2011-2012 Strategic Plan Annual Report Through the generous support and dedication of our faculty, staff, students, business partners, and community supporters, LakeSumter has made remarkable strides this year in achieving its mission and strategic plan. Guided by the leadership of our Board of Trustees, the College completed the first year of its three-year Strategic Plan. As a part of the 2011-2012 year’s Institutional Annual Plan, 14 projects were undertaken, 78 indicators of effectiveness were developed, and 194 actions were taken to make progress towards achieving our strategic goals. The strategic plan goals and projects were accomplished or partially met as found in the overview table below. 2011-2012 Strategic Plan Goals and Projects Strategic Goal I ENABLE STUDENTS TO ACHIEVE THEIR GOALS Project 1 IMPLEMENT QEP AND MEET PLAN TARGETS Project 2 COMPLETE DISTANCE LEARNING PROSPECTUS & EXPAND COURSES Project 3 IMPLEMENT CAREER & TECHNICAL EDUCATION STRATEGIES TO INCREASE ENROLLMENT & COMPLETION Project 4 PURSUE APPROVAL & PARTNERSHIPS TO EXPAND FOUR YEAR DEGREES Project 5 EVALUATE DUAL ENROLLMENT PROGRAMS & DEVELOP STRATEGIES OR SUPPORT Project 6 IMPLEMENT STRATEGIES TO MEET COLLEGE COMPLETION AGENDA GOALS Strategic Goal II COLLABORATE AND PARTNER TO ACHIEVE INSTITUTIONAL MISSION Project 1 INCREASE IN FUNDRAISING AND GRANTS Project 2 ENHANCE & EXPAND PARTNERSHIPS WITH UNIVERSITIES, COLLEGES, AND INDUSTRY Strategic Goal III BUILD EXCELLENCE IN PROGRAMS AND SERVICES FOR ALL Project 1 IMPLEMENT SERVICE EXCELLENCE PROGRAM Project 2 MANAGE BUDGET TO MINIMIZE USE OF RESERVES Project 3 IMPROVE EFFECTIVENESS OF ENROLLMENT MANAGEMENT PLAN – FOCUS ON SUMTER CAMPUS Project 4 CREATE NEW PROGRAMS & INCREASE PARTICIPATION IN PDC & CET Strategic Goal IV CREATE AND SUSTAIN A CULTURE OF CONTINUOUS IMPROVEMENT Project 1 DEVELOP CAPABILITY FOR DATA MINING & ANALYSIS TO SUPPORT DATA-DRIVEN IMPROVEMENTS Project 2 ADOPT CONTINUOUS IMPROVEMENT INITIATIVES AT ALL LEVELS OF THE INSTITUTION PARTIALLY MET PARTIALLY MET PARTIALLY MET PARTIALLY MET MET PARTIALLY MET PARTIALLY MET MET MET MET MET MET MET PARTIALLY MET MET PARTIALLY MET PARTIALLY MET PARTIALLY MET In order to accomplish the year’s 14 projects, staff and faculty engaged in 78 indicators of effectiveness and 194 actions to make progress towards achieving the strategic projects and goals. Indicators and actions were met, partially met, or not met, as indicated in the tables below. Those indicators and actions not met have been rolled to next year’s annual plan. Indicators of Effectiveness with Target to Achieve Projects and Strategic Goals Total Indicators of Effectiveness 78 Met 41 Partially Met 31 Not Met 6 3/6/2016 12:37 PM Actions Taken to Achieve Indicators of Effectiveness Total Actions Taken 194 Met 115 Partially Met 48 Not Met 32 Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 1 During the 2010-2011 year, we accomplished projects, met targets, and took actions that produced significant outcomes while also increasing student learning and completion rates. The 2010-2011 strategic plan accomplishments include: The Service Excellence Program was announced to the College community in May 2011. The college embarked on this initiative in an effort to improve how we treat our students, how we relate to our colleagues, and how we treat our partners in the community. The Foundation Scholarship Program worked towards making college more affordable for our students by providing $461,807 dollars in scholarships. These scholarships were directed for students with the highest need and who were closest to completion. An Application to Offer Bachelor Degrees was approved by the State of Florida. An application was submitted to the SACS Commission on Colleges for approval to offer a BAS in Organizational Management beginning in Spring2013. In response to local workforce needs, UCF and the College approved and are planning to offer an ASN-BSN Nursing Bachelors program on the Leesburg campus beginning Fall 2012. SACS Substantive Change for Distance Learning was approved in March 2012, allowing the College to expand its online course delivery offering to fully online (greater than 50% possible credits earned towards a degree). The Quality Enhancement Plan was successfully implemented; resulting in measurable gains in student learning. The Learning Center provided 354,140 student tutoring sessions or 63,949 hours of learning assistance. A Completion Agenda Data Collection and Communication Plan was developed to provide data scripts and report templates in an effort to increase transparency and to focus attention on completion data elements over the next three years. A corresponding communication plan was designed to reach out to students who are struggling and need support services. The concept of a Virtual Student Success Center (VSSC) was developed and piloted. The VSSC integrates learning and student services in a single connected virtual environment that includes online tutoring and academic advising in the initial