Request for Proposals (Stage Two of a Two-Stage RFQ/RFP Qualifications-Based Competitive Selection Process) University of California, San Diego North Campus Apartments Issued to: Prequalified Development Teams: Allen & O’Hara/Fairfield LLC with SOM, Chicago, Architects American Campus Communities with Perkins & Will, Architects JPI Westcoast Development LP with either Studio E or Fisher Friedman and Moore, Ruble & Yedell, Architects Trammel Crow Company with SOM, San Francisco, Architects Issued by: Office of Real Estate Development University of California, San Diego July 1, 2002 Request for Proposals University of California, San Diego North Campus Apartments Table of Contents Page Section 1 Introduction 1 Section 2 Project Goals 1 Section 3 Project Requirements 2 Section 4 RFP Submission Requirements 8 Section 5 Instructions to Proposers and Review Process 12 Section 6 Preliminary Project Schedule 15 Exhibit A-1 Project Costs and Fees Exhibit A-2 Operating Costs Exhibit A-3 Cash Flow Analysis APPENDICES B, C, D, AND E, ISSUED AS A PART OF THE RFQ, ARE ALSO INCORPORATED INTO THIS RFP DOCUMENT: Appendix B Project Site Appendix C Design Guidelines Appendix D Environmental Issues Appendix E Utility Assessment 2 Section 1 Introduction The University of California, San Diego (the “University”) has completed its process to pre-qualify firms to design, finance, construct, develop, own, and manage a rental housing apartment complex for advanced standing (juniors and seniors) undergraduate students and transfer students on leased land on the University of California, San Diego (UCSD) North Campus (the “Project”). The Project will include space associated with the Project’s operations, as well as associated parking facilities. The Project, to be known as “North Campus Apartments”, will be located on approximately 5 acres of land (“Project Site”) in the northern sector of the campus. The Project MUST be ready for full occupancy no later than September 1, 2005. The University will retain ownership of the Project Site and make it available to the selected proposer (“Developer”) under a Ground Lease arrangement. The Ground Lease for the Project Site will be for a term of not more than 25-40 years, at which time the improvements will revert to the University’s ownership or be demolished. Neither the University’s fee interest in the Project site nor the University’s interest in the Ground Lease will be subordinated to any financing or other lien or encumbrance which the Developer may obtain in connection with development and ownership of the Project. However, subject to the terms of the Ground Lease, the Developer will have the right to pledge its interest in the Ground Lease as security to a recognized lending institution, which advances funds for the development of the Project. This is the second stage of a two-stage Request for Qualifications (RFQ), and Request for Proposals (RFP) competitive selection process. The RFQ stage was issued on March 24, 2002 and completed on June 5, 2002. A short list of pre-qualified Developers is invited at this time to submit detailed project proposals for the RFP stage. This RFP document delineates only the process and requirements for the RFP stage, which is the evaluation of short-listed Developers’ cost, finance, schedule, design, and management proposals in response to specific requirements of the Project. The RFP stage will result in a ranking of the Developers, and the University will proceed to exclusively negotiate an Agreement with the highest ranked Developer. RFP submittals are due by 4:30 PM on September 20, 2002. Following are the University’s goals and requirements for the Project, RFP submission requirements, instructions, and review process. Section 2 Project Goals The University desires that the proposed Project will: Consist of an architecturally and visually appealing apartment complex, which reflects varied elevations in buildings from approximately 30 feet to an approximate maximum of 90 feet in height (see Appendix C Design Guidelines 1 of the RFQ) in order to meet the program target of a mimimum of 1,050 apartment beds (single occupancy). Provide housing at rental rates which are comparable to other on-campus housing facilities now and in the future. Deliver the total number of beds no later than September 1, 2005. Feature high quality construction. Use first class maintenance and operating standards. Be staffed with experienced property management professionals showing sensitivity to student needs. Provide the University with participation in cash flow from Project revenues. Section 3 Project Requirements Project Programming The University intends that the new North Campus Apartments Project will consist of the following components: Apartments. A program target of a minimum of 1,050 apartment beds, all of which are single occupancy (one bed per bedroom), provided in a mix of one bedroom/one bath (minimum of 500 gross square feet), two bedroom/two bath (minimum of 900 gross square feet), and three bedroom/two