TEMPLATE INTAKE REPORT INFRASTRUCTURE <TEST PROJECT> Author SC Version 1.0 Location Vianen Characteristic <Test project> Version information VERSION INFORMATION Version Date Remarks Author <<Template information>> << This document is a template. It contains text that may not apply to the situation at hand. Text displayed in blue italics (style=InfoBlue) is included to provide guidance to the author and should be deleted before publishing the document. All sections of this document are to be preserved to maintain uniformity and indicate areas of deliberate omissions. The author should note deliberately omitted sections with the notation “NA”. There is also text between single brackets (<Text>). This text contains examplea and also needs to be removed or replaced by the definitive text. All other standard text may be adjusted as need fits>> Copyright Sogeti Nederland B.V. ©, based in Vianen, the Netherlands. This work (or any part thereof) may not be reproduced and/or published (for whatever purpose) in print, photocopy, microfilm, audio tape, electronically or in any other way whatsoever without prior written permission from Sogeti Nederland B.V. (Sogeti). TMap is a registered trademark of Sogeti Nederland B.V. Sogeti Nederland B.V. August 20, 2008 1.0 II <Test project> Distribution list DISTRIBUTION LIST Name Sogeti Nederland B.V. August 20, 2008 Company/Function 1.0 III <Test project> Table of contents TABLE OF CONTENTS VERSION INFORMATION ..................................................................... II DISTRIBUTION LIST ......................................................................... III TABLE OF CONTENTS ...................................................................... IV 1 DESCRIPTION .......................................................................... 1 2 INTAKE REPORT D(EVELOPMENT)-ENVIRONMENTS ............................... 2 3 4 5 2.1 Executed steps for intake development environment .......................................2 2.2 Executed steps for intake of the test tools....................................................2 2.3 Executed steps for the intake of (test) workplaces ..........................................3 INTAKE REPORT T(EST)-ENVIRONMENTS ........................................... 4 3.1 Executed steps for the intake of the test environment .....................................4 3.2 Executed steps for intake of the test tools....................................................4 3.3 Executed steps for the intake of (test) workplaces ..........................................5 INTAKE REPORT A(CCEPTANCE)-ENVIRONMENTS ................................. 6 4.1 Executed steps for the intake of the acceptance environment ...........................6 4.2 Executed steps for intake of the test tools....................................................6 4.3 Executed steps for the intake of (test) workplaces ..........................................7 INTAKE REPORT P(RODUCTION)-ENVIRONMENTS ................................. 8 5.1 Executed steps for the intake of the production environment ............................8 5.2 Executed steps for intake of the test tools....................................................8 5.3 Executed steps for the intake of (test) workplaces ..........................................9 6 REFERENCES .......................................................................... 10 7 APPENDICES .......................................................................... 11 Sogeti Nederland B.V. August 20, 2008 1.0 IV <Test project> Description 1 DESCRIPTION <<Describe here which environments from the DTAP are included. Describe a chapter per type involved. >> Sogeti Nederland B.V. August 20, 2008 1.0 1 <Test project> Intake report Development-environments 2 INTAKE REPORT DEVELOPMENT-ENVIRONMENTS << Specify here which environment(s) will be used and describe which intake process steps are executed for these environments. >> 2.1 Steps for intake development environment << Describe: - Which part of the development environment has the intake step taken place. - How is the intake executed, for example by using a related checklist; - What are the criteria for obtaining a sufficient result; - The results of the intake steps; - Which actions have to be taken still; The text above can easily be described in a table, for example: Component Database DB2 Database DB2 How Physical inspection by system maintenance Executing a back-up job Criteria Result Actions Tables changeable Pass None Full backup possible within 1 hour Pass none The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> 2.2 Executed steps for intake of the test tools << describe : - On which part of the test tool has the intake step taken place. - How is the intake executed, for example by using a related checklist; - What are the criteria for obtaining a sufficient result; - The results of the intake steps; - Which actions have to be taken still; The text above can easily be described in a table, for example: Component Loadrunner How Physical inspection by technical maintenance Criteria Result Actions Restart possible Failed To be installed The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 2 <Test project> Intake report Development-environments 2.3 Executed steps for the intake of (test) workplaces << Describe: - On which part of the workplace has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Desk tester 1 Desk tester 2 Desk tester 3 How Physical inspection Physical inspection Detailed specification for workplace Criteria Result Actions Presence Pass none Presence Fail Van andere afdeling halen Large enough for 3 pc’s Fail Order parts The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 3 <Test project> Intake report Test-environments 3 INTAKE REPORT TEST-ENVIRONMENTS <<Specify which environment(s) will be used and describe which intake process steps are executed for these environments. >> 3.1 Executed steps for the intake of the test environment << Describe: - On which part of the test environment