pilot. Services to be integrated later include career and library services, social networking, technical assistance, and financial literacy. The Talent Search and Upward Bound programs were deemed strong and viable as evidenced in a five-year extension of federal funding for a total of over 2 million dollars. The number of students applying for graduation significantly increased as a result of removing the $20 fee associated with the application. During spring 2011 (fee required), 320 students applied for graduation as compared to 489 in spring 2012 term (when a fee was not required). The College was awarded an opportunity to develop career curriculum for TAA and displaced workers in Cyber Security jobs through a collaborative TAACCCTP grant with nine other Florida colleges. The College developed an AS Degree in Environmental Science in collaboration with Promise Ranch and Progress Energy. Assessments of student learning outcomes were conducted for all students who took one or more AA, AS, AAS, or Technical Certificate courses. This year over 53% of our 457 course offerings were populated with formal SLOs evaluating 11,515 students in the online system. Increasing support to students by 130% this year, the Early Alert Intervention Program worked with students individually and provided academic/personal support. The Office of Students with Disabilities (OSD) built a new dedicated testing lab space to increase student support and success. Career Advisors met with 55% more students this year, assisting them in exploring major/career and/or university transfer options. Career advising class presentations increased by 250%. Online Career Development Tools were developed and 16% of currently enrolled students are using the online services. Career Employer Services implemented an online career management portal resulting in an employer job postings increase of 235% The Youth Outreach Department developed an Alumni Association, reaching 83 members in the first year. 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 2 Lake Sumter Community College - 2011-2012 ANNUAL MANAGEMENT PLAN Year-End Assessment Strategic Goal One Assist Students in Meeting Their Educational Goals PARTIALLY MET 1.1 Project 1: IMPLEMENT QEP AND MEET PLAN TARGETS Where is LSCC Today Target MET Indicator 1.1.4 General Education and Transfer Programs are Plan was implemented in Spring 2011. QEP is successfully launched, assessed, and annual progress report is effective when the QEP is successfully launched, completed. assessed, and annual progress report is completed. Responsible Individual Achievement Actions 1.1.4.1 ACTION ONE: First Classes implemented in Fall of 2011 - Annual Status - The QEP was implemented in 5 sections of MAT 0028 in spring of 2012. Perez/Sligh MET 1.1.4.2 ACTION TWO: Annual report complete by October 2011. - Annual Status - Annual report for Year 2 is in development. Perez/Sligh MET 1.1.4.3 ACTION THREE: Second Semester Complete and data gathered by May 2012. - Annual Status - Second Semester complete and data gathered by May 2012. Perez/Sligh MET DATA NOT YET AVAILABLE – NOT MET Indicator 1.1.1 LSCC is effective when QEP students persist to graduation. Where is LSCC Today The 2010-11 QEP student persistence rate is undetermined at this time. This is a longitudinal measure that will take approximately 2 to 4 years before valid data can be collected Target The 2014 target will be met when the QEP student persistence rate. This longitudinal measure will take approximately 2 to 4 years before valid data can be collected. Achievement Actions 1.1.1.1 ACTION ONE: 80% of assessed math QEP students will score at Level 3 (Competent) of Level 4 (Exemplary) with an increase of 1 percentage point each year in content level Student Learning Outcomes. Annual Status - 80%, of assessed math QEP students who persist to the end of the course will score at Level 3 (Competent) or Level 4 (Exemplary) in each of the 4 Student Learning Outcomes assessed in MAT 0028. In SLO #1 (Simplifies expressions using the order of operations) 93% of assessed math students who persisted to the end of the course scored at Level 3 or Level 4. In SLO #2 (Solves linear and literal equations and linear inequalities) 86% of assessed math students who persisted to the end of the course scored at Level 3 or Level 4. In SLO #3 (Simplifies expressions involving exponents) 77% of assessed math students who persisted to the end of the course scored at Level 3 or Level 4. In SLO #4 (Factors polynomials) 100% of assessed math students who persisted to the end of the course scored at Level 3 or Level 4. 1.1.1.2 ACTION TWO: 80% of assessed reading QEP students will score at Level 3 (Competent) of Level 4 (Exemplary) with an increase of 1% point each year in content level Student Learning Outcomes. Annual Status - Data on reading QEP students is projected to become available in the fall of 2015. 