bath (minimum of 1,140 gross square feet) options. The preferred unit mix ratio is: 25% one bedroom, 50% two bedroom, and 25% three bedroom units, as further outlined below. The University seeks to maximize the number of beds while preserving quality of life in the Project. # of Units 131 263 131 525 Unit Type 1/1 2/2 3/2 Min Unit Sq.Ft. Beds/Unit # of Beds 500 900 1,140 1 2 3 131 526 393 1,050 Automobile Parking. Automobile parking exclusively for the use of residents and on-site staff at a ratio of one (1) parking space per bed. Bicycle Parking. Bicycle parking racks located throughout the project at a minimum ratio of 10-20% of the number of beds. Outdoor Space. Outdoor space generously landscaped for passive use, which may include such things as seating areas, picnic tables, and barbecues. Since many recreational facilities are available nearby in other campus facilities, such facilities as swimming pools, tennis, or basketball courts should not be included. Refer to Figure 12 in Appendix C Design Guidelines of the RFQ for required open space corridors. 2 Telephone, Cable Television and Data Service. Telephone, cable television, and data access is the responsibility of the Developer. The University currently provides cable television and data services to other on-campus housing facilities and the costs are included as part of the rental rate. The Developer should consider including these University service providers when determining the most cost effective method of providing the highest quality of these services to the residents. Utilities. Utilities except water and trash shall be paid separately by the residents. All units must be individually metered for gas/electric. Operational Space. Facilities such as a maintenance shop and equipment storage area as required by the Developer. Staff Apartments. Apartments (not included in program target number) designated for Developer’s on-site, live-in management staff. Meeting Space. Common meeting space appropriate to the design and size of building(s). For example, computer lounge(s), study room(s), but at a minimum a common meeting room of approximately 1,000 gross square feet, with kitchenette facilities, furnishings, and telephone, data, and cable service. Project Phasing Development of the project can be undertaken in phases. Phasing of the Project should achieve the delivery of a maximum number of beds possible prior to the deadline (for example, up to 50% of total beds available by June 15, 2005). However, the total number of beds must be delivered no later than September 1, 2005. Apartment Requirements Furnishings – furnish units appropriately for transfer and advanced standing students. Living room – size living rooms sufficiently large to allow the residents to congregate together comfortably. Bedroom Occupancy - one occupant per bedroom is mandatory. Bedroom Windows - each bedroom must have at least one operable window. Bathrooms - one full bathroom with toilet, bathtub, shower and vanity for each one-bedroom unit. Two and three-bedroom units must include at least one full bathroom including bathtub. (Note: Toilet, shower, and vanity may be placed in separate but adjacent areas for more efficient use and privacy.) Bathrooms require vent fan and/or operable window in each shower area. Kitchen - assume more than one occupant may be cooking at the same time and include sufficient counter and cabinet space, a four-burner, self cleaning stove/oven with exhaust fans vented to the exterior, sink/garbage disposal, microwave oven, dishwasher, and large capacity frost-free refrigerator appropriate to the number of occupants. 3 Washer/Dryer – full size washer and dryer standard to industry in each apartment unit. Patio - each unit should have a patio or balcony of at least 40 square feet with no plan dimension less than five feet (patio included in apartment gross square footage). Windows and Window Coverings – provide as much natural light as possible. A combination of miniblinds and vertical blinds may be used. Doors - solid-core entry and bedroom doors. Security - window and door security that meets or exceeds criteria (to be provided). Each bedroom must be lockable via key or card key. Main entries must be equipped with wide-angle door viewers and be card key or key controlled. Electrical - capacity that assumes the use by each resident of a computer, printer, stereo, television, facsimile machine, and array of small and large appliances, many of which will be running simultaneously. Telecom Outlets - separate connections in each bedroom and living room for telephone, cable television, and data line for connecting to an optic fiber network. Occupancy, Rental Rates, and Student Referral Occupancy The Developer should use the following tiered priority system for occupancy, which may be subject to change by UCSD Housing and Dining Services. Exceptions may be approved by written request at the sole discretion of the Director of Housing and Dining Services. Priority 1: Any new single undergraduate with a designation