Name: Sushil Kumar Kapoor Date of Birth: 08/11/1954 Place of Birth: Ajmer (Rajasthan) Contact Address: C1 Evershine 2, J P Road, Andheri (W). Mumbai 400053. India e-mail: sushilkapoor@gmail.com SKYPE: sushilkumarkapoor Phone: 0091-9819836535 Educational Qualification: Bachelor of Science from Bombay University. (Chemistry & Physics) Passport Details: Passport Number: - H 9263004 Issued at: Mumbai Valid till: 07/12/2019 Driving Licence: Malaysian driving Licence Qatari driving Licence Omani driving License Nigeria driving Licence. EXPERIENCE: 38 years. (31 Years in Gas Processing). Experience: 2006 to date – NLNG, Bonny Island, Rivers State, Nigeria. Currently working with Nigeria LNG at Bonny Island. Producing 24 MT LNG per annum (using APCI MCHE) from 6 trains in the Niger Delta. Trains constructed by consortium of TSKJ. Worked as Shift Supervisor, Storage & Loading. Loading facilities include 2 Jetties for loading LNG, Condensate loading, LPG loading. Currently working as Supervisor, Expansion projects for the 7th Mega train of 8.8 MTPA, which is under consideration & for which preparation work is on. 1998 to 2006 - “Oman LNG”: P O Box 888, SUR 411. Sultanate Of Oman. Producing 9.9 MTPA LNG using APCI MCHE. I have been involved in the development of training materials, the Preparation of start-up & shutdown procedures and the building of “Specific Training Packages”. Pre-Commissioning & commissioning of process plant & equipment. Assisted in Services operations and worked as a “Loading Supervisor/Shift Instructor” covering Process and Utilities. 1995 to 1998 - “Qatar Liquefied Gas Company, Ras Laffan”. P O Box 22666, Doha. QATAR I worked as a Panel Operator in their LNG plant, producing LNG, Condensate and Sulphur. This was a joint venture of Total, QGPC, and Mobil. I was involved with the pre-commissioning, commissioning & start-up of utilities and the LNG trains, Off-sites including Gas reception & distribution, LNG & LPG Storage & loading. I was involved in Training & development of Qatari Operators, [Plant produced 6 MT LNG]. 1992 to 1995: “Toyo Engineering Corporation, Japan”. Petronas Gas, Kerteh. MALAYSIA – seconded to PETRONAS Gas, the national oil company of Malaysia in the Project Management & Consultancy (PMC) group for commissioning, start-up, operation & training local operators for three NGL gas plants at Kerteh-Terenggannu, W. Malaysia. Plant constructed by Hyundai & Stone & Webster. 1986-1992: “ARL LTD”. W 72-73, MIDC Industrial Area, Thane Belapur Road, THANE. India A research laboratory involved in the development of dyes & chemicals for other chemical Industries. 1980-1986: Abu Dhabi Gas Industries LTD (GASCO), P O Box 665, Abu Dhabi. U. A. E. Process/Utility Operator with Bab, UAE. A Shell, Total, Partex, ADNOC joint venture. Manufacturing NGLs’. Plant constructed by Fluor. Involved in pre-commissioning, commissioning & operations. 1973 – 1980: National Organic Chemical Industries LTD. P O Box 73, Belapur Road, THANE, India. Plant Operator at the joint venture between Shell & Mafatlal Group. First plant in India to manufacture Petochemicals by cracking Naptha. Plant constructed by Stone & Websters. Operated EO, Glycols, Air Separation, Air liquefaction, water treatment plants. Personal Training history in brief: OMAN LNG: - Fire Fighting, Electrical Isolation, B A, Safety Induction, Defensive Driving, Health Risk Assessment, Safety Road & Mind, Pacer System Basics, Sampling Instruction, Process Information Course, Pre Incident Planning, Lubrication, Elliot Compressors, Air Dryers-Del Air, “Demag” Compressors, Chlorination, CCC Honeywell, Honeywell Hi Spec Simulator Training, Risk Assessment, Route Cause Analysis, Power Generation by GE, Otter, Dock-master for LNG ships. QATAR GAS: - Safety Induction, Fire Fighting, BA Search & Rescue, Gas Turbines by Thomoson, Ebara Pumps, ENRAF gauging, Power generation, Water treatment, Gas processing, DCS & instrumentation, Honeywell CCC anti-surge system operation, etc. Summary Commissioning: Pre-commissioning, commissioning & start-up of: 2 Gas plants & utilities at Bab & Asab gas plants of GASCO in UAE. 3 Gas plants in GPP in Malaysia. 2 LNG plants of 2.4 MTPA, utilities, Storage & loading facilities in Qatargas, Qatar. 3 LNG plants of 3.3 MTPA & utilities in Oman LNG at Qalhat, Oman. 1 LNG plant of 3.3 MTPA. Experienced in; GE Avon, Caterpillar, Thompson, Nuovo-pignone gas turbines of different frames “Frame V, VI & VII with Mark V control”. Ship loading. DCS Systems Handled: Honeywell TDC 3000, Foxboro & Yokogawa Centum CS. Computers: I am fully familiar with MS Office suite of software and understand/use “Pacer” system for Job maintenance. PROCESSES HANDLED: Naptha Cracking. Syn gas, IPA, DIPA, VC, PVC. Ethylene oxide reaction (The plant where I worked in NOCIL, India is the only Ethylene Oxide plant which has not exploded so far in the world). Ethylene & Polyethylene glycol reactions. Gas Gathering, Dehydration & Distribution. Gas sweetening by Hot