eXemplar <Project Name> Business Case Version <1.0> <Project Name> Business Case <document identifier> Version: <1.0> Date: <dd/mmm/yy> Revision History Date <dd/mmm/yy> Commercial in Confidence Version <x.x> Description <details> Author <name> eXemplar Page 2 of 6 <Project Name> Business Case <document identifier> Version: <1.0> Date: <dd/mmm/yy> Table of Contents 1. Executive Summary 4 2. Introduction 4 2.1 2.2 2.3 2.4 2.5 4 4 4 4 4 Purpose The Business Challenge Assumptions, Constraints and Conditions Definitions, Acronyms, and Abbreviations References 3. Baseline State Description 4 4. Future State Description 4 5. Options Analysis and Metrics 5 5.1 5.2 5.3 5.4 Lifecycle Costs Qualitative Benefits Analysis Schedule Analysis Economic Analysis 5.4.1 Net Present Value (NPV) 5.4.2 Payback Period 5.4.3 Internal Rate of Return 5.5 Risk and Sensitivity Analysis 5.6 Funding Profile 5 5 5 5 5 5 5 5 5 6. Recommendation 5 7. Appendices 6 Commercial in Confidence eXemplar Page 3 of 6 <Project Name> Business Case <document identifier> Version: <1.0> Date: <dd/mmm/yy> Business Case Analysis 1. Executive Summary 2. Introduction 2.1 Purpose 2.2 The Business Challenge 2.3 [This subsection should provide a complete list of all documents referenced elsewhere in the Business Case Analysis. Each document should be identified by title, report number (if applicable), date, and publishing organization. Specify the sources from which the references can be obtained. This information may be provided by reference to an appendix or to another document.] Baseline State Description 4. [This subsection should provide the definitions of all terms, acronyms, and abbreviations required to properly interpret the Business Case Analysis. This information may be provided by reference to the project Glossary.] References 3. [Briefly describe important assumptions, constraints, and conditions having major influence on the analysis and its conclusions. The following should be considered as a minimum: the service life of the currently fielded capability, the assumed required operational date for the proposed investment, the assumed economic service life of any proposed investment, and the operational framework within which any new investment must function.] Definitions, Acronyms, and Abbreviations 2.5 [A brief description of the business challenge that this Business Case Analysis addresses; what it is associated with and anything else that is affected or influenced by this document.] Assumptions, Constraints and Conditions 2.4 [Specify the purpose of this Business Case Analysis.] [This is the baseline state (manual control tractor fleet. Describe the set of existing or anticipated conditions assuming business strategy, policies, configurations, regulations, and customer conditions remain unchanged. Describe in the current system capabilities that will be addressed by the planned initiative. Describe impacts to current operations from the perspectives of customers and the company.] Future State Description [This is the investment option (autonomous control truck fleet). Describe the future capabilities needed to implement and support the advanced technology (autonomous control) tractor fleet. Describe impacts to operations from the perspectives of customers and the company.] Commercial in Confidence eXemplar Page 4 of 6 <Project Name> Business Case <document identifier> Version: <1.0> Date: <dd/mmm/yy> 5. Options Analysis and Metrics 5.1 Lifecycle Costs 5.2 Qualitative Benefits Analysis 5.3 [Summarize anticipated qualitative benefits likely to accrue from each case. The summary should provide enough information to show the differentiation and relative merits of each option.] Schedule Analysis 5.4 [Briefly summarize the life cycle cost estimates for each alternative, noting any potential risks to the cost base. Include the life cycle cost estimate for each alternative. Cost estimates shall be presented in base-year and in then-year dollars.] [Provide general assumptions regarding the schedule for each alternative. Summarize the schedule features for each option. The summary should include a discussion of considerations for incorporation of risk for each option] Economic Analysis [Summarize the cost and benefit analysis conducted for each alternative or proposed investment.] 5.4.1 Net Present Value (NPV) 5.4.2 Payback Period 5.4.3 [Summarize risk-assessment activity and results. Include the overall risk ratings for each alternative or for the proposed investment program. Identify major risks and planned mitigation strategies for each alternative. Discuss the comparative risk assessment for the investment decision.] Funding Profile 6. [Determine the internal rate of return for each of the two cases.] Risk and Sensitivity Analysis 5.6 [Show assumptions and results of calculations used to determine the length of time required to recover the cost of each alternative.] Internal Rate of Return 5.5 [For each alternative show the monetized value of a future stream of expected net benefits discounted to the present by the current discount rate.] [Display the funding profile for each alternative by fiscal year in then-year dollars.] Recommendation [Identify the recommended option, if any, and summarize the rationale for the recommendation. Record any caveats to this recommendation.] Commercial in Confidence eXemplar Page 5 of 6 <Project Name> Business Case <document identifier> 7. Version: <1.0> Date: <dd/mmm/yy> Appendices [Provide calculations as verification of the Business Case Analysis.] Commercial in Confidence eXemplar Page 6 of 6