1.1.1.3 ACTION THREE: 80% of assessed English QEP students will score at Level 3 (Competent) of Level 4 (Exemplary) with an increase of 1 percentage point each year in content level Student Learning Outcomes. Annual Status - Data on English QEP students is projected to become available in the fall of 2013. DATA NOT YET AVAILABLE – NOT MET Indicator 1.1.2 Academic Affairs is successful when QEP students taking their first corresponding credit course after taking a development math, reading or English course(s) pass with a C or better Achievement Actions 3/6/2016 12:37 PM Where is LSCC Today 2010-11 percentage of students receiving a C or Better in their first corresponding credit course after taking a developmental Math, developmental reading or developmental English course(s) Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation Responsible Individual Sligh/ Perez MET IN SLO 1, 2, AND 4. NOT MET IN SLO 3. Sligh/ Perez NOT MET: DATA NOT YET AVAILABLE Sligh/ Perez NOT MET: DATA NOT YET AVAILABLE Target The 2014 target will be met when there is a 2 percentage point increase per year in students earning a grade of C or higher in their first corresponding credit course after taking developmental math, reading or English courses(s). Responsible Individual 3 1.1.2.1 ACTION ONE: 75% of assessed math QEP students will score at Level 3 (Competent) or Level 4 (exemplary) with an increase of 1 percentage poi t each year in QEP program level Student Learning Outcomes. Annual Status - 75% of assessed math QEP students will score at Level 3 (Competent) or Level 4 (exemplary) with an increase of 1 percentage poi t each year in QEP program level Student Learning Outcomes. In PSLO #1 (Note Taking) 79 % of assessed math QEP students scored at Level 3 (Competent) or Level 4 (Exemplary). In PSLO #2 (Test Taking) 83% of assessed math QEP students scored at Level 3 (Competent) or Level 4 (Exemplary). In PSLO #3 (Using Feedback) 87% of assessed math QEP students scored at Level 3 (Competent) or Level 4 (Exemplary). In PSLO #4 (Goal Setting) 87% of assessed math QEP students scored at Level 3 (Competent) or Level 4 (Exemplary). 1.1.2.2 ACTION TWO: 75% of assessed reading QEP students will score at Level 3 (Competent) or Level 4 (exemplary) with an increase of 1 percentage poi t each year in QEP program level Student Learning Outcomes. Annual Status - Data on reading QEP students is projected to be available in the fall of 2015. 1.1.2.3 ACTION THREE: 75% of assessed English QEP students will score at Level 3 (Competent) or Level 4 (exemplary) with an increase of 1 percentage poi t each year in QEP program level Student Learning Outcomes. Annual Status - Data on English QEP students is projected to be available in the fall of 2013. MET Indicator Where is LSCC Today Sligh/ Perez MET Sligh/ Perez NOT MET: DATA NOT YET AVAILABLE Sligh/ Perez NOT MET: DATA NOT YET AVAILABLE Target 1.1.3 Academic Affairs is successful when QEP The current fall to spring retention rate of students in developmental The 2014 target will be met when students in developmental classes students in developmental classes demonstrate fall classes = The current fall to fall retention rate of students in demonstrate a 1 percent increase in fall to spring and fall-to-fall to spring and fall-to-fall retention. developmental classes = DATA NOT YET AVAILABLE retention. Responsible Individual Achievement Actions 1.1.3.1 ACTION ONE: CCSSE Student Engagement Course Evaluation Form will be administered at the end of each QEP class. Sligh/ Perez Annual Status - 91% of QEP assessed students indicated a positive response to the benefits of the skills attained for increasing their success in college on the CCSSE student MET Engagement Course Evaluation Form which was administered at the end of each QEP class. 1.1.3.2 ACTION TWO: At least 70% of QEP assessed students will indicate a positive response to the benefits of the skills attained for increasing their success in college on the Sligh/ Perez CCSSE student Engagement Course Evaluation Form to be administered at the end of each QEP class. MET Annual Status - 91% of QEP assessed students indicated a positive response to the benefits of the skills attained for increasing their success in college on the CCSSE student Engagement Course Evaluation Form which was administered at the end of each QEP class. 1.1.3.3 ACTION THREE: The QEP will improve student performance in dev. classes by embedding college success skills in a collaboratively taught environment. Sligh/ Perez Annual Status - Data show that the QEP has improved student performance in dev. classes by embedding college success skills in a collaboratively taught environment. MET Project 2: COMPLETE DISTANCE LEARNING PROPECTUS & EXPAND COURSES MET Indicator Where is LSCC Today Target MET 1.2.1 LSCC is effective when approval of the Distance 2010-11 the Distance Learning Prospectus is due to Learning Prospectus and implementation of new distance SACS 9-9-99 and no programs have increased the % of learning courses within programs is achieved. distance learning courses. Achievement Actions 1.2.1.1 ACTION ONE: The Distance Learning Prospectus is