TECHNICAL AND FINANCIAL OFFER FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT Subject : Technical and Financial offer for Central Registry Elctronic Records Management System Customer : Zambia Revenue Authority Document Title : Technical and Financial Offer Date : __/__/201_ TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [1/151] Contents Contents................................................................................................................................................................. 2 1.1. TechNet AFRICA. ...................................................................................................................................... 7 1.2. Data Concept S.A. .................................................................................................................................... 7 1.2.1. Business Outline ................................................................................................................................... 7 1.2.1.1. IT Services ......................................................................................................................................... 7 1.2.1.2. IT Products ........................................................................................................................................ 7 1.2.1.3. Telemetry & Automation ................................................................................................................ 8 1.2.1.4. GIS Solutions Business...................................................................................................................... 8 1.2.2. Memberships and Qualifications ........................................................................................................ 8 1.2.3. Clients .................................................................................................................................................... 9 1.2.4. Technologies ......................................................................................................................................... 9 2. Glossary – Abbreviations ........................................................................................................................... 10 3. Executive Summary.................................................................................................................................... 11 4. Records.Trak™ ............................................................................................................................................ 14 4.1. .Trak – Accelerated Solutions Development Platform ..................................................................... 15 4.1.1. Preamble.............................................................................................................................................. 15 4.1.2. Core Architecture and Foundation Modules .................................................................................. 17 4.1.3. Typical Architecture (H/W and S/W Requirements) .................................................................... 22 5. Requirements .............................................................................................................................................. 24 5.1. 5.1.1. 5.2. General Requirements........................................................................................................................... 24 Previous experience........................................................................................................................... 24 Technical Requirements ....................................................................................................................... 25 5.2.1. Users Management ............................................................................................................................. 25 5.2.2. Security Policies ................................................................................................................................. 25 5.2.3. Ontologies Management .................................................................................................................... 25 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [2/151] 5.2.4. Workflow Engine................................................................................................................................. 26 5.2.5. Collaboration Infrastructure ............................................................................................................ 26 5.2.6. Data Import Mechanism .................................................................................................................... 27 5.2.7. Data Export and Templating ............................................................................................................ 27 5.2.8. Report Generator & Analytics .......................................................................................................... 27 5.2.9. Georeferencing Addon (EXTENDED) ................................................................................................ 27 5.2.10. 5.3. Electronic Payments (EXTENDED) ................................................................................................ 27 Functional Requirements ...................................................................................................................... 28 5.3.1. Records.Trak™ Document/Records Management Requirements ................................................ 28 5.3.1.1. .Trak™ and SOA Architecture ....................................................................................................... 28 5.3.1.2. The Goal of SOA.............................................................................................................................. 29 5.3.1.3. Concept of SOA platform .............................................................................................................. 30 5.3.1.4. SOA standards ................................................................................................................................. 31 5.3.2. .Trak™ Extended Capabilities .......................................................................................................... 32 5.3.3. Data Migration Methodology ............................................................................................................. 33 6. Workplan ...................................................................................................................................................... 34 7. Team Composition and infrastructure .................................................................................................... 35 7.1. Team composition .................................................................................................................................. 35 7.1.1. 1st Level : Steering Committee ....................................................................................................... 36 7.1.2. 2nd Level : Management Team ........................................................................................................ 37 7.1.3. 3rd Level : Implementation Level ................................................................................................... 38 7.1.4. Work Group Composition .................................................................................................................. 38 7.1.5. Key Team Members ............................................................................................................................ 40 7.2. TechNet’s infrastructure ...................................................................................................................... 43 8. Major Deployment Requirements (ISO 9001:2008) ............................................................................... 48 9. Methodologies ............................................................................................................................................. 49 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [3/151] 9.1. Quality assurance methodology ........................................................................................................... 49 9.1.1. Application of the method to measure Quality in contract management and achievements 50 9.1.1.1. Goal for monitoring the project progress .................................................................................. 50 9.1.1.2. Impact of variation factors on quality focus ............................................................................. 52 9.1.1.3. Baseline hypothesis on quality focus .......................................................................................... 54 9.2. Project Management Methodology – Prince 2 ................................................................................... 59 9.2.1. Introduction ........................................................................................................................................ 59 9.2.2. What is a project? .............................................................................................................................. 59 9.2.3. The scope of PRINCE2........................................................................................................................ 61 9.2.4. PRINCE2 in context ............................................................................................................................ 62 9.2.5. Overview of PRINCE2 ......................................................................................................................... 64 9.2.6. The processes ..................................................................................................................................... 66 9.2.7. PRINCE2 techniques ........................................................................................................................... 72 9.2.8. Process and component links ........................................................................................................... 73 9.2.9. Processes - Brief ................................................................................................................................. 75 9.3. Development methodology - RUP Methodology ................................................................................ 76 9.4. Communication with ZRA...................................................................................................................... 79 9.5. Risk Management.................................................................................................................................... 80 9.5.1. Introduction ........................................................................................................................................ 80 9.5.2. Definitions ........................................................................................................................................... 80 9.5.3. Risk Management Flow ...................................................................................................................... 81 9.5.4. Risk Identification .............................................................................................................................. 83 9.5.5. Risk Assessment and Classification ................................................................................................. 84 9.5.6. Risk Reduction .................................................................................................................................... 85 9.5.7. Risk Reporting and Review ............................................................................................................... 86 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [4/151] 9.5.8. Maintenance/Support/SLA Requirements ...................................................................................... 87 9.5.9. System/Platform Support ................................................................................................................. 87 9.5.9.1. actions Preliminary agreement definitions of the Vendor’s responsibility over system restoration 88 9.5.9.2. Problem Classification ................................................................................................................... 89 9.5.9.2.1. Severity 1 : .................................................................................................................................. 89 9.5.9.2.2. Severity 2: ................................................................................................................................... 90 9.5.9.2.3. Severity 3: ................................................................................................................................... 90 9.5.9.2.4. Severity 4: ................................................................................................................................... 90 9.5.9.3. Providing Solution .......................................................................................................................... 90 9.5.9.4. Monitoring Reports ......................................................................................................................... 91 9.5.9.5. Installing new software versions ................................................................................................. 91 9.5.9.6. Debugging ........................................................................................................................................ 91 9.5.9.7. System Software Upgrade ............................................................................................................. 92 9.5.9.8. Upgraded software versions installation methodology............................................................ 92 9.5.9.9. Tuning Services ............................................................................................................................... 93 9.5.9.10. Application Software Maintaining Methodology .................................................................... 95 9.5.9.11. Installing updated software versions ...................................................................................... 97 9.6. Training .................................................................................................................................................... 98 9.6.1. Administration Support - Training ................................................................................................... 98 9.6.1.1. Training Scope and Schedule ....................................................................................................... 98 9.6.1.2. Training Techniques....................................................................................................................... 99 9.6.1.3. Tutors-Qualifications ................................................................................................................... 100 9.6.1.4. Training Reports ........................................................................................................................... 100 9.6.1.5. Final Report................................................................................................................................... 101 9.6.1.6. Tutors’ Evaluation ........................................................................................................................ 101 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [5/151] 9.6.1.7. Seminars Description ................................................................................................................... 101 9.6.1.8. Training Framework ..................................................................................................................... 102 9.6.1.9. Documentation ............................................................................................................................. 102 9.7. Help Desk - Support ............................................................................................................................. 103 9.7.1. Overview ............................................................................................................................................ 103 9.7.2. Help Desk Features .......................................................................................................................... 104 9.7.3. Intention ............................................................................................................................................ 104 9.7.4. Goals ................................................................................................................................................... 104 9.7.5. Submittal mechanisms .................................................................................................................... 104 9.7.6. Priority System ................................................................................................................................. 105 9.7.7. Scope .................................................................................................................................................. 105 9.7.8. Incident Management ...................................................................................................................... 105 9.7.9. Problem Classification ..................................................................................................................... 106 9.7.10. Inspection-Evaluation .................................................................................................................. 106 9.7.11. Reporting ....................................................................................................................................... 106 9.7.12. Incident tracking system ............................................................................................................. 107 10. Technical Specifications ..................................................................................................................... 108 11. GANTT Chart ......................................................................................................................................... 147 ANNEXES ............................................................................................................................................................ 148 Annex A – CVs .................................................................................................................................................... 149 Annex B – Company’s Profile .......................................................................................................................... 150 Annex C – References – Past Similar Assignments ...................................................................................... 151 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [6/151] The Consortium 1.1. TechNet AFRICA. 1.2. Data Concept S.A. Data Concept S.A. is a privately-held, leading European Information Technology Services and Solutions group of companies, headquartered in Athens, Greece, with subsidiaries in Sofia, Bulgaria and Limassol, Cyprus. Our scope is: To apply innovative software solutions to dedicated industries such as: public sector, media, healthcare, engineering, education, energy and environment To evolve the i2015 European strategy by developing ICT solutions that make a real and positive contribution to growth, productivity and social inclusion To contribute into the modernization of businesses by applying customized ebusiness software. By implementing more than 240 Projects in the regions of Europe, Middle East and Africa (EMEA), over the last 10 years, we are experts in: the development of software and the integration of the best of breed applications, hardware and network, delivering turn-key solutions for the public sector and the enterprises the application of custom made on-demand solutions for businesses. Data Concept S.A. is one of the pioneers of internet solutions in Greece as we are developing web applications since 1999. We were the first company in Greece to develop a document management system totally exploited via the Internet that over the years has being evolved to our flagship application; .Trak™, an accelerated solutions and development platform. 1.2.1. Business Outline 1.2.1.1. IT Services Data Concept and its affiliate Media Concept supply government agencies and private-sector companies with a range of IT services such as consulting, custom software development and web marketing. Using its extensive experience in building highly reliable systems backed by state-ofthe-art IT and network technologies, Data Concept aims to contribute in the development of an information society friendly to humans and the earth whilst efficient to the organizations. 1.2.1.2. IT Products Data Concept and its affiliate Media Concept install all types of software, hardware and network products such as WiFi systems, servers, workstations - peripherals and integrate them with best of TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [7/151] breed applications essential to the construction of composite IT systems. Our IT solutions portfolio includes knowledge management systems, digital citizenship applications, eco-friendly appliances and digital signage equipment. 1.2.1.3. Telemetry & Automation Data Concept and its affiliate Media Concept supply industrial and telemetry systems that support social infrastructure, including water resource and energy systems, video surveillance, track and trace, bike sharing and risk management systems suitable for public/private venues and local governments. Our systems enhance public safety and eco-friendliness. 1.2.1.4. GIS Solutions Business Data Concept develops WebGIS applications that combined with other business solutions are suitable for exposing data on any digital map. Our systems are exploited via mobile handsets (device independent), personal computers and other terminals accentuating internet services 1.2.2. Memberships and Qualifications Data Concept S.A. is a member of the Athens Chamber of Commerce and Industry (ACCI, Reg. No 213948); the Federation of Hellenic Information Technology & Communications Enterprises (SEPE); the Association of Technical Greek Software Enterprises (SETEL); the Hellenic-Irish Commerce Chamber (HIBA), the Cyprus-Greek Business Association, the Hellenic Network for Corporate Social Responsibility, the Panhellenic Exporters Association as well as an affiliated member of Climate Savers Computing. In the framework of the provision of high-quality services and applications, Data Concept, since its foundation, runs a Quality Management System (QMS) based on ISO 9001 for all its activities. The company has also recently been awarded the certification for Information Security Management Systems (EN ISO 27001) and Environmental Management System (ISO 14001). Data Concept is also certified as a Greek Defense Material Supplier. During the last year, Data Concept also operates under the IT Service Management Standard (ISO 20000). In terms of specific operations and always in accordance to its ISO certificates, Data Concept uses PRINCE2 methodology for project management, a method that is considered the defacto standard for project management in most European countries and is practiced worldwide. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [8/151] Data Concept S.A. IT infrastructure and software ecosystem are capable to host the development environment of the NEW TT System (please see Company’s infrastructure (G7)) 1.2.3. Clients 1.2.4. Technologies Telemetry Infrastructure TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [9/151] 2. Glossary – Abbreviations Term Owner Vendor Subcontractor RFQ IT BoM SW HW PM DM RM CV UAT WO Web/App SCA SOA RFC SLA PRINCE RUP ECH RCH NEW system .Trak™ v.3.0 Records.Trak™ EAI GQM QMA Description Zambia Revenue Authority (ZRA) TechNet AFRICA Data Concept S.A. Request for Quotation Information Technology Bill of Materials Software Hardware Project Management Document Management Records Management Curriculum Vitae User Acceptance Test Work Order Web/Application Server Service Component Architecture Service Oriented Architecture Request For Changes Service Level Agreement PRojects IN Controlled Environments Rational Unified Process Extra Coverage Hours Regular Coverage Hours Central Registry Electronic Records Management System, Records.Trak™ Accelerated Solutions Development Platform – Enterprise Knowledge Management .Trak’s pre-configured Ready Software Application for Documents and Records Management Enterprise Application Integration Goal/Question/Metric approach Quality Manager - Auditor TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [10/151] 3. Executive Summary The Vendor (TechNet AFRICA) in conjunction with its supplier/subcontractor Data Concept S.A. (a Microsoft and Oracle GOLD partner) attaining a solid understanding of the engineering/IT business ecosystem and the business operations of Zambia Revenue Authority (ZRA) and taking into consideration the deployment of a business critical solution such as an ‘Central Registry and Electronic Management System’, are proposing a pioneer system based on Data Concept’s .Trak™ Enterprise Knowledge Management System (Accelerated Solutions Development Platform), integrated and supported by TechNet’s expertise as a systems integrator. Taking into consideration the fact that the system has great value for ZRA everyday operation, the Vendor has selected the best-of-breed combination between enterprise knowledge management solutions, databases and operating systems in order to assure the project’s success. The Vendor is proposing a .Trak™ based turn-key solution, Records.Trak™, as the most appropriate solution to fulfil all project requirements and further development features. In terms of the transition period between the Pilot and the Operational Phase, the Vendor will support, on-site, the NEW software infrastructure with engineers and experts of both the Vendor and the Subcontractor working team. The ‘Central Registry Electronic Records Management System’ will be based on: .Trak™, as an accelerated solutions development and integration platform (Enterprise Knowledge Management System) and more specifically Records.Trak™, a Data Concept S.A. software product and MS SQL Server 2008 R2 database components for the infrastructure. The advantages of .Trak™ v.3.0 are: .Trak’s Foundation Modules that encompass a set of customizable applications designed to administer the core system’s setup and operations within any practice or set of specifications. These modules provide all the functionalities in order to develop and customize the software solution to fit specific business needs. .Trak™ can be integrated to any relational database as well as any third party applications including Microsoft desktop applications such as: MS Word, MS Excel etc. Oracle Primavera P3, ERP, CRM and GIS systems, offering advanced interoperability and facilitating everyday work environment. .Trak’s suite of software products (Modifiable of the Shelf Software - MOTS) consists of business specific applications that address document management, project management, quality management, content management and ecommerce issues, as separate applications that operate in an homogeneous ‘360 ecosystem’. .Trak enables next generation SOA capabilities through: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [11/151] o o o o A unified and declarative toolset by which business users and developers can work together to develop business applications. A single Business Process Platform with which to orchestrate people, systems and documents into processes that can be monitored and optimized in real time. A 100% standard platform that is service enabled and easily consumable by modern web applications, allowing enterprises to quickly and easily adapt to changes in their business and IT environments. Greater visibility, controls and analytics to govern how services and processes are deployed, reused and changed across their entire lifecycle. .Trak™ v.3.0 covers all of the capabilities to deliver robust, agile and reliable SOA solutions. The Central Registry Electronic Records Management System, Records.Trak™, will be based on an n-tier architecture providing: high performance, speed, redundancy/failover, scalability, security and interoperability by optimizing both software and hardware native features. .Trak™ –components- will be installed in a 2-tier cluster of 2 x Windows Server – Application (Microsoft IIS 6.0 or later) and 2 x Windows Servers- MS SQL Server 2005 (or later) databases, supported by 1 optical switch and 1 Storage Area Network (SAN). Data integrity of the proposed system is further secured with the installation of an integrated/complete Tape Backup library. The team that will be engaged in the Project consists from top engineers, managers and programmers, specialists within the installation, development, support and training of both the .Trak™, application server, web server and windows operating systems. The Vendor will make the best use of the EXISTING hardware, software and network components in order to facilitate the smooth transition into the NEW system whilst exploiting the existing licensing agreements between ZRA and the H/W, S/W vendors. The components of the NEW System (Records.Trak™) guarantee an enterprise business Automated Document/records Management Solution with flawless execution of processes that will enable ZRA to provide more competitive products or services, reduce costs, improve customer service, and react quickly to changing market conditions. Selecting .Trak™ as the applications development platform ensures the removal of the existing, traditional integration solutions that are proprietary and expensive in terms of support and interorganizational operations. The NEW System will be implemented with an industry standard for orchestrating business processes and Web services that will speed the implementation and deployment of new projects and will reduce the overall cost of management, modification, extension, and redeployment of existing processes. In addition to tactical time and cost savings, this provides a strategic advantage: superior responsiveness to changing market conditions. