifics List any comments or notes pertaining to contractual issues (i.e. supply agreements): Competitors: Similar projects we have done: Application Data Sheet – R0 Page 1 of 3 Alpha Integration Confidential ALPHA INTEGRATION, INC. APPLICATION DATA SHEET Section B – Project Specifics B1 - Rate Yearly Volume: + Hrs/Shift + Shifts/Day Or Required Cycle Time: Efficiency: Operators allowed/preferred: B2 - What is the customer’s preferred concept? No Preference Lean Cells Walking Beam Robotic Precision-Link Other (list) + Wk/Yr Dial Indexing Conveyor Power & Free Cam-Driven Chassis B3 - What are the customer’s key drivers for this project? (Check those that apply) Flexibility Modularity Uptime Quality High Complexity Low Complexity Support Relationship Familiarity Other (list) Cost Delivery Error-Proofing B4 – Customer Expectations – the current equipment in their plant is; current equipment B5 – Customer Expectations – for this project they want project expectations B6 - List the basic sequence of operations: (Add as required) Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 B7 – Part Handling + Misc. How are raw parts presented to the system list - generic or each if different (trays, bulk, operator load) Out-feed from the system (bin/tray/conveyor) How many models/products are to be assembled/tested? Will any of the hardware be drop-shipped for integration? Required capacity of feed systems (in # parts or minutes) Describe the parts to be handled if samples are not available but you have seen them. (Include weight, size, material, physical characteristics, etc.) Condition of parts (Oil/powder/burrs/wet/hot/cold) How much operator intervention is acceptable? How many components are in the final assembly? Describe the components. Will the final assembly be made up of sub-assemblies? Will the sub-assemblies be assembled off-line? List major equipment to be used (such as nut runners, dispensing heads, bowl feeders, etc.) and the preferred manufacturer of each. Describe any special poke-yoke and/or SPC data collection requirements. Does the customer have any machine acceptance criteria? If yes, describe. Is there change-over required? (manual, auto, sensing, time allowed) Operators will be Standing Application Data Sheet – R0 Page 2 of 3 Alpha Integration Confidential ALPHA INTEGRATION, INC. APPLICATION DATA SHEET SECTION C – Equipment Specifics Section C.1 – Controls PLC or P.C. based? Preferred PLC HMI If PC, what is the preferred PC hardware/software/OS? Is the controls system to be networked or bussed (ProfiBus or)? Open What is the building supply voltage(S) - 1 120VAC 1-ph 2 none Section C.2 – Pneumatics and Hydraulics Pneumatic actuator Pneumatic valve Pneumatic piping/other (hard pipe, soft, mfg) Building air pressure Building air system moisture content Hydraulic actuator Hydraulic valve Hydraulic pump/H.P.U. Material/style for hydraulic piping Section C.3 – Mechanical Preferences RobotsServos Paint Type/Manufacturer of conveyors Guarding system Open Spec Operator working height Linear slides Vision Plating Section D – Gage and Test Systems (as applicable) What is the test to be performed (electrical, mechanical, leak, flow, vision)? How many part numbers are to be tested? Will change over tooling be manual or automatic? What is the preferred type and manufacturer of hardware? Is the hardware P.C. based? Describe the test method? Describe the test method pass/fail criteria? How is test data to be collected? What is the test time? Is gauge R & R required? If yes, give specifics. Who will supply masters and how many? How is calibration completed? How is the correlation completed? Is the calibration to be performed automatically or manually? Temperature compensated (Yes/No/How) List any other external variations and influences? How much operator intervention is acceptable? Section E – Your Notes/Comments Application Data Sheet – R0 Page 3 of 3 Alpha Integration Confidential