of “Transfer” and full-time status. Priority 2: Any single undergraduate with a designated class standing of Junior or Senior and full-time status. Priority 3: Any single undergraduate with a designated class standing of Sophomore and full-time status. Priority 4: Any currently enrolled single advance standing undergraduate with part-time status. Priority 5: Any currently enrolled single graduate or medical student. Priority 6: UCSD faculty or staff Priority 7: Non-UCSD affiliates Proposed Rental Rates It is the intention of the University to provide housing at rental rates that are comparable to other on-campus housing facilities. Therefore, the following average per unit rental rates in the first year (in 2005 dollars) are as follows. The University desires that 12-month leases be used. Rents must include furnishings, water, 4 refuse removal, and routine and emergency maintenance services. Electricity, gas, cable TV, data services, and parking fees are not included. Developer is required to propose a schedule for parking fees assessed to residents. Campus monthly parking fees for 2005/06 are estimated to be $56 for students. One bedroom/one bath Two bedroom/two bath Three bedroom/two bath $1,158 per unit per month $1,748 per unit per month $2,327 per unit per month Rental Rate Adjustments Annual rent increases will be limited to increases in the Consumer Price Index, provided that such increases shall not exceed 3% plus ½ of any Consumer Price Index increase in excess of 3%. In addition, a formula-driven process shall be included in the ground lease for periodic reevaluation adjustments (every 5 years) comparing this Project to other on-campus housing rental rates and community rental rates. Student Referral The University’s involvement in the student referral process will be limited to: Include information regarding the Project in the housing application materials for newly admitted transfer students. Provide to Developer mailing addresses of all newly admitted transfer students who authorize UCSD to release this information. Provide to upper class students information regarding the Project along with listings of other campus units. Allow information regarding the Project to be linked to the official Housing and Dining Services website. Provide confirmation of the status of residents and potential residents. Other Project Guidelines and Requirements Project will be subject to Design Guidelines (Appendix C of RFQ). This document is meant to provide general design standards and guidelines for the development of the University of California, San Diego North Campus Apartments. If the University identifies no specific guidelines, the Developer will build to the City of San Diego or the most recent Uniform Building Code (UBC) requirements, using the most restrictive code. This document is not aimed to replace the work of the Design Professionals or their best judgment. These standards are complementary to the Project program, and have been modified for this Project. While the University is not subject to the building ordinances and zoning requirements of local building jurisdictions, the University requires the Project to comply with all applicable local codes and ordinances. City of San Diego building permits are not required for real estate owned or controlled by the University. The University of California, San Diego Office of Facilities Design and Construction is the code official. However, the design and construction of utility related connections and fire protection systems may require liaison with local jurisdictions. This liaison shall be coordinated only through the University’s Designated Administrator. Construction or 5 encroachment upon city or county owned property is subject to local codes and requirements. The UC Regents require that an independent review be conducted of the structural seismic design of all capital projects which involve structural design and are intended for human occupancy or which affect human safety, and include review of non-structural building elements. In all cases, working drawings and calculations shall be reviewed by an independent structural engineer for conformance of the new work to the most current and stringent applicable seismic design code requirements of UBC, CCR, and Title 24 prior to commencing work or authorizing structural change orders. The developer will have both its architects and engineer certify in writing that the completed improvements meet the performance rating required by the University of California’s Seismic Safety Policy Criteria. A copy of the independent structural engineer’s peer review report will be given to the Office of Facilities Design and Construction. The design and construction of this project must comply with the applicable laws, rules and regulations of the California Code of Regulations (CCR), 2001 Edition. The developer is responsible for the design’s compliance with these laws, rules and regulations. The following list, not meant to be totally inclusive or exclusive, of