MOHAMMAD BIN ALI LOT 1288, JALAN GALING, PIASAU JAYA

advertisement
MOHAMMAD BIN ALI
LOT 1288, JALAN GALING, PIASAU JAYA FASA 2
98000 MIRI, SARAWAK
PHONE : +6012-846 7522 or +6017-853 4932 (H/P)
E-MAIL : mohd.ali8087@gmail.com or mohd8023@yahoo.co.uk
PROFILE
An Engineer with a wide range of experience in development, technology, innovation, electrical,
computing and as well as networking industry. Proven leadership skills involving managing, developing
and motivation to achieve the objective. First-class analytical, design and problem solving skills,
dedicated to maintaining high quality standards.
MAJOR ACHIVEMENT
 Successfully completed the JOB METHOD STATEMENT for SUB-MARINE/RIVER Cable Crossing
which Sesco Sibu, Central Region requirement as they have faced the problem that that Cable
been washed away by the river current velocity especially for crossing at Batang Paloh, Pulau
Bruit, Daro. The method statement also includes Test Reports for River Current Velocity, Depth,
High and Low Tides, Sites Condition, Photos, Approval Letter for Related Government Bodies,
Obstruction, Locality, Coordinates, Site Plan, Point-to-Point and also Public Traffic Justification.
This is the 1st Method Statement required by Syarikat SESCo Berhad and approved to be used for
execution. Date released: May 2011.
 Upgrading the electrification system in Sawai Teakwood Estate from using Twin-Twisted Cable
(Double 16mm2 cables) as a overhead lines to the standard 3 Phase 415V Overhead Lines (using
7/.122 PVC Insulated Cables) to supply all the residential in the affected area.
 Installed and commissioned the first portable TMAVL (Telekom Malaysia Auto Vehicle Locator)
1st Phase Project for Telekom Malaysia which the vehicle can be monitor from any networking
access within the TMTOUCH coverage throughout the satellite access.
 Approved Trainer for Electrodata Voice Recorder from the manufacturer (Australia) to train the
Sarawak Shell Berhad personnel on operation and maintenance.
 Successfully designed, install, digitized and commissioned DIGI in-building Coverage Upgrading
Project in Boulevard Hypermarket.
 Designed, installed and commissioned the 60 channels digital Point to Multipoint Microwave
Digital Subscriber Radio using SR Telecom equipment for Petronas Carigali Sdn Bhd Sarawak
Operations.
 Individually developed, evaluated and designed test procedures for commissioning the J H
Syscom Hotline System according to the manufacturer (UK) standard.
1
 Successfully invented and design the TEST BOX to simplify the method of testing and
commissioning for J H Syscom Hotline System.
 Successfully solved the problems that halted the Wireless Terminal (SR Telecom equipment) in
offshore location for link between Baram A to Baronia B, Sin Bee 1 barge to Tukau Living Quarter
and also between SKO to SIWA platform under Petronas Carigali project.
CAREER HISTORY
 MARCH 2012 to DATE – SENIOR ELECTRICAL ENGINEER cum CHARGEMEN in PRESS
METAL BINTULU SDN BHD
PRINCIPAL ACCOUNTABILITIES
 Main tasks are assisting the Head of Department on ensuring all the Low Voltage panels,
machines, motors, equipments, electronics components, work procedures, electrical
safety rules & regulation and to adhered Authorities standard & specification.
 Educating, develop and motivate/consulting all the subordinates under same section on
Electrical Standard Practices, proper/practical work procedure, Electrical Safety Rules,
information, communication skills, adhering instruction, work order, usage of tools &
equipment, monitoring & handling of pertaining materials, new task/project start-toend details, sharing knowledge & skills to enhanced & simplify the workforce.
 To enhanced, developed and established any operation and maintenance procedures
upon achieving company and as well as Local Authority requirement without
jeopardizing/compromising any company asset & financial condition, human safety,
Authority Regulation and racism aspect as well.
 Responsible to monitoring from each and every company production; to ensure the
operation to be done/running smoothly with less/zero problems and rectification works.
 Responsible to plan, design, survey, documentation, organize and manage resources of
each task & target to ensure operations of company facilities to be managed well and
continuously supporting operation of each & every production.
 Ensuring all the day-to-day routine/inspection/maintenance works to be execute/done
(by the subordinates) accordingly and complete up to Standard/minimal requirement.
 Ensures and motivates the entire workforce to be more alert on any unsafe
act/condition/workmanship/new installation/work procedure/personal attitude/ to
prevent or even trigged in the earlier stage and prevent bigger problems/rectification
works in the near future.
 Developed and established all necessary procedure and method for all the facilities.
2
 OCT 2011 to FEB 2012 – PROJECT ENGINEER in Syarikat AM-ME SDN BHD
PRINCIPAL ACCOUNTABILITIES
 Responsible to manage from Start-to-End of each and every company project to ensure
the project been done smoothly with less problems and also in accordance with
Authority Standard and Specification.
 Responsible to plan, manage, design, survey, documentation, organize and control
resources of each projects to ensure operations of company facilities been managed
well and able to support continuous business operation.