completed and sent to SACS by the due date Annual Status - Final letter of approval from SACS was issued on March 26, 2012. PARTIALLY MET Indicator 1.2.2 LSCC is effective when all electronically offered courses are consistent with LSCC’s role and mission 2014 target will be met when 8 programs implement new distance learning courses. Responsible Individual Gary Sligh, Nathanson MET Where is LSCC Today 2010-11 planned progression of accessibility for programs is at an average of 25% however, some disciplines fall far below and other far above 25%. Target The 2014 target will be met when a planned progression of accessibility is in place so that each discipline is equally at 25% increasing or decreasing where appropriate. Including a planned progression of accessibility where general education courses are averaged as a whole with equality across disciplines. Achievement Actions 1.2.2.1 ACTION ONE: An evaluation of the current on-line percentages of course offerings will be prepared for review. Annual Status - Some review has been achieved but final version will be complete in Fall of 2012. Where is LSCC Today PARTIALLY MET Indicator 1.2.3 General Education and Transfer Programs is effective when the Schedule is developed for training. AA, HIM, and Criminal Justice Programs have implemented greater 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation Responsible Individual M. Nathanson PARTIALLY MET Target Other degree programs will be considered in subsequent years. 4 than 50% online delivery. Responsible Individual Achievement Actions 1.2.3.1 ACTION ONE: January-May 2012, Training of faculty is completed. Annual Status - AA program is at 80% online. HIM and Criminal Justice are both over 50% for Fall 2012 semester. 1.2.3.2 ACTION TWO: Fall Semester 2012, New classes launched in online and hybrid formats. Annual Status - New programs have been approved by Teaching and Learning committee for advancing beyond the 50% limit for online delivery. 1.2.3.3 ACTION THREE: Assessment completed each semester. - Annual Status - Completed in Fall of 2011 and Spring of 2012 MET Indicator Where is LSCC Today 1.2.4 General Education and Transfer Programs is effective when Distance Draft is in place. Learning prospectus is completed and submitted to SACS. Achievement Actions 1.2.4.1 ACTION ONE: Draft reviewed by SACS Leadership Team. - Annual Status - Completed Fall 2011 1.2.4.2 ACTION TWO: Draft reviewed by Editing Team. - Annual Status - Completed Fall 2011 1.2.4.3 ACTION THREE: Draft submitted to SACS - Annual Status - Approval rendered by SACS on March 26, 2012. M. Nathanson PARTIALLY MET Faculty/Nathanson PARTIALLY MET MET Target Completed by September 30, 2011. Responsible Individual Sligh/ M. Nathanson MET Lisle/English/Nathanson MET Lisle/Sligh MET Project 3: CREATE/IMPLEMENT CAREER & TECHICAL EDUCATION STRATEGIES TO INCREASE ENROLLMENT & COMPLETION PARTIALLY MET Indicator Where is LSCC Today Target 1.3.1 LSCC is effective when all students enrolling in career and 2010-11 Number of career and technical The 2014 target will be met when the total number of career and technical technical programs complete successfully. student completers = 00% program completers meets or exceeds 00% Responsible Individual Achievement Actions 1.3.1.1 ACTION ONE: Program Managers will review and analyze CTE enrollment and completion data to establish benchmarks. Rager/Program Annual Status – Analysis of this data has been placed on hold until Fall 2012. Program Managers and CTE staff were involved with a number of division projects during spring Mgrs. semester which had priority deadlines, such as Program Reviews, grant project deadlines, baccalaureate, and SACS initiatives. NOT MET 1.3.1.2 ACTION TWO: Program Managers and workforce staff will review student records to assess their progress towards degree or certificate completion. Rager/Program Annual Status - Students in HIM degree/related certificates who had in excess of 45+ credit hours had either graduated, were listed in the degree program but were actually Mgrs. only working on a certificate, and/or had unrelated credits on their transcript and were on track to complete the HIM program within a year. Records of EDT students have been PARTIALLY MET reviewed and a 2012-13 class schedule has been developed to enable students to complete their Basic or Advanced Certificate by Summer 2013. Lists of program majors have been provided to faculty and follow-up results will be tracked by the Workforce Education Program Manager. 