carbonate, Benfield, DGA, Sulfinol. Gas chilling & liquefaction. Propane refrigeration. Mixed refrigeration. Liq C1, C2, C3, Condensate & LNG storage & loading. Sulphur loading. Cooling water, Sea cooling water, desalination, firewater, Demin water systems. Waste water & effluent systems. Air separation & liquefaction systems. Instrument air, Utility air & tool air system. EQUIPMENTS HANDLED Columns: Absorbers, Strippers, Rectification towers, Contactors – working under pressure & vacuum. Compressors: Centrifugal & reciprocating compressors, single & multi-stage. Docking Stations: for ship loading. Drivers: Motors & steam turbines, Expansion turbines, Expanders. Furnaces: Natural draught, Forced draught & Natural draught. Gas Turbines/Generators: Thomson, Avon, Nuovo Pignone, Ruston, GE turbines of various sizes up to frame VII. Heat Exchangers: Shell & tube, Serpentine, Floating head, plate type of single & multiple passes. Ion Exchange Plants: For water treatment – cations, anions & mixed bed polishers. Pumps: Centrifugal, Piston & plunger types – both single & multi stage of very high capacities, steam & electrical driven. Separators: two phase & three phase. Turbines: Gas Turbines (25 turbines) & Steam turbines. Vessels: Many types of vessels related to Oil & Gas Industry. Water Treatment systems: CPI, Effluent systems, Storm water systems. DETAILS OF JOBS: Nigeria LNG: Worked as Shift Loading Supervisor for loading LNG, LPG & Condensate ships. Also involved in preparation works for the 7th Mega LNG train of 8.8 MTPA likely to come up soon. Oman LNG: Worked as Shift Instructor/ Sr. Operative Technician imparting On-the-job training to local Omani Operators & preparing them for doing their B. Tec (U. K.). Also worked as Loading Supervisor for loading LNG & Condensate ships. Oman LNG is the only recognized company in the Gulf to impart this training. Also conducted class room lectures in Physics, Chemistry, Mathematics, Distillation, Refrigeration & other subjects & processes related to Oil & Gas Industry. Further, once the Omanis passed B. Tec they were also trained on Panel. Prepared course material, for training, prepared question papers & conducted regular tests to assess the progress of the Omani Operators. The trainees were tested orally, in writing & practically. Also guided the operators in Safety aspects of plant, work permit requirements, conducted safety audits. Operated the LNG plant, the biggest single train (2 x 3.3 MMTPA) in the world at that time. Processes involved were gas conditioning, measurement, distribution, sweetening, dehydration, chilling & liquefaction. Propane & mixed refrigeration, LNG storage, LPG separation, fractionation & storage. Our plant was the first Oil & Gas plant in the world to use Computerised PTW system & OTTER for taking plant rounds & readings. Total number of trainees were 84. QATAR GAS: Worked as Panel Operator in LNG plant. Beside Panel work, also involved in commissioning of LNG, Off-sites – LNG, Condensate storage, Loading Jetties, Sea water intake, Power Generation & utilities such as IA, CW, TCW, SCW, Nitrogen Plant, Water treatment, IR etc. Also trained Qatari Nationals by imparting OJT in field & on Panel. PETRONAS (Malaysia): Seconded by Toyo Engineering Corporation to Petronas at Kerteh in Terenggannu, West Malaysia. Worked with Project Management & Consultancy group. Job involved Consultancy services for Pre-Commissioning, Commissioning, Start-up & running the plant with Malaysian Operators & trainees. Imparted On the Job Training to local operators. Also conducted class room lectures. Also trained local Malaysians in aspects of plant operations, safety, storage, commissioning etc. ARL LABS (INDIA): Basically a chemical company producing dyes for textile Industry by batch process. GASCO (UAE): Gas plant. I was involved in Pre-commissioning, commissioning & start-up. Led a team of 8 operators during commissioning of process & services. Processes involved gas gathering, gas compression, distribution, liquefaction, propane refrigeration, power generation, Inert gas generation, etc. NOCIL (INDIA): Started my career as Process/Utility operator & trained 20 operators thereafter. TRAININGS & SEMINARS ATTENDED: Pre Incident Planning. Lubrication Workshop. First Aid. BA & SCBA & Rescue. Ship Docking. Fire Fighting. Gas Turbines. Work Culture. Presently I am following a 28 days Work/28 day Off rota & drawing a salary of US$ 600 per day with business class air ticket & fully furnished bachelor accommodation, medical facilities, etc. I am interested in a Supervisory post as Process Supervisor / Loading Supervisor / Job Instructor / Commissioning Supervisor. AVAILABILITY: Available at short notice any time from 1st February 2009. References: 1. Mr. Joseph Alagoa, Head of Operations, Nigeria LNG. e-mail: joseph.alagoa@nlng.com 2. Mr. Terry Coles, Head of Training, Nigeria LNG. e-mail: terry.coles@nlng.com 3. Mr. Isidro Buenaffe, Shift Superintendent, Oman LNG. e-mail: isidrobuenafe@omanlng.co.om