 Developed and established all necessary procedure and method for all the facilities.
 Responsible on project implementation of High Tension (Up to 33kV)/ Low Tension
Overhead Lines, Aerial Cable, Underground Cable, Internal Wiring and some Mechanical
Works.
 Project Involved:
 High Tension/Low Tension Electricity Supply (Supply, Install, Testing &
Commissioning of HT/LT Transformer, LT Poles, 3 Phase 7/.183 PVC AL Cables
Laying, Underground Service Cables, Termination & Testing) to Celcom Tower
for sites from Sri Aman to Lubok Antu area. Client : Celcom Malaysian Berhad,
Date : Oct 2010 to date
 Re-wiring Works in Telekom Malaysia Exchange Building at Tanjong Kidurong,
Bintulu. Client : Telekom Malaysia Berhad, Date : Mac 2011 to date
 High Voltage Interconnection and equipment, switchgears supply, installation &
testing for Klinik Kesihatan Jenis X3, Bintulu. Main-Contractor : Sarahon Sdn Bhd
Date : May 2011 to date
 M&E works for the Selangau Water Supply Project under Kementerian
Kemajuan Luar Bandar dan Wilayah. Main-Contractor : Musyati Sdn Bhd,
Date:Feb 2011 to date
 JULY 2010 TO JULY 2011 – Regional Engineer (Central Region of Sarawak) in ESAWIN
RESOURCES SDN BHD
Project : Rural Electricity Supply (RES) under Kementerian Pembangunan Luar Bandar
dan Wilayah Malaysia (KKLW) for 2009/2010 and 2010/2011 project.
PRINCIPAL ACCOUNTABILITIES
 Responsible to manage from Start-to-End of company project to ensure the project
been done smoothly with less problems and also in accordance with Authority Standard
and Specification.
3
 Responsible to plan, manage, design, survey, documentation, organize and control
resources of each projects to ensure operations of company facilities been managed
well and able to support continuous business operation.
 Developed and established all necessary procedure and method for all the facilities.
 Responsible on project implementation of High Tension (Up to 33kV)/ Low Tension
Overhead Lines, Aerial Cable and Underground Cable as per below:
 Doing Site Survey including pole pegging for High Tension/Low Tension Overhead
Lines.
 Excavation, trenching, laying and backfilling for High Tension / Low Tension
Underground Cable.
 Installation of High and Low Voltage Protection Equipment such as ABFI, ABI, AutoRecloser, Earth Fault Indicator, Lightning Arrester, Pole Mounted Fuse and Cut Out
Fuse.
 Installation and Dismantling of Street Lighting.
 Doing Testing and Commissioning for High and Low Voltage Overhead lines, Aerial
Cable, Underground Cable and Substation.
 APRIL 2007 TO JUNE 2009 – PROJECT DIRECTOR/MANAGER in ELFOMA ENGINEERING
SDN BHD
PRINCIPAL ACCOUNTABILITIES
 Responsible to manage from Start-to-End of each and every company project to ensure
the project been done smoothly with less problems and also in accordance with
Authority Standard and Specification.
 Responsible to plan, manage, design, survey, documentation, organize and control
resources of each projects to ensure operations of company facilities been managed
well and able to support continuous business operation.
 Developed and established all necessary procedure and method for all the facilities.
 Responsible on project implementation of High Tension (Up to 33kV)/ Low Tension
Overhead Lines, Aerial Cable and Underground Cable as per below:
 Doing Site Survey including pole pegging for High Tension/Low Tension Overhead
Lines.
 Excavation, trenching, laying and backfilling for High Tension / Low Tension
Underground Cable.
4
 Installation of High and Low Voltage Protection Equipment such as ABFI, ABI, AutoRecloser, Earth Fault Indicator, Lightning Arrester, Pole Mounted Fuse and Cut Out
Fuse.
 Installation and Dismantling of Street Lighting.
 Doing Testing and Commissioning for High and Low Voltage Overhead lines, Aerial
Cable, Underground Cable and Substation.
 To ensure all necessary materials, tools & equipment are up to Authority standard for
implementing the Internal Wiring works such as:
 Installation and testing of single & three phase internal wiring.
 Installation of Main Switch Board including incoming & outgoing wiring c/w the
control cable from the source to the MSB.
 Manage & organize the group of teams to achieve the completion target date.
 Conduct in-house safety training/briefing for key personal and supervisors.
PROJECT INVOLVED IN ELFOMA ENGINEERING SDN BHD
1. September 2008-to-date – Rural Electricity Supply (RES) under the Kementerian
Kemajuan Luar Bandar dan Wilayah Malaysia (KKLW) as a sub-contractor to CITRA ALTI
SDN BHD on Installation of High Tension/Low Tension, Transformer c/w the Protection
Equipment, Service Line etc. which include :
 Meeting with the Client on tender rate justification.
 As a team leader doing consumer line route survey, pole pegging and profiling on
the system.
 Project cost evaluation, material estimated, work scheduling and coordination.
 Supervising the commencement and implementation of work and also doing
testing & commissioning the witnesses from the Consultant.
 Documentation and project handover.
2. March 2008 to August 2008 – SESCO Annual Contract (3 Years Contract) under METRO
GLIDE SDN BHD on Installation of High Tension & Low Tension Overhead Lines & Aerial
Cable in Miri Region.
3. April 2007– to date – GENSET Installation & Accessories for Rural Area Schools for Miri
Package. – Client : Tele Kenyalang Engineering Sdn Bhd.