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [12/151] The Vendor assures the operational objectives of the system within ZRA: 1. 2. 3. 4. 5. 6. Minimize the number files and documents that are 'lost' Automate the relocation of files to and from officials Track the location of any file at any time Link documents with files Manage files and file contents Create and manage digital files TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [13/151] 4. Records.Trak™ At Data Concept, we believe that software should be scalable, agile and extensible. That's why we developed .Trak™ (dot Trak). .Trak™ is a C# .NET accelerated software development plateau that allows non-programmers, easily and effectively, to develop customized software solutions for their clients or even a whole business industry and to deliver business process outsourcing services. Data Concept is a pioneer in the development of service-oriented architecture (SOA) systems. Our applications as our development platform .Trak™, are utilizing the SOA principles providing a dynamic creation of ontologies and a seamless integration within multiple business domains. Our roadmap for custom software development starts with the identification of the key business services and business process of each customer. Using our .Trak™ Accelerated Solutions Development Platform and a Service Oriented Approach we create agile applications, such as Records.Trak™, that accommodate modular business services and have multiple uses. .Trak™ Foundation Modules encompass a set of customizable native modules designed to administer the core system’s setup and operations within any practice or set of specifications. These modules provide all the functionalities you will need in order to develop and customize the software solution to fit each business needs. .Trak™ is an open architecture accelerated solutions development platform. Thousands of organizations globally depend on .Trak™ to design and deploy faster and better IT business solutions that positively impact their operations. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [14/151] 4.1. .Trak – Accelerated Solutions Development Platform .Trak™ is the best software development tool for IT business consultants due to the flexibility that it offers to describe business ontologies, business rules, workflows and create dynamic reports with absolutely, no programming. It’s scalable, flexible, secure and robust. Client quote: Mr. Andreas Karpathakis, General Director Jacobs S.A 4.1.1. Preamble .Trak™ is an ecosystem of Foundation Modules and ready software applications. Foundation modules are the core modules for creating and setting up, on-demand, administering and customizing any application whereas Ready Software Applications are .Trak™ industry specific, pre-configured instances, that encompass the business logic of common office administration tasks such as: document management - protocol registrar - records management (Records.Trak™), content management (Hyper.Trak™), project management (Project.Trak™) and quality management (Quali.Trak™). .Trak™ Foundation Modules TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [15/151] Based on the above ready-made .Τrak™ applications such as: Records.Trak™ (Document Management and Records Management), our working team will start by the identification and setting out of ZRA operational requirements. .Trak™ provides an inherited designing environment (no programming required) to develop and deploy fast any web based application. All customization and administration of .Trak™ foundation modules, inside the Records.Trak™, is performed over web, on-the-fly from any browser. .Trak’s administration mechanism (foundation modules) allows ongoing re-structuring of all ontologies, dependencies, business rules, data exports, reports and security policies according to the evolving requirements and the new set of specifications. All ontologies can be edited, copied, moved and merged to other associated ontologies with absolutely no loss of data. The Administrator can securely logon to the system with the appropriate credentials and create, edit and delete data schemas, workflow rules, user’s privileges or even create any report and aggregate any kind of digital content. Transparently to all users, the NEW application (system) will adjust to the new requirements they have been set, keeping track of changes and a detailed log of input and output data. .Trak™ provides automatic versioning for each new application instance. To enhance simplicity and functionality even more, Records.Trak™ provides specific pre-made, preconfigured, business logic roles, workflow scenarios and reports that are ready-made and can be adjusted accordingly, saving time and enhancing functionality. .Trak™ Application’s Instances TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [16/151] 4.1.2. Core Architecture and Foundation Modules .Trak™ v.3.0 (release 5.2011), has been developed on ASP .Net 3.5 - C# 3.0 bottom to top by professional certified software engineers and system architects, based on a multi-tier (n-tier) application architecture, with a SOA design and using the Rapid Application Development (RAD) Methodology. .Trak™ Systemic Layers .Trak™ handles presentation, middle tier (business logic and utilities) and data layers as logically separated processes, providing a model for developers to create a flexible and reusable application. By breaking up an application into tiers, developers only have to modify a specific layer, rather than have to rewrite the entire application over. Layers are logical structuring mechanisms for the elements (ontologies) that make up the software solution, while tiers are physical structuring mechanisms for the system infrastructure that are hosted as server based applications. Providing an n-tier XML Web service type of application design (SOA approach), .Trak™ offers the richness of a desktop application from an HTTP interface (thin client, browser based). By keeping the business rules on the server side, .Trak™, provides optimum network traffic, caching, session management and security. .Trak™ runs on IIS 6.0+ web/application server providing among other native features, access protection, secure content publishing and dynamic caching and compression. .Trak™ employs various database engines such as: MS SQL, Oracle DB etc. providing the flexibility to adjust to the need of what database engine your Organization might already have in-house, how much and what type of data needs to be stored and to consider various operating systems on the database tier. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [17/151] Native .Trak’s environment is a rich and responsive interface in terms of User Experience (UI) being developed on .aspx, ajax, javascript and CSS. Baring the ‘Simplicity Concept’ in mind, all interfaces used, offer to users the dynamic interaction that they will expect from advanced, sophisticated, professional IT solutions. For that matter and considering the World Wide Consortium (W3C) designing and programming principles, .Trak™ is compatible with most of W3C Domains and Standards, especially the UI and Web Accessibility Initative (WAI). .Trak™ also supports multiple languages. Using third party add-ons .Trak™ applications can support text-to-speech features, facilitating readability: the ease in which text can be read and understood. Totally integrated with the Active Directory, Single-Sign-On (SSO) users have only one user name and password to remember in order to access their application modules. When a user logs onto the local network, the Active Directory SSO automatically logs the user onto every authorized resource. Networked users attributes and access application’s rights can be set from .Trak™ [Users Management]. Information on all .Trak’s applications can be further personalized based on the profile of each registered user. Intranet users receive their information on a personalized dashboard based on their access rights and their role in each application of the system. Furthermore outside internet users can also get a personalized view of the web site that dynamically adjusts to their profile, keeping track of their most common clicks and searches. Complying with the Records Management Requirements when implementing Governmental Systems (Paperwork Elimination Act), .Trak™ [Security Policies] module adopts Public key cryptography, which is used to implement digital signatures. Public Key Infrastructure (PKI) is one of the principal electronic signature technologies that agencies use when conducting business electronically. PKI is defined as “a set of policies, processes, server platforms, software and workstations used for the purpose of administering certificates and public-private key pairs, including the ability to issue, maintain, and revoke public key certificates”. Utilizing the Microsoft IIS functionality for digital, or SSL certificates, .Trak™ offers PKI based digital signature into any .Trak™ based application. This feature allows the user to sign and verify the files, forms or any data. The signed data is maintained in PKCS#7 format (as per industry standards). This module also supports multiple TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [18/151] signatures, third party time stamping, PKI based encryption-decryption and embedded digital signature in the PDF and PDF/A files in Adobe compatible format, which can be verified through Adobe Reader. .Trak™ encompasses class libraries, Business Logic Layers (BLLs), Data Access Layers (DALs), Models, and Utilities into the core (behind- the-scene) programming administration environment, hosted into the [Ontology Management Module]. By defining and deploying these tools, an IT Business Consultant, as a system administrator, can design and launch logical processes into discrete classes. The front-end user interface of any application is designed using .Trak’s Web Forms Designer [Ontology Management Module] whilst business rules components are set up in the [WorkFlow Engine] graphical interface (drag-and-drop support). For each business rule a digital identification code is assigned to and stays the same along with the object through its whole life-span, facilitating tracking and homogenity as accepted as the definite identification of the entity all throughout the Organization’s ecosystem. The Search capability of the .Trak’s environment is outstanding. Based on the ontology and semantics architecture it allows simple keyword(s) free text searches, structured searches based on keywords and composite searches based on tabular forms and drop list boxes. Results are presented and prioritized based on the contextual relevance percentage rate. Each result is further associated with the site map path that each searchable keyword was located inside the content. Trak’s [Data Import Mechanism] facilitates importing from any digital format (file type) such as: .xls, csv, ascii, xml etc. .Trak™ among other third party applications, inherits most of Microsoft Office features that integrate one or more products, like MS Word, MS Excel, MS Outlook with your application. Facilitating digital data collection, .Trak™ offers compatability and core accessibility in terms of protocols, to integrate with hardware peripherals like POS systems, scanners, cameras, or even medical systems. . TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [19/151] .Trak™ supports both TWAIN and ISIS scanning drivers protocols enabling fast digitization and data capturing and providing (a) a disaster recovery tool for the paper based register; (b) a searchable access to the data and (c) serve as a tool for crosscheck of the data duplication. Based on SOA framework, .Trak™ uses Web Services to promote loose coupling between software components so that they can be reused. A service is an implementation of a well-defined business functionality, and such services can then be consumed by clients in different applications or business processes. .Trak’s SOA allows for the reuse of existing assets where new services can be created from an existing IT infrastructure of systems. In other words, it enables businesses to leverage existing investments by allowing them to reuse existing applications and facilitates interoperability between heterogeneous applications and technologies. These Web services are using technologies such as XML, Web Services Description Language (WSDL), Simple Object Access Protocol (SOAP), and Universal Description, Discovery, and Integration (UDDI) to deploy integration in today's complex and heterogeneous computing environment. .Trak [Collaboration Infrastructure] also enhances collaboration (micro-social community) both in the administration environment and the deployed application ecosystem. Providing advanced multichatting, send and receiving file(s), forums, e-voting, digital library (archive), shared group/personal calendars, SMS messaging and integration with video conferencing software, facilitates communication between team members, executives, partners, vendors and customers in all levels, resolving upcoming issues real-time and re-forming a ‘new’ intranet and extranet of enterprise services provision and experience. With a powerful input and output digital geodata mechanism [Georeferencing Addon], .Trak™ inputs and outputs into several common geodata formats. Output data can be aggregated and merged dynamically into content templates associated with a geographical digital terrain such as Google maps, providing visual association of geolocation based information. Georeferencing Addon can associate all types of entities managed by the system with georeferenced shape such as: points, polylines and polygons. Basic calculations such as: distance measurements, areas, perimeters as well as search by GIS criteria can be executed for all objects. Electronic payments can be executed [electronic payments] online from the environment of the .Trak™ application by embedding common ebanking payment portlets, allowing customers to conduct financial transactions on a secure website operated by their retail or commercial bank. Turning data into info is all about meaningful information presentation, .Trak’s [Report Generator & Analytics] allows report administrators to design any report, create cubes, pivot tables, set Key Performance Indicators (KPIs) and display them in graphical charts, gauges and consolidated reports. .Trak’s reporting tool unifies data into real time reports, allowing drill down information from multiple sources and tables. With no prior IT training, users can use the graphical interface to create basic or complex reports for top line reporting. The system delivers both: Dynamic reports: Are created at runtime. Each time a dynamic report is run, it gathers the most recent data in the Database. Only the report definition, which remains the same over time, is stored. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [20/151] Static reports. Are run immediately upon request, and then stored with the data in the Completed Reports module. Static SQL reports are run asynchronously, allowing you to continue using the application to perform other tasks while static reports are running. Static multidimensional expression (MDX) reports are run synchronously, therefore, you will not be able to perform other tasks using Business Desk until the reports are complete. All .Trak™ modules, software products and reports can be multichannel diffused enabling Organizations to gain critical momentum in their markets delivering real time information on any screen or device. Multiple information channels: - Local and Global messaging Local administrator can edit local messaging that appears on the computer monitor and send them over IP or GSM. This is messaging specific to the location of the end user, notified according to his/her position. - SMS Text The user can sign-up for SMS text messaging related to the subject they are interested in. - Mobile Information and reports are available on any mobile smart phone device, operating iOS or Android operating systems. .Trak Logical Architecture TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [21/151] 4.1.3. Typical Architecture (H/W and S/W Requirements) Intranet Users (LAN) Switch/HUB Load Balancer Internet Users Firewall Peripherals Web/App Server Web/App Server Database Server Database Server DMS Zone Network Storage (NAS) Redundant Architecture (2nd Tier) TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [22/151] Web/Application Server Layer -1- Function Web/Application server is a comprehensive service layer that provides an environment in which IIS 6.0+ and .Trak™ Applications will run. Web/App Server is a dedicated machine(s) that efficiently executes procedures (programs, routines, scripts) for supporting the deployment of .Trak™ applications. Additional vertical Tier of Web/App Server(s) complemented with network equipment (firewalls, routers etc.) can be used to provide redundancy, clustering, fail-over, and load-balancing, so that the business logic operations, never fail. Technologies Web/App application server hosts applications and transparently handles connections to the database on one side, and connections to the Web client on the other. Operating System: MS Windows Server 2005 or later Application Server: MS IIS 6.0+ Application(s) Platform: .Trak™ (v.3.0) Database Server Technologie s Function Layer -2.Trak™ collaborates with all relational database systems. Trak™ (v3.0) is compatible with: Oracle DB, DB2, Informix, Postgress, MS SQL Server. As its server has its own query logic and structure. .Trak™ resolves any interoperability issues as it connects with built-in data access layers. Database recommended: Oracle DB or MS SQL Server 2005 or later. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [23/151] 5. Requirements This section consists of two sets of requirements, General and Functional, where each one aims to clarify specific areas of interest, concerning the solution. 5.1. General Requirements This section consists of requirements that justify Vendor’s overall organization, skills, project delivery competence and experience. 5.1.1. Previous experience TechNet AFRICA and Data Concept S.A. have a wide range of software solutions installations in private and public sector including government, transportation, health, banking and telecommunication corporations for customer support and knowledge management systems, similar in complexity with the ZRA Central Registry Electronic Records Management System. TechNet AFRICA Limited has already installed and supports ……………………………………………………….. Data Concept S.A. has installed and supported the document and records management system (intranet – extranet) for the ‘Attiki Odos’ and all Olympic 2004 Venues projects that supports the business operations of design, construction, quality and materials submission and approvals for the largest European Infrastructure Construction Project. The system has handled critical business operations for 300+ users of the ‘Attiki Odos’ Project during a period of 7 years. The system had facilitated centralized communication among all involved project parties such as: independent engineer staff, project owner engineers, construction J/V, designers and the concessionaire. The system is considered highly critical in terms of implementing and monitoring the strict deadlines of flows and processes imposed by the concession contract as well as the Project Quality Plan. The system has been implemented in the .Trak™ (accelerated development solutions platform) –a Microsoft approved solution-. The Vendor feels confident of the execution of the ZRA System as has been completed similar projects for private and public entities separately and as a joint venture. The engineers, programmers, business consultants and managers of both companies have worked closely over the last 5 years for the execution of ‘European Information Society’ projects, serving a variety of digital services over web to customers and organizations, ensuring interoperability and conformity among heterogeneous public systems. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [24/151] 5.2. Technical Requirements No. .Trak™ - Foundation Module 1 5.2.1. Users Management 2 5.2.2. Security Policies A. Key Features 1. 2. 3. 4. 5. 1. 2. 3. 4. 1. 2. 3. 4. 3 5.2.3. Ontologies Management 5. 6. 7. 8. B. Extended Features Add, Edit and Delete a User Add, Edit and Delete a Role Password autoreply verification mechanism Graphical Mapping of Organogramme Structure Logged tracking of all users activity within the system Define security criteria throughout the whole entities schema Define security criteria for all attributes (data fields) Define security criteria to forms, menus, list boxes etc. Assign privileges to users and roles Define entity(ies) and relations (master-detail, many to many) Define entity attributes (data schema) Assign attributes with data types and lists (data, long integer, text etc.) Design Form layout, using a Web Form Designer providing drag and drop functionality from a data field repository and layout management Save and name each layout Create query objects based on dynamic combination of entity’s attributes Create tree structure layouts to represent master-detail relationships between entities Incorporate additional features to each entity such as: multimedia, email addresses, physical addresses with 1. Import users and roles from Active Directory and LDAP infrastructure 2. Assign certificates via IIS Application Server 3. Define an Electronic Signature 4. Trace, undo and roll back previous actions 1. Encompass and implement third party security policies (Active Directory and LDAP) 2. Internal scheduler for backup mechanism 1. Create validation rules for each attribute 2. Create calculated fields by imposing mathematical and logical calculation 3. Implementation of ontologies regarding the correlation of cross entities data for the means of enological search 4. Free text search throughout the attached documents such as: MS Word, MS Excel, PDFA etc. 5. Dynamic multiple criteria search mechanism 6. Tracking of users actions within the entity schema 7. Incorporation of thesaurus and indexes for schematic search TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [25/151] 4 5 5.2.4. Workflow Engine 5.2.5. Collaboration Infrastructure geolocation capabilities, file attachments 9. Dynamic production of data grids presenting a selected set of records for each entity 10.Full management functionalities such as: create, edit, delete, copy and move of records 11.Version Management for each record 12.Checkin/Checkout management in order to assure data integrity and impose change management 1. Building of Workflow expressions involving the whole set of entities attributes 2. Define systemic conditions that trigger workflow actions 3. Define comprehensive sequential and parallel actions 4. Central asynchronous application management (daemons) that monitor all systemic parameters for the initiation of a workflow mechanism 5. System driven workflow rules implementation regarding: users and roles notifications, procedural hold points (approvals, recommendations, status updates, dynamic field calculation etc.) 6. Human driven workflow scenario initiation (adhoc assignments) 1. Messaging from the system: email, SMS, internal message 2. Chatting, multi chatting (available connection status) 3. Online file exchange (send-receive) 4. Calendar and Task scheduler 5. Collaboration of groups (invite, share) and Project Management 6. Micro-social community 7. Multimedia and electronic Library, central repository 1. Graphical User Interface environment for setting our business rules (condition and action builders) 2. Incorporate external business logic units (DLLs) in order to facilitate complex algorithmic and workflow structures 3. Integrate with SharePoint lists and WFF 1. Alert Chatting for technical support and/or sales representatives 2. Video conferencing 3. Personalized dashboard 4. Intranet, Extranet post wall communication 5. Events and groups generator 6. Mail Merging capabilities TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [26/151] 6 5.2.6. Data Import Mechanism 7 5.2.7. Data Export and Templating 8 5.2.8. Report Generator & Analytics 9 5.2.9. Georeferencing Addon (EXTENDED) 10 5.2.10. Electronic Payments (EXTENDED) 1. Importing external structures file(s) such as: xls, csv, xml etc. 2. Mapping of file columns to dynamically defined entities attributes 3. Set out importing rules such as: omission of headers, set of lines to be imported and duplicates management 4. Saving importing template for future usage 5. Import YouTube URL videos with dynamic thumb nailing 1. Create of dynamic data sources based on attributes throughout the application’s data schema 2. Transform proprietary data schemas into ready to use third party applications utilizing SOA architecture over Web Services 3. Integrate with MS Word in order to create document templates incorporating data from dynamic data sources in order to reproduce documents used within the Organization 1. Transform all data sources extracted by ‘Data Export and Templating’ into dynamic or static reports. 2. The embedded report generator communicates with .Trak SOA infrastructure via Web Services. All fields all of data sources are available to form comprehensive reports such as: tabular reports, pivot tables, cubes, cross-tab reports etc. 1. Correlate all system entities to georeference shapes such as: points, polylines and polygones 2. Search by any GIS criteria 1. Executed electronic payments online by embedding common ebanking payment portlets, PayPal or CODs 1. Import content form scanned documents using OCR and ICR technology 2. Define document regions and map it with entities attributes 3. Mass importing of multimedia content with editable image processing capabilities (resize, crop, color adjustment etc.) 1. Integrate with SharePoint lists and WFF 1. Define PKIs and perform drill down analysis through gauges, 2d and 3d graphs 1. Perform basic calculations such as: distance measurements, areas, perimeters Advance security provided over ‘https’ and SSL 128 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [27/151] 5.3. Functional Requirements The following section consists of three parts (Product/Solution, Deployment and Maintenance/Support) and aims to provide a more detailed view on the solution’s architecture, further developments on the system and the solution’s support requirements. 