has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Database DB2 Database DB2 How Physical control system maintenance Executing a back-up job Criteria Result Actions Tables changeable Pass None Full backup possible within 1 hour Pass none The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> 3.2 Executed steps for intake of the test tools << describe: - On which part of the test tool has the intake step taken place? - How is the intake executed, for example by using a related checklist? - What are the criteria for obtaining a sufficient result? - The results of the intake steps; - Which actions have to be taken still? The text above can easily be described in a table, for example: Component Loadrunner By Physical control by technical maintenance Criteria Result Actions Restart possible Fail To be installed The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 4 <Test project> Intake report Test-environments 3.3 Executed steps for the intake of (test) workplaces << Describe: - On which part of the workplace has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Desk tester 1 Desk tester 2 Desk tester 3 How Physical inspection Physical inspection Template detailed specification workplace Criteria Result Actions Presence Pass none Presence Fail Obtain from other area Large enough for 3 pc’s Fail Order parts The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 5 <Test project> Intake report Acceptance-environments 4 INTAKE REPORT ACCEPTANCE-ENVIRONMENTS << Specify here which environment(s) will be used exactly and describe which intake process steps are executed for these environments. >> 4.1 Executed steps for the intake of the acceptance environment << describe: - On which part of the acceptance environment has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Database DB2 Database DB2 By Physical inspection by system maintenance Executing a back-up job Criteria Result Actions Tables changeable Pass None Full backup possible within 1 hour Pass none The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> 4.2 Executed steps for intake of the test tools << describe: - On which part of the test tool has the intake step taken place. - How is the intake executed, for example by using a related checklist; - What are the criteria for obtaining a sufficient result; - The results of the intake steps; - Which actions have to be taken still; The text above can easily be described in a table, for example: Component Loadrunner By Physical inspection by technical maintenance Criteria Result Actions Restart possible Fail To be installed The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 6 <Test project> Intake report Acceptance-environments 4.3 Executed steps for the intake of (test) workplaces <<describe: - On which part of the workplace has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Desk tester 1 Desk tester 2 Desk tester 3 By Physical inspection Physical inspection Template detailed specification workplace Criteria Result Actions Presence Pass none Presence Fail Obtain from other area Large enough for 3 pc’s Fail Order parts The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 7 <Test project> Intake report Production-environments 5 INTAKE REPORT PRODUCTION-ENVIRONMENTS << Specify here which environment(s) will be used exactly and describe which intake process steps are executed for these environments. >> 5.1 Executed steps for the intake of the production environment <<describe: - On which part of the production environment has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Database DB2 Database DB2 By Physical inspection by system maintenance Executing a back-up job Criteria Result Actions Tables changeable Pass None Full backup possible within 1 hour Pass None The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> 5.2 Executed steps for intake of the test tools <<describe: - On which part of the test tool has the intake step taken place? - How is the intake executed, for example by using a related checklist? - What are the criteria for obtaining a sufficient result? - The results of the intake steps; - Which actions have to be taken still? The text above can easily be described in a table, for example: Component Loadrunner By Physical inspection by technical maintenance Criteria Result Actions Restart possible Fail To be installed The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 8 <Test project> Intake report Production-environments 5.3 Executed steps for the intake of (test) workplaces <<describe: - On which part of the workplace has the intake step taken place? How is the intake executed, for example by using a related checklist? What are the criteria for obtaining a sufficient result? The results of the intake steps; Which actions have to be taken still? The text above can easily be described in a table, for example: Component Desk tester 1 Desk tester 2 Desk tester 3 By Physical inspection Physical inspection Template detailed specification workplace Criteria Result Actions Presence Pass none Presence Fail Obtain from other areas Large enough for 3 pc’s Fail Order parts The table can be extended as one pleases with for example a column ‘date’ or column ‘responsible’ >> Sogeti Nederland B.V. August 20, 2008 1.0 9 <Test project> References 6 REFERENCES <<The various documents related to this document and infrastructure. In the accompanying table a number of documents is filled in, but can be worked out. >> Document <Checklist office lay-out> Author Sogeti Version 1.0 <0.5 Define organization> Danny Visser 0.5 <template detailed intake workplace> < test environment intake> TMap Next, chapter. 6.4.3 TMap Next, chapter 6.4.4 Willem Sloot 1.0 Ewald Roodenrijs Sogeti Sogeti 1.0 2006 2006 Remarks To be translated and placed on www.eng.tmap.net To be translated and placed on www.eng.tmap.net To be translated and placed on www.eng.tmap.net Under review And so on…. Sogeti Nederland B.V. August 20, 2008 1.0 10 <Test project> Appendices 7 APPENDICES Sogeti Nederland B.V. August 20, 2008 1.0 11