Appendix I to the Brief Information and Facilities provided by the Employer (a) Planning Report No. 3/2011 ‘Planning and Investigation Study of Desalination Plant at Tseung Kwan O’ issued by the Development (2) Division of WSD dated January 2012. (b) Tseung Kwan O Final Preliminary Design Report of Agreement No. CE 71/2000 (WS) “Feasibility Study on Development of Desalination Facilities in Hong Kong” dated June 2002. (c) Technical Feasibility Statement for “Design and Construction for the First Stage of the Desalination Plant at Tseung Kwan O” approved by DEVB on 22 August 2014. (d) Reports under Agreement No. CE 21/2012 (WS) – Desalination Plant at Tseung Kwan O Feasibility Study: (i) Site Investigation Desk Study Report (ii) Construction and Demolition Material Management Plan (iii) Drainage Impact Assessment (iv) Energy Efficiency Report (v) Environmental Impact Assessment Report (vi) Environmental Monitoring & Audit Manual (vii) Geotechnical Assessment Report (viii) Natural Terrain Landslide Hazard Assessment Report (ix) Hazard Assessment Report (x) Heritage Impact Assessment Report (xi) Hydraulic Assessment and Surge Analysis Report (xii) Marine Traffic Impact Assessment Report (xiii) Options Selection Report (xiv) Process and Preliminary Design (xv) Public Engagement Report (xvi) Risk Management Plan (xvii) Sediment Quality Report (xviii) Site Review Report W Water Supplies Department Agreement No. CE 8/2015 (WS) (xix) Site Investigation Report (xx) Sustainability Assessment Report (xxi) Traffic Impact Assessment Report (xxii) Tree Survey Report (xxiii) Report on Effect of Climate change on Project Implementation Strategy and Programme (xxiv) Report on Project Implementation Strategy and Programme (xxv) Report on Sensitivity Analyses on the Capital and Recurrent Costs of the Desalination Plant (xxvi) Report on Value Management Workshop (xxvii) Working Paper No.1 – Process Option (xxviii) Working Paper No.2 – Intake Options (xxix) Working Paper No.3 – Seawater Outfall Structure and RO Concentrate Management (xxx) Working Paper No.4 – Review of Initial and Ultimate Capacities of the Desalination Plant (xxxi) Working Paper No.5 – Feasibility of Coexistence of the Explosive Off-loading facilities of CEDD (xxxii) Working Paper No.7 – Operation and Maintenance Strategy of all M&E Plants and Equipment (xxxiii) Working Paper No.8 – Review of Demonstration Plant (xxxiv) Working paper on seawater quality characterization and seawater quality envelope for the design of the desalination plant (xxxv) Working paper on final water quality objectives for Tseung Kwan O Desalination Plant (xxxvi) Project Financial Report (xxxvii) Draft Report (xxxviii) Draft Final Report (xxxix) Executive Summary W Water Supplies Department Agreement No. CE 8/2015 (WS) Appendix II to the Brief Sketches (i) Location Plan - Sketch No. G14-079 (ii) Temporary Magazine for SCL project at the TKO Area 137 – Sketch No. 52008/1 (iii) Natural Terrain Hazard Study Area – Sketch No. 52008/2 W Water Supplies Department Agreement No. CE 8/2015 (WS) Appendix III to the Brief Relevant Standards, Guidelines and Manuals Title Issuing Authority (1) General Specification for Electrical Installation in Government Buildings of the Hong Kong Special Administrative Region ArchSD (2) General Specification for Fire Service Installations in Government Buildings of the Hong Kong Special Administrative Region ArchSD (3) General Specification for Air Conditioning, Refrigeration, Ventilation and Central Monitoring & Control System Installation in Government Buildings of the Hong Kong Special Administrative Region ArchSD (4) Project Administration Handbook for Civil Engineering Works CEDD (5) Standard Drawings CEDD (6) Technical Circulars/Memoranda CEDD (7) Port Works Design Manual : Part 1 - General Design Considerations for Marine Works CEDD (8) Port Works Design Manual : Part 2 - Guide to Design of Piers and Dolphins CEDD (9) Port Works Design Manual : Part 3 - Guide to Design of Reclamation