5.3.1. Records.Trak™ Document/Records Management Requirements The following section consists of functional requirements and aims to provide an overall description of the solution’s capabilities and architecture. Several key issues are covered such as architecture, data migration, interfacing, redundancy, etc. 5.3.1.1. .Trak™ and SOA Architecture Changing markets, increasing competitive pressures and evolving customer needs are placing greater pressure on IT to deliver greater flexibility and speed. Today, every organization is faced with the need to predict change in a global business environment, to rapidly respond to competitors, and to best exploit organizational assets for growth. In response to these challenges, leading companies are adopting service-oriented architecture (SOA) as a means of delivering on these requirements by overcoming the complexity of their application and IT environments. SOA provides an enterprise architecture that supports building connected enterprise applications to provide solutions to business problems. SOA facilitates the development of enterprise applications as modular business Web services that can be easily integrated and reused, creating a truly flexible, adaptable IT infrastructure. You can move and reconfigure pieces, turning your systems into the IT equivalent of Lego blocks. In that way ZRA can gain the required Flexibility, Modularity, Coherence, Openness, in order to Deliver new features quickly Improve service delivery and lower risk TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [28/151] Maintain information standards and governance 5.3.1.2. The Goal of SOA Increasingly fragmented and complex infrastructures are limiting IT's ability to deliver on business needs. Many organizations have inherited disjointed legacy systems and packaged applications, a large proportion of which were never designed for information interoperability, integration, and reuse. The result of this is that most of the IT budget goes into maintenance of the current IT infrastructure and only a small amount is available for new functionalities to drive new business opportunities. The major portion of budget for new capabilities goes into the cost of integrating new functionality into the existing systems that offer poor support for interoperability. Traditionally, business information systems have been developed with a functional orientation often resulting in silos of information. The fundamental problem with this approach is that end-to-end business processes, which span silos, are not adaptable to change as business needs evolve. The processes become fragmented and embedded deep within systems. Enterprise application integration (EAI) and other traditional middleware solutions partially address this by enabling systems to communicate with each other, but they do not fully solve the problem. Their ability to create cross application business processes is inadequate, and they allow only limited business process adaptability. Moreover, these traditional solutions come at a high cost. The majority of EAI and TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [29/151] traditional middleware solutions use proprietary technology, which causes dependency on specialized skills and to that single vendor's products. In addition, the systems become tightly coupled, so if an interface change occurs in one system, all other systems need to be adjusted. Not only does the technology make it difficult to make changes, it can become cost-prohibitive to do so. Service-oriented architecture (SOA) helps address the fragmented IT landscape and addresses the difficulties associated with silos of IT infrastructure and applications. Therefore in the case of ZRA the integration engine will be based on a modern SOA platform, so as to fulfill the required flexibility and reliability that the project demands. 5.3.1.3. Concept of SOA platform The components of a SOA platform benefit from common capabilities, including a single deployment, management, and tooling model, end-to-end security, and unified metadata management. A SOA platform should provide the following set of integrated capabilities: Messaging Service discovery Orchestration Web services management and security Business rules Events framework Business activity monitoring TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [30/151] These capabilities help address the fragmented IT landscape and addresses the difficulties associated with silos of IT infrastructure and applications. It enables greater flexibility through: Interoperability: SOA, and the industry standards underpinning it, enable existing siloed applications to interoperate seamlessly and in an easier-to-maintain manner than any traditional EAI solution. Increased reuse: Once legacy systems and applications are service enabled, these services can be reused, which results in reduced ongoing development costs and results in reduced time to market. Further, business processes built as an orchestration of services can also be exposed as services, further increasing reuse. More agile business processes: SOA reduces the gap between the business process model and implementation. This enables changes to business processes already implemented as orchestrations of services to be easily captured and implemented. Improved visibility: SOA can give improved business visibility by enabling business capabilities exposed as services, and the status of in-flight business processes automated with business activity monitoring, to be rapidly integrated into serviceenabled enterprise portals, aiding business decision-making. Reduced maintenance costs: SOA development encourages duplicated overlapping business capabilities (services) that span multiple applications and systems to be consolidated into a small number of shared services. SOA development enables elimination of redundant services and reduces the cost of maintaining systems by providing a single point of change for application logic. Further, SOA gives IT the means to gradually phase out legacy systems and applications, while minimizing disruption to the applications that are built on or are integrated with them using SOA principles. This process frees up funds for new projects. Compliance and governance: By realizing better and more standardized operational procedures, SOA provides the basis for a comprehensive security solution, and enables better visibility into business operations and exception conditions. 5.3.1.4. SOA standards A SOA platform should put a strong emphasis on standards and interoperability. Among the standards it should leverages are: The Service Component Architecture (SCA) assembly model abstracts the implementation and allows assembly of components, with little implementation details. SCA enables you to represent business logic as reusable service components that can be easily integrated into any SCA-compliant application. The resulting application is known as an SOA composite application. The specification for the SCA standard is maintained by the Organization for the Advancement of Structured Information Standards (OASIS). TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [31/151] Service Data Objects (SDO) provide a data programming architecture. It provides a standardized view on data, and provides efficient transportation, as well as change capture, in form of a change summary. More specifically, it collects a data graph of related business objects, called DataObjects. This graph tracks the schema that describes the DataObjects. Knowledge is not required about how to access a particular back-end data source to use SDO in an SOA composite application. Consequently, you can use static or dynamic programming styles and obtain connected and disconnected access. .Trak™ Business Logic provides enterprises with an industry standard for business process orchestration and execution. Using Ontologies Management Module, you design a business process that integrates a series of discrete services into an endto-end process flow. This integration reduces process cost and complexity. XSL Transformations (XSLT) processes XML documents and transforms document data from one XML schema to another. 5.3.2. .Trak™ Extended Capabilities .Trak™ Platform covers all of the capabilities you need to implement robust, agile and reliable SOA solutions. The following is a partial list of the capabilities of the suite across the major areas of focus: SERVICES • Service level agreements • Message routing • Message transformation • Message encryption PROCESSES • Orchestration • Transactional / Compensating • Business Rules • Human workflow • System integration MANAGEMENT & MONITORING • Unified management • Assets & Impact Analysis • Reuse and ROI metrics • Architectural standards and enforcement • Reporting & Dashboards • Meta-data DEPLOYMENT • Service Component Architecture (deployment) 100% STANDARD • XML /XPath / XQuery / XSLT • Service Component Architecture • UDDI INTEGRATION • Web Services • HTTP/HTML • ERP SECURITY • Message level encryption • Field level encryption • Basic Auth • Fine grained authorization • Identity management DEVELOPMENT • .NET C# • SCA Standard assembly • HTML / XML / WSDL EVENT ORIENTED • Complex event recognition • Declarative TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [32/151] • Applications • Servers • CRM Custom • Streaming These capabilities, taken as a whole, provide the ability to create complete solutions at the enterprise level. Instead of cobbling together enterprise solutions from disparate vendors and products, .Trak™ Platform provides you with a unified product suite to meet all of your SOA needs. 5.3.3. Data Migration Methodology The .Trak™ Platform provides a unified set of communication and collaboration services including enterprise messaging, team collaboration and synchronous collaboration. By migrating existing databases, such as Oracle, Sybase and Lotus Domino to MS SQL Server, you can standardize on a single architecture that allows you to centrally manage, securely audit, and globally apply compliance rules across an integrated set of communication and collaboration services, from email to team workspaces to conferencing. Migrating data between systems is a more complicated process than a simple upgrade, but .Trak™ Platform comes with set of tools that helps make migrating easier. The migration process can be done in a phased approach or be completed all at once. A phased approach can involve both the moving of user groups and the moving data in various stages. .Trak’s Workflow Engine Module, enables enterprises to quickly build and deploy standards-based business processes, or workflows, for a variety of applications. .Trak’s Workflow Engine Module provides a comprehensive and easy-to-use infrastructure for creating, deploying, and managing workflows, including an engine for executing workflows, a console to monitor, manage, and debug workflows, and an interface to design and build workflows. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [33/151] 6. Workplan Please see the detail GANTT Chart. The Vendor will participate in weekly technical review meeting in customer premises. The Vendor will provide weekly and monthly reports for the progress of the Project and respective tasks as well as the achievement of the decided milestones. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [34/151] 7. Team Composition and infrastructure 7.1. Team composition The Vendor in terms of managing and implementing successfully the project will provide highly trained staff with great experience in similar projects. The staff, having developed and supported several composite ICT systems, geo-portals, database systems, and having exercised innovative development and management methodologies exceeds the experience requirements defined in the call for tender. The staff’s qualifications guarantee the successful fulfillment of the project. The goal of the work group’s organizational structure is to create a team with high rates of cooperation in all levels. Additionally the suggested Organizational Structure guarantees flawless cooperation between our company’s team members and: The institution’s staff that will observe or participate in the project. Third parties that will participate in the project The project is monitored and implemented by three organizational levels as shown in the following diagram: Project Monitoring Committee Steering Committee Project Manager Customer’s Project Manager Management Team Deputy Project Manager Training Team Implementation Level Data Concept Software Development Team Technical Support Team Work Group Directorate-General for the Environment The Organizational Structure Consists of: The Steering Committee, who is responsible, in an executive level, for the coordination of all the aspects of the project. The Steering Committee is also responsible to communicate with (and report to) the customer’s Project Manager and the Project Monitoring Committee. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [35/151] The Management Team, which is responsible to monitor and control the project’s implementation on a daily basis. The project’s Implementation Subgroups, which will undertake the appropriate parts of the project. The subgroups will cooperate with the customer’s counterpart. The factors / criteria for the staffing of the Work Group on all of these levels are: Coverage of the subject matter Experience-Expertise Availability The level of Satisfaction of these criteria is very high because the staff that the company will provide is fully trained and has extensive experience in developing and carrying out projects similar to this .More specifically, individuals that will be deployed in the organizational structure have experience and expertise in the following areas: implementation of informatics projects in a large number of organizations and corporations design and Development of web-based systems standardizing information and communication technologies in the areas of integrated informational systems and Internet based applications operation and support of information systems security of informational systems artistic approach to designing internet applications database design and development issues of statistical analysis and econometrics, with particular knowledge of African and European economic environment maintenance and technical support of informational systems project management quality Assurance training, documentation and knowledge transfer telecommunications Bellow you can find a more analytic description of the responsibilities and the duties of the organizational structure levels: 7.1.1. 1st Level : Steering Committee The steering committee consists of the Project manager of the company and the corresponding one of the customer. The Steering Committee takes responsibility to: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [36/151] Resolve coordination issues and take determining decisions for the project’s evolution Resolve management and administrative issues in a higher level Special update on the progress and any problems of the project to the Project Monitoring Committee Suggest the partial and final acceptance of project The Steering Committee is a flexible mechanism through which critical decisions can be taken in order to meet the deadlines, to solve problems that affect the outcome of the project and the duration of the project. Depending on the nature of each issue the Steering Committee makes decisions in cooperation with the customer’s counterpart. Finally the Steering Committee takes into account the management risks and acts accordingly to minimize them. 7.1.2. 2nd Level : Management Team The Management Team Consists of the Project Manager, the Deputy Project Manager and the Quality Assurance Manager and is responsible to monitor and control the projects implementation on a daily basis. The Project Manager and the Deputy Project Manager have several years of experience in the management of similar, in terms of managing complexity, informational systems. They represent the company (Vendor) and are responsible to carry out the contractual obligations of the company. The Project Manager is responsible to coordinate the overall operations , management of administrative issues and to take the most important decisions that are crucial to the process of integration implementation works. Specifically the Project Manager is responsible for a series of actions like: Coordination and monitoring of all the members involved in the project’s implementation Convene regular meetings which contribute greatly to effectively control the project's progress Assess and reassess the progress of project at predetermined intervals. Gathers the documentation and assesses the progress of the project in the provision of time, cost, and availability of resources. Analyzes and identifies the causes of deviations from the original project design. Redefines the future course of the project (change or shift operations, replacing people, etc.). TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [37/151] Informs the project participants of any changes and the causes of such breaches. Enables completes and distributes the documentation relating to the progress of the project Prepares and promotes alternatives to correct the course of the project and its compatibility with the intended objectives. Predicts the possible risks and issues that will arise and takes care in time Monitors the implementation of the methodologies and additional instructions given by the Contracting Authority (ZRA). 7.1.3. 3rd Level : Implementation Level To ensure the efficient operation of the work group the implementation level is divided into subgroups based on the nature of the work and will take over discrete and specialized sub-tasks of the project. Each subgroup will work in parallel with the others, provided there is not overlap or interdependence of the subtasks, and will cooperate closely with the others when required. The proposed structure is estimated that it will be flexible concerning the implementation of specific deliverables and on the other hand it will accelerate the completion of work. The subgroups of the proposed organizational structure will be the following: Software Development Team, responsible to design and implement the software applications and electronic services required by the project’s specifications or the implementation study Training Team, responsible to train and transfer the know-how. This team is composed of individuals with experience in education, professorship, and software development. Finally this team will undertake the drafting and production of all the system manuals and training material (digital or hard copy). Technical Support Team, responsible to provide with technical support services offered by our company. 7.1.4. Work Group Composition The criteria taken into consideration for the team composition that will work in the subtasks and successfully manage the contract are: Indepth knowledge of the topics and thematic areas covered by the contract TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [38/151] Experience in similar projects Optimum coordination and project management skills Administration and technical support for the duration of the contract. The effective cooperation and cohesion of the people that will work in the contract is of great importance to its success. A full list of Work Group’s CV’s is included in our offer’s Annex. A brief List of the team can be found bellow: Name Work group position Responsibilities 1 Andreas Vlachos Project Manager Project Management – Software Design 2 Kostas Kalomiris Deputy Project Manager Project Management – Software Design/Development 3 Kimon Panagopoulos Head of Software Development Team 4 George Skrimpas Quality Assurance Manager 5 Panagiotis Pazarakiotis Software Development Team 6 Ioanna Papadopoulou Head of Training Team 7 TechNet (1) 8 Grigorios Arnokouros Development Team Member Training Team Member Support Team Member Head of Technical Support Team TechNet (2) Development Team Member 9 10 TechNet (3) Development Team Member Analyzing, Development, integration Quality assurance audits and S/W evaluation Analyzing, Development, integration Training and support Programming, integration Training, technical support Technical Support Analyzing, Development, integration Analyzing, Development, integration TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [39/151] 11 TechNet (4) 12 Anastasia Kallimani Development Team Member Administrative Assistant Analyzing, Development, integration Administration A short presentation (golden paragraphs) of the key team members follows. 7.1.5. Key Team Members Project Manager – Mr. Andreas Vlachos Mr. Andreas Vlachos is a senior information technology manager with over 25 years of demonstrated career success, executing and administrating large scale information technology projects. As IT Services Director of Data Concept S.A., Mr. Vlachos is leading operations for Technology, Business Development and Application Development within diverse range of industries and for government entities with full PM responsibility. Mr. Andreas Vlachos possesses in-depth experience with government and civil contracts, development of Statement of Work (SOW), proposal development, competitive bidding and negotiations. In the framework of his work, Mr. Andreas Vlachos, is a decisive leader of operational initiatives of organizations of varying size and scope recognized for taking major initiatives, adapting to rapidly changing environment and resolving mission critical issues to ensure bottom line success. Mr. Andreas Vlachos technical expertise include: Application development and administration for Oracle, J2EE, Microsoft and .NET technologies. Deputy Project Manager – Mr.Kimon Panagopoulos Mr. Kimon Panagopoulos is a highly experienced project / program manager, with over 10 years’ experience in managing multi-disciplinary teams of varying sizes and complex IT projects. Mr. Panagopoulos is an effective team leader and mentor, a creative systems thinker and problem solver who consistently identifies optimum software business solutions, whilst formulating and reporting strategic plans at main board level. Mr. Panagopoulos as a Senior Project/Product Manager of Data Concept S.A. is responsible for the project management and product development throughout the entire project lifecycle, including project initiation/proposals, project delivery, business liaison, post implementation review and project close out / handover. Mr. Panagopoulos technical expertise include: administration for Microsoft and .NET technologies. Application development and TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [40/151] Mr. Kostas Kalomiris Mr. Kostas Kalomiris is senior project manager, expert in Systems Integration with over 20 years of defining and executing systems integration projects. Mr. Kostas Kalomiris as the Director of Public Projects & Enterprise Clients of Data Concept S.A. is a solutionsfocused project manager with accomplished experience heading the success of multimillion-euro project engagements for major clients focused on software development, systems interoperability and customization. Mr. Kostas Kalomiris is a leader in the organizational challenge to migrate from proprietary to open-standard interorganizational systems that work across the entire company. Mr. Kostas Kalomiris is an expert in mapping the project scope and defining the best-of-breed-solutions best fit for every project and client. Mr. Kostas Kalomiris technical expertise include: Systems integration and administration for IBM, BEA, Lotus and Oracle technologies. Mr. Grigorios Arnokouros Mr. Arnokouros is a Networks/Systems Administrator and Security Engineer with a 15-year career track in the development and administration of wired/wireless large scale networks and H/W infrastructure projects. Mr. Arnokouros as the Senior Systems Engineer of Data Concept S.A. has managed critical data center installations and operations with a focus on Server-side and Operating Systems availability, security and support. Mr. Arnokouros is supervising a team of technical/network staff providing excellent support and assistance with the day-to-day running of 35 Data Concept’s customers of their IT departments and their business IT systems. Mr. Arnokouros has an extensive knowledge of monitoring and controlling data security, supervising and assuring the implementation and the internal audits for ISO 27001. Mr. Grigorios Arnokouros technical expertise include: Microsoft and Oracle installation and tuning, UNIX, Linux and Windows Operating Systems administration and CISCO networking administration. Mr. Arnokouros attains high-level network related skills such as network architecture, network design, choosing of network devices, and network policies. Mr. George Skrimpas Mr. George Skrimpas is an expert in developing scalable solutions that dramatically improve efficiency, productivity and profitability with a demonstrated ability to define and map project scope, specifications, project timeline, resources and budget requirement from point of planning through production in both traditional and virtual business environments. As a Senior Software Engineer in Data Concept S.A., Mr. George Skrimpas has been involved both as a team member or project leader in several custom software applications for public and private clients. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [41/151] Mr. George Skrimpas technical expertise include: Application development and administration for Microsoft and .NET technologies, coding web pages utilizing CSS and XHTML, including JavaScript and SQL. Mrs. Ioanna Papadopoulou Mrs. Ioanna Papadopoulou is a PMI Certified PMP with excellent project management and software developing skills. Mrs. Ioanna Papadopoulou as a Software/Junior PM Engineer in Data Concept S.A. provides technical leadership in software releases and upgrades, while leading with best practices to support business capability and user adoption across the each client. Mrs. Papadopoulou supports the analysis of business processes starting from the proposal to the implementation and ensures the interoperability and data diffusion across the organization. Mrs. Papadopoulou attains strong analytical, methodical and resourceful approach to problem solving, identifying root causes, and taking corrective actions to meet short and long-term business, operational and system requirements. Mrs. Ioanna Papadopoulou technical expertise include: Application development and administration for Microsoft and .NET technologies, coding web pages utilizing CSS and XHTML, including JavaScript and SQL. Mr. Panayiotis Pazarakiotis Mr. Panayiotis Pazarakiotis is a Web Applications Engineer, designing and developing internet applications and ensuring strong web optimization and functionality. Mr. Pazarakiotis is an expert in analyzing, reviewing and modifying web systems by designing, monitoring, maintaining, documenting, and testing web based applications. As a Senior Software Engineer in Data Concept S.A., Mr. Pazarakiotis has been working on multiple web projects including website enhancements, layout enhancements, mobile applications, application-backed websites and web-based applications, assisting in the planning of overall company policies regarding search engine optimization and W3C conformity. Mr. Panayiotis Pazarakiotis technical expertise include: Application development and administration for Microsoft and .NET technologies, coding web pages utilizing CSS and XHTML, including JavaScript and SQL. Mrs. Anastasia Kallimani Mrs. Kallimani is a customer-focused administrative professional with 20 years of experience in self-directed positions requiring effective support, secretarial, and administrative capabilities. Mrs. Kallimani is the Administrative Assistant to the Technical Division of Data Concept S.A. providing customer support and administration assistance to Project Managers in terms of: financial, technical, contractual and organizational tasks. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [42/151] Mrs. Anastasia Kallimani technical expertise include: Microsoft Office, MS Access database administration and software quality control. TechNet AFRICA STAFF 7.2. TechNet’s infrastructure TechNet has a significant amount in terms of quality and quantity of infrastructure to support the testing environment of the NEW System. Α. SERVERS - WORKSTATIONS ΔΙΑΚΟΜΙΣΤΕΣ (SERVERS) No. Type Configuration OS HTTP/APPLICATION /WEB-DATABASE HP DL360G5 / Quad-Core Intel Xeon E5355 2GHz/1333Mhz / 12GB RAM / Serial Attached SCSI (SAS) 876GB WINDOWS 2003 SERVER 2 GIS SERVER HP DL360G5 / Quad-Core Intel Xeon E5355 2GHz/1333Mhz / 12GB RAM / Serial Attached SCSI (SAS) 876GB WINDOWS 2003 SERVER 3 TEAM FOUNDATION SERVER HP DL360G5 / Quad-Core Intel Xeon E5355 2GHz/1333Mhz / 12GB RAM / Serial Attached SCSI (SAS) 876GB WINDOWS 2003 SERVER VmWare Server HP Smartbuy Aio (All-in-One) 600 storage system / 2GB ram / 3.0 TB SATA Model: 6 x 500GB front load, hot plug, 7200 RPM SATA HDDs VmWare Server 4.0 1 4 5 Domain Controller P IV 2,3 GHz / 1G RAM / 2 x 80 GB HDD / CD RW WINDOWS 2003 SERVER 6 Domain Controller 2 P IV 2,6 GHz / 2 GB RAM / RAID 4 WINDOWS 2008 SERVER 7 Back Up P IV 3 GHz / 2G RAM / 120 GB HDD / CD RW WINDOWS 2003 SERVER 8 Sql Database P IV 3 GHz / 2G RAM / 8 x 1.5 T WINDOWS 2003 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [43/151] HDD / CD RW SERVER 9 Oracle Database P IV 2,6 GHz / 1,5G RAM / 80 GB HDD / CD RW WINDOWS 2003 SERVER 10 TEAM FOUNDATION SERVER P IV 3,2 GHz / 2G RAM / 120 GB HDD / CD RW WINDOWS 2003 SERVER Workstations No. 1 Configuration OS Hp 7900 Workstation/Intel Core 2Quad 2.66GHz/4 GB RAM/500 GB HDD WINDOWS 7 2 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS XP PRO 3 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS XP PRO 4 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS XP PRO 5 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS XP PRO 6 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS 7 7 Acer Travelmate 5730 G / INTEL CORE 2 DUO P8400 2G RAM WINDOWS VISTA BUSINESS 8 Fujitsu Siemens Esprimo Mobile V5505/Intel Core Duo T7300 2GHz/2GB RAM/250 GB HDD WINDOWS 7 9 Acer Aspire 5536/AMD Athlon X2 Dual Core 2.10GHz/3 GB RAM/500 GB HDD WINDOWS XP PRO 10 Acer Extensa 5230/Intel 2 GHz/2 GB RAM/160 GB HDD WINDOWS 7 12 Hp dx7500 Microtower/Intel Core 2 Quad Q 8200 2.33GHz/4 GB RAM/500 GB HDD 13 14 Hp dx7500 Microtower/Intel Core 2 Quad Q 8200 2.33GHz/4 GB RAM/160 GB HDD Hp dx7500 Microtower/Intel Core 2 Quad Q 8200 2.33GHz/4 GB RAM/160 GB HDD WINDOWS XP PRO WINDOWS XP PRO WINDOWS XP PRO TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [44/151] 15 Acer Travelmate 5720/Intel Core 2 Duo T7700/ WINDOWS XP PRO 2 GB RAM/240 GB HDD (Laptop) 16 Acer Aspire 5920G/Intel Core 2 Duo T9300 2.50GHz/4 GB RAM/ 320 GB HDD (Laptop) WINDOWS 7 17 Acer Aspire 5920G/Intel Core 2 Duo T9300 2.50GHz/4 GB RAM/ 320 GB HDD (Laptop) WINDOWS VISTA 18 Hp 6735b/Amd Turion Dual Core 2GHz/2GB RAM/160 GB HDD (Laptop) WINDOWS 7 19 Hp 7900 Workstation/Intel Core 2Quad 2.66GHz/4 GB RAM/500 GB HDD WINDOWS XP PRO 20 Pentium Dual Core E5300 2.60GHz/2 GB RAM/240 GB HDD WINDOWS XP PRO 21 IBM Lenovo T60/Intel Core 2 Duo T7200/3 GB RAM/240 GB HDD WINDOWS XP PRO 22 IBM Lenovo T60/Intel Core 2 Duo T7200/3 GB RAM/320 GB HDD WINDOWS XP PRO 23 Hp dx7500 Microtower/Intel Core 2 Quad Q 8200 2.33GHz/4 GB RAM/160 GB HDD WINDOWS XP PRO 24 Hp dc7800/Intel Core 2 Duo E4500 2.20GHz/ WINDOWS XP PRO 2 GB RAM/160 GB HDD 25 Hp dx2250/Amd Athlon 64 x2 4400+ 2.00GHz/2GB RAM/120 GB HDD WINDOWS XP PRO 26 Rise Amd Athlon 64 Processor 3800+ 2.25GHz/2 GB RAM/120 GB HDD WINDOWS XP PRO 27 Hp xw4600/Intel Core 2 Quad Q 9450/4 GB RAM/500 GB HDD WINDOWS XP PRO 29 Hp xw4400/Intel Core 2 6600 2.40GHz/2GB RAM/250 GB HDD WINDOWS XP PRO 30 Dell Xps 420/Intel Core 2 Duo Q8200 2.40GHz/4 GB RAM/500 GB HDD x2 WINDOWS XP PRO 31 Dell Xps 420/Intel Core 2 Duo Q8200 2.40GHz/4 GB RAM/500 GB HDD x2 WINDOWS XP PRO 32 Dell Xps 420/Intel Core 2 Duo Q8200 2.40GHz/4 GB RAM/500 GB HDD x2 WINDOWS XP PRO TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [45/151] 33 Dell Xps 420/Intel Core 2 Duo Q8200 2.40GHz/4 GB RAM/500 GB HDD x1 & 1T x1 WINDOWS 7 34 Hp xw4600/Intel Core 2 Duo / 4 GB RAM/ 500 GB HDD WINDOWS VISTA 35 Hp xw4600/Intel Core 2 Quad Q 9450/4 GB RAM/500 GB HDD WINDOWS XP PRO 36 QUEST XPAND FORMULA / INTEL QUAD CORE Q6600 2.4GHz / 2 GB RAM / 240 GB HDD WINDOWS XP PRO Monitors No. Specs Quantity 1 HP 17’’ TFT 1 2 VIEW SONIC VG 2021M 20’’ TFT 6 3 ASUS 17’’ TFT 4 4 SONY 17’’ TFT 2 5 SONY 15’’ TFT 1 6 LG 15’’ TFT 2 Printers 1 HP COLOR LASERJET 2550 2 HP DESKJET CP1700N 3 HP DESKJET 940C 4 DOT MATRIX PANASONIC KX-P1150 5 XEROX WORKCENTER PRO 412 6 XEROX 8400 7 HP 1320 8 KONICA MINOLTA BIZHUB C252 9 KONICA MINOLTA BIZHUB C650 Peripherals 1 HP Scanjet 5590 2 CD RW - PLEXTOR 24X10X40X USB 3 UPS - APC SU-3000V INET LINE INTERACTIVE 4 UPS - APC SU-2200V INET LINE INTERACTIVE 5 UPS - POWER MUST EK TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [46/151] 6 HUB - 3COM 10/100 – 16 7 HUB - 3COM 10/100 – 16 8 CISCO ROUTER – FIREWALL 735 (800 SERIES) (3 Τεμ.) 9 ZYXEL U35 10 ZYXEL 653 Β. SOFTWARE No. Software 1 Oracle SOA Suite 11g 2 Oracle 11g Jdeveloper, BPEL 3 Oracle 11g DB EE 4 Silverlight 5 Visual Studio .ΝΕΤ 2003 6 Visual Studio .ΝΕΤ 2005 7 Microsoft Server 2008 Standard Edition 8 Microsoft Server 2008 Enterprise Edition 9 Microsoft Server 2003 Express 10 Microsoft Office XP Professional 11 Microsoft Office 2000 Professional 12 Adobe Illustrator – Photoshop 13 UBUNTU LINUX 6.10 14 RED HAT LINUX 8.1 15 SuSE LINUX 7.1 16 NESSOS ISSUE TRACKER 17 CITRON COLLABORATION 18 ERP SAP Business One – INTEGRA TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [47/151] 8. Major Deployment Requirements (ISO 9001:2008) The Vendor for the integration of the project uses and follows the most capable and effective methodologies. The team follows a quality assurance methodology for fixing all the inappropriate results. The Vendor as described in the ‘development methodology’ has a test/development environment for developing new features and bug fixing. The updated code is tested on the test environment and if it is found to be functional and error-free, it should then be delivered in patch/service pack form, which would be installed on the ‘production’ environment. The quality assurance methodology the Vendor follows; together with the development methodology requires the Vendor to run UATs on the ‘production’ environment, in order to prove the correct and agreed functionality of the system. The UATs will be run along with customer’s engineers. The Vendor incorporates Request for Changes (RFCs) needed by customer’s users for the existing applications. An RFC is considered to be a modification in the existing code (application interface, logic, workflow etc.), or the development of a new feature (e.g. new reporting requirement, new functionality). The scheduling of the task will be done by the ZRA’s and Vendor’s project managers, based on the availability of the resources and the urgency of the specific task. The Vendor further develop, tune and redesign the outlined applications, where required. A new project is considered to be a change of an existing system / application that is not a RFC, or the introduction of a new system / application or piece of functionality. The initiation and the scheduling of a new project will be done in a case-by-case basis by the Customer’s and Bidder’s project managers. The Vendor is responsible for the completion of the following steps, in the development of a new project: User requirements gathering and analysis (in cooperation with Customer’s project management teams) Feasibility study Design (approved by Customer’s project management teams) Programming Implementation Testing TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [48/151] These requirements totally agree with the project methodology the Vendor uses and also with the requirements of the SLA that the Vendor offers. 9. Methodologies 9.1. Quality assurance methodology The GQM approach (Goal/Question/Metric approach) is a specific technology for goaloriented measurement in software projects. It consists of three components: the GQM paradigm; GQM plans or GQM models the GQM method The GQM paradigm includes the basic idea that measurement should be goal-oriented as well as several principles are followed when applying GQM-based measurement. A GQM plan or GQM model documents the refinement of a precisely specified measurement goal via a set of questions into a set of metrics. Thus, a GQM plan documents which metrics are used to achieve a measurement goal and why these are used. The questions provide the rationale underlying the selection of the metrics. The GQM plan is also used to guide analysis tasks because it documents for which purpose the respective data are collected. The GQM method provides guidance on how to set up and perform GQM-based measurement programmes. Its relevant steps are: Definition of the goals to be evaluated. For each goal, the viewpoint from which the goal is evaluated is specified. A goal is specialised in quality focuses (see next step). Definition of the quality focuses. Quality focuses define all the aspects that should be evaluated in order to assess the accomplishment of the goal. Definition of variation factors. Variation factors are all those elements that can influence the degree of accomplishment of quality focuses. For instance, the capability of a system to support workflow scenarios can be influenced by the fact that users trust these electronic procedures, or not. Definition of the impact of variation factors on quality focuses. The way variation factors affect quality focuses is specified in qualitative terms. Definition of baseline hypotheses. Hypotheses on values of variation factors and quality focus are defined. These hypotheses act as the reference point against which the data TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [49/151] gathered as a result of the evaluation phase are compared. The level of accomplishment of the goal depends on the distance between these reference values and the values that are actually collected. Definition of questions and metrics. Each quality focus is detailed in a number of questions that have to be answered in order to evaluate the accomplishment of the quality focus and the corresponding goal. The way questions are answered is defined by the respective metrics. 9.1.1. Application of the method to measure Quality in contract management and achievements 9.1.1.1. Goal for monitoring the project progress Goal 0: Monitor the progress of the project according to the schedule, outcomes produced and accomplishment of the objectives planned. Quality Focus About the team co-operation QF0.1 The work presented reflects a good co-ordination and integration between the partners QF0.2 The work is well distributed between the partners according to the allocation made in the Description of Work. QF0.3 All the roles representing the different boards: financial co-ordination, scientific co-ordination, dissemination are put into practice successfully. QF0.4 The communication skills between the members of the Company are satisfactory. About the outcomes QF0.5 The contract follows a unified methodology from the available methods QF0.6 The outcomes of the contract (subprojects, documents, presentations...) show that there have been defined good data management procedures. QF0.7 The number of subprojects developed corresponds to the number planned. QF0.8 The deliverables have been submitted on time. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [50/151] QF0.9 The information provided in the deliverables is consistent and of enough quality. About the administrative activities QF0.10 project. The periodic reports sent to WIND reflect quite well the situation of the QF0.11 The Cost Statements are well balanced with the progress state. Relationships with previous relative projects QF0.12 QF0.13 A strategy has been defined for collaboration with previous projects to build on work already done. There have been some positive contacts. QF0.14 Some data exchanges and consultations have been made with some of the contacts. QF0.15 The project has taken into account the results of previous projects coming from the same field and expanded them. Variation factors VF0.1 Withdraw of one or more partners from the initial Company. VF0.2 Replacement of the people who were carrying the key role of the different established project boards. VF0.3 Internal situation and strategy of the partner companies. VF0.4 The absence or inadequacy of the communication policies and procedures promoted by the PM. VF0.5 Lack of academic knowledge and/or practical use in the Company of software engineering methodologies. VF0.6 Absence of clear data management procedures. VF0.7 Absence of a clear work procedure, which according with the Description of Work, establishes the work distribution, the responsibilities and the deadlines to accomplish. In each Task. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [51/151] VF0.8 Absence of a risk analysis and different recovery strategies in case that the established work line is behind the planned schedule. VF0.9 Absence of a control and revision policy of drafts. VF0.10 Absence of a common strategy to report periodically the situation of the project. VF0.11 Absence of control mechanisms, which let the PM, supervises the periodic reports with the cost statements of each corresponding period. VF0.12 There is not enough information sources where to get contacts. VF0.13 Absence of a good and efficient policy from WIND to facilitate the information exchange and the collaboration between projects belonging to the same action line. 9.1.1.2. Impact of variation factors on quality focus VF0.1 The possible withdraw of one or more partners from the initial Company will definitively affect the partner’s integration. The impact of the possible consequences will depend on some factors like, for example, when the withdrawal takes place, rapidity of the substitution of these partners by new ones (see QF0.1 and QF0.2). VF0.2 The replacement of the people who were carrying key roles can affect the project schedule and the continuity of the work until the people who substitute them assume their responsibilities totally. Also the distribution of the work can be updated, according to the profile of the new partners and the arranged compromise (see QF0.2). VF0.3 The internal situation and the strategy followed of the different companies that are part of the project can affect directly to the project success, e.g. lack of human resources, different priorities. (See QF0.1 and QF0.3). VF0.4 The PM must establish the adequate communications procedures and guarantee the good practice of those mechanisms. Without these policies, communications between the different partners can become very difficult and delay the normal project development (see QF0.4) VF0.5 The lack of academic background and/or practical use in the Company of SW engineering methodologies can affect the right use of these methods, and therefore the benefits they provide can turn into disadvantages (see QF0.5). VF0.6 The absence of a clear data management procedure can provoke misunderstandings and a lot of confusion between the partners when handling documentation (see QF0.6). TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [52/151] VF0.7 The absence of a clear work plan, which establishes the work distribution, the responsibilities and the deadlines to accomplish. In each Task can cause delays and low quality outcomes (see QF0.6 and QF0.7?) VF0.8 The absence of a risk analysis and of different recovery strategies will affect the right project development in case that the established work line is behind the planned schedule (see QF0.8). VF0.9 The absence of a control and revision policy of drafts will affect the quality of the deliverables produced (see QF0.9). VF0.10 The absence of a common strategy to report periodically the situation of the project can create a false perception of the real situation of the project (see QF0.10) VF0.11 The absence of control mechanisms, which let the PM, supervise the periodic reports with the cost statements of each corresponding period can affect the balance of the costs statements according to the project progress (see QF0.11) VF0.12 The possibility to get contacts will depend on the up-to-date information sources available (see QF0.12 and QF0.13) VF0.13 The possibility to get contacts and start a possible information exchange channel between other projects will be affected by the efficient policy from the Commission to organise meetings and workshops between the projects belonging to the same action line (see QF0.13, QF0.14 and QF0.15) Baseline hypotheses on variation factors VF0.1 We assume that the members of the Company will continue during the whole project life. VF0.2 We assume that the replacement of a person who was carrying a key role in the project will be done, if possible, gradually. VF0.3 We assume that the internal situation of the partners won’t be visible to the rest of the partners. VF0.4 We assume that the PM will establish which are the communications policies of the Company and will look after the application of these policies during the project life. VF0.5 We assume that all the technical partners involved in the project have worked with and applied any web design methodology. VF0.6 We assume that the QAM will design the data management procedures to be used by the Company. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [53/151] VF0.7 We assume that each Task leader will establish the work plan of his corresponding Task according with the distribution of effort and timeline specified in the contract. VF0.8 We assume that the PM will perform an analysis of the possible risks for the accomplishment of the project objectives and will design different recovery strategies in case that the established work line is behind the planned schedule. VF0.9 We assume that the PM will perform the control and revision of final drafts before the submission. VF0.10 We assume that the PM will distribute periodic report templates between the partners in order to collect in a formal way their input. VF0.11 We assume that the PM will check the different periodic reports and contrast them with the cost statements presented by each partner. VF0.12 We assume that WIND has maintained contacts with previous contractors and these contacts will be made available to the company. 9.1.1.3. Baseline hypothesis on quality focus About the team co-operation QF0.1 We assume that the Company always reflects a high level of co-ordination and integration in all his activities. QF0.2 We assume that the distribution of work between the partners will match 90% the allocation of work made in the contract. QF0.3 We assume that the different activities carried out by the Company reflect a good integration and participation of the corresponding boards. QF0.4 We assume a high level of satisfaction regarding the communication procedures used by the members of the Company. About the outcomes QF0.5 We assume a medium-high level of knowledge and practice of web developing methods from the technical partners of the Company. QF0.6 We assume that the different outcomes produced by the Company (applications, web services, software…) reflect a good application of the data management procedures established. QF0.7 We assume that the number of deliverables produced will correspond to the number planned. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [54/151] QF0.8 We assume that all deliverables will be submitted on time QF0.9 We assume that the information reported in each deliverable will be very much consistent and of high quality. About the administrative activities QF0.10 We assume that the periodic reports sent to WIND Management will reflect quite well (>90%) the situation of the project QF0.11 We assume that the Costs Statements sent to WIND Management will be well balanced (>90%) with the progress state Relationships with other relevant projects QF0.12 We assume the definition of a strategy for collaboration with previous contractors QF0.13 We assume to contact those contractors. QF0.14 We assume to get more than two positive contacts. Questions About the team co-operation Q0.1.1 Does the work done reflect a good co-ordination and integration between the partners? Q0.2.1 Has the work been well distributed between the partners according to the allocation made in the Description of Work? Q0.2.2 Are the different weights well represented at the Review? Q0.3.1 Are the roles representing the different boards: financial co-ordination, scientific co-ordination, dissemination and market co-ordination put into practice successfully? Q0.4.1 Does the Company activities reflect good communication skills? Q0.4.2 How many problems have not been solved on time because of misunderstandings? Q0.4.3 How many problems have been solved twice because of misunderstandings? About the outcomes Q0.5.1 Do the outcomes produced and related activities reflect the good application of an IT engineering method? TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [55/151] Q0.6.1 Are all the deliverables based on a common template? Q0.6.2 Is this template clear and well organised? Q0.6.3 Is it easy to know in each deliverable which is the version history? Q0.6.4 Are the presentations based on a common template? Q0.6.5 Is there any repository (web or FTP site) where the partners can obtain all the information about the project? Q0.6.6 Is there any backup system where all the final documentation and developments are duplicated? Q0.7.1 How many deliverables have been submitted during this period? Q0.8.1 Have all the deliverables produced during this period been submitted on time? Q0.8.2 How much delay had the deliverables submitted behind the schedule? Q0.9.1 Is the information provided in the deliverables consistent and of enough quality? About the administrative activities Q0.10.1 Do the periodic reports sent to WIND reflect well the situation of the project? Q0.11.1 Are the Cost Statements well balanced with the progress state of the project? Relationships with previous contractors Q0.12.1 Is there a strategy to approach them and utilise part of their work? Q0.13.1 How many contacts have been made? Q0.14.1 How many positive contacts (with useful collaboration) have been made? About the team co-operation M0.1.1 Level of co-ordination and integration showed between the partners TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [56/151] High Medium M0.2.1 Distribution of work according to the allocation made in the contract Accurate M0.2.2 Good Good Regular Medium Bad Bad Low Number of problems not solved on time because of misunderstandings High M0.4.3 Regular Level of communication showed between the partners High M0.4.2 Bad Level of representation and practice of the different boards Good M0.4.1 Regular Representation of the different partner in developing the work allocated Accurate M0.3.1 Low Medium Low Number of problems solved twice because of misunderstandings High Medium Low About the outcomes M0.5.1 High M0.6.1 Level of expertise in the application and use of web developing methodologies Medium Low Existence of a common template for deliverables TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [57/151] Yes M0.6.4 Yes M0.6.5 Yes No Existence of a common template for presentations No Existence of a repository (FTP site) available for the entire Company No M0.6.6 Existence of a backup system and procedure for the backup of final documentation and developments Yes No M0.7.1 Number of subprojects completed during the contract M0.8.1 Number of subprojects completed on time during this period Relationships with previous contractors M0.12.1 Yes M0.13.1 Existence of a good strategy to get contacts to previous contractors No Number of contacts made TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [58/151] M0.14.1 Number of positive contacts made 9.2. Project Management Methodology – Prince 2 9.2.1. Introduction PRINCE (PRojects IN Controlled Environments) is a structured method for effective project management. The method was first established in 1989 by CCTA (the Central Computer and Telecommunications Agency). PRINCE was developed from PROMPTII, a project management method created by Simpact Systems Ltd in 1975. PROMPTII was adopted by CCTA in 1979 as the standard to be used for all government information system projects. PRINCE superseded PROMPTII in 1989 within government projects. CCTA(now the Office of Government Commerce) continued to develop the method, and PRINCE2 was launched in 1996 in response to user requirements for improved guidance on project management on all projects, not just information systems. PRINCE2 is based on the experiences of scores of projects, project managers and project teams, who have contributed, some from their mistakes or omissions, others from their successes. PRINCE2 is a de facto and is widely recognized and used in the private sector internationally. 9.2.2. What is a project? PRINCE2 defines a project as: a management environment that is created for the purpose of delivering one or more business products according to a specified Business Case Another definition of a project might be: a temporary organization that is needed to produce a unique and predefined outcome or result at a prespecified time using predetermined resources PRINCE2 additionally supposes that those responsible for the project will not have experience of working together to produce a similar set of outcomes or results for the same customer in the past; that co-ordination between those working on the project will need to be well organized; and that the responsibilities shared among those undertaking the work, those managing it and those sponsoring it will need to be clearly defined. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [59/151] A PRINCE2 project, therefore, has the following characteristics: A finite and defined life span Defined and measurable business products A corresponding set of activities to achieve the business products A defined amount of resources An organization structure, with defined responsibilities, to manage the project. Each project falls within a specific business context. A project may be stand-alone, it may be one in a sequence of related projects or it may form part of a program or corporate strategy. A project, by its nature, is a temporary structure, created to achieve a specified business benefit or objective. When the work has been completed, the project is disbanded. A project has a life cycle, which is the path and sequence through the various activities to produce the final product. The term ‘life span’ is used to describe the life of a product. The two should not be confused. Figure shows how a product life span might start from the initial idea or conception, through to the operation of the product, finishing with the eventual scrapping of the product when it comes to the end of its usefulness. The project life cycle covers the tasks of specifying and designing a product, through to its testing and hand-over into operational use. PRINCE2 covers the project life cycle plus some preproject preparation. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [60/151] 9.2.3. The scope of PRINCE2 Figure below shows where PRINCE2 fits into a business and project environment. PRINCE2 is not intended to cover all subjects relevant to project management. The project management techniques and tools required will vary according to the project type and the corporate environment. There are also certain aspects of project management that are well covered by existing and proven methods and are therefore excluded from PRINCE2. Examples of these aspects are: People management techniques such as motivation, delegation and team leadership Generic planning techniques such as Gantt charts and critical path analysis Risk management techniques The creation and management of corporate quality management and quality assurance mechanisms Budgetary control and earned value analysis techniques. PRINCE2 covers the management of the project and the management of the resources involved in carrying out the activities of the project. It does not cover the specialist techniques involved in the creation of the products. This is the job of other methods, although PRINCE2 must interface with them to enable information on such areas as estimating, for example, to be provided for project management. Although PRINCE2 is centered on the project, it begins before the project does: by preparing the ground so that the project starts in an organized and controlled manner. Another often critical project area is procurement. PRINCE2 assumes that the project is run within the context of a contract. The contracting process is not included within the method itself. Contracting and procurement are themselves specialist activities (like software engineering) and can therefore be managed using the PRINCE2 method. If procurement or contracting is to be undertaken during the early stages of the project, changes may be needed to the Project Board and other parts of the project management team once these stages have been completed. For example, it may be appropriate to have a senior representative of the contractor organization as a member of the Project Board (in the role of Senior Supplier). PRINCE2 relationship with projects and business Contract and procurement issues will also increase the importance of a complete and accurate Project Initiation Document (PID) which will need to be kept in line with the text of the contract(s). Where PRINCE2 describes project roles, the conversion of these into formal job definitions for a particular project will also require careful attention, for example Project Assurance, the approval of Product Descriptions and the allocation of risk ‘ownership’. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [61/151] 9.2.4. PRINCE2 in context PRINCE2 is designed to be used on any type of project in any environment. It contains a complete set of concepts and project management processes that are the minimum requirements for a properly run and managed project. However, the way in which PRINCE2 is applied to each project will vary considerably, and tailoring the method to suit the circumstances of a particular project is critical to its successful use. PRINCE2 projects are always focused on delivering specified products to meet a specified Business Case. PRINCE2 enables the project to capture and retain a definition of the business benefits that are the driving force behind the project itself. The benefits are stated in the project’s Business Case. Benefits can take many different forms: Financial, in the form of additional profit or avoided costs Strategic, by providing a platform to move towards one of the organization’s strategic aims Legislative, by fulfilling some absolute requirement laid down by head office or a government body. Throughout a PRINCE2 project, the Business Case is reviewed and progress is measured against any revised expectations of achieving defined benefits. During any project there are often opportunities to discover new benefits, which may enhance the project’s product or indeed impact on another project. However, any deviations from the original Business Case must be controlled through the Project Board. Within any project there are stakeholders with an interest in the project and its product, including: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [62/151] Customers, who have commissioned the work and will be benefiting from the end results User, who will use or operate the final product. The customer and user may be the same group of people Suppliers, who are providing specialist resources and/or skills to the project or are providing goods and services Sub-contractors, who provide products or services to the supplier. The customer/supplier environment assumes that there will be a customer who will specify the desired product, make use of the final products and(in most cases) pay for the project and a (prime) supplier who will provide resources and skills to create that product. PRINCE2 is written from the standpoint that these two parties come from separately managed areas and typically from commercially separate organizations. Where, as may often be the case, both customer and supplier have a common management; this will influence the composition of the project management team. Whatever the team composition, the customer should always participate (throughout the project) in the creation and verification of products. A project, by its nature, is set up to deal with change and the future is always less predictable than with routine work. During the project, the specification of products will inevitably need to change. These changes need to be controlled because they can easily destroy the project’s chance of success. Controlling changes is linked to version control, a topic that is covered within PRINCE2 under configuration management. Configuration management is an essential part of project control as it is focused on controlling the products being delivered, knowing where they are at any point in time, what their status is, who is working on them and which is the latest version. In addition, projects can be large and complex, dealing with novel or unusual factors. Risk is therefore a major factor to consider during project management and PRINCE2 incorporates the management of risk into its processes. Whatever the nature or size of the project, PRINCE2 defines an initiation stage that covers the planning and definition of the project. The initiation stage enables a management review before making any commitment to later stages and their associated resources and costs. There will be many higher level issues surrounding the project. These will need to be dealt with by other methods and approaches, such as program management. PRINCE2 aimed at the middle ground between these higher level, more strategic, issues and the specialist techniques required to create the technical products. Few projects can be completed entirely in isolation from other work. PRINCE2 projects may exist as part of a program, contributing to the realization of benefits of a larger organizational change. In a program context, the outputs from one project may be used as input by another project. There may be other dependencies between projects, such as TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [63/151] shared resources. PRINCE2 places strong emphasis on the products that the project is required to deliver and so provides a firm basis for defining the boundaries. Feasibility studies In some situations, a feasibility study might be required to investigate the situation and determine options for the way ahead. Using PRINCE2, the optimum approach would be to handle the study as a separate and distinct project and then operate a second project to implement the results of the study. Figure shows the (relatively) simple life cycle for a feasibility study project. It has one Project Plan, Business Case and set of risks. The possible options may each vary enormously in their cost and timescales. Each option would have a different Project Plan, Business Case and set of risks. Having chosen the appropriate option, the second project would proceed with a straightforward set of project information. 9.2.5. Overview of PRINCE2 PRINCE2 is a structured project management method based on the experience of scores of project managers, who have contributed, some from their mistakes or omissions, others from their success. PRINCE2 has a process-based approach to project management. The processes define the management activities to be carried out during the project. In addition, PRINCE2 describes a number of components that are applied within the appropriate activities. Figure shows the components positioned around the central process model. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [64/151] TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [65/151] 9.2.6. The processes The PRINCE2 process model, shown in Figure consists of eight distinctive management processes, covering the activities from setting the project off on the right track, through controlling and managing the project’s progress, to the completion of the project. The common Planning process is used by many of the other processes. Any project run under PRINCE2 will need to address each of these processes in some form. However, the key to successful use of the process model is in tailoring it to the needs of the individual project. Each process should be approached with the question: How extensively should this process be applied on this project? Starting up a Project (SU) This is the first process in PRINCE2. It is a pre-project process, designed to ensure that the prerequisites for initiating the project are in place. The process expects the TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [66/151] existence of a Project Mandate that defines in high-level terms the reason for the project and what product is required. The process should be very short. The work of the process is built around the establishment of six things: The design and, as far as possible, appointment of the project management team The Project Brief The Project Approach (in general terms how a solution will be provided) The customer’s quality expectations A Risk Log The initiation Stage Plan. Directing a Project (DP) Directing a Project runs from the end of Starting up a Project (SU) until the project’s closure. This process is aimed at the Project Board, a group of managerial decision makers representing business, users and suppliers. (The Project Board is fully explained in Chapter 14, Organization.) The Project Board manages by exception, monitors via reports, and controls through a number of decision points. The key processes for the Project Board break into four main areas: Initiation (starting the project off on the right foot) Stage boundaries (commitment of more resources after checking results so far) Ad hoc direction (monitoring progress, providing advice and guidance, reacting to major threats to plans or benefits) Project closure (confirming the project outcome and bringing the project to a controlled close). Initiating a Project (IP) The objectives of Initiating a Project are to: Define how the required product quality will be achieved Plan and cost the project Document and confirm that an acceptable Business Case exists for the project Ensure that the investment of time and effort required by the project is justified, taking account of the risks to the project Enable and encourage the Project Board to take ownership of the project Provide the baseline for the decision-making processes required during the project’s life Agree to the commitment of resources for the next stage of the project. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [67/151] The key product of the process is the Project Initiation Document, which defines the what, why, who, when and how of the project. Three other blank products are created in readiness for use during the project. These are: The Quality Log The Issue Log The Lessons Learned Log. Another required product is the next Stage Plan. This, however, comes from the process Managing Stage Boundaries (SB), which will occur at the end of the initiation stage. Managing Stage Boundaries (SB) This process produces the information on which the Project Board will take key decisions on whether to continue with the project or not. The objectives of the process are to: Assure the Project Board that all products planned in the current Stage Plan have been completed as defined Provide the information needed for the Project Board to assess the continuing viability of the project Provide the Project Board with any other information needed to approve the current stage’s completion and authorize the start of the next stage, together with its delegated tolerance level Record any measurements or lessons that can help later stages of this project and/or other projects. The products of this process are: An End Stage Report, given by the Project Manager to the Project Board, containing information on the stage achievements Current Stage Plan actuals, showing performance against the original Stage Plan The next Stage Plan or Exception Plan, for which approval is sought A revised Project Plan The updated Risk Log, which, together with the next two products, is used by the Project Board to review the continuing viability of the project A revised Business Case TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [68/151] The Lessons Learned Log, updated with any lessons learned from the current stage Any changes to the structure or staffing of the project management team. Controlling a Stage (CS) This process describes the monitoring and control activities of the Project Manager involved in allocating work, ensuring that a stage stays on course and reacts to unexpected events. The process forms the core of the Project Manager’s effort on the project, being the process that handles day-to-day management of the project. Throughout a stage there will be a cycle of: Authorizing work to be done Gathering progress information about that work Watching for changes Reviewing the situation Reporting Taking any necessary corrective action. This process covers these activities, together with the ongoing work of risk and issue management. Products produced during the stage on a cyclic basis are: Work Packages Highlight Reports Project Issues (and updated Issue Log) An updated Risk Log A regularly updated Stage Plan. There may also be the need for an Exception Report. Managing Product Delivery (MP) The objective of this process is to ensure that planned products are created and delivered by the project by: The Team Manager negotiating details of Work Packages with the Project Manager Making certain that work on products allocated to the team is effectively authorized and agreed Ensuring that work conforms to the requirements of interfaces identified in the Work Package TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [69/151] Ensuring that the work is done Assessing work progress and forecasts regularly Ensuring that completed products meet quality criteria Obtaining approval for the completed products. Products created or updated during this process are: Team plans Quality Log updates, giving the Project Manager a view of quality work being done Project Issues (updating the Business Case) Risk Log updates Checkpoint Reports, regular progress reports from the Team Manager to the Project Manager. Closing a Project (CP) The purpose of this process is to execute a controlled close to the project. The process covers the Project Manager’s work to wrap up the project either at its end or at a premature close. Most of the work is to prepare input to the Project Board to obtain its confirmation that the project may close. The objectives of Closing a Project are, therefore, to: Check the extent to which the objectives or aims set out in the Project Initiation Document have been met Confirm the customer’s acceptance of the products Assess to what extent all expected products have been handed over and accepted by the customer Confirm that maintenance and operation arrangements are in place (where appropriate) including any relevant training Make any recommendations for future work (Follow-on Action Recommendations) Capture lessons resulting from the project and complete the Lessons Learned Report Prepare an End Project Report Archive the project files Produce a Post Project Review Plan Notify the host organization of the intention to disband the project organization and release the resources (end project notification). TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [70/151] Planning (PL) Planning is a repeatable process and plays an important role in other processes, the main ones being: Planning an Initiation Stage (SU6) Planning a Project (IP2) Planning a Stage (SB1) Updating a Project Plan (SB2) Accepting a Work Package (MP1) Producing an Exception Plan (SB6). Apart from a plan, the process produces: A Product Checklist, which is a table of the products to be produced by the work planned, with space for planned and actual dates for delivery of draft, quality-checked and approved products The Risk Log, updated with any risk situation changes made as a result of the planning activity. The components Each component is described in further detail in the Components section of this manual, showing how the particular subject affects project management and providing guidance on when and how to address the issues. Business Case The existence of a viable Business Case is the main control condition of a PRINCE2 project. The Business Case is verified by the Project Board before a project begins and at every major decision point throughout the project. The project should be stopped if the viability of the Business Case disappears for any reason Organization PRINCE2 provides a structure of a project management team and a definition of the responsibilities and relationships of all roles involved in the project. According to the size and complexity of a project, these roles can be combined or shared Plans PRINCE2 offers a series of plan levels that can be tailored to the size and needs of a project and an approach to planning based on products rather than activities Controls PRINCE2 provides a set of controls which facilitate the provision of key decision-making information, allowing an TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [71/151] organization to pre-empt problems and make decisions on problem resolution. For senior management PRINCE2 controls are based on the concept of management by exception, i.e. we agree a plan, then let the manager get on with it unless something is forecast to go wrong In order to promote sound management control, a project is split into stages as an approach to defining the review and commitment points of a project. (Using stages also helps to reduce the amount of work that the Project Manager needs to plan in detail at any one time) Management of Risk Risk is a major factor to be considered during the life of a project. PRINCE2 defines the key moments when risks should be reviewed, outlines an approach to the analysis and management of risk and tracks these through all the processes Quality in a Project Environment PRINCE2 recognizes the importance of quality and incorporates a quality approach to the management and technical processes. It begins by establishing the customer’s quality expectations and follows these up by laying down standards and quality inspection methods to be used and by checking that these are being used Configuration Management Tracking the components of a final product and their versions for release is called configuration management. There are many methods of configuration management available. PRINCE2 defines the essential facilities and information requirements for a configuration management method and how it should link with other PRINCE2 components and techniques Change Control PRINCE2 emphasizes the need for change control, and this is enforced with a change control technique plus identification of the processes that apply the change control. 9.2.7. PRINCE2 techniques PRINCE2 offers very few techniques, preferring to leave the choice of technique to the users of the method, and according to the circumstances of the project. But in support TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [72/151] of the method the manual does contain details of three techniques, product-based planning, change control and quality review. PRINCE2 provides a product-based start to the planning activity. It also provides a planning framework that can be applied to any type of project. This involves: Establishing what products are needed Determining the sequence in which each product should be produced Defining the form and content of each product. Part of the product-based planning technique enables the project to define the standard of quality to which each product must conform. Every project needs a technique for the control of changes. For organizations that do not already have a suitable technique, PRINCE2 describes a change control technique. PRINCE2 also describes a specific technique: quality review, which is particularly suitable for the quality testing of document-based products. 9.2.8. Process and component links It is often difficult for newcomers to PRINCE2 to understand the main relationships and links between the processes, components and techniques. In which processes are the components used? Where is this technique used? Figure gives a picture of these links. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [73/151] TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [74/151] 9.2.9. Processes - Brief Management levels Project management is seldom straightforward enough to be a simple, linear process. In a PRINCE2 context, there are four parallel management levels to take into account The four management levels These management levels are reflected in the PRINCE2 Process model. At the highest level is corporate or program management. While not part of project management as such, this higher management level is important, as it will often set the business context for one or more projects. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [75/151] Within the project itself the highest level is Directing a Project (the Project Board work). This level is for key decision making and direction setting. At the next level of managing a project a great deal of management effort is expended in day-to-day planning and control, and would largely be handled by the Project Manager. The lowest management level, Managing Product Delivery, would be handled by Team Managers. There are two major ways in which these levels interact: The higher level processes exercise control over the lower levels. For example, managing a project provides the Work Packages that define the work for Managing Product Delivery The output of the lower level processes provides the inputs that allow the higher-level processes to function effectively. For example, managing a project provides essential planning and control information to enable the effective conduct of activities in Directing a Project. 9.3. Development methodology - RUP Methodology The methodology approach for the project scenario is based in the Methodology “Incremental Development Process Engineering” and will also take into account the basic principles of the Rational Unified Process (RUP). RUP is based on a set of building blocks, or content elements, describing what is to be produced, the necessary skills required and the step-by-step explanation describing how specific development goals are achieved. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [76/151] Inception Phase: Establishing a baseline by which to compare actual expenditures versus planned expenditures. If the project does not pass this milestone, called the Lifecycle Objective Milestone, It can either be cancelled outright or it can repeat this phase after being redesigned to better meet the criteria. Elaboration phase: The elaboration phase is where the project starts to take shape. In this phase the problem domain analysis is made and the architecture of the project gets its basic form. This phase must pass the Lifecycle Architecture Milestone by the following criteria: o o o o o o A use-case model in which the use-cases and the actors have been identified and most of the use-case descriptions are developed. A description of the software architecture in a software system development process. An executable architecture that realizes architecturally significant use cases. Business case and risk list which are revised. A development plan for the overall project. Prototypes that demonstrably mitigate each identified technical risk. Construction phase: In this phase, the main focus goes to the development of components and other features of the system being designed. This is the phase TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [77/151] when the bulk of the coding takes place. In larger projects, several construction iterations may be developed in an effort to divide the use cases into manageable segments that produce demonstrable prototypes. Transition phase: In the transition phase, the product has moved from the development organization to the end user. The activities of this phase include training of the end users and maintainers and beta testing of the system to validate it against the end users' expectations. The product is also checked against the quality level set in the Inception phase. If it does not meet this level, or the standards of the end users, another iteration of the phase begins. The contractor for beta testing should run UATs on the ‘production’ environment, in order to prove the correct and agreed functionality of the system. The UATs will be run along with customer’s engineers. If all objectives are met, the Product Release Milestone is reached and the development cycle ends. The deliverables of the development process of a system, subsystem or application also include: A detailed architectural diagram of the system (containing also DB structure diagram) The User’s guide Written operation and maintenance procedures for the efficient support of the system – Administration guide. Other relevant documents, such as Acceptance Test document (for confirmation by the Customer), backup policy documents etc. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [78/151] 9.4. Communication with ZRA The communication strategy aims to keep the ZRA Management primary and the company secondary fully informed about the project status, planning of future activities and all other issues that are of importance and to increase the synergy and cooperation between TechNet AFRICA and ZRA. A two way communication strategy will be followed utilising face to face meetings and tools for distant cooperation and communication. Communication through electronic and other means: Prior to initiating a communication, one must consider the following checklist even though obvious: 1. What it is the key information that is to be communicated? 2. Why does it need to be communicated? 3. Who is the audience? 4. How should the information be communicated? I.e. by what medium (fax, telephone, e-mail etc.)? Is it one-way or does it demand interaction? 5. When does it need to be communicated? 6. What is the priority? (Urgent, normal, low?) Running through this checklist will reduce the number of unnecessary communications and help make each transfer of information more effective Communications will be based on standards for documents (Microsoft Office) and will be supported by electronic exchange and messaging via E-mail. In addition a project web site will be set, capable of up and downloading, will be made available by the Project Manager where relevant documentation of the Project will be kept for dissemination among Project Partners and collaboration between Project teams. As well as being a monitoring aid for managers to observe progress on a regular basis. Communication standards must be applied to the project to minimise the overhead in the distribution of electronic information. It is the strategy of the company to guarantee a fast and complete flow of information by using the following electronic mechanisms:TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [79/151] E-mail exploders – grouped as appropriate to the active work DropBox – For centralised sharing of active project information and progress as it develops Skype – For offsite voice communications and teleconferencing Shared workspace. The Vendor will establish a shared workspace, accessible through the Internet, where draft reports, deliverables, progress to date, description of the work achieved will be available for internal review and comment by both Vendor and ZRA. Based on the requirements of the project management methodology and the training methodology selected the Vendor for the effective management and communication of the project work and outcomes will utilize a set of reports and forms. The bidder should provide weekly and monthly reports for the progress of the project and respective tasks, as well as for the achievement of the decided milestones. 9.5. Risk Management 9.5.1. Introduction The purpose of this part is to define the processes and procedures that shall be employed to successfully manage contract risk. 9.5.2. Definitions Risk: a notable threat to the project that has the potential to compromise the basic objectives of delivering an acceptable application or service, within an acceptable time, and within an acceptable cost. Risk Management: the identification and containment of such threats through the structured application of the activities defined below. The process to be applied to the contract is illustrated in the following Figure and further defined in the remainder of this document. Risk Identification: identifies the risks to the contract that have the greatest potential to compromise its objectives and assigns responsibility of the risk management within the project team. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [80/151] Risk Assessment and Classification: evaluates the probability of the risk occurring, the potential impact of the risks, and, if appropriate, undertakes quantitative risk analysis. Risk Reduction: Identification and deployment of measures aimed at reducing the probability of undesirable events and defining actions to eliminate or mitigate the impact of the occurrence on the project. Risk Review: monitoring the status of project risks, monitoring the progress of risk reduction actions, and ensuring the continued application of the risk management process throughout the project. Risk Reporting: reporting the status of project risk, producing and maintaining the project risk log and reporting the progress of risk reduction actions. Originator: Associate that initially identifying the risk. Owner: Associate whose responsibility it is to ensure the risk is mitigated. 