As a Project Manager cum Safety on coordinating the work and to ensure the work
have to be done accordingly to the SESCO and JKR standard and also to be
implemented in the safest way.

Doing report on work completion every twice a month and also doing safety
meeting every once a week and safety toolbox meeting on daily basis.
5

Liaise with the SESCO or JKR Personnel, consumer, client or land developer on new
job/project or site inspection.

Material request, material leftover, outstanding material and coordinate/liaise with
the supplier.

Monitor the number of team via the supervisor on job implementation and safety
awareness.
 DEC 2003 TO APRIL 2007 – PROJECT ENGINEER IN FATIMAH BERSATU SDN BHD
PRINCIPAL ACCOUNTABILITIES
 Responsible on project implementation of High Tension (Up to 33kV)/ Low Tension
Overhead Lines, Aerial Cable and Underground Cable as per below:
 Doing Site/ Consumer Survey including pole pegging for High Tension/Low Tension
Overhead Lines & Line Route Survey for Underground Cable.
 Erection, Laying, Dismantling and Tensioning High Tension / Low Tension Overhead
Lines on Belian, Steel and Concrete Pole including ABC & Service Lines c/w
installation of stay, cross-arm, bracket, jumper, connection/disconnection and
earthing/bonding.
 Excavation, trenching, laying and backfilling for High Tension / Low Tension
Underground Cable.
 Installation of High and Low Voltage Protection Equipment such as ABFI, ABI, AutoRecloser, Earth Fault Indicator, Lightning Arrester, Pole Mounted Fuse and Cut Out
Fuse.
 Installation of various type Transformer including the platform, jumpering and
earthing.
 Erection, Installation and Dismantling of Street Lighting including fitting, wiring,
clamping, modification of bracket, connection to the mains wiring and also to the
time switch/photocell.
 Doing pole jointing, piling, hole excavation on rocky ground for stay block (kicking
block) and also rentis clearing and tree cutting.
 Doing Testing and Commissioning for High and Low Voltage Overhead lines, Aerial
Cable, Underground Cable and Substation.
 Installation and testing of single & three phase internal wiring.
 As a HSE (Health Safety & Environment) officer in achieving the HSE matter as the top
priority in the company by implementing:
 Developed the safety program for lifting appliances, portable tools, fire extinguisher
and scaffold.
6
 Conduct in-house safety training/briefing for key personal and supervisors.
 Supervision of worker safety and environmental care at site.
PROJECT INVOLVED IN FATIMAH BERSATU SDN BHD
1. Sept 2004 – to date – SESCO Annual Contract (3 Years Contract) on Installation of High
Tension & Low Tension Overhead Lines & Aerial Cable in Miri Region.

As a Project Coordinator cum Safety on coordinating the work and to ensure the
work have to be done accordingly to the SESCO standard and also to be
implemented in the safest way.

Doing report on work completion and also doing safety meeting every once a week
and safety toolbox meeting on daily basis.