1.3.1.3 ACTION THREE: Program Managers and CTE Dean will analyze results and submit report to VP of AA & SA. Rager/Program Annual Status - This action item will be carried forward to the 2012-13 Annual Management Plan. Mgrs. NOT MET PARTIALLY MET Indicator Where is LSCC Today Target 1.3.2 Youth Outreach is effective when participants that do not enroll in college No concerted or structured efforts At least 25% of information session attendees enrolling in immediately after HS school graduation are formally introduced to “alternative” have been applied to target this “alternative” postsecondary education programs at LSCC and other postsecondary education programs available at LSCC and other local institutions. population. local institutions. Responsible Individual Achievement Actions 1.3.2.1 ACTION ONE: (Fall 2011) Conduct information session between YOD staff and LSCC’s Career/Tech programs representative. Also, compile a directory of external Cortes/ Balon organization/institutions (40 mile radius?) that also provide alternative postsecondary education opportunities. Information session between YOD staff, Patti Weasel and Betty PARTIALLY MET Downing is tentatively scheduled for December 8th. Annual Status - Focus was solely placed in LSCC’s Career & Tech., Ed. Programs; therefore, a directory of other local organizations/institutions that offer similar alternative PSE opportunities has not yet been compiled. YOD staff members were introduced to LSCC’s Career & Tech. Ed. Programs and are prepared to promote programs with former YOD participants who are currently not enrolled in PSE. Due to primary duties required by the ETS/UB/CROP grants, staff was unable to include this task among their other priorities. 1.3.2.2 ACTION TWO: (Fall 2011) Compile a roster with contact information of 2011 YOD graduates who are not enrolled in college; and, conduct a phone-a-thon to inquire and Siegrist/ Cortes inform participants of pertinent opportunities available at LSCC. Phone-a-thon will be conducted during the week of December 12 and January 2nd. MET Annual Status - A directory was compiled, which consisted of 158 former YOD participants who graduated high school since 2007 and had not yet enrolled in PSE. Directory contained participants’ full name, high school attended and year of HS graduation, YOD program, and last known phone number(s). A preliminary phone-a-thon (conducted by 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 5 LSCC work-study student) produced the following results: Of the 158 names in the directory, only 30 remained at the same phone number. 37% (11) of the 30 students contacted were found to have been enrolled or completed some form of PSE, technical training or military service. During the summer 2012, the YOD Managers will reach-out to the remaining 19 YOD graduates who remain at the same phone numbers and have not yet pursued PSE; and, at that time, staff will promote and assess the potential candidates’ interest in LSCC’s Career & Technical education opportunities. 1.3.2.3 ACTION THREE: (Spring/Summer 2012) survey senior participants and establish a roster of potential candidates for follow-up and notification of formal information session concerning LSCC alternative education programs. Annual Status - As of April 30th, 78 YOD seniors completed a Senior Update Report (survey). Only 1 senior indicated that she was not planning to attend PSE and was joining the workforce full-time instead. ETS Manager will follow-up with this student for promotion of LSCC’s Career & Tech. Ed. Program. Approximately half of the respondents (45%) indicated that LSCC was either their 1st or 2nd choice for PSE. Continued follow-up with these recent high school graduates will be performed by YOD staff during the summer. PARTIALLY MET Indicator 1.3.3 Career and Technical Education Programs are effective when students successfully enroll in credit courses that meet their educational, career, and personal enrichment goals. Where is LSCC Today Indicator MET Target Today’s Headcount: Summer 2010 – 2553 Fall 2010 – 4886 Spring – 4623 Today’s 2010-11 FTE is 3260.8 (FCS projection for 2010-11 was 3273 The target will be met when enrollment headcount is … Summer 2011, Fall 2011, Spring 2011 Achievement Actions 1.3.3.1 ACTION ONE: Determine FTE projections for CTE programs Annual Status - This action item will be carried forward to the 2012-13 Annual Management Plan. 1.3.3.2 ACTION TWO: Assess Perkins data on completers, leavers, and placements. Annual Status - A Program Improvement Plan was developed and submitted to DOE to address the following measures in 2012-13: technical skill attainment, student retention, and nontraditional enrollments. 1.3.3.3 ACTION THREE: Identify CTE students with <15 cr. Hrs. towards program completion and conduct student follow up to assist students with progression Annual Status - HIM student records have been reviewed and those students with 45+ credit hours are on track to complete their HIM program within a year. MET Cortes / YOD Managers Where is LSCC Today Responsible Individual Rager/ Prog. Mgrs. NOT MET Rager/ Weasel MET Rager/ Weasel MET Target 1.3.4 Career and Technical Education Programs are effective when students enrolled in The 2010-11 NCLEX licensure pas rate is ## The 2011-12 targets will be met when 90% of the students pass programs requiring a licensure examination, pass the examination on the first attempt. the NCLEX on their first attempt. Responsible Individual Achievement Actions 1.3.4.1 ACTION ONE: 2010-11 nursing