CCR titles contain requirements applicable to this project. o Title 8 Industrial Relations o Title 17 Public Health o Title 19 Public Safety o Title 22 Public Health o Title 24 Building Standards o NFPC National Fire Protection Code o OSHA Federal Occupational Safety and Health Act of 1970 o UBC Uniform Building Code o UPC Uniform Plumbing Code o NEC National Electric Code with California Amendments o ADA Americans with Disabilities Act Plan review and inspection will be performed by UCSD Facilities Design & Construction and the UCSD Fire Marshal. Developer will pay UCSD in advance for plan check and building permit (inspection) fees as follows: (1) Plan Check Fees: $18,000 for the first $10,000,000 valuation plus $2.50 for each additional $1,000 valuation or fraction thereof; (2) Building Permit Fees: $27,000 for the first $10,000,000 valuation plus $3.75 for each additional $1,000 valuation or fraction thereof. The University’s review of plans and related documents at the various stages of project development is intended as a check by the University to determine that: 6 1. The design solution satisfies the University housing programmatic needs. 2. The project is in conformance with University administrative policies and procedures. 3. The construction documents meet statutory and University requirements. Review by the University of the plans, designs and related documents shall not relieve the Design Professional of responsibility for the adequacy of the design. University of California, San Diego’s final written approval will be the equivalent of a building permit. Compliance with the applicable construction codes and regulations is a normal element of all construction projects, and will be the responsibility of the Development Team. Unless otherwise enumerated in the Developer’s proposal and subsequently approved by the University, the North Campus Apartments project shall be designed to meet applicable codes and be in accordance with the UCSD Facilities Design Guidelines. The Developer is responsible for coordination of design for all applicable disciplines as necessary for complete construction. This includes, but is not limited to: market data research, site planning, surveying, geotechnical, civil engineering, site demolition, landscape architecture and irrigation design, architectural, structural, mechanical, plumbing, fire protection, electrical, telecommunications, acoustical, interior design and furniture procurement, and all necessary project scheduling, cost estimating as required to complete the development within the program and guidelines established by the University. Developers will be required to obtain copies of UCSD Facilities Design Guidelines from the Office of Real Estate Development. Copies are available in hard copy as well as CD-Rom. Developers will be required to obtain copies of Supplemental Requirements from the Office of Real Estate Development. Site services and utilities are as outlined in Appendix E of the RFQ. Developer’s contractor and subcontractors shall pay prevailing wages in the manner required of public entities that are subject to Section 1770 and applicable sections of the California Labor Code. A University-approved consultant under the direction of the Developer shall prepare environmental documentation for the Project in accordance with University requirements and the California Environmental Quality Act (CEQA) Guidelines (Section 15000 et. Seq., Title 14, Code of California Regulations). Such documentation shall be tiered from the University of California, San Diego 1989 Long Range Development Plan (LRDP) Environmental Impact Report (EIR). The University is the lead agency for the Project and will review and approve all documentation. Additional environmental issues are outlined herein (Appendix D of RFQ). The Developer will be responsible for preparation of the coastal development permit application to the California Coastal Commission, in consultation with UCSD representatives. 7 Section 4 RFP Submission Requirements The University will consider all submitted information and determine which of the proposals submitted, in the University’s sole discretion, best meets the University’s Project objectives. Development Team’s Qualifications and Experience The Developer must identify any known change to the RFQ submittal, including but not limited to any proposed changes to previously assigned individual team members, project approach, conflict of interest, financial capability, bonding capacity, etc. A. B. C. Project Program and Design 1) Program. Provide a schedule with the number of apartments, unit mix, number of beds, and type of construction. 