Liaise with the SESCO Personnel, consumer, client or land developer on new
job/project or site inspection which include the terrain condition, site clearance
from building or tree/bushes, line congested and also way leave problems.

Material request, material leftover, outstanding material and coordinate/liaise with
SESCO Personnel on competency course schedule and whichever need to be
attend.

Monitor the number of team via the supervisor on job implementation and safety
awareness.
2. May 2004 - July 2004 – Low Tension Overhead Lines for Sawai Teakwood Estate under
Sarawak Plantation Agriculture Development Sdn. Bhd.

Doing site / consumer survey including pole pegging for Low Tension Overhead
Lines.

Erection, laying and installation of Street Lighting including fitting, wiring, clamping,
modification of bracket, connection to the main s wiring and also to the time
switch/photocell.

Doing installation including wiring for the Main Control Box (MSB) form the
GENSET to the overhead lines and also doing testing and commissioning of the
system.
3. Dec 2003 – March 2004 – Rural Electrification Scheme under the Kementerian
Pembangunan Luar Bandar dan Wilayah.
 Meeting with the Kementerian on tender rate justification.
 As a team leader doing consumer line route survey, pole pegging and profiling on
the system.
 Project cost evaluation, material estimated, work scheduling and coordination.
7
 Supervising the commencement and implementation of work and also doing
testing & commissioning the witnesses from the Consultant.
 Documentation and project handover.
 DEC 2001 TO DEC 2003 – TELECOM ENGINEER IN NETMASK TELECOMPUTER SDN BHD
PRINCIPAL ACCOUNTABILITIES
 Responsibilities to manage projects and lead a team to make sure every project to be
done smoothly and according to the client’s standard.
 Plan, lead, organize and control resources & activities within the telecommunication
team to ensure operations of telecommunication facilities are able to support
continuous business operation.
 Develop and establish any necessary procedure and method for all telecommunication
facilities.
 Ensure all the communication and technical facilities that to be needed in present or
future project been analyze comprehensively.
PROJECT INVOLVED
1. Dec 2001 – Feb 2002 – Sabah Lotteries Operation and Networking Project

As a part of a team doing installation of J 4910 computer at it premises around Sabah
region.

Configured the networking through PSTN network from KK to the premises.

Upgrade and commissioned the J 4910 computer.

Documentation.
2. Feb 2002 – Electrodata Voice Recorder for Sarawak Shell Berhad

As a trainer which trained the SSB personnel on operation and maintenance.
3. March 2002 – May 2002 – PCSB Digital Subscriber Radio System Project.

As a Project Coordinator doing site survey, documentation, work planning, installation,
commissioning and testing including path calculation, drawing layout and work report.

The locations are between Baronia LQ and SKO and from Baronia LQ the coverage covers
most platform and barge.

Documentation.
4. Jun 2002 – July 2002 - Sarawak Shell Berhad CCTV Project.

As a part of a team doing site survey, work planning, installation, commissioning and
testing including path calculation, drawing layout and work report at St Joseph Platform
for Sabah field.

Trained the SSB personnel on operation & maintenance.

Maintaining and servicing for any problems that halted the system.
8

Documentation and prepared the as-built drawing and system for the client.
5. Aug 2002 – Oct 2002 – J K Hotline System for Sarawak Shell Berhad

As a team leader doing work planning, installation, commissioning and testing.

The job been done at most of SSB platform.

Prepare the test procedure for 3U and 1U unit.
6. Nov 2002 – Mid of Nov 2002 – FreeWave Radio Modem for Petronas Carigali

As a Project Coordinator doing site survey, documentation, material requirement, work
planning, installation, commissioning and testing including path calculation, drawing
layout and work progress.

The event was held at Baronia LQ, Baronia A, Bokor A and Betty A.

Documentation for submission.
7. Jan 2003 – Feb 2003 – Telekom Malaysia Auto Vehicle Locator (TMAVL)

As a team leader doing material requirement costing, work planning, installation,
commissioning and testing.
8. March 2003 – April 2003 – Cable Replacement for Sarawak Shell Berhad

As a team leader install the equipment, establish the LAN, testing and commissioning at
F23 platform.

The equipment to be used with Xybernaut Portable Wireless Computer which personnel
from onshore can monitor on what is happening in the platform.
9. Aug 2003 – Oct 2003 – DIGI In building Coverage Upgrading Project in Boulevard Hypermarket.