graduates = 70. As of 8/1/11, 60 nursing graduates passed the NCLEX on their first attempt (85...7%); final results will be determined Wacker, Nursing MET from State Board of Nursing Report in December 2011. Annual Status - completed 1.3.4.2 ACTION TWO: Analyze results and determine need for curricular changes. Annual Status - pilot change in sequencing Nur Found I and Alterations I for incoming class. Wacker PARTIALLY MET 1.3.4.3 ACTION THREE: Determine best practices in NCLEX preparation to assess effectiveness of HESI. Annual Status - Faculty decided to stay with HESI. Wacker, Nursing MET Project 4: PURSUE APPROVAL & PARTNERSHIPS TO EXPAND FOUR YEAR DEGREES PARTIALLY MET Indicator Where is LSCC Today Target 1.4.1 Foundation/Institutional Advancement is effective when we are able The Foundation will set the The target for the next (2 or 3 years) will be to identify the process to offer financial assistance to support with the planning and figure during the 2012-13 year. to begin raising investments for the four year degree program(s). implementation of four year degree programs. Responsible Individual Achievement Actions 1.4.1.1 ACTION ONE: Annual Status - Waiting approval. R. Brandeburg NOT MET 1.4.1.2 ACTION TWO: Annual Status - Received $1,000 for the new four year degree programs. Brandeburg PARTIALLY MET MET Indicator Where is LSCC Today Target 1.4.2 Career and Technical Education Programs are The New Vision Council submits a recommendation to LSCC 1) The target will be met when at least one of the effective when the application to offer BAS degrees has Board of Trustees to offer four-year degrees in the following three programs identified by the DBot has been been submitted to the Florida Department of Education (FL program areas: approved by the FL DOE. DOE), and SACS. --Health, Organizational Management, environmental Science And 2) SACS approval. Responsible Individual Achievement Actions 1.4.2.1 ACTION ONE: President’s Cabinet has identified two baccalaureate programs (BSN & BAS in Organizational Mgmt.). Information will be presented to Rager/ Wacker 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 6 the Board on 8/9/11 for review and subsequent approval. Annual Status - The College is on target to offer the BAS in Organizational Management in Spring 2013, and the LSCC/UCF Concurrent Nursing Program is scheduled to begin in Fall 2012 with a pilot class of 20 students. 1.4.2.2 ACTION TWO: Proposed timelines and budgets have been prepared for the BSN and BAS degrees. Target date for submission of Letter of Intent to Division of Florida Colleges is 12/15/11. Annual Status - BAS in Organizational Management was approved by the Florida State Board of Education in March 2012. SACSCOC application was submitted in April 2012, and the College anticipates approval of the BAS in Organizational Management in June 2012. The College is on schedule to offer courses in Spring 2013, pending approval from SACSCOC. The LSCC/UCF Concurrent Nursing Program is on schedule with selection of 20 students to be completed by UCF in June 2012. 1.4.2.3 ACTION THREE: Receive approval from DOE to offer baccalaureate degrees. Submission of SACS Application Seeking Accreditation at a Higher Degree Level in April 2012. Annual Status - BAS in Organizational Management was approved by the Florida State Board of Education in March 2012. SACSCOC application was submitted in April 2012, and SACS approved the BAS in Organizational Management in June 2012. MET Rager/ Wacker PARTIALLY MET Rager/ Wacker MET WITH EXCELLENCE Project 5: EVALUATE DUAL ENROLLMENT PROGRAMS & DEVELOP STRATEGIES OR SUPPORT PARTIALLY MET Indicator Where is LSCC Today Target 1.5.1 General Education and Transfer Programs is effective when a Information-gathering is in process internally. Summit Recommendations would be ready for Dual Enrollment impact study is complete, which allows us to make held 11/3/11. implementation in years two and three. decisions regarding the future of that program. Responsible Individual Achievement Actions 1.5.1.1 ACTION ONE: Summit Held on November 3, 2011 Sligh/B. Nathanson Annual Status - Summit completed with all interested parties. PARTIALLY MET 1.5.1.2 ACTION TWO: Committee reports submitted by January 12, 2012 Com. Chairs/Sligh Annual Status - Reports were completed and sent to districts in December 2011. PARTIALLY MET 1.5.1.3 ACTION THREE: Recommendations submitted to appropriate planning committees. Sligh/B Nathanson Annual Status - Articulation committees have completed drafts and are preparing final approvals. (not yet approved) PARTIALLY MET MET Indicator Where is LSCC Today Target 1.5.2 Dual Enrollment is effective DE Manager visits high schools to meet with guidance counselors, informs guidance counselors Maintain and monitor same level of visits, when the relationship with high of updates via email. events & trainings. Host Guidance school and county personnel is DE Manager attends up to 2 Guidance Counselor trainings per year. Counselor breakfast & DE Summit. established