Day I Actions: 18 June 2002
Document and post TMDE LCSC action item listing to
ALCON and provide periodic status update as directed by
NAVSEA 04L52
Mr. Diver requested that NAVSEA invite CNCTC, CNET,
SPAWAR, Naval Media Center, Naval Reserve, Naval
Medical Command and Logistics command representatives to
attend next years LCSC conference.
Post Web site URL to ALCON
Re. Mr. Chergoski’s Program Priorities briefing. Mr. Waller
requested that NAVSEA keep him informed as to the
PEOs/SYSCOMs we are working with and provide the
briefing schedule and results of PEO/SYSCOM meetings as
they occur.
LCDR Tuohy requested a listing of ISEAS to contact for
various engineering groups who support various areas of lab
support. Mr. Fritzche will provide the list and suggested
contact Corona on any questions or issues re. Lab support.
Will include list when sending the minutes out.
Mr. Waller requested that NAVSEA make the Single
SYSCOM effort a number one priority on Mr. Chergoski’s list
of program priorities and make a long-term goal to move
SPETERL into COSAL as the ships allowancing document.
Inventory what SCATs can be combined with SCAT 4236 and
develop NAVSEA PD.
Day II Actions: 19 June 2002
Chief McClellan, NTTU Keesler AFB: One big issue is
phased replacement of test equipment. Kathy Saunders took an
action to identify funding line and make proper contacts to
help resolve the issue and work it through the TAMS EB or
CNET.
Chief McClellan will prepare a phased replacement of test
LEAD
DUE
STATUS
Jim Babb
Dennis Kelly
Keith Reynolds
Jane Heldreth
Monthly
Status: List sent to NAVICP
to post. Flagged to provide
periodic status report.
Jane Heldreth
Jim Babb
60 days prior
to next
scheduled
LCSC
6/26/02
7/02
Ongoing per
POM/PR data
calls
Status: Flagged to invite
prior to next scheduled
LCSC.
Jane Heldreth
Ed Chergoski
Jim Babb
Complete
Status: Flagged to keep Mr.
Waller informed as these
events occur.
Bob Fritzche
Upon delivery Complete
of minutes.
Ed Chergoski
Jane Heldreth
John Lupi
SPETERL to Cosal in
progress. TAMS EB was
briefed on Single Syscom
Steve Makiel
Report before
next
scheduled
TAMS EB
8/31/02
Kathy Saunders
30 Days
Completed. Working with
NAVAIR Training LEM,
Pete Ward on an on-going
basis
Jim Waller
30 days
NAVAIR Training LEM
Completed in FY02 as part
of the DMM standardization.
10
11
12
13
14
15
16
17
18
TMDE LCSC ACTION ITEMS
6/22/02
equipment issue brief and provide to Mr. Waller and Mr.
Roy Masuko
Masuko. Messrs. Waller and Masuko will schedule the issue
Chief
for review on their next scheduled Working Group agenda.
McClellan
- Ms. Kathy Saunders will prepare a status/progress brief on
Kathy Saunders
all billet issues associated with mechanical workload
deficiencies and present at next LCSC. Will e-mail to lab
mgrs. for review
- Ms. Kathy Saunders will also put together an IM workload
issue presentation and e-mail to lab managers to review.
Mr. Mullin will provide NAVSEA 04L52 a list of all GPETE
Tom Mullin
purchases made through NAVICP MART to date for
TYCOMs and CINCs
Mr. Chergoski requested that Mr. Bill Elmore contact Mr. Ken Bill Elmore
Jacobs, NAVSEA 04M1, to ensure his CBM efforts are in
synch with NAVSEA efforts.
Mr. Teti has action to look at all the test equipment the 2947
Joe Teti
can possibly replace as a result of the CCET installation.
Ms. Kathy Saunders was assigned an action to contact Mr.
Kathy Saunders
Darrell Mason to follow up on training requirements for the
2947 test set and report back.
Earle will increase allowance to include the CCET 2947.
NSWC Earle
Re. CCET. Mr. Chergoski assigned Mr. John Krawchuk an
John Krawchuk
action to contact NAVSEA 04M11 Mr. Phil Hans to change all
affected MRC cards at once rather than piecemeal.
Seal Beach to provide AN/MK Mod of systems requiring
Steve Makieil
1Gig/second sample rate and those requiring 1nanosec glitch
Trang Mai
capture to NRL and NAVICP.
Jane Heldreth
- Schedule meeting at NAVSEA with all principals week of 15
July for release of 100MHZ Oscilloscope Purchase
Description.
Day III Actions: 20 June 2002
Kathy Ingenhousz assigned action to look at 1271 cal.
Kathy
procedures and determine if note on having two specific labs
Ingenhousz
to calibrate 1271 be brought up to a more prominent position
in the calibration procedure so it’s not missed by the
technicians. Report back to CDR Tuohy and NAVSEA
7/6/02
responsibility with NAVSEA
training LEM assist – effort
on-going
Completed. Brief provided at
TMDE Working Group in
April at Corona –
information also provided at
Lab Managers conference in
July 2003
On going
8/15/02
Complete
30 days
Earle submitted a list to Seal
Beach in Sep 02.
On going – had discussion
with D. Mason. Best fit into
training being evaluated
Open
Mr. Hans was contacted Still
in progress 10/20/03
End of June
3 Weeks
30 days
30 days
NLT 15 July
Complete on 6/26/02
15 July 2002
Open
TMDE LCSC ACTION ITEMS
6/22/02
19
20
21
22
23
24
25
26
04L52.
Ms. Heldreth has action to draft a NAVSEA 04 e-mail to
determine who builds and introduces the Rubidium frequency
standards across the PEOs and what maintenance is required.
Ms. Heldreth will seek inputs from TYCOMSs to determine
how we want to SCAT Code SPEETE frequency standard
mark/mods on configuration worthy SPEETE and what the
requirements are.
Mr. Waller requested that Ms. Levya prepare a feedback report
on the multiple concerns from the January 2002 LANTFLT
METCAL WG issues and provide a list of all the auditors.
Provide both to Mr. Waller and Mr. Masuko.
Schedule next LCSC for June 2003 in DC area
Gair Brown took action to provide his fiber optic allowance
spreadsheet to TYCOMs for review and comment and for
ultimate entry into SPETERLs once the agreed to allowances
are determined.
NAVSEA 04M will develop a certified vendor list for
calibration services and a process for keeping it current.
Mr. Chergoski took action to report back on NEMIAS.
Ken Felix will develop issue paper on virtual TE cal
requirements and report out at TAMS EB
Jane Heldreth
Kathy
Ingenhousz
Jim Babb
Jane Heldreth
John Lupi
2 weeks
Status: Sent reminder e-mail
to leads on 6/28/02.
45 days
Open
Patty Levya
30 days
UNK
Ed Chergoski
Jane Heldreth
Gair Brown
TBD
2 weeks
Changed with Mr Waller’s
concurrence
Complete
Joe Dressel
90 days
Open
Ed Chergoski
KenFelix
30 Days
90 days
Open
Open
Remarks: Leads are requested to review and provide periodic status reports to NAVSEA 04L525, Ms. Jane Heldreth and Mr. Jim Babb until