9.5.3. Risk Management Flow The following picture shows the risk management flow: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [81/151] A Risk has been identified Assign risk to owner ORIGINATOR Review relevance of assignment OWNER XOR Assignment not accepted Assignment accepted XOR Plan corrective action Forward assignment OWNER QAM OWNER Forward action for approval OWNER Assign risk to appropriate owner Review action plan QAM Risk assigned to appropriate owner XOR Action Plan accepted Action Plan not accepted Perform corrective action OWNER Report results OWNER Log corrective action results QAM Review outcome PMB XOR Risk is not mitigated Risk is mitigated. End of Process TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [82/151] The risk will be managed by using a risk management form that will be used to keep track of the risk and of the appropriate counter measures. The form will contain information relative to the risk and the planned corrective actions. 9.5.4. Risk Identification All project members are responsible to identify potential risks to the project. The person identifying the risk shall then discuss it with the Project Manager. Risk Management Form Generation If it is agreed that a Risk needs will be formally identified then the Project Manager, the “Originator”, shall record the risk on a Risk Management Form. At this stage in the process, the form shall contain the following information: Risk Identification: A unique identifier in the format: Originator [Id partner]/Number e.g. TXT/001 Originator: Name of Project Manager / Partner identifying the risk Risk Description: A brief description of the risk First Classification: Technical / Exploitation / Management Suggested Owner: Reference code of the task that the risk falls within e.g. Task1.1 Assignment The “Originator” of the risk may not always be the “Owner” of the risk. In these cases, the Originator shall identify who they believe should own the risk and communicate this to the proposed “Owner”. The Risk Management Form should then be sent to the “Owner”. The “Owner” of a risk is generally a task but can be a subtask if the risk falls entirely within the subtask area. If the risk “Owner” doesn't agree, this should be reported to the Project Manager for resolution. The PM may escalate the risk ownership assignment to the Project Management Board. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [83/151] 9.5.5. Risk Assessment and Classification The “Owner” of the Risk shall undertake an initial risk assessment. This shall be recorded on the Risk Management Form. The following information shall be recorded: Probability of Occurrence: High - Greater than 80% probability of occurrence Medium - Between 20% and 80% probability of occurrence Low - Less than 20 % probability of occurrence Impact: Impact will be evaluated along the following categories: Timescale Impact: T- Will cause a delay of less than two weeks TT - Will cause a delay of between two weeks and six weeks TTT - Will cause a delay of over six weeks Cost Impact: This heading concerns budgetary constraints. C- Will impact the overall project cost by less than 5% CC - Will impact the overall project cost by between 5% and 20% CCC - Impact to overall project cost will be greater than 20% Functionality Impact: This heading includes most technical risks. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [84/151] F- Will have a minor impact on the system functionality (Minor functionality not available, operator inconvenience) FF - Will have a medium impact on system functionality (Functionality limited, performance degradation) FFF - Will significantly impact the system functionality (Major functionality not available, significant degradation in system performance) Acceptance Impact: This heading concerns the risk that the project might not be able to prove the possibility of a large-scale deployment. This includes the risks to exploitation posed by security concerns. P- Will have a minor impact on the system (Minor functionality may not prove) PP - Will have a medium impact on system usability (A major functionality of the system may be difficult to demonstrate) PPP - Will significantly impact the system usability (Significant risk of rejection of the system) 9.5.6. Risk Reduction Planning On completing the initial Risk Assessment, the “Owner”, in discussion and agreement with other affected Partners, shall propose means of reducing the risk. These “Risk Reduction Actions” shall be tangible and measurable actions that are accepted and owned by an identified Partner and can be tracked to conclusion through the Risk Management process. Risk reduction measures are divided into two kinds: Immediate actions. Immediate actions are actions that do not depend on an external event and they can be implemented immediately. The risk “owner” is responsible for overseeing the implementation of these actions. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [85/151] Contingency plans. Contingency plans are actions that depend on the occurrence of an independent event. They are usually the answer to “what shall we do if…” questions. The main purpose of contingency plans is to reduce reaction time and facilitate advance planning. Responsibilities Once all actions have been recorded on the Risk Management Form, the “Owner” shall forward the form to the QMA. The QMA may approve the plan or return the form to the risk owner with the suggestion that further actions are necessary. Once the action list has been approved, partners identified with specific risk reduction actions shall then ensure that their assigned action is undertaken and then report to the risk “Owner”. The “Owner” shall then assess the success of this action and perform a new evaluation of the risk in the new scenario. Any significant change in the status of the risk should generate a new Risk Management Form. The “Owner” shall then forward this form to the QMA. If there is no significant change in the status of the risk the owner shall report so. 9.5.7. Risk Reporting and Review On receipt of a Risk Management Form, the QMA shall input a summary of the information into the project Log. It shall be the Project Manager responsibility to ensure that the Risk Log is maintained throughout the project. The Risk Log will be reviewed at each PMB Meeting Reviews shall: I. Review the risk assessment and, if appropriate, notify the “Owner” of any recommended changes. Changes may entail the “closure” of a risk that is no longer significant to the project’s success. II. Ensure the risk reduction actions are appropriate and assigned III. Review progress on the risk reduction actions and their effectiveness in mitigating the risk. IV. Provide an overall assessment of the risk in the contract TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [86/151] 9.5.8. Maintenance/Support/SLA Requirements Vendor’s top priority is customer satisfaction. Our Customer care department will help the Contracting Authority with any query it has at any time 24/7/365, without canned responses. We provide results, fast. TechNet’s Support will help any time no matter how difficult the task, we provide a fully managed service for all our clients` needs. TechNet’s Support team consists of trained and certified engineers with decades of experience. Our Support team is available 24/7/365, to provide fast and solid solutions to the organization’s technical queries. Our Support team provides instant results, no expense spared and no time spent waiting are the hallmarks of our Support services. The Vendor offers technical support services over the duration of the project and extra technical support services during the SLA period (post project period for the first 2 years). These services include solving incidents-malfunctions and answering queries (Help Desk), related to capabilities and functionality of the offered equipment and applications which form the whole system. The Vendor offers the capability of extending the project’s pilot period after it has expired if ZRA requires it; in this case we are entering the maintenance - SLA period. Consider that offered technical support services are the same during the pilot period and the maintenance period and comply with the terms and conditions of this call for tender. All maintenance actions leading to loss of functionality are scheduled (whenever possible) outside normal working hours or during low traffic (system utilization) hours. 9.5.9. System/Platform Support As depicted above the Vendor uses a help desk for all maintenance actions. The support is for the system/platform (Records.Trak™), the users and the administration. All maintenance actions, such as upgrades, leading to loss of functionality will be scheduled (whenever possible) outside normal working hours or during low traffic (system utilization) hours. In the case of scheduled maintenance actions of any depended outside normal working hours, affecting the availability of the NEW system covered by this agreement, a TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [87/151] system specialist of the Vendor’s team will be on site. In this case an a-priori mutual agreement among ZRA’s and TechNet’s project managers must take place. 9.5.9.1. Preliminary agreement definitions of responsibility over system restoration actions the Vendor’s Expected uptime: is the sum of expected uptime during the measurement period. Specifically: For RCH (Regular Coverage Hours: Between 07:00 – 17:00 for working days Monday – Friday), the accepted availability rate is defined in an annual basis for the whole of the applications and subsystems. The same rate is defined as acceptable availability rate for the warranty period. For ECH (Extra Coverage Hours: Rest of the time), the acceptable availability rate is defined in an annual basis for the whole of the applications and subsystems as well. The company guarantees that availability rate will arise to the rates below: System-Software performance and availability is not required to overtake 99,9%. Downtime period is the time interval starting from the incident report ending to the full restoration of the system. If the time interval exceeds the predicted one, lag hours doubled will count to the Downtime period. Proactive support and probable upgrades causing availability issues should be performed outside ECH, or else they will be considered as Downtime period. Annual availability concerns the time interval between 1/1 and 31/12 of the specific year. TechNet will take steps to head off potential issues in advance of the issue occurring. The Vendor, recognizing the importance of precautious maintenance, takes all necessary measures in order to ensure all computer system’s (Records.Trak™) availability. Proactive support begins with proper use of each system (which is based on effective training), is extended with simple maintenance operations performed by the users TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [88/151] (mainly providing acceptable operating conditions and proper consumables use), keeping safety measures, keeping organized records on each units behavior, running diagnostic tests, and is fulfilled with the programmed Hardware/Software maintenance services. Maintenance services will be executed by our authorized technicians according to the constructor’s (Data Concept) specifications; the proactive support program will be notified to the organization’s staff in time. The operations performed will be recorded in a Systems Support Log file separately for each installation. Proactive Support actions will be performed once a year; the time interval will be set after communication between the two parties. Support actions will be programmed so that minimum inflictions in the organization’s normal operation are achieved. Special issues (i.e. access to the Server room) concerning the needs of operating outside working hours, will be included in the relevant contract. Proactive support actions include the following equipment: Automated Document/Records Management System (Database Server, Application Sever, Web Server, Records.Trak™) Subsystems’ Software Overcoming Incidents 9.5.9.2. Problem Classification TechNet identifies the following classification of possible problems 9.5.9.2.1. Severity 1 : Problems concerning overall system functionality. In this case services will possibly be fully unavailable. Overall functionality is of vital importance and such problems are considered an emergency situation. At least one of the following incidents must be reported: Degraded or corrupted data One of the main services is unavailable System malfunctioning causing unacceptable or continuous response delay System repeatedly malfunctioning even after reboot attempts TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [89/151] 9.5.9.2.2. Severity 2: The Contracting Authority is experiencing installation problems or the Software does not operate as described in the user documentation Problems causing severe loss of a system service. No solution can be found, although the affected service can still be offered in a limited manner. No alternative or bypass is available based on TechNet’s analysis of the cause of the Deficiency. TechNet will report on a regular and reasonable basis to advise the Contracting Authority of: the current status of TechNet’s efforts to resolve the Deficiency; TechNet’s estimate of the remaining time required to resolve the deficiency; and other information that is reasonably related to the Deficiency or TechNet’s remediation efforts that the Contracting Authority reasonably requests. 9.5.9.2.3. Severity 3: Problems slightly infecting a system service. Repercussion is restricted to a malfunction which possibly requires coming up against it so that the system functionality is restored. 9.5.9.2.4. Severity 4: Problems in this class do not cause service malfunction. The result is an error or misbehavior of a slight importance which does not affect system functionality 9.5.9.3. Providing Solution For the total of malfunctions errors or system misbehavior TechNet: Should be informed via phone, the web or FAX during the Contracting Authority’s working days and hours, accompanied with a detailed description of the incident. In this case TechNet will reply within the maximum of one hour via phone or the web. If the incident remains unsolved after remote guidance, our expert technicians will take control of the situation and solve the problem. When Severity 1 classified problems occur, our technicians will immediately be alerted and the problem will be resolved within the maximum of 8 hours since their notification. After the system restoration the institution will be submitted a report which will include main causes of the malfunction as well as the actions taken by our technical support staff and all necessary proofs (such as system logs). TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [90/151] When Severity 2 and 3 classified problems occur TechNet binds to solve them within 2 working days since the day they have been reported When less serious Severity 4 classified problems occur our technical support staff resolves them within 3 days since they have been reported. In order to restore the system TechNet will perform all necessary actions such as: Data recovery, software installation, customization, etc. 9.5.9.4. Monitoring Reports In the frame of monitoring, during the Operational period TechNet will deliver in a monthly basis a report including the following elements: Number of errors occurred and solved daily in the system categorized based on severity The frequency of reoccurred errors. Errors considered solved yet reoccurring consist a problem in need of special treatment. A list of all errors in the order of their occurrence in order to be able to monitor the speed in they are solved A list of all errors classified in special categories by the test group team Analysis of the way errors were traced. If a specific tracing method produces more errors it would be preferred. 9.5.9.5. Installing new software versions TechNet (if required by the Contracting Authority) commits to offer technical support of the system and application software. Between its responsibilities, the company is responsible and obliged to: Restore the system in case of a malfunction or system failure, which are caused by system software bugs ensuring backwards compatibility. Installing new software versions Analysis on the above mentioned services follows 9.5.9.6. Debugging Technical support and maintenance of the system software is organized. Thus a possible report for malfunction or error in the system/application software is reported to the Help Desk. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [91/151] According to all mentioned above Help Desk staff will record and evaluate the reported issue and will attempt to give immediate solution. In case this isn’t considered possible the issue is transmitted to the appropriate system technician who is responsible to take all appropriate actions leading to a solution (Second level of interference). In case the issue is not solved with common reconfiguration or tuning methods, the case of encountering a software bug is examined. The next phase is to inform the manufacturer (Data Concept). This process is recorded and monitored through the Help Desk service. In parallel, the issue is reproduced in a similar system of the company and as soon as it is solved the solution is applied to the organization as well. Several patches which encounter known bugs will first be installed and checked to the company’s systems and (if considered necessary) to one of the Contracting Authority’s systems. The next step includes installing the patch to the appropriate equipment regardless of its location in certain schedule and manner which guarantees its effectiveness. In order to successfully support software, our company will have a repository of several versions and releases of all installed system/application software products. The availability of this software bank will last until the end of the warranty (or maintenance) period. In this way our mechanics will be able to evaluate the products’ versions/releases functionality not only separately for each one of them but as well the degree of their functionality when they perform as a combination of applications (exchanging information etc). 9.5.9.7. System Software Upgrade The Contracting Authority will be notified about new software releases (with a full description of their main characteristics) with a limit of two months after the manufacturer has officially released the version. The notification will be confirmed with the manufacturing house’s official documents. In the meantime the changes towards the former version will be submitted to the organization in both electronic and printed form. If the Contracting Authority requires additional presentation of the benefits included in the new software version and possible issues during installation, the Vendor will respond to all relative questions. 9.5.9.8. Upgraded software versions installation methodology In order to install new versions a software upgrade schedule will be formed (in cooperation with the Contracting Authority’s staff) concerning all installations. The company former to each installation and particularly at the moment it receives the new software version, is obliged to check it in its own similar systems. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [92/151] Compatibility / Interaction of the upgraded version with the installed one as well as impact to the overall system performance will be seriously considered. In cases of incompatibility or malfunctions, the organization’s relevant staff will be informed and a possible upgrade will be performed only after written agreement of the Contracting Authority. Next (and especially when basic changes according to the manufacturer’s notification), installation in one of the organization’s systems is proposed, which will function for a certain period of time ( evaluation period ) as a test site and it will be in a monitoring state from the company’s technicians in cooperation with the organization’s relevant staff. After the evaluation period is completed, the upgraded version will be installed to the total of the organization’s systems according to the schedule formed. The company has a fixed policy to offer maintenance and technical support to system software following strictly the maintenance policies and recommendations of the product manufacturers. The basic steps which will be followed in system software upgrade (new version – new release) are mentioned bellow: First, the manufacturing house (Data Concept) announces publically that the new version-release works normally with all the system software’s contributing parts. A test installations is performed in a test node where several product tests take place, Since the above mentioned steps have positive results our technicians take a full system backup. Then the upgraded version is installed and the system is providing service again. For a respective time interval the system is continuously monitored so that Errors are tracked The system gets tuned up In case of a malfunction, the relevant manufacturer’s patch is applied (since it exists) or the system software is restored to its previous step using the system backup. In the latest case, special treatment is taking place so that files are still updated to their latest versions. 9.5.9.9. Tuning Services TechNet’s technicians throughout the whole procedure of software maintenance cooperate with the Contracting Authority’s staff and provide possible additional help TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [93/151] required to optimize the equipment’s usability. Tuning operations are included in the total of general technical support services of the system software. Debugging In order to overcome anomalies / errors of the system software, the company provides the organization with immediate and continuous technical support. A software engineer will be available on-site to encounter such reported issues. The duration of this service is equal to the SLA period, which begins after the complete delivery of the closed project, so that problems of the initial application stage are procured and encountered. The methodology of debugging process is described below: Malfunctions(Bugs) Categorization In case bugs or malfunctions are traced in the offered software applications, the company takes responsibility to correct any malfunctioning software applications or applications executing in an unexpected manner. Concerning the response procedure in such cases: The Contracting Authority’s staff will record the issue in a certain form which will be provided by the company and sent to Help Desk service of the company’s technical support. In case of a high severity issue, phone communication can take precedence. In each case the issue is recorded (according to the methods mentioned in equipment maintenance) and analyzing and resolving procedure is initiated. In each case the Vendor’s head software engineer is informed. The company’s engineer (during the warranty period) takes control of the issue and if it is possible, he fixes and checks proper functioning himself; then the organization’s relevant staff and the company’s head software engineer are informed that the issue is solved. If he cannot find a resolution the company’s Help Desk and head software engineer are properly informed; the latter activates the following procedure In a sort time interval, a software engineer takes responsibility over the issue; if a solution is found, he checks along with the Contracting Authority’s staff that the system has fully recovered. In this case the relevant organization staff signs a form which proves that the issue is solved and therefore the call is considered closed If the engineer concludes that the problem cannot be solved on-site, he forwards it. The issue is checked in the company’s labs it is evaluated and the recovery period is calculated (any possible effort to minimize it is held). The Contracting Authority is informed by phone about the duration of unavailability. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [94/151] Resolution of the problem takes place next (thorough methodology is described below), and the engineer revisits the organization with the appropriate modifications. Repaired software is installed to the appropriate servers, their flawless functioning is checked and fine tuning takes place if needed; the user who notified Help Desk about the issue is informed, along with the organization’s relative staff. Then a form referring that the issue is closed is filled and signed and the process is completed. Changes in software systems will be performed in a way that system users are affected in a bare minimum way. It is mentioned that in each step of the procedure the Help Desk service is informed so that all appropriate electronic monitoring files (electronic Data Base) of the Contracting Authority are updated. 9.5.9.10. Application Software Maintaining Methodology Software architecture is structured in a way that allows errors, modifications, additions to be repaired easy and quick. As soon as the system/software is delivered, installed and accepted by the client maintenance period begins. The purpose of maintenance procedure is to modify the system/software after delivery to correct possible errors, improve its performance or to adjust it for use in another environment. The stages of the maintenance procedure are demonstrated in the following schedule: Procedure Implementation Procedure Implementation Problem/Modification Analysis Modification Implementation Retrospection/Problem Acceptance/ Modification TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [95/151] Analyzing procedure includes the following: TechNet defines the system’s demands, defining the system’s elements that need to be fixed. TechNet has certain procedures to get, record and trace problem reports and modification requests and therefore is able to give essential guidelines for the problem’s resolution; When needed company staff will solve the existing problems. TechNet’s Configuration Management procedure is applied over system’s modifications, according to each project’s special needs. TechNet defines certain responsibilities in project’s staff who is properly experienced in terms of maintenance. Problem / Modification Analysis The Analyzing problem/modification procedure includes the following: TechNet analyzes the problem report or the request for modification considering the impact it has on the system over the following: Problem type: solution, improvement, precautions, adjustments for use in a new environment Influence range: modification size/time Problem importance Based on problem/modification analysis the company develops choices for the proper solution implementation. The company records problem reports or modification requests, analysis results and implementation choices. Modification Implementation Modification Implementation procedure involves the following assets: The company conducts analysis and defines which documents, operating system, software and versions need to be modified. The results are recorded according to the projects specific needs. The company deploys the development procedure in the degree needed to implement the modification. Full and proper implementation of new and modified demands TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [96/151] Retrospection/Problem Acceptance/ Modification Retrospection/Problem Acceptance/ Modification procedure will be performed in a manner accepted both by the client and the company. The above mentioned procedure of applying changes / Modifications in the application software is implemented in cases of correcting system malfunctions and in cases of updated version installations. 