2) Design Concept Plans. Provide Concept Plans which include the following: Overall site plan showing building placement, landscaping, streetscape improvements, exterior lighting, vehicle circulation and parking (structured and on-site), and pedestrian/bicycle circulation. Utility connections/extensions, size, and capacity for each utility serving the Project. Building design showing variation in elevations, construction materials, color selection, etc. Floor plates for each level of the Project that define the prototypical templates for each unit design or cluster of unit mixes. The larger floor plate for each level should show common design elements such as entry and lobbies, common areas, stairs, elevators, etc. Floor plans for each rental unit template and include sufficient information to determine dimensional layout, floor to ceiling heights, materials and finishes, security features, dable/telecom/power outlets, light design, light levels, furniture layout, sound attenuation features, energy efficiencies, etc. 3) Design Schematic Plans. Please refer to Section 4 “Architectural Review Process” below for more information. While Schematic Plans are not due with initial RFP Submittals, they will be required as part of the Developer selection process. Please refer to Section 5 below for Preliminary Project Schedule. Schematic Plans are preliminarily scheduled for review by the Design Review Board on December 3, 2002. Financial Plan 8 D. 1) Apartment Rental Rates. Provide a schedule of apartment rental rates for the Project, including annual rental adjustments. 2) Project Costs and Fees. Using the Excel workbook template attached as Exhibit A-1, provide an itemized accounting of estimated construction costs, development fees, financing costs, and any other fees by category. 3) Operating Costs. Using the Excel workbook template attached as Exhibit A-2, provide a breakdown of income and operating expenses, and contributions to a capital reserve fund based on life cycles of major capital items. 4) Cash Flow Analysis. Using the Excel workbook template attached as Exhibit A-3, provide a cash flow analysis for the first 10 years, including debt service and contributions to capital reserves. 5) Replacement Reserves. Provide an estimate of major maintenance/replacement expenses over the life of Project and describe how they will be funded. 6) Ground Rent. Include in the above C.4 Cash Flow Analysis the proposed ground rent before debt service and any shared residual income after debt service to be paid to the University. 7) Ownership and Financing. Provide a detailed description of the ownership entity, financing, and repayment plan, including how expenses will be paid prior to availability of financing. 8) Debt Rating. Provide the information described in C.2, C.3, and C.4 on the basis of both an A-rated, credit enhanced bond structure and an unenhanced bond structure. Management Plan The Developer must provide: A detailed management plan, including on-site staffing plan (professional and para-professional), general job descriptions, an organizational chart showing supervisory relationships, on-site 24-hour emergency contact, and resident security plan. A description of the proposed ongoing custodial, building, and landscape maintenance in order to provide high standards of maintenance to the Project. The actual procedural and contractual terms (i.e. management and rental agreements) and conditions specific to the proposed management plan. Given a target population of transfer students new to the campus, a description of what level of student activity programming will be provided, including a description of typical programs expected to be offered during the course of a year that are compatible with ongoing campus-wide and college-based programs. A description of its plans for working together with University officials to maintain the highest level of consistency in processes, programs, and student life issues. Important: Management of the Project by a non-profit 9 property management company would be viewed favorably by the University. A detailed description of its plans for managing its parking spaces within the Project, and provide the actual procedural processes that it will use. The University will provide health and safety services such as police services and annual environment, health & safety (including State Fire Marshal) inspection services to the Project. The costs of these services will be reimbursed to the University by the Developer or Manager. Contracting with the University for other services, such as nightly residential security guards, would be viewed favorably by the University. E. Contractor. Identify proposed contractor, its qualifications, insurance coverage, and bonding capacity. F. Development Schedule. Provide detailed development schedule, including timing to establish ownership entity, complete the CEQA process, start and finish of site development, start and finish of building construction, and commissioning of facilities. G. Major Agreement Terms The Developer must be prepared to agree to the basic terms as set forth in the RFP, or identify those terms to which it is unable to agree. Maximum Fees o Asset Management 0.25% of actual gross project revenue o Developer Fee 3.5% of design and construction costs, excluding financing o Property Management 3% of actual gross project revenue Ground Rent o