and successfully DE Manager delivers College Readiness Presentation once a year at 3 high schools. maintained. LSCC hosts an annual Counselor Breakfast and College Night. Meet regularly with County personnel to update and revise annual articulation agreement. Responsible Individual Achievement Actions 1.5.2.1 ACTION ONE: Maintain and monitor same or increased level of visits, events & trainings as FY 10-11. J. Delgado & T. Harris-Rocker MET Annual Status –2010-11 total number of visits Completed 22 total high school visits in Lake County, offered 25 presentations in the high schools in Lake County, Jessica Delgado attended 3 high school counselor trainings and hosted one at the South Lake campus 1.5.2.2 ACTION TWO: Host Guidance Counselor breakfast 10/19/11. Host Dual Enrollment pre-summit 9/26/11 and DE Summit 11/3/11 J. Delgado & T. Harris-Rocker MET Annual Status – These two events were held and the data and information exchange was significantly positive. PARTIALLY MET Indicator Where is LSCC Today Target 1.5.3 Dual Enrollment is effective when the Dual Enrollment -Currently do not track this information. Develop DE advising survey, track student program provides quality Academic Advising to all Dual -We recently started logging students in as they stop in via appointments & distribute advising guides. Enrollment Students. software and excel spreadsheet. 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 7 -Students that are interested can make an appointment to receive an advising audit/academic plan. -Personalized Advising Guides are distributed to each student during DE NSO. -Currently we only have 1 DE advisor for LE and SL campuses. Responsible Individual Achievement Actions 1.5.3.1 ACTION ONE: Develop DE advising survey (in progress 12/1/11) J. Delgado & T. Harris-Rocker NOT MET Annual Status - In progress, will be completed by 7/15/12, an advising survey was drafted, vetted with the academic advisors & will be approved by PIE office for fall 2012 1.5.3.2 ACTION TWO: Formally track student appointments (ongoing). J. Delgado & T. Harris-Rocker MET Annual Status – Completed and data is being used for resource allocation and decision making MET Indicator Where is LSCC Today Target 1.5.4 Dual Enrollment is effective when High School personnel -Currently semester grade and registration reports are sent to each Collect data & distribute reports to can monitor student achievement. individual school at the end of each term. LSCC staff and County Partners. -Currently enrollment and course type reports are generated and shared with LSCC and County personnel. Responsible Individual Achievement Actions 1.5.4.1 ACTION ONE: Collect data and create reports. Distribute reports to LSCC staff and County partners. J. Delgado & T. Harris-Rocker MET Annual Status - . Filezilla has been implemented as a secure tool to disseminate grade reports to our county partners. 1. Filezilla was implemented in Spring 2012 for Lake and Sumter Counties 2. The Spring 2012 grade report posted on Friday, May 4th. 3. The Summer A and AE enrollment report was posted on May 15th. Regularly reviewed/monitored grade reports and noticed high school guidance counselors about their students’ status to remain eligibility for dual enrollment 1.5.4.2 ACTION TWO: Seek continuous improvement feedback from County partners. J. Delgado & T. Harris-Rocker MET Annual Status - Through the PIE office, a significant depth and breadth of data collection and analysis has occurred over the past academic year(PIE DE Research Reviews) . We will continue to use this data to inform our practice and make data-driven decisions. County Partners received this document at multiple points throughout the year as data was updated. Feedback and problem-solving shared via discussions with County partners in committee meetings such as the Sumter Operations Committee and dual enrollment cohort scheduling meetings to improve DE course offerings at Sumter Campus and high school site. Continuous improvement efforts were also made in dual enrollment articulation workgroups to improve processes and procedures for the 2012-2013 Dual Enrollment Articulation Agreement and subsequently the 2012-2013 academic year for dual enrollment students. Project 6: IMPLEMENT STRATEGIES TO MEET COLLEGE COMPLETION AGENDA GOALS MET Indicator Where is LSCC Today Target 1.6.1 Student Development is effective No formal assessment has Year 1 – Research Completion by Design initiative, collect best practices & offer basic training to SD when Academic, OSD, DE & CDS advising been completed to prove this staff. is contributing significantly to the overall impact. Year 2 & 3 – Create a Completion by design (CBD) taskforce in Student Development, develop SD SLO’s. student educational experience and Offer “Completion by Design” training for SD staff, incorporate CGD objectives into departmental completion agenda. outcomes & strategic planning. Measure completion rates, SLO’s and utilize CCSSE results & analysis. Responsible Individual Achievement