THE BUILDING CONTROL ACT (CAP 29)
[SECTION 8(1)(a) or 11(1)(d)(i)]
NOTIFICATION OF APPOINTMENT OF QUALIFIED PERSON AND
PROJECT REFERENCE NUMBER AND TITLE
Commissioner of Building Control
Building & Construction Authority
52 Jurong Gateway Road
#11-01
Singapore 608550
Website: http://www.bca.gov.sg/
INSTRUCTIONS:
(1) This notification shall be submitted before any pre-consultation or
submission of building plans to the Commissioner of Building Control .
(2) The registered Project Reference Number and Title is valid for a period of two
years from date of acknowledgement by the Commissioner of Building Control.
(3) * Delete where not applicable.
(4) One copy of this form is to be submitted and two copies of Appendix 1 to be
submitted
(5) This form need not be submitted for simplified A/A submission for
conventional residential houses.
(6) This form is to be filled in BLACK INK only.
SECTION A - APPOINTMENT OF QUALIFIED PERSON BY *DEVELOPER /BUILDER (For Design & Build Project)
As required under section 8(1)(a) or 11(1)(d)(i) of the Building Control Act, I hereby appoint
_______________________________ as the qualified person in respect of the building works herein described:
UEN (if a company) and Name and Address of * Developer
/Builder
Mr/Mrs/Ms
UEN (if a company) and Name & Signature of * Developer/Builder
(In the case of a Company include the designation of the authorised
Signatory)
Tel No.:
NRIC No./Passport No.:
SECTION B - ACCEPTANCE OF APPOINTMENT BY QUALIFIED PERSON
Date:
(1)
I confirm that I have been appointed as the qualified person in respect of the building works herein described.
(2)
For the purpose of project initiation, I hereby notify you of the following project:(a)
Project Title:
Description of building works: _______________________________________________________
________________________________________________________________________________
*Lot/Plot: _______________________________________ *TS/MK ________________________
Address/Road: ____________________________________________________________________
(b)
Project Reference Number issued by me:
________________________________________________________________________________
Address of Qualified Person
Tel No.:
BPD_QP01
[Ver1.1_Dec_2014]
Name & Signature of Qualified Person
Fax No.:
Regn No. (*Arch/PE):
Date
Page 1 of 2
Date:
Name & Address of Qualified Person:
____________________________________________
____________________________________________
____________________________________________
Singapore (
)
BUILDING PLAN & MANAGEMENT GROUP
BUILDING & CONSTRUCTION AUTHORITY
52 JURONG GATEWAY ROAD
#11-01
SINGAPORE 608550
Tel : 680 __
Fax : 63344031
QP’s Fax No: _____________________________
Dear Sir/Madam
ACKNOWLEDGEMENT OF NOTIFICATION OF
PROJECT REFERENCE NUMBER AND TITLE
PROPOSED _________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
1
This is to acknowledge that the abovementioned project has been classified by this Division as a
*Major/Minor Project under the following project reference number issued by you:-
Project Reference Number : __________________________________________
2
Please attach a copy of this acknowledgement letter and print “*Major/Minor Project” and the project
reference number on the top right hand corner of the plans in your direct submissions to the relevant technical
departments/authorities. You are also advised to quote this reference number in all the documents and
correspondence during the pre-submission consultation stage.
Yours faithfully
BUILDING PLAN & MANAGEMENT GROUP
for COMMISSIONER OF BUILDING CONTROL
FOOTNOTE:
This form is to be self-addressed and the project title and project reference number to be completed by the
qualified person. Please refer to the guidelines PC.04:1999 for the classification of projects.
BPD_QP01_Appendix 1
[Ver1.1_Dec_2014]
Page 2 of 2
Download