HYTORC SPANNER – CHECK LIST

P ROJECT N UMBER

O UTAGE M ANAGER

D OCUMENT N UMBER

P ROPOSED W ORK M ETHODOLOGY

W ORK P ARTY

L OCATION

D ESCRIPTION

P ROP

R EVIEW OF P ROPOSED P ROCEDURES & E QUIPMENT

P ROJECT T ITLE

S ITE M ANAGER

D ATE

M ANDATORY R EQUIREMENTS

H AZARD

Unidentified Job

Specific Hazards

C ONTROL M EASURE

JHA to be carried out by staff detailing on the day hazards that could not be practically assessed prior to attending site in addition to this

“C HECK L IST . All staff to sign on to JHA accepting this form and the on the day hazards and controls. JHA has been completed and approved by the relevant personnel in accordance with the JHA Procedure

Project or Outage manager to notify work party of ALL Hydro

Tasmania Assets in area (including Protection PLC, Mechanical,

Electrical and Civil Assets). Work party to inspect and make safe

Hydro Hazards-Lack of awareness of local asset and other simultaneous operations

Page 1 of 4

C HECKED

DOCUMENT REFERENCE: CL – 03 – 01 REVISION: 2 BUSOPS – 68736 DATE: 24/11/2010

HYTORC SPANNER – CHECK LIST

P ROJECT N UMBER

O UTAGE M ANAGER

D OCUMENT N UMBER

G ENERAL R EQUIREMENTS

H AZARD

Incorrect selection of equipment

Unserviceable condition of

HYTORC

P

S

D

ROJECT

ITE

ATE

M

T ITLE

ANAGER

C ONTROL M EASURE

Identify the type of work to be carried out and select the appropriate equipment for the task

Ensure that the torque (pressure setting) is known prior to selecting the appropriate equipment

Ensure all of the hydraulic fittings are of the correct pressure rating

The hydraulic hoses are of the correct pressure rating and are in good condition

The condition of the HYTORC head is good (no signs of cracks or fatigue)

The pump and pressure gauge are in good condition

Socket / spanner selection

Torque setting selection

The reaction legs are in good condition (no signs of cracks or fatigue) and are the correct legs for the job

The pendant cable and pendant are in good condition

The HYTORC motor electrical lead is in good condition and has been tested and tagged and is within the date range

Check HYTORC pump oil level is correct and only use recommended HYTORC oil for topping up

Ensure that only HYTORC sockets / spanners are used

Inspect for damage, cracks etc before use

Ensure that the HYTORC socket / spanner selected is the correct fit to the nut or bolt before applying pressure

Ensure that the correct HYTORC chart accompanies the HYTORC unit prior to the unit being used

Ensure that the torque required for the job is known from drawings, specifications, engineering etc

Convert the torque setting to a pressure setting using the correct HYTORC chart for the particular type of

HYTORC being used

N / A

DOCUMENT REFERENCE: CL – 03 – 01 REVISION: 2 BUSOPS – 68736

Page 2 of 4

C HECKED

DATE: 24/11/2010

HYTORC SPANNER – CHECK LIST

P ROJECT N UMBER

O UTAGE M ANAGER

D OCUMENT N UMBER

G ENERAL R EQUIREMENTS

H AZARD C ONTROL M

P

S

D

ROJECT

ITE

ATE

EASURE

M

T ITLE

ANAGER

Testing the HYTORC equipment with socket or spanner attached prior to use

Operation of

HYTORC

(communication)

Use of HYTORC on site, varied locations and manual handling

Incorrect PPE

Connect the HYTORC unit to the pump and check the security of the fittings

Set up the correct pressure in accordance with the

HYTORC operating manual instructions

Ensure the area around the HYTORC is clear while the

HYTORC is being tested and all personnel in the area understands what is happening

Operate the HYTORC on the floor to check correct mechanical operation, to set the correct pressure and check for oil leaks

The HYTORC is to be operated by two personnel who are familiar with the HYTORC equipment

Where-ever practically possible the HYTORC pump operator will be in line of sight with the HYTORC head handler

Ensure all personnel not required during the HYTORC operation are clear of area

The HYTORC pump operator will not operate the

HYTORC equipment until given the command from the

HYTORC head handler

The HYTORC pump operator will not operate the

HYTORC pump unit if they are not clear on the instructions that have been given by the HYTORC head handler

The HYTORC pump operator will cease operation of the pump when given instruction by anyone who gives the command to stop

Ensure there is a thorough understanding (detailed planning stage) of the issues involved with using the

HYTORC

Ensure a JHA is developed on-site in consultation with personnel carrying out the work clearly identifying the manual handling issues associated with using the

HYTORC equipment

Ensure a manual handling risk assessment is carried out for the work involved

The minimum requirement for PPE will be safety helmet with full face visor, gloves, overalls and steel

DOCUMENT REFERENCE: CL – 03 – 01 REVISION: 2 BUSOPS – 68736

N / A

Page 3 of 4

C HECKED

DATE: 24/11/2010

HYTORC SPANNER – CHECK LIST

P ROJECT N UMBER

O UTAGE M ANAGER

D OCUMENT N UMBER

G ENERAL R EQUIREMENTS

P

S

D

ROJECT

ITE

ATE

M

T ITLE

ANAGER

H AZARD C ONTROL M EASURE capped safety shoes or boots

S ITE R EGISTRATION (Note: Applies to all Work Parties and personnel working on site)

N / A

R EQUIREMENT

Authority to Work issued

Visitors register sheet or emergency board being used. Site Map issued (showing emergency assembly areas and fire equipment)

Hydro Tasmania Level 2 O H & S Induction complete

Hydro Tasmania Level 3 Site induction complete

S

A DDITIONAL P ERSONAL P ROTECTIVE E QUIPMENT (C OMPLIANT WITH A USTRALIAN S TANDARDS )

Page 4 of 4

C HECKED

C HECKED

R EQUIREMENT

C ERTIFICATION

C HECKED R EQUIREMENT C HECKED R EQUIREMENT C HECKED

I have personally checked and verified all items on all pages of this check list

Project or Outage Manager Name Signature Date

I acknowledge and agree that all items are detailed on all pages of this check list. I agree to ensure that all employees and sub-contractors engaged in this work will fully comply with all control measures indicated

Manager of Work Party Name Signature Date

DOCUMENT REFERENCE: CL – 03 – 01 REVISION: 2 BUSOPS – 68736 DATE: 24/11/2010