Minimum of $500,000 per year before debt service, plus a percentage of net cash flow to be negotiated after debt service. Summary of Ground Lease Terms • Term: The term of the ground lease will not exceed 40 years. • Rent: In general the University will seek a ground lease rent payment based on fair market value of the highest and best use of the property, adjusted for terms and conditions of the ground lease, including use restrictions, and limits on rent levels. • Residential Rent Levels: As described above, the initial residential rent levels will be set at rates provided by the University. In subsequent years, “permitted rents” may be increased according to a pre-negotiated formula based on CPI. • Condition of Site: Site will be leased “as is” and subject to all applicable local, state and federal government regulations. • Costs of Development and Operations: The lessee shall be responsible, at its own expense, for all design and soft costs, permitting costs, on- and off-site improvements, project improvements, operating costs, minor and major repairs 10 and maintenance, government fees, assessments and taxes, management costs, etc. • Financing: For purposes of securing project financing, the lessee may pledge the rights and privileges granted in the ground lease. The University, however, will not pledge its underlying fee simple interest in the land as security for the development’s financing. The University shall have sole and absolute discretion to approve all financing and refinancing. • Transfer & Assignment: The University shall have the right to approve any sale, assignment or sublease of lessee’s interest in the project. • Occupancy: Project occupancy shall be governed by the Referral Process outlined in Section 2 “Project Requirements – Occupancy”. Insurance: The Developer will provide proof of insurance at levels and with deductibles acceptable to the University, prior to the signing of a ground lease. Required coverage will include, but not be limited to, comprehensive form general liability, business auto liability, property, worker’s compensation, and construction insurance. Other insurance as is customary in this type of transaction may be required. In addition, coverage against insurable risks relating to performance may be required by the University. • Property Management: Property shall be maintained in first class condition and otherwise in good, clean, attractive, sanitary and safe order, condition, habitability and repair. As described above, the fee for Project property manager shall be capped as a percent of adjusted gross income. Lease to include Property management standards; if standards not met, Property Manager must be replaced with new manager subject to University approval. • Property or Possessory Interest Taxes: The lessee’s interest in the project may be subject to property or possessory interest taxes by San Diego County. Lessee shall diligently pursue any appropriate tax exemptions based on the use of the project. Benefits of any such exemption must flow to the University or be used to reduce rents subject to approval of the University. • Capital Reserve: The developer shall deposit a portion of revenues into a capital reserve account for major maintenance and repair; amount to be negotiated. Consent of the University will be required before the withdrawal of funds from the account. Upon termination of the lease, remaining balance in the capital reserve shall revert to the University. • End of Term: At the end of the lease term, the University may assume ownership of all improvements on the site, or alternatively require the developer to demolish the improvements and restore the site to its original condition. • Liquidated Damages: Upon project approval, a date of substantial completion of the housing portion of the project will be determined. Any delay in occupancy beyond the completion date will obligate the developer to pay liquidated damages, which will be assessed on a per unit basis to cover the cost of comparable temporary housing. • Financial Covenants: The developer will be subject to financial covenants including a maximum amount of debt allowed on the project and a minimum net worth covenant (which will be indexed by CPI). 11 • Indemnification & Hold Harmless: The developer will defend, indemnify, and hold harmless The Regents, its officers, employees, and agents from and against any and all liability, claims, liens, judgments, expenses, and costs which result from, or in any way arise out of, or in connection with developer's ownership or operation of the project improvements. • Equal Opportunity: During the term the developer shall not discriminate against any person employed or seeking employment in the project because of race, color, marital status, religion, sex, sexual orientation, handicap, or national origin. Other Terms: The ground lease shall contain such other conditions as are customary in transactions of this type Section 5 Instructions to Proposers and Review Process Pre-Proposal Meeting A mandatory