Exchange Participant's Investment In order to trade through the HKATS environment, at least one pair of SDNet lines with modems and routers, one switch, and LAN connection cable(s) are needed. Exchange Participant can choose to connect to HKATS through central gateway and/or network gateway. The following system configuration is suggested for CLICK workstations: CLICK Workstation Note 1 Hardware Requirement 1. Intel® CoreTM i3-550 3.2 GHz (or higher) 2. 4 GB RAM 3. Hard disk with at least 10 GB disk space available 4. 8 MB video memory (or more) 5. 21" monitor with 1280 x 1024 resolution (or higher) 6. Ethernet network adapter (supporting 100/1000 Mbps with full duplex) 7. CD/DVD-ROM drive 8. Mouse & US-keyboard 9. Sound blaster & loud speaker (optional) Software Requirement 1. Microsoft Windows 7 Professional 64-bit (Service Pack 1 or later) (English) 2. Anti-Virus software Note 1 Other comparable configuration may also work, which is subject to further verification. Network gateway is required for CLICK workstation. Switch Note 2 1. Provide at least eight (see Note 2 below) 10/100/1000 BaseT RJ-45 connections with UTP (Cat 5 cable) to PC, network gateway and SDNet routers at each Exchange Participant’s site. 2. Conforms to IEEE 802.3(x) Ethernet standard with capability for 10/100/1000 BaseT auto-negotiation. 3. Can be managed through SNMP. 4. Able to support telnet-based or terminal-based out-of-band management is an advantage. 5. Switch port connecting SDNet routers and network gateway must be configured as 100/1000 Mbps full-duplex mode. Auto-negotiation is required for 1000 BaseT. Note 2 Exchange Participants should use switches which comply with the above specification and industrial standard. Exchange Participant may consider purchasing additional switches for better redundancy and port capacity when deemed appropriate. If the switch is connected to Exchange Participant’s own internal network, Participants should ensure that network loop will not be created. In addition, Participant should ensure that there is no network address conflict. Three ports will be taken up by the two SDNet routers and the Network Gateway while the remaining ports are for Click Trade and OAPI application connections. If more connections are anticipated, the procured switch should provide more RJ-45 connections. Since SDNet circuits of different site are using the same HSRP group, Participants are reminded not to connect SDNet circuits of different site on the same layer-2 LAN. If switch will be shared among sites, it should be separated by VLAN. Ref: 150424 Two Straight Cat 6 UTP cables 1. Connection between the routers and the switch. 2. The cable standard and wiring must meet the TIA 568-A/UTP Cat 6 standard. 3. The Cat 6 UTP cables should be of sufficient length and comply with the above standard. 4. If the Exchange Participant purchases additional switch, please ensure there are additional cables for cascading the switches. Power Sockets (13A) 1. Sufficient for 2 routers, 2 modems and 1 (or 2) switch. 2. Sufficient for network gateway and CLICK workstation(s). Network Gateway Note 3 1. 2 x six-core Xeon 2.8 GHz or faster processor 2. 12 GB RAM or more 3. 2 x 73 GB mirror local disk (or more available hard-disk space) 4. CD-ROM or DVD-ROM drive 5. Ethernet network adapter with 10/100/1000 BaseT Full Duplex (auto-negotiation required for 1000 BaseT) 6. Red Hat Enterprise Linux 6.5 7. Symantec AntiVirus Note 4 8. OMex Genium subsystems Note 3 Hardware should be fully compatible with the standard of Red Hat Enterprise Linux 6.5 Operating System as indicated in release notes from Red Hat website: http://www.redhat.com Note 4 Software maintenance is required in order to obtain version/release upgrade. Please see next section for the estimated cost. Estimated Cost Note 4 Initial cost paid by Exchange Participant: Hardware Network Gateway with installation for Genium TIA 568-A/UTP Cat 5 Cable x 2 Switch CLICK Workstation with Microsoft Windows 7 Professional (English) preinstalled Sub-Total Software Red Hat Enterprise Linux 2 Sockets 1 Guest 1 Year Subscription Symantec AntiVirus Sub-Total Installation Fee Installation of Network Gateway Ref: 150424 e.g. only one workstation Remarks: $ 65,000.00 Estimated $ 200.00 $ 8,000.00 $ 25,000.00 Estimated Estimated Estimated $ 98,200.00 $ 64,000.00 Estimated $ Estimated; Assumed one network gateway and one CLICK workstation 360.00 $ 64,360.00 $ 8,500.00 Not required for first network gateway Installation of Network Gateway Software Sub-Total $ Total Initial Cost: $174,060.00 Running cost paid by Exchange Participant: Monthly Fee Monthly Rental for one set of 2 x 10M SDNet lines with routers and modems Monthly CLICK or OAPI Sub-license Fee (per user per connection) Monthly Recurring Cost of Network Gateway (per Network Gateway) Total 3,000.00 $ 11,500.00 $ 7,000.00 Estimated $ 1,750.00 $ 3,000.00 Assume one CLICK workstation Not required for first network gateway $8,750.00 for first network gateway Software maintenance is required in order to obtain version/release upgrade. Estimated Estimated Estimated; Assumed one network gateway and one CLICK workstation $ 11,750.00 Annual Maintenance Fee Note 6 Network Gateway Hardware Switch Software Maintenance Fee for: $ 24,000.00 $ 1,300.00 $ 600.00 Symantec AntiVirus Total Estimated; Price may change from time to time $3,000.00 for first network gateway $165,560.00 for first network gateway $ 25,900.00 Note 4 Exchange Participant (EP) who desires to install more than the allowed maximum number of CLICK workstations at any location, or who are using multiple APIs per workstation, or who decides to have trading workstations located at different locations will need to acquire additional sets of SDNet lines with routers and modems, switch and network gateway. Note 6 EP is responsible for maintenance renewal for gateway hardware & software, and switch purchased and owned by EP. Ref: 150424 Configuration Diagram for Exchange Participant Site with Dual Router under the HKATS Environment: Ref: 150424 HONG KONG FUTURES EXCHANGE LIMITED TO: (A wholly owned subsidiary of Hong Kong Exchanges and Clearing Limited) 6/F Two Exchange Square 8 Connaught Place Central, Hong Kong (Ref: DT) Fax: Hotline: 2877 0017 2211 6360 CLICK WORKSTATION INSTALLATION/TERMINATION REQUEST FORM Particulars of Exchange Participant Exchange Participant Contact Person Email Phone No. Fax No. Services Required (Please tick the box for the appropriate service(s) required.) Installation of CLICK Termination of CLICK Re-installation of CLICK Intended Installation Date Intended Termination Date Intended Re-installation Date Number of CLICK Address of Service Required PC Configuration Host Name (e.g. ABCW01001) Type of CPU (e.g. Intel i3-550) Speed of CPU GHz Memory GB RAM Hard Disk GB Display Card MB RAM We hereby request for the installation/termination of CLICK workstation(s) and agree to pay the required charges stipulated in the HKFE Rules, Regulations and Procedures. Authorized Signature Name/Title Date (with company chop) _________________________________ For Official Use Remarks Setup Guide Sent On Click Installed On Ref: 150424