9.5.9.11. Installing updated software versions Data Concept commits to: For each new software version developed in the future, the Contracting Authority will be provided with executable code (in electronic form) as well as full documentation of the changes relevant to the previous version (both in paper and electronic form). If the organization requests it the company will furthermore present the advantages offered by the new version and the possible problems its installation would create. In case there are changes in law concerning the functionality of any subsystem, the company commits to modify in time the system as to be compliant to the new laws. In the following paragraph the methodology of installing new software versions is described. New Software Version Installation Since the new software version/improvements is developed (in a manner it ensures compatibility with already installed system - hardware/software), it is thoroughly tested in the company’s systems and documented. The following cases are distinguished: The upgrade affects the Data Base’s structure and therefore data transition is required The upgrade does not affect the Data Base’s structure When the structure is affected, the following steps are taken: A full Data Base and system backup is taken. Then the new version is installed and data transition is performed The result is thoroughly tested and in case of an occurring error, data restoration is executed Upgrades are installed to the work stations TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [97/151] For a reasonable time interval the system is supervised in order to : Trace possible faults Tune up the system When the structure is not affected, the following steps are taken: A full Data Base and system backup is taken. The new version is installed. The result is thoroughly tested and in case of an occurring error, data restoration is executed Upgrades are installed to the work stations For a reasonable time interval the system is supervised in order to : Trace possible faults Tune up the system New software versions will be installed to the appropriate equipment, independent of its location. Installations will be performed according to a schedule agreed with the organization. Furthermore it will be performed in a way that minimum conflict to the Contracting Authority’s normal operation is achieved (preferably outside working days and hours). 9.6. Training The Vendor as depicted above performs installation of client software and configuration of user accounts. The Vendor provides detailed user guide and related documentation, for all the relevant functions that can be executed by the users. The team also provides user training sessions, covering the main functionalities of the platform for every possible user group. 9.6.1. Administration Support - Training 9.6.1.1. Training Scope and Schedule The Vendor in the frame of providing superior high quality services and fully aware of the importance of education as an integral part of every computer system, takes full responsibility of educating the Contracting Authority’s staff. Each ‘student’ will be provided with a hand on experience; the company will design and deliver appropriate educating material covering all training fields. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [98/151] The Vendor will offer complete education to the Delegation’s staff in order to assure the software’s correct and productive functioning and generally the exploitation of the system. The training fields will cover each and every system aspect thoroughly. The design and content of the training schedule ensure that the staff will be trained both in a theoretical and practical level in order to apprehend the way the NEW system should be utilized. The suggested training program keeps in pace with the overall project’s timetable. 9.6.1.2. Training Techniques Prior to developing the offered training schedule, it is necessary to mention and describe the Principles of Instructional Design. The training procedures taking place will be based on this specific method. Training methods and techniques that will be applied during training procedure have to comply with education’s profile. The students, being adults, present some particular characteristics: • They have formed a character based on a sum of experiences, virtues, and knowledge as well as their own learning methods which differ a lot between people. • They have certain intentions over their education – most of times different of that of the trainers • They have competitive needs concerning education (financial needs, family responsibilities, other problems). The above characteristics are taken into consideration in adult training procedures and active training – educational methodologies. Based on the above mentioned, the educational process is considered a dynamic procedure aiming at changing the knowledge, skills, and indicates using techniques which motivate trainees to energetically participate in the educational process. These techniques, as presented below: • • • • Emphasize the processes which usually create oppositions, organize comprehension, and develop insight (eg simulation techniques, case studies). They make defining personal and group goals easier in different levels (schedule, union, activity ) during the evolution of education procedure (eg feedback, evaluation) The make easier to correlate new knowledge / educational experiences with already existent ones and constitutively adopt them Based on experiential learning and learning cycle, the educational techniques aim at creating –during the training procedure- opportunities to: o Acquire specific experiences o Critical reflection over experiences o Use of knowledge and concepts during experience analyzing TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [99/151] o o Active experimentation, which leads back to recalling a certain experience and recycling / continuing the learning cycle. Experimental learning through practice training in the organization Training techniques furthermore encounter the nature of the educational objective. Given that the training object belongs in the technology field, training methods are exclusively laboratory as far as gaining the appropriate knowledge is concerned. This kind of knowledge can be analyzed to: the nature of the system and the subsystems’ functionality, equipment operation, operating and processing techniques in their level of manufacturing, operating and creating the technological product (managing and exploiting corporate resources informational system). The training method is shaped based on problem solution which prescribes model construction. According to the above the main teaching methods and techniques to be applied during training will be: • • • • • Case Studies Role Playing Revision Discussion Computer Lab Evaluating Tests 9.6.1.3. Tutors-Qualifications The Consortium tutors have proven and aged teaching experience in this certain field. Our tutors are informatics scientists having acquired a University degree and they will furthermore participate in the project as members of the development and support team. They also have huge experience in editing user’s manuals and technical sheets. In this way the teachers are actually the ones who implemented the final solution offering in this way a more complete teaching experience. Of course there will always be the option of changing a tutor if this is requested by the Contracting Authority. 9.6.1.4. Training Reports The advisor of each lesson will deliver to the organization weekly the following elements concerning his seminar which provide information about the past week: • Title • Absent trainees catalogue • Name • Sum of excused absence • Sum of unexcused absence TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [100/151] • Extended reference to problems / difficulties Report with possible urgent issues which obstruct the teaching procedure. 9.6.1.5. Final Report The advisor of each lesson will deliver to the Contracting Authority between six days maximum after the end of the seminars the following elements: • • • • • • • Title Content For each trainee: Name Sum of excused absence Sum of unexcused absence Performance (Excellent, Very Good, Good, Bad) Comments and suggestions concerning the lesson’s content, the training material, the synthesis of the particular segment and training conditions will be delivered as well. 9.6.1.6. Tutors’ Evaluation Training performance of the Vendor’s tutors is checked and evaluated from the trainees themselves after the end of the training procedure. In particular the trainees are voluntarily asked to fill an evaluation questionnaire after each training seminar field. This information is used by the company to improve the quality of offered training and to evaluate the trainers. 9.6.1.7. Seminars Description The general characteristics of the suggested seminars are the following: • • • • • • Daily 5-Hour training per training day Groups of 6 trainees per training sub group One computer per trainee Teaching which covers the theoretical and practical section of the Training fields (60% theory – 40% practical exercise) Technical sheets properly edited to meet with training needs; they will be delivered to each trainee ( a full set per person) Seminars will be held in the trainee’s native language TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [101/151] • • • • The training material (books sheets) will be delivered in the organization’s staff native language Comprehension exercises are performed during the whole training procedure Time intervals for clarification conversations and questions during each lesson Provided education and tutor’s performance are evaluated after the completion of each teaching unit. 9.6.1.8. Training Framework The reason the particular curriculum was chosen, is to provide the organization’s staff with a global angle of the system’s basic rules, technologic means, new applications and capabilities. The main advantage is that training is provided from the people who developed and set up the informational system. The Vendor will provide the Contracting Authority with a team of scientists fully experienced in managing and carrying out teaching seminars in the field of informatics intending to consolidate users with the functionality of the offered system. 9.6.1.9. Documentation The company will deliver detailed operation manuals and user manuals and analytical system manuals, in the organization’s native language. It is mentioned that system documentation will include logical description of the data base along with the offered applications. In particular the following will be delivered: User manual including: • System Reports • Screen flow • Reports & Processes • User manual • Messages • Data dictionary The installation-administration-operation manual will include: • Storage and interface requirements • Developed products / source code delivery • Installation / precession steps • Adjustment and continuity of Workflow The application verification manual including: • Multilevel examination based on System control scenarios • Examination results TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [102/151] During user & system manuals writing, usability, friendliness, effectiveness, and consequence to the described characteristics are seriously encountered issues. Manuals will be delivered both in electronic (.pdf) and printed form. Particularly the produced manuals will be accessible through the web browser interface as well. For every new system version, service pack or patch the changes will be delivered in electronic form. The organization is enabled to demand printed versions if the number and volume of changes disable the old manuals. In this case the company commits to print new manual versions. TechNet will provide the Contracting Authority with copies of all manuals, accessory to the ones used during the training procedure. Furthermore the Vendor commits to provide the Contracting Authority during the SLA period additional manuals in electronic form which will include the total of modifications and corrections over the initial applications without any additional cost. 9.7. Help Desk - Support 9.7.1. Overview Help Desk implies as a central contacting point between users and our support technicians over the various software systems build or utilized in terms of building and maintaining the offered NEW system. Help Desk is indeed implemented as a work-flow. Help Desk’s progress is dependent to the severity of the problem as well as to the technicians’ actions. In terms of Incident Reporting end users will be enabled to immediately register a request to the relevant website (which will become available by the Vendor especially for customer support). That is to say, it will be possible for users to set Help Desk’s work-flow moving (Filling a problem implementation form). TechNet, in terms of this particular project, will utilize the already functioning Help Desk service of the technical support team. The team will undertake problem solving and user support in issues concerning the NEW system based on the services level agreed with the organization. Help Desk will receive telephone calls and register them in the appropriate database. As soon as the complete website is up and running the institution will be notified with an exclusive Technical support line providing the following functions: Providing advice relevant to using the CMS system Incident-malfunctions reporting and providing resolution to the user TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [103/151] Technical support line will be available in a daily basis (Monday through Friday). Normal business hours for Customer Service are from 9 AM to 6 PM. 9.7.2. Help Desk Features Incident and Problem Management: We deliver real-time incident information to ensure problem resolution and avoid recurring issues. Change management: Schedule, test, and report all moves, additions, and changes. Configuration management: Our knowledge base contains all information on hardware, software, and network configurations, including documentation. Release management: Upgrade to new versions, detect illegal software, and discover multiple versions 9.7.3. Intention Help Desk intention is to provide immediate high quality support to the administrators and users of the NEW system so that maximum productivity levels are achieved. The sole criterion to the service’s point of success is user satisfaction. Unquestionable condition to the help desk service’s success is to properly inform the users over the offered services the way they are executed and generally to clearly determine the boundaries of its responsibilities. 9.7.4. Goals The Help Desk service has the following goals: To concentrate and categorize the reported problems Administrator support in the frame of network issues Immediate response to issues – malfunctions concerning the network’s functionality and their immediate resolution To record and resolve sole cases of system problems as they are reported by system users and to provide weekly reports so that upgradable parts of the system are presented To guarantee resolving/managing typical user errors while they use the software To support users in using the environment 9.7.5. Submittal mechanisms TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [104/151] All system users will be able to access the Help Desk feature through phone, fax, email, online report or by filling the special case form of the Help Desk service. In case of phone communication the incident/request is reported orally to the technician responsible. In order to send a fax or e-mail, users are required to fill up an appropriate form, where they should give analytic description of the concerning problem and include the kind of support they seek. 9.7.6. Priority System A priority system will be formed dependent to the volume of incoming calls and the urgency for support. For this reason user problems/issues will be categorized according to their severity and assigning priorities will be dependent in a great degree to the Contracting Authority’s needs. Priority system will provide guidance where the response and escalation time of the service will be clearly mentioned. 9.7.7. Scope The following list includes responsibilities and scope of the Help Desk service’s technicians Receiving problem reports / requests for help Communicate with users in order to solve their problem / answer their question Pose questions to collect the required information Record information Diagnose problems or categorize requests Analyze data and problems/requests Transmit issues to the appropriate technical support personnel Prioritize functions Resolve problems / answer help questions Close problems / requests and editing technical reports Notify users about call status Support users over the system’s environment 9.7.8. Incident Management TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [105/151] The incidents lifecycle begins as soon as the users report them to Help Desk. First, the technician receiving the report collects the required information for further incident screening. E.g. user identification data, system specifications, detailed incident report, incident severity, incident priority etc. For each problem /request reported in the service a Problem Notice form should be filled. The technician’s interventions while encountering the incident will be recorded. The problems / questions are tracked through all their life cycle and appropriate information is recorded. Since the problem is solved the form is filed for possible future use. The problem / question is considered solved if both the user and technician agree that no further resolving can be operated. A good idea is to ask users if they are ok with their issue. Since they are positive the issue is considered closed. The technician then takes care to fulfill the documentation etc. 9.7.9. Problem Classification Calls will be tracked in large problem categories. This is particularly useful when Help Desk feeds information to software development groups. Problem severity can be evaluated based on the volume of incoming calls and work done to successfully encounter them; In this way priorities are given to development teams. User groups can be formed with the most calls to the Help Desk in order to resolve a specific problem group. These teams in future will receive special support. 9.7.10. Inspection-Evaluation The service’s main goal is to continuously improve itself in terms of customer satisfaction. In this framework Help Desk will hold open communication channels with end users as to understand their demands and serve them in the best possible way. The Help Desk service is evaluated towards productivity, efficiency, cost effectiveness, and many other indicators through systematic processing of collected data. 9.7.11. Reporting All the information gathered by the Help Desk are organized in a neat way and are used for producing useful reports. The target is to provide information to the project’s staff in charge in the following points: Overall activity (volume, intensity etc) TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [106/151] Output (Helps Desk’s level of achieved efficiency) Changes and tensions during the time interval Relations between measurements and cause – result models Productivity and staff targets etc 9.7.12. Incident tracking system All the above mentioned elements (User credentials, the problem, solution etc) are stored in a unique incident tracking system: Service Desk. In terms of completing the current project Service Desk will be utilized. It is a Webbased software developed especially to assist our technicians in managing support calls with even better results. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [107/151] 10. Technical Specifications No Criteria /Technical Specifications Function 1.0 FILE CIRCULATION Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements File circulation is simply the tracking of records or files wherever they are at any given time in all records management processes. Therefore the following factors should be considered in the final user product/software. 1. The system should M be able to track the files, that is, Monitoring the lifecycle of documents will be the movement of done in 2 ways: the files and also the officer who has For Physical records tracking and circulation among authorized personnel requested for the (internal users) and filing into storage files. Including the rooms/file cabinets will be facilitated with department where an embedded barcode mechanism into the the officer is workflow engine of Records.Trak™. More based. specifically a unique barcode will be assigned automatically by the System for each Document, printed on the attached to each workstation default printer and placed with sticker in the right front page or each document. Handheld barcode scanners available in all departments, storage rooms and main cabinets will provide real-time tracking. For Digital Records (scanned or native), circulated electronically among authorized users, Records.Trak™ will provide full life cycle monitoring via the embedded workflow engine. Records printed on paper (physical records) will be monitored as above. As the organizational structure of ZRA will be mapped inside the users management module of Records.Trak™, internal officers roles and departments will attain specific attributes and all records circulation will be traceable as far as users and department TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [108/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements concern. 2. The system should allow for the configuration of the period the files can be with the requesting officer. The system should allow the systems administrator to configure the period that a file can be out based on departmental requirements. 3. When the file is out the system should specify how long the officer/department has had the file and the period remaining for it to be returned to the registry. 4. The system must provide functionality to recall the document/file through a trigger recall message to the officer holding the document/file. M Requesting officers can either be logged into the system or they can apply for a specific document in the administration front desk. Either logged users or registered applicants will be notified for the availability of the document and the admissible period of usage. The Administrator of the System will be able to assign the period that each document will be available for circulation among users and the period for each user/role specifically. As all documents can be categorized (catalogued) under specific thematic groups, the lending period (out period) can be assigned directly to thematic groups in order to be inherited to all relative documents that belong to the group. M Based on the availability period of each document, the System will calculate the elapsed and the remaining time (based on computer time). M The System will send alerts (email and/or SMS) to users reminding them for the time elapsed and the remaining time by which the document should be returned. These messages will be sent within an adjustable time interval prior to the expiration date of document’s acquisition. Email will be used as TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [109/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements an attribute for each logged user (officer). 5. The system should be able to generate a reminder on overdue files, the file shall be held by an officer for a configurable number of days after which the system will trigger a reminder to inform the officer that the files need to be returned to the registry. 6. The system should also deny an officer holding on to the file which is overdue, from requesting for another file. The system should provide for configuration of overdue period and possible extension 7. The system should allow a requesting officer to use a bar-coded ZRA Identification card when requesting for files to enable his/her details be captured and linked to the file/files being M See all Above M As all users document handling – assigning and all document circulation periods will be monitored, the System can be customized to prohibit further assignments of other documents until the original document will be returned. The lending period of each thematic group of documents can be adjusted by the Administrator and time extension can be applicable accordingly. M Users (Officers) will be granted with a unique Document System’s ID Card that will be presented each time are willing to take out a document. Each ID (document access cards) Card will have a similar barcode structure to the documents barcode system provided directly by the Records.Trak™ Users Management Module. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [110/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements requested or should facilitate for the generation of a request that should manually be signed by the officer collecting the file from the registry. 8. The system should facilitate online File Request which once approved by registry online, the requesting officer can collect the file sign the print out of a request file form or have his/her bar code swipe to link file and borrowers details. 9. The system should allow for file transfers between units within a department/divisio n. Supervisor in departments/units should approve upon which Central Registry should receive a notification and an immediate update of the holder of the file. Each Officer’s barcode ID Card will be related to the documents that have been taken out by him/her. Alternatively, in case that the Officer has not been issued an ID ZRA card, the administrator of the system will be able to manually assign taken out documents to this specific authorized User. M Each user logged into the system can request online (via the System’s interface) to the Central Registry for the borrowing of a document. The Central Registry can then authorize this user to take out the requested document(s). All this transaction is automatically monitored and logged by the internal log of the System. For collecting, taking out, the document(s), the Officer will have to present his/her ID card and swipe it out in the Central Registry’s front desk for barcode identification and approval. M The System will allow groups of documents to be requested (batch request) by a user’s group (department/division) to be transferred to another department/division. The approval will be granted by the Central Registry. Upon approval a notification will be send to relative users (holder of the file) about the document’s reallocation – reassignment. 10. The system should M allow officers to request part A set of files that construct each document TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [111/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements files/volume. Considering that these files have documents running in a chronological order by year the system should allow for file structure definition. 11. The system should limit the number of files going out to a configurable specification of files per account. 12. The system should be able to show the user (Requester) the status of the file e.g. Available, not available nonexistent etc. can be registered separately and categorized according to their specific metadata, such as: issue - volume date, issue-volume number etc. creating a tree-structure model. Assignment of these types of documents can be done either in total concerning relevant files or as per specific file described by each unique metadata. M Rules applied to the amount of files that can be taken out by a user can be adjusted accordingly by the administration System’s console of the Central Registry. M The Status Stage of each file is automatically changed according to the circulation’s lifecycle ‘hold points’ inside the Authority. Each user can obtain real-time information relative to the status of each document as it is taken and circulated among personnel and departments/divisions. A queuing mechanism will be available for future requests. 13. Where files are not available, the system should give details as to the current user in possession of the file 14. Where files are almost overdue, the system should trigger a reminder and request the M See above M Same as -4- TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [112/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements user to either renew or return the file to Central Registry for storage. The system should be able to show status of file and provide an option for action – renew/return 15. Any approved electronic file request approved by Central Registry should only be valid for a configurable period after which if the officers does not collect file the request must be invalid 16. On return of files, system should provide for verification of completeness of file content. M The validity period of each approved request will be set by the administrator of the Central Registry. This period could differ among departments and division within the organizational structure of ZRA. M A visual inspection by the administrator of Central Registry based on the structure of the original document formulated by one or more physical files will determine the completeness of the returned document. The System will facilitate this procedure providing a tree-structure with checkpoints and a commentary area for each document. Comments can be forwarded accordingly to escalate and alleviate possible inconsistencies. REPORTS Note: Data structure for tracking ZRA records: A unique Please see Chapters: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [113/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements identifier/ Reference code Title of file records office location Name of original user Date of retrieval Date of transfer to another users Name of additional users Date of return to registry 1. Requested file/files by date, Date of dispatch, Department, Name and location of requesting officer, etc. 2. Overdue files report, Date of last reminder if overdue for return, Date of return to storagewhether overdue or not 3. Recalled files report 4. Weekly Statistical report (Files out against files coming in). Produce statistical reports based both on individual users as well as on files and 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [114/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements subject areas. 