CURRICULUM VITAE Name: Saiful Anwar DOB: 17 June, 1960 Status: Married Nationality: Indonesian Address: Health: Excellent Qatar Gas Housing complex B-176 Alkhor -Doha. State of Qatar. PO Box 22166 Phone 0974-5559 3026 Address in Kuala Lumpur 12 Lorong Haji Openg satu Taman Tun DR Ismail 60000 Kuala Lumpur Telp resident 03-77299012 Address in Indonesia Desa Cuebrek Lorong Pang Puteh No 2 Lhoksukon Aceh utara N.A.D Indonesia E mail: saifulanwar@qatar.net.qa banganwar@yahoo.com Qualifications Have over 29 years of work experience especially exposed in Gas Industry i.e.: Qatar Gas LNG (14 years); PT Arun LNG (15 years). Highly capable and well experience in handling of SRU, LNG, LPG Process. A personable but firm professional; with good and strong sense of commitment toward success, able to direct and lead others to produce objective and desired results. Have experience shut down and start up / precommissioning and commissioning LNG plant and Helium extraction unit. Acid Gas Enrichment (AGE) and Sulphur Recovery Unit (SRU) Education 1979-1980 University of Syiah Kuala (Banda Aceh) Indonesia Chemical Engineering (2 Years) 1980-1981 Academy Oil and Gas, in Cepu (Central Java) Indonesia Subject: Oil and Gas processing - Certificate 1976-1978 Senior High School – Banda Aceh Professional Training /Courses Compressors and Refrigerant - Certificate Oil and Gas Processing - Certificate Fire and Safety - Certificate DCS Centum Operation - Certificate Anti Surge Control (CCC) - Certificate Sulfinol Course - Certificate Supervisory skill- Certificate LNG Overview by Mr. Andy Flower LNG Safety and technology by Jean Goanvic-Certificate. Trouble shooting and problem solving by Euromatech Dubai 1 Working experience March ‘96 – Present Qatar Gas LNG Ltd (Qatar 14 years) Qatar Gas - 1 LNG Ltd. has three LNG trains, and Helium extraction unit respectively, two sulphur recovery (SRU) units, two Acid Gas Enrichment (AGE) units. And others facility to support condensate, LNG and sulphur production. Attend 3D Review PMP project in Technip office France.07-11 February 2011 Objective: Application for suitable post as per my experience in hydrocarbon plant. Expected start up or shut down coordinator. Status rotation job, well known 28/28 Positions held 17 April to 11 May 2008 Assigned as shut down coordinator LNG train 1 SRU 1 and AGE 1 Plans supervise and coordinate the activities of assigned personnel in Shutdown team. Performs coordination duties LNG train 1 SRU 1 and AGE 1shut down Activity. Reviews shut down progress ensure establish performance standards. Chaired meeting of the planning, job progressing, evaluate, in making work site ready for maintenance, job completion hand over to operation. Develops detailed scope of works for shutdown incorporating operating authority requirements, Engineering Support Team packages and integrity work requests. Develops execution plan and resources requirements. Liaises with Site Maintenance Teams to optimize resources utilization for shutdowns including manpower, marine spread, environment and safety issue. Secures require materials and equipment for planned activities availability. Review and approve PTW, updated status of plant under shut down activity. Closely coordinate with site teams for the supervision/control the execution of shutdown and campaigns. Follows up and ensures completion of post shutdown and campaign close out report. Ensures activities synchronization so that production targets and safety are not compromised and ensure integrity and certification of plant and equipment is maintained. Make arrangement with concern party to conduct JSA. Arrange tool box talk with performing party and operation staff Participates in developing standards and techniques of maintenance to optimize availability and cost. Focal point entire night shut down activity with approx 400 contractor and Qatar Gas employee. New modular (five gas turbines) were replaced during this shut down Sulfinol reboiler piping system repair was done successfully. Successfully and safely start up LNG train 1 SRU 1 and AGE 1 without delay As Shift Supervisor - Sept. 2002 – Present: Supervising 15 members team, to manage the production LNG 950M3/hour/train of 3 LNG trains including fractionation unit respectively, and high safety alert. Preparing, assessing and issuing permit to work regularly. Following up daily activity as a vocal point operation department process down stream. Supervising SRU unit; with daily production of 500-ton Sulphur granular and Sulphur enrichment unit. Fully concern of flaring to minimize Sulphur emission to Atmosphere. Ensuring and full understanding of safety procedure, ability to relate ESD and process upset, clear view on plant operation department and section objectives. Coordinated and directed plant activities with the maintenance Managing major shut down for capacity improvement project with many discipline. It was assigned as shut down supervisor in 2003 2004 2005 and 2006. four consecutive year Leading, communicate and motivating own staff continuously; as well as to communicate with related department Proactive Qatarization to promote Qatar Nationality workforce in LNG plant. Supervising Helium extraction unit with Helium purity up to 60% and send to Ras Gas for further liquefaction process. 2 Reported directly to the Shift Superintendent in charge. As Panel Operator - March 1996 - September 2002 Involved from beginning of precommissioning, commissioning, start-up till normal operation of Qatar Gas LNG Company. Actively in start up and shut down activity. Familiarized and full understanding in operation environments with the DCS Foxboro, DCS Centum V, Yamatake and some others instrumentation system. Process handle: Methane, Ethane, Propane, and Butane Recovery. Acid gas removal system by means of hot Potash and DEA (PT Arun NGL Co Indonesia) and Sulfinol-D (Qatar Gas). High-pressure pump, Absorber, Regenerator, Sulfinol Reclaimer, Dehydration system, Scrubbing system, Propane System, Multy Component refrigerant system, heat exchanger, Cryogenic heat exchanger. Gas turbine mark II and mark V, Centrifugal compressor. Fully concern about emission, safety, environment and health. Monitor and control the allocated unit through the DCS workstation Respond to any plant upset through DCS graphic pages Start up and shut down process unit. Relate the cause and effect diagram Troubleshoot plant upset. Shift report and sequence event. Full understanding about F&G /ESD system. Communicate through the radio and PAGA system. July ‘81 – June ‘96 PT Arun NGL Co (Indonesia) – Aceh North Sumatera (15 years) PT Arun has 6 LNG trains and some others related unit such as fractionation and LPG. Gas treating in LNG commonly has several units i.e.: Inlet Reception (to remove HHC from feedstock); Mercury Removal (to remove Mercury from feedstock); Acid Gas Removal (Hot Potash liquid system); DEA (Diethanol Amine system); Sulfinol-D system. Dehydration and Mercaptan Removal; Double & Triple bad parallel; Scrubbing Unit (to separate heavy end and light end component); Refrigerant composed to major system, Propane system and MR system, Propane system provides chilling temp to (-22 – 26ºC), MR system provides low temp refrigerant to produce the LNG (-150ºC); Liquefactions Unit; Nitrogen Rejection units; Fuel Gas system Positions held As Panel Operator (May 1992 - March 1996) As Rover Operator (July 1981 - April 1992) Responsibilities Fully responsible and performed routine job field operator for checking normal process parameter identified any abnormal condition, and correct action taken in process upset. During period time basic knowledge of oil and gas industrial plant fire and safety system, Basic of instrument system has been conducted on the mandatory job-training program. All the original certificates will be produced as required. Thanks and Regards (Saiful Anwar). Doha 01/May/2011 3 4