meeting to discuss the RFP submission requirements and process will be held on July 15, 2002 at 9:30AM to 11:00AM at the following address. UCSD Campus Torrey Pines Center South 10280 No. Torrey Pines Rd. Suite 466 La Jolla, California Directions and Parking: Exit I-5 at Genesee Ave. and head West. Turn left at No. Torrey Pines Rd. Turn left at first signal at North Point Dr. and purchase parking permit ($6.00) at North Point Information Booth (see campus map at www.parking.ucsd.edu). Return to signal at North Point Dr. and continue West across No. Torrey Pines Rd. and follow ramp into building’s underground parking structure on Level 1 (limited metered parking also available). Take elevator to Level 4. Proposal Due Date and Delivery Proposals submitted for consideration are due by 4:30 PM on September 20, 2002, and 15 sets of submitted information and 3 complete sets of Concept Plans should be sent or delivered to: If by U.S. Mail: Nancy E. Kossan, Director UCSD Real Estate Development 9500 Gilman Dr., 0982 La Jolla, CA 92093-0982 If by hand or express delivery: Nancy E. Kossan, Director UCSD Real Estate Development 10280 North Torrey Pines Road, Ste. 365 La Jolla, CA 92037 Format of Proposals 12 Proposals should be submitted in the same outline format as shown in Section 4 “RFP Submission Requirements”. Information should be submitted on 8-1/2” x 11” pages (with foldout pages up to 11” x 17” in size if needed), and bound in a 3-ring binder. Pages should be consecutively numbered. Emphasis should be on completeness and clarity of content. Concept Plans should be submitted in sheet dimensions not to exceed 30” x 42”. Formal Presentations to Selection Committee Developer teams shall make formal presentations to the Selection Committee on October 8, 2002 at the same location as noted above for the Pre-Proposal meeting. Time appointments will be made with each Developer team. Architectural Review Process Presentations to Design Review Board The Developer’s architect will be required to begin the design process during this RFP phase. UCSD utilizes a Design Review Board (DRB) charged with the review of facilities design and major landscape projects to insure that they are architecturally appropriate and consistent with the Long Range Development Plan and UCSD planning principles as specified in the Master Plan and Design Guidelines. The DRB is comprised of four distinguished professional practitioners in architecture and landscape design. Currently those members include: David Rinehart, FAIA; Ray Kappe, FAIA; Owen Lang, ASLA; and Donn Logan, FAIA. The DRB is also comprised of four representatives from academic and administrative areas of the campus. The Developer will be required to submit its proposal for design a minimum of two times to the DRB. The first time will be to present design alternatives and a recommended solution (Concept Plan presentation). The second DRB review will be for the final Schematic Design. The DRB will evaluate how well the architect responded to the comments that were articulated by the DRB at the Concept Plan presentation and rank the designs of the four development teams. Those rankings will be incorporated in the overall selection evaluation criteria. The presentations to the DRB of the Concept Plan and Schematic Design will be scheduled individually with each development team. It is anticipated that the presentations to the DRB will take approximately one and one-half hours. Please refer to the Preliminary Project Schedule for estimated presentation dates. Requirement for Schematic Design Fully complete Schematic Design documents will be required, including site plan, landscape plan, floor and unit plans, sections, elevations and two rendered perspective views, and materials description. Additional materials such as study models and other media/graphics that assist with showing the design will be helpful. Stipend The pre-qualified development teams that submit proposals through schematic design and are not selected will be compensated in the form of a stipend. The stipend amount will be $40,000 per invited development team, payable upon completion of the RFP process. The selected development team will not receive a stipend as it will be awarded the project. 13 Questions and Interpretation All substantive inquiries must be submitted via email to nkossan@ucsd.edu, and both the question and the answer will be posted on this web site at the link for “RFP Questions & Answers”. Any interpretation or correction of this RFP that may be issued will be made only by written addendum, which will be posted on this web site. Communications with the University Proposers or members of their teams shall not communicate concerning this Project with Selection Committee or Design Review Board members, students, and employees of the University, except with Nancy E. Kossan via email at nkossan@ucsd.edu, as stipulated per the requirements of the RFQ and RFP. Failure to abide by this requirement may result in rejection of the Proposer’s submittal. The