5. List of files by status (Available, taken, reserved, etc) 6. Report on file transfers between officers, Date of transfer to another user, Name and location of user to whom file transferred 7. The system should be able to provide a report on files in transit(files transfers before confirmation) The system must be able to produce ad hoc reports by drawing on relevant information from the audit trail. 2.0 ENQUIRY Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 The purpose of this function is to make it possible for registry and officers to search for files that are in the registry in order to know their status before requesting. It is also intended at displaying search results in line with queried search perimeters. 1. The system should provide for the configuration of the file search criteria, e.g. by M Please see Chapters: 4.1.2 & 5.2.3 Account Number TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [115/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements Name of file TPIN Tax Type Tax Office Date of Registrati on 2. The system should provide an option to either request for the physical file or view the digital format. M Please see Chapters: 4.1.2 & 5.2.3 REPORTS 1. File location report The system should be able to generate a report with the search criteria requiring information on: the entire classification scheme and part of the classification scheme as defined by the user 2. The system should be able to give a report on a specific entry and its status(e.g. active, semi active, not available, requested, Available) when queried D Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [116/151] No Criteria /Technical Specifications Function 3.0 FILE REQUEST Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements 3. The system should M be able to provide Please see Chapters: the user a report of all active files for a 4.1.2 & 5.2.8 defined file category 4. The system should M be able to provide a Please see Chapters: report of all or part of the semi active 4.1.2 & 5.2.8 file category in record Centre The purpose of this function is to facilitate requests of files from Central Registry by officers from their workstations. 1. The system should allow officers to request for physical files electronically and must also provide access to digital files. 2. Once search results are displayed, the system should indicate the status of the file to requesting officer i.e. in registry or out and with whom. 3. Where the status of the file is in registry, the system should allow the user to request for the file. 4. Where the status is out, then the system should M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [117/151] No Criteria /Technical Specifications Function System Features/Requirements provide for reservation of the file through a queuing system. 5. When a file is returned, the system must notify next person in the queue of the files availability. 6. The system must ensure that all requests for physical files are approved by the supervisor of the user before sending the request to the registry. 7. The system should be able to allocate approved files to available officers in Registry for issuance/ 8. The system must provide functionality for the registry supervisor to reallocate cases pertaining to issuance of files to other officers. 4.0 Mandatory(M)/Desirable(D)/Important(I) Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION FILE The purpose of this function is to manage the organization and storage MANAGEMENT of physical active records. FOR ACTIVE RECORDS TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [118/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements 1. The system must M provide for the configuration and Records.Trak™ provides a complete definition of the customizable set of documents categorization based on structural, classification thematical and contextual characteristics. system 2. The system should be flexible to allow new changes to administrative structure or the classification scheme by the systems administrator. 3. The classification scheme should allow for centralized management of the scheme by the System Administrator or other authorized user. 4. The system should support the development and use of more than one Classification scheme. 5. In terms of file classification the system should allow for the definition of levels and the allocation of unique identifiers for business functions, M The Administrator can re-set and re-organize documents or groups of documents with different classifications and set views of the category structure accordingly. M The Users Management Module of Records.Trak™ will restrict users from altering the classification scheme. Only authorized users can alter and re-set the classification scheme. M Please see: FILE MANAGEMENT FOR ACTIVE RECORDS Technical Specification -1M Please see: FILE MANAGEMENT FOR ACTIVE RECORDS Technical Specification -1- TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [119/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements activities transactions. and 6. The system should restrict the definition and maintenance of records classification tools to a System Administrator or authorized user 7. The system should be able to create bar codes for all files registered in the system. 8. The system should be able to generate barcodes for each particular volume 9. The system should allow for the transfer of files according to a configurable user defined criteria, e. g transfer between locations, and transfer between towns. Once the transfer process is activated, the system should indicate “in transit” until the file is received. Once the recipient confirms receipt the system should M Please see: FILE MANAGEMENT FOR ACTIVE RECORDS Technical Specification -3- M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Records.Trak™ as a web based software application will operate throughout the Metropolitan Area Network (MAN) of the Authority, keeping log of each operation regarding place, building, division, department, and user(s). The availability of the documents will be monitored and set according to the relocation process of each document. TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [120/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements confirm availability of the file in the new location. 10. The system should allow a folder or group of folders, and their attached records, to be moved and reclassified within the system by a System Administrator or other authorized user 11. The system should provide for configuration or definition of the period that a record/file can be active 12. The system should provide for the purging or removal of records from the active file/files upon turning semiactive M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION REPORTS 1. The system should be able to produce reports on file transfer between locations 2. The system M Please see Chapters: 4.1.2 & 5.2.8 M TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [121/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements should be able to produce reports on the actions carried out across all or part of the scheme, for a defined time period. e.g. volumes opened, volumes closed, close files 3. The 4. system should be able to produce reports listing: all files created or registered within the records classifications scheme structured according to the hierarchy of the record plan The system should be able to generate a report comprising: The entire classification scheme and part of the classification scheme as defined by the user Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [122/151] No Criteria /Technical Specifications Function System Features/Requirements 5. The system should produce a daily, weekly, monthly report on the files that have turned semi active 6. The system should produce a report of records pending purging or removal from the active files 7. The system should produce a report of documents purged or moved from an active file to a semi active file due to the status 8. The system should have defined report access perimeter for different user groups. 9. Active’ Report 5.0 Mandatory(M)/Desirable(D)/Important(I) records M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 FILE The purpose of this function is to manage the organization and storage MANAGEMENT of physical semi active records. FOR SEMI ACTIVE TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [123/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements RECORDS 1. The system must provide for the configuration and definition of the classification system 2. The system must also allow the systems administrator to set the disposal criteria 3. The system should display all files contained in a particular box/rack 4. The system should provide for review/change of the records destruction date. 5. The system should be able to show the content of a location at any one particular point in time. The system should also show the location of the file. 6. The system should assign a clear identification to the storage location. The system should allow the system M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Records.Trak™ as a web based software application will operate throughout the Metropolitan Area Network (MAN) of the Authority, keeping log of each operation regarding place, building, division, department, and user(s). The availability of the documents will be monitored and set according to the relocation process of each document. M Please see Table of Specifications: FILE CIRCULATION TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [124/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements administrator to move files between storage locations. 7. The system should be able to give reminders for the files which are due for destruction. 8. The system should provide an interface for the transfer of physical files from active range (registry) to semi active (record center) REPORTS The system should be able to produce reports on all disposal activities undertaken by the system e.g. 1. The system should be able to produce a report listing: all records for which a particular disposal action will occur, over a given period of time e.g. transfer to archives or destruction; and all records due for disposal M Please see Table of Specifications: FILE CIRCULATION M Please see Table of Specifications: FILE CIRCULATION M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [125/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements 2. 3. 4. 5. within a given period of time, providing quantitative information on the volume and type of records. e.g. files eligible for disposal The system should be able to produce statistics of review decisions over a given period of time. The system should be able to produce a report with details on the outcome of a disposal process. The system should be able to produce reports to support file transfer processes between locations e.g. from slot A to slot B, files/volumes transferred to archives The system M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [126/151] No Criteria /Technical Specifications Function System Features/Requirements should be able to report on the volume and types of files that are overdue for disposal. 6. Report on files/volumes destroyed within a defined period 7. ‘Semi-active’ records Report 6.0 MAIL MANAGEMENT Mandatory(M)/Desirable(D)/Important(I) Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 8. ‘Records earmarked for disposal Report The purpose of this function is to provide an audit trail and assist the mailroom in providing efficient mail handling services to and from the Postal Service by dispatching mail as determined by the sender (originating office) and documenting receipt of mail into the organization. The function will deal with the tracking of incoming and outgoing mail by making it possible to inform recipients that their mail is ready for collection. Outgoing Mail 1. The system must M provide Records.Trak™ will be customized functionality through an accordingly to facilitate this specific request. interface for officials to make a request for their physical mail to be sent/posted by registry via registered mail courier 2. The system must M provide functionality for Records.Trak™ will be customized TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [127/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements the supervisor of the official to approve the request for registered mail to be posted by registry 3. Once this is done the approved mail should appear on the mailroom function 4. The system must provide functionality for registry to accept the request by confirmation of receipt and indication of dispatch details. 5. The system should have functionality to capture/enter incoming registered mail and notifying relevant recipients of mail received in the registry accordingly to facilitate this specific request. Records.Trak™ will be customized accordingly to facilitate this specific request. M Records.Trak™ will be customized accordingly to facilitate this specific request. M Records.Trak™ will be customized accordingly to facilitate this specific request. Beyond traditional mail, Records.Trak™ provides an MS Outlook adapter for importing automatically e-mails and attachments. The user can generate e-mail responses or forwards to other e-mail recipients, automatically by the system (outgoing). REPORTS 1. Full details of official registered mail received from departments by registry 2. Full details of official ordinary mail received Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [128/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements 3. 4. 5. 6. 7. from departments by registry A report of all official registered and ordinary mails confirmed receipt and posted by registry A report of incoming registered official mail The system should be able to produce any other reports of the relevant activities of the metadata concerning the receipt and dispatch of incoming and outgoing mail. The system should be able to produce statistics on the number of mail received and dispatched for the period defined by the user e.g. daily, monthly, yearly Registered Outgoing and incoming mail 8. Registered 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 Mail TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [129/151] No Criteria /Technical Specifications Function 7.0 RECORDS CAPTURE Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements pending collection by recipients etc The purpose of this function is to capture and manage digital records. The function is also intended to display an electronic or scanned copy of the actual record. 1. The system should provide for the creation of new master files 2. The system should provide for the appending of files in the master files in any ZRA recommended format, e.g. PDF 3. The system must be able to receive new registrations from secondary systems via the interface and the system must provide functionality to confirm receipt and activation of such registrations. 4. The system should provide for integration between the physical files and the digital files 5. The system should be a centralized system that will allow access from any point on the ZRA network M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [130/151] No Criteria /Technical Specifications Function 8.0 Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements [provide for the scanning of files and records that are in different regions/stations onto the main ZRA records management system] 6. The system should allow a System Administrator or other authorized user to close a folder, ensuring that no new records can be added to that folder. 7. The system should ensure that closed folders and their contents are still accessible for retrieval and viewing purposes. 8. The system should allow a System Administrator or other authorized user to open a previously closed folder for the addition of records, and subsequently close the folder again. REPORTS 1. Report on digital records or categories of digital records, transferred M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 M Please see Chapter 4 and 5.2 M Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [131/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements within the classification system according to user defined metadata elements. 2. The system should be able to produce statistics for the number of digital records viewed by a user or group of users within a defined period 3. The system should be able to report the actions carried out on a particular folder, or group of folders, during a specified date range e.g. addition of records 4. The system should be able to produce a report on the records scanned and newly registered physical files by a user or group of users on the system for a defined period of time with relevant file/record M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [132/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements details 5. The 9.0 INTERFACES system should be able to produce statistics for the number of records scanned and physical files registered by a user or group of users on the system for a defined period of time 6. The system should be able to report on the size and remaining capacity of its digital record stores and repositories. 7. During disposal the system should give details on all digital records successfully destroyed and identifying those records which were not successfully destroyed. 1. The system must interface with the Integrated Tax Administration System (Detailed specs to be done) M Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 4.1.2 & 5.2.8 Please see Chapters: 4.1.2 & 5.2.8 M Please see Chapters: 5.2.6, 5.2.7 & 5.3.1.1 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [133/151] No Criteria /Technical Specifications Function Mandatory(M)/Desirable(D)/Important(I) System Features/Requirements 2. The system must interface with SAP (Detailed specs to be done) 3. The system must interface with ASYCUDA (Detailed specs to be done) 4. The system must interface with Teammate (Detailed specs to be done) M Please see Chapters: 5.2.6, 5.2.7 & 5.3.1.1 M Please see Chapters: 5.2.6, 5.2.7 & 5.3.1.1 M Please see Chapters: 5.2.6, 5.2.7 & 5.3.1.1 A. NON-FUNCTIONAL REQUIREMENTS 1. The system must be on-line and realtime. The system must also support batch processing. 2. The system must have a graphical user interface and be menu driven with screen navigation and screen selection facilities. 3. The system must have a provision to cater for M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [134/151] customization/reco nfiguration of forms. 4. The system must support distributed processing of transactions at stations around the country but data accessible on a central database based at Head Office. 5. The system must be able to support multiple concurrent users. 6. The system must be accessible from multiple locations seamlessly with centralized processing and a centralized database. 7. The system must have facility to archive data after a predefined period. A facility to enable enquiry on archived data and retrieval of archived records should be made available. 8. The system must maintain up to information for a predetermined period prior history on-line before 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [135/151] archiving. 9. The system must have an online help facility for each user screen. 10. The system must have a multi-level approach to system security based on the recognized audit controls of ‘authentication’ and ‘verification’, including: Level 1 Unique usernames and passwords should be required for all users at the operating system or domain level e.g. Windows user accounts. Level 2 - Once the user has gained authorized and authenticated access to the operating system, unique usernames and passwords should be required for all users at the application level. M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [136/151] Level 3 - Once the user has gained authorized and authenticated access to the application, there should be configurable access to specific modules/transa ctions within the application. Level 4 - The final level of secure access control is based on implementing configurable parameters to control the user’s actions once access has been gained to authorized modules or transactions e.g. Read Only, Insert, Amend/Update, and Delete. 11. The system must have the facility to control user/group access at userdefined levels/functions including the following: Functions M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [137/151] User id/password Systems Administrati on and Control Application/ Module/Submodule Forms (screens) and Reports Buttons/Fun ctions Levels Data entry/captu re level Officer/Insp ector level Manager/Se nior Inspector level Assistant Director level Director level Commission er Level Access to combination s of the above (functions and levels). 12. The system must have a facility to log out the user after specified time M Please see Chapters: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [138/151] of inactivity. 4 and 5 13. The system must have end to end application encryption. M 14. System passwords must be userdefined e.g.: Complex and alpha numeric Minimum 8 characters in length Held in an encrypted form. 15. The system must require periodic password changes at regular intervals defined by management. 16. The system must lock account after user-defined unsuccessful attempts. 17. The system must provide for a clear audit trail for all transactions with a time and user account stamp. Authorized staff/roles must be able to view audit trail logs online or print hardcopy. 18. The system must support automatic Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [139/151] archiving of audit trail logs per userconfigurable intervals. Audit trail logs must be readonly and securityenabled to prevent unauthorized access or modifications. 19. The system must have an easy-to-use report generator facility, which must allow for the generation of adhoc reports. 20. The system must permit both on-line entry and batch update of transactions and be capable of accepting and validating input from other feeder systems. 21. System control and maintenance at the system administrator level must include: System control files System parameter files Look-up tables Calendar set up Validation levels Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [140/151] Ability to set validation rules at the field level. 22. The system must have the provision of on-line warning or alert messages and transaction rejection where validation identifies invalid data input. 23. The system must have facility for output/reports to be directed to either printer, screen or file and reports must have user-defined characteristics including have: A title/ description Detail the period/ year Page numbering End of report message Nil report message where appropriate Default spooling where output size exceeds user-defined limit. No limit on number of print queues M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [141/151] 24. The system must provide a facility to convert an ad-hoc report into a standard report. 25. The system must support the generation and use of bar codes. 26. The system must be able to print an exact duplicate of a previously generated notice etc. 27. The system must seamlessly integrate all modules/functions within the proposed solution, both on a one-to-one basis and also on a oneto-many. 28. The system must allow options to accept transactions from any feeder system, subject to validation. 29. The system must have complete package/module integration running under a recognized, Open Standards compliant hardware independent operating system (to be determined by the application M Please see Chapters: 4 and 5 D Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [142/151] requirements). The system must be based on a reliable and tested relational database management system. The latest tried and tested version of Oracle is preferred. 30. All packages must run on latest Open Standard Technology Platform and be RDBMS compliant. 31. The system must have the capability to run third party reporting products in order to access system data. 32. The system must have the facility to print any information displayed on a screen. 33. The system must have the provision of on-line enquiry/ interrogation for transaction level record retrieval. 34. All correspondence to be generated by the system should be in PDF format. 35. The system must properly display, calculate and M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapters: TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [143/151] transmit date data, including, but not restricted to 21st Century dates. 36. The system must be capable of receiving inputs and generate reports through web (webenabled). 37. The system must meet the Minimum tolerable Mean Time between Failures (MTBF) in any one calendar year to achieve an uptime of 98%. 38. The system suppliers must provide the users and ZRA with copies of all documentation pertaining to the software including user manuals, technical specifications. 39. All the software and hardware and associated utilities installed must be well documented. 40. The system suppliers must commit to providing on-going technical support for the first 2 years. 41. The system suppliers 4 and 5 M Please see Chapters: 4 and 5 M Please see Chapter 9.5 M Please see Chapter 9.6.1.3 M Please see Chapter 9.6 M Please see Chapter 9.7 M TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [144/151] must test all the system functions before implementation. 42. The system suppliers must correct any system error that is detected in the course of testing and thereafter retest again as necessary. 43. The system must be thoroughly tested to ensure user acceptance with production volume workloads in a production environment to determine overall performance in terms of throughput, response time, run time and resource utilization. 44. The system must be tested for scalability. 45. The system must be tested to ascertain that interfaces are functional and correct by electronically uploading/downloa ding data from interfaced systems. 46. The system must provide for a development, testing, Please see Chapter 9.1 & 9.2 M Please see Chapter 9.1 & 9.2 M Please see Chapter 9.1 & 9.2 M Please see Chapter 9.1, 9.2 & 9.3 M Please see Chapter 9.1, 9.2 & 9.3 M Please see Chapter 9.1, 9.2, 9.3, 9.4 & 9.5 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [145/151] quality assurance, training, and disaster recovery and production environment. 47. The Supplier must M provide ZRA with Please see Chapter 9.1, 9.2, 9.3, 9.4 & 9.5 the source code or acceptable escrow Records.Trak™ is a Data Concept S.A. agreement. software product offered to all Public Authorities as ZRA with full-documented source code. 48. The Supplier must ensure end users are adequately trained in the use of the system as well as technical training for system administrators and second level support staff M Please see Chapter 9.6 TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [146/151] 11. GANTT Chart TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [147/151] ANNEXES TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [148/151] Annex A – CVs See attached TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [149/151] Annex B – Company’s Profile See attached Folder TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [150/151] Annex C – References – Past Similar Assignments See attached Folder TECHNICAL AND FINANCIAL OFFER FOR A SOLUTION FOR CENTRAL REGISTRY ELECTRONIC RECORDS MANAGEMENT TechNet Africa (Data Concept S.A. Supplier/Subcontractor) [151/151]