CEDD (10) Port Works Design Manual : Part 4 - Guide to Design of Seawalls and Breakwaters CEDD (11) Port Works Design Manual : Part 5 - Guide to Design of Beaches CEDD (12) Geotechnical Manual for Slopes GEO of CEDD (13) Geoguide 1 – Guide to Retaining Wall Design GEO of CEDD (14) Geoguide 2 – Guide to Site Investigation GEO of CEDD (15) Geoguide 3 – Guide to Rock and Soil Descriptions GEO of CEDD (16) Geoguide 4 – Guide to Cavern Engineering GEO of CEDD (17) Geoguide 5 – Guide to Slope Maintenance GEO of CEDD (18) Geoguide 6 – Guide to Reinforced Fill Structure and GEO of CEDD W Water Supplies Department Agreement No. CE 8/2015 (WS) Title Issuing Authority Slope Design (19) GEO Report No. 138 – Guidance for Natural Terrain Hazard Studies GEO of CEDD (20) Stormwater Drainage Manual DSD (21) Sewerage Manual DSD (22) Technical Circulars/Memoranda DSD (23) Code of Practice for the Energy Efficiency of Electrical Installations, Lighting, Installations and Air Conditioning Installations EMSD (24) Code of Practice for the Electricity (Wiring) Regulations EMSD (25) Technical Memoranda on the Environmental Impact Assessment Process of the Environmental Impact Assessment Ordinance EPD (26) Circular Letters and Codes of Practice for Minimum Fire Service Installations and Equipment and Inspection, Testing and Maintenance of Installations and Equipment FSD (27) Technical Circulars/Memoranda HyD (28) Guidelines on Traffic Impact Assessment and Day-Time Ban Requirements for Road Works on Traffic Sensitive Routes HyD (29) Highways Department's Guidance Notes on Pavement Design HyD (30) Code of Practice for the Lighting, Signing and Guarding of Road Works HyD (31) Hong Kong Planning Standards and Guidelines PlanD (32) Professional Persons Environmental Consultative Committee (Pro PECC) Practice Notes PlanD (33) Civil Engineering Design Manual WSD (34) Manual of Mainlaying Practice WSD (35) Project Administration Manual for Engineering Works WSD (36) Standard Drawings WSD (37) Departmental Instructions WSD (38) Standard Specifications for Mechanical and Electrical WSD W Water Supplies Department Agreement No. CE 8/2015 (WS) Title Issuing Authority Works (39) Electrical Project Design Manual WSD (40) Mechanical Project Design Manual WSD (41) Feasibility Study on Cleaning and Disinfection of Service Reservoirs and Disposal of the Effluent (Agreement No. CE 19/94) WSD (42) Design Guide for Polyethylene (PE) Pipelines for Water Supply Purpose WSD (43) General Specification for Civil Engineering Works Government of HKSAR (44) Standard Method of Measurement for Civil Engineering Works Government of HKSAR (45) General Conditions of Contract for Civil Engineering Works Government of HKSAR (46) General Conditions of Contract for Term Contracts for Civil Engineering Works Government of HKSAR (47) General Conditions of Contract for Electrical and Mechanical Engineering Works Government of HKSAR (48) General Conditions of Contract for Term Contracts for Electrical and Mechanical Engineering Works Government of HKSAR (49) General Conditions of Contract for Design and Build Contracts Government of HKSAR (50) The Administrative Procedures for Use with the Government of the Hong Kong Special Administrative Region General Conditions of Contract for Design and Build Contracts Government of HKSAR (51) Dangerous Goods Ordinance Government of HKSAR (52) Factories and Industrial Undertakings Ordinance Government of HKSAR (53) Boilers and Pressure Vessels Ordinance Government of HKSAR (54) Electricity Ordinance Government of HKSAR (55) Fire Services Ordinance Government of HKSAR W Water Supplies Department Agreement No. CE 8/2015 (WS) Title Issuing Authority (56) The Administrative Procedures for Use with the Government of the Hong Kong Special Administrative Region General Conditions of Contract for Design and Build Contracts Government of HKSAR (57) Public Works Departmental, Lands and Works Branch, Works Branch, Works Bureau, Environment, Transport and Works Bureau and Development