University reserves the right to reject any or all submittals, or to withhold the award for any reason it may determine, and to waive or decline to waive irregularities in any submittal. Disclosures and General Conditions Modifications to the RFP Any material clarifications or modifications to the RFP or the selection process will be made in writing and provided to all prequalified development teams. It is the responsibility of the development teams, before submitting a response to the RFP, to ascertain if the University has issued any notices, clarifications, addenda, or other communications to responders. Oral explanations or instructions from University staff, campus staff, city officials, or consultants shall not be considered binding on the University. Reserved Rights The University reserves the right to: Modify or cancel the selection process or schedule at any time Waive minor irregularities Reject any and all responses to this RFP and to seek new proposals when it is in the best interest of the University to do so Seek clarification or additional information from proposers as it deems necessary to the evaluation of the response Request any additional information or evidence from individual respondents, including but not limited to evidence of the developer’s financial status Judge the developer’s written or oral representations as to their veracity, substance and relevance to development of the property, including seeking and evaluating independent information on any development team Incorporate this RFP and the selected team’s response to this RFP as a part of any formal agreement between the University and the developer Modify the development opportunity available to potential development teams Hold Harmless By participation in this RFQ/RFP process, development teams agree to hold harmless the University of California, it officers, employees, students and consultants from all claims, liabilities and costs related to all aspects of the development team selection process. 14 Public Information The California Public Records Act limits the University’s abililty to withhold bid data. If a submittal contains any trade secrets that a Developer does not want disclosed to the public or used by the University for any purpose other than evaluation of the Developer’s elgibility, each sheet of such information must be marked with the designation “Confidential.” The University agrees that if a “Public Records Act” request is made for disclosure of data so classified, it will notify the submitter of such data so that the submitter will have an opportunity to legally challenge the University’s obligation to disclose such information. All documents, conversations, correspondence, etc. between the University and Developers are public information subject to the laws and regulations that govern the University, unless specifically identified otherwise. Expenses All expenses related to any Developer’s response to this RFP, or other expenses incurred while the selection process is underway, are the sole obligation and responsibility of that development team. The University will not, directly or indirectly, assume responsibility for these costs. In addition, the University shall not be liable for any real estate commissions or brokerage fees that may arise because of the development team selection process. The proposer shall not offer any gratuities, favors, or anything of monetary value to any official, employee, or outside consultant associated with the development of the property for purposes of influencing consideration of a response to this RFP. Representations The University makes no representations about the conditions of the site, including buildings, utilities, soils, land use entitlements, or other surface, subsurface or legal conditions. The respondent shall make its own conclusions concerning such conditions. Information referenced in this RFP or otherwise made available by University staff or consultants, is provided for the convenience of the responders only. The University does not warrant the accuracy or completeness of this information. Exclusive Negotiations and Future Phases of Redevelopment The University reserves the right to hold exclusive negotiations that may differ from the terms and conditions originally solicited or offered. Section 6 Preliminary Project Schedule June 5, 2002 July 1, 2002 July 15, 2002 September 20, 2002 October 1, 2002 October 8, 2002 Short-listed developers announced Request for Proposals (RFP) issued Pre-proposal meeting RFP Submittals due by 4:30 P.M. Developer Presentations of Concept Plan to Design Review Board Developer Presentations to Selection Committee 15 December 3, 2002 December 17, 2002 January-July, 2003 July 16, 2003 September 1, 2005 Developer Presentations of Schematic Design to Design Review Board Candidates ranked and one recommended to proceed to exclusive negotiations Developer prepares CEQA documentation Approval of Ground Lease and Certification of CEQA compliance by The Regents Occupancy of Project 16