As a team leader doing site survey, job coordination, material sourcing, install and run the
7/8 feeder, power cable, grounding cable,cable tray, radio base station and the antenna.

Testing and commissioning the system by measuring the gain and loss and also walk test
to ensurethe enough coverage covers certain areas.
10. Dec 2003 – Bintulu Intergrated Facilities (BIF) Mini Backup Link

As a part of a team install the equipment, establish the LAN, testing and commissioning at
BCOT Plant.

PROXIM Digital Data Communication Radio was been used for link between Radio Room
at the coastal area (which communicate to the base station at the off-shore platform) to
the Central Control Room (BIF).
9
 2002-2001 – Technical Executive (as part of practical period in Kuala Lumpur) in
Fuzison Technology (M) Sdn. Bhd.
 Doing technical and also administration job, for instance, computer networking (HUKM), earth
and in building wiring (LHDN, UIA and HUKM), computer software and hardware servicing,
supplying, maintenance, repairing and telephone line (HUKM and LHDN)
SKILLS

Able to use and apply computer software such as:
 AutoCad Design
 Microsoft Project
 Microsoft Office
 C ++ Programming Language
 Programmable Logic Control (PLC) Console

Able to handle in-building wiring, overhead lines installation, computer network and telephone
line (including PABX system).

Fibre-Optic Wiring & Termination works.

Sesco’s Overhead Lines works from 1kV to 33kV which includes Conventional Method, ABC and
LT Distribution system.

Sesco’s Underground Cabling works with maximum operation voltage up to 33kV.

Able to write and speak fluently in English, Malay and local dialect.

Public Speaking.
QUALIFICATION

Diploma in Electrical Engineering (Telecommunication) – Universiti Teknologi Malaysia (UTM),
cawangan Kuala Lumpur.

SPM Grade 1 : Distinction in Math and Islamic Knowledge and also credit in all major subjects.

Competence (L2)Low Voltage Chargeman (415V) from Electrical Inspectorate Unit (EIU) Sarawak.

Competence (H2/L2) Underground Cable Laying (Up to 33kV) from Electrical Inspectorate Unit
(EIU) Sarawak.

Competence First Aider from Red Cresent Society Miri.
10
AWARDS

Scholarship from MLNG Bintulu (1994)

Best Student 1997 (1997)

School Head perfect for all session (1996-1997)
TRAINING
 Underground Cable (Up to 33kV) Laying Course for Contractors at SESCO Training School,
Kuching on May 2005.
 Basic First Aid Induction Course held at PBSMM Miri Branch on 16 October 2004.
 High and Low Voltage Overhead Lines Practices Course held at SESCO Training School, Kuching
on 23-26 August 2004.
 Occupational Safety & Health Management Course for Contractor held at Dynasty Hotel
conference room on February 2004.
 JH Syscom Hotline System held at SSB Training Room in 2002.
 FingerTac Maintenance and Operation Training.
 Basic Wiring Course held on 2000 at UTM KL.
 January 2002 – SR500s – Theory, Maintenance and Operation (Slim 10, Slim 34, Micro II, Central
Station, AUX 34)held at Bangkok, Thailand.
 Sea survival at Sribima Maritime Training Centre (SMTC) Miri
PERSONAL DETAILS
Date of Birth
:
23rd November 1980
IC No
:
801123-13-5395
Nationality
:
Malaysian
Race
:
Malay/Iban
Marital Status
:
Married
Driving Licence
:
B2 / D
11
REFERENCES
1.
Mr. Chin Kiam Chung
Facility Manager
Press Metal Bintulu Sdn Bhd
Lot 36, Samalaju Industrial Park
97000 Samalaju, Bintulu, Sarawak
Tel : 086-855032 Fax : 086-855050
E-mail : chinkiamchung@pmsarawak.com
2.
En. Medhi Bin Abdul Rahman
Managing Director
Fatimah Bersatu Sdn Bhd
Lot 2197, Ground Floor, Jalan Saberkas 2
Saberkas Commercial Centre
98000 Miri, Sarawak
Tel : 085-664600 / 664009 Fax : 085-620168
E-mail : fbsb@pd.jaring.my
Website : www.fatimah-bersatu.com.my
3.
Mr. Tan Chin Kian
Managing Director
Netmask Telecomputer Sdn Bhd
Lot 2249, Pujut 7 Shopping Centre
Jalan Firuz, Miri-Pujut Road
98000 Miri, Sarawak
Tel : 085-663928 / 085-660785
E-mail : tckian@pc.jaring.my
Website : www.netmaskmy.com
12
Download