Bureau Technical Circulars DEVB (58) Code of Practice on Monitoring and Maintenance of Water-carrying Services Affecting Slopes (59) Stores and Procurement Regulations The then ETWB Financial Services and the Treasury Bureau (60) Planning, Environment and Lands Bureau (Branch), Planning and Lands Bureau and Housing, Planning and Lands Bureau Technical Circulars The then HPLB (61) Regulations for Electrical Installations IET (62) IEE Wiring Regulations IET (63) BEAM Plus for New Buildings W Water Supplies Department BEAM Society Agreement No. CE 8/2015 (WS) Appendix IV to the Brief Treated Water Quality Objectives (A) (B) The design for new or upgraded water treatment works shall be capable of producing a reliable and continuous supply of wholesome potable water. The final water quality after treatment shall comply with the following standards: pH at 25°C Colour Turbidity : : : Iron as Fe Manganese as Mn Aluminium as Al Free residual chlorine Fluoride as F : : : : : Taste and odour Total Coliforms & E. coli (no./100mL) Cryptosporidium Giardia Viruses : : 8.2 – 8.8 not exceeding 5 Hazen units not exceeding 1.0 NTU, and not exceeding 0.3 NTU in 95% of daily samples in any month prior to pH adjustment not exceeding 0.1 mg/L not exceeding 0.05 mg/L not exceeding 0.10 mg/L 0.5 – 1.5 mg/L ±10% of nominal level (current 0.5 mg/L) unobjectionable absent : : : 4-log(99.99%) reduction or inactivation 4-log(99.99%) reduction or inactivation 4-log(99.99%) reduction or inactivation For individual water quality parameters not referred to above, they shall meet the guideline values in the latest edition of the World Health Organization’s “Guidelines for Drinking-water Quality”. W Water Supplies Department Agreement No. CE 8/2015 (WS) Appendix V to the Brief Examples of Local and Overseas Relevant Projects 1. 2. 3. Contract No. 15/WSD/10 of WSD - Expansion of Tai Po Water Treatment Works and Ancillary Raw Water and Fresh Water Transfer Facilities - Design and Build of New Stream II, Hong Kong Contract No. EP/SP/58/08 of EPD - Sludge Treatment Facilities, Hong Kong Contract No. DC/2008/03 of DSD - Design, Build and Operate Pillar Point Sewage Treatment Works, Hong Kong 4. SingSpring Desalination Plant (Tuas 1), Singapore 5. Tuaspring Desalination Plant (Tuas 2) , Singapore 6. Changi NEWater Plant, Singapore 7. Monterey Bay Desalination Plant, USA 8. Shuwaikh Desalination Plant, Kuwait 9. Al Ghubrah IWP Desalination Plant, Oman 10. Bundamba Advanced Waste Water Treatment Plant, Australia W Water Supplies Department Agreement No. CE 8/2015 (WS) Appendix VI to the Brief Guidelines to Resident Site Staff who need to conduct inspection visits outside Hong Kong (a) In the event that production activities in a works contract are undertaken outside Hong Kong, the supervisory staff conducting inspections on the production sites outside Hong Kong shall, to the best of their knowledge, declare to the Engineer for the contract if the main contractor, the sub-contractor for the production activities, or any of their employees is his spouse, family member, or close relatives. (b) Such inspection visits shall also be subject to the approval of the Consultants. Where the contractor makes arrangement for transportation, accommodation and entertainment including meals, such arrangement shall be agreed to by the Engineer for the contract beforehand. Other than the agreed arrangement, supervisory staff shall not be allowed to receive any form of hospitality or entertainment from the contractor during such inspection visits. (c) Should the supervisory staff incur reimbursement expenses in the course of inspection, all claims for reimbursement should all be made to the Consultants in accordance with the prevailing rules and regulations for such. The Consultants will in turn seek reimbursement from the contractor where applicable. Under no circumstances should all the staff seek reimbursement direct from the contractor. W Water Supplies Department Agreement No. CE 8/2015 (WS)