Actions 1.6.1.1 ACTION ONE: Research CBD initiative Annual Status - Completed, CBD research initiative is complete C. Brady MET 1.6.1.2 ACTION TWO: Offer “Completion by Design” training for Student Development staff. (not yet started) C. Scott/ T. Harris Rocker/ C. Annual Status - Completed Claire Brady conducted a Completion by Design training at the annual Student Development retreat in Mary 2012 Brady MET 1.6.1.3 ACTION THREE: Prepare for year 2 & 3 tasks. (not yet started) C. Scott/ T. Harris Rocker/ 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 8 Annual Status -(SD staff used this training to set goals and determine priorities for initiatives that will contribute to completion efforts in 2012-13) C. Brady PARTIALLY MET NOT MET Indicator Where is LSCC Today Target 1.6.2 Student Development is effective Currently, students articulate their educational goal on Year 1 – Investigate a system for incorporating goal setting and tracking into when all students’ educational goals are their admissions application and in individual advising all aspects of academic advising from new student orientation through supported, tracked and monitored by appointments. completion. Academic advisors from NSO through Year 2 & 3 – Incorporate this goal tracking into the newly established completion There is no formal expectation or mechanism for academic record keeping system. Fully monitor and track student goals in Advising staff to store, monitor and/or track changes to the system. student goals. Responsible Individual Achievement Actions 1.6.2.1 ACTION ONE: Develop a system for incorporating goal setting and tracking into all aspects of academic advising from new student orientation through C. Scott/T. Harris completion. Rocker/C. Brady Annual Status -Completed & ongoing PARTIALLY MET -Student Development submitted a 2012-13 budget technology request for the development of an advising database) -Student Development staff have attended degree audit meetings organized by Guiler/Balon -Claire Brady met individually with degree audit technology companies at the annual SACS meeting in December -Claire Brady developed a degree audit rationale document to be included in future grant or budget requests 1.6.2.2 ACTION TWO: Incorporate this goal tracking into the newly established academic record keeping system. C. Scott/T. Harris Annual Status - Not yet started No academic record keeping system has yet been purchased or developed, awaiting 2012-13 funding request decision Rocker/C. Brady NOT MET 1.6.2.3 ACTION THREE: Monitor and track student goals in the system. Scott/Rocker/ Brady NOT MET Annual Status - Not yet started No academic record keeping system has yet been purchased or developed, awaiting 2012-13 funding request decision MET Indicator Where is LSCC Today Target 1.6.3 LSCC is effective when a pilot group of ENC Since standardized information literacy tests such a SAILS and ILT cost $3- Create institutional benchmark that can be used 1101 students successfully complete the LakerLit $8 per student to administer, LSCC created a locally mounted tutorial and to improve the instrument, the assessment tools information literacy tutorial. assessment tools. The tutorial draft is complete and ready to pilot. and student outcomes. Responsible Individual Achievement Actions 1.6.3.1 ACTION ONE: Confirm Integration of the tutorial into the curriculum with the selected instructors Cason/English MET Annual Status - Five ENC 1101 instructors agreed to pilot the LakerLit information literacy tutorial in their Fall 2011 classes. Librarians consulted with instructors on the integration of the tutorial into the curriculum and administration of the assessment. 1.6.3.2 ACTION TWO: Administer Assessment in selected classes Annual Status - The LakerLit information literacy tutorial was piloted in nine sections of ENC Cason/English MET 1101 during the Fall 2011 semester. Six of these sections were on the Leesburg campus and three were on the South Lake campus. A total of 179 students viewed the tutorial and took the assessment. 1.6.3.3 ACTION THREE: Analyze results and create benchmark Annual Status - The data showed a general increase in scores between the pre assessment Cason/English MET and the post assessment for the Spring 2012 students. However, one area of weakness was in comprehending MLA citation. Librarian James Cason is working on revising the citation module of the tutorial during the Summer 2012 semester. He will be attending the English faculty meeting during Convocation week in August 2012 to promote the tutorial and expand use of the tutorial in more ENC 1101 sections. Librarians will continue to monitor assessment scores and improving tutorial content and assessment tools. MET Indicator Where is LSCC Today Target 1.6.4 Foundation/Institutional Advancement is The Foundation has been awarding scholarships to students The target for the next 2 or 3 year(s) will be met when we increase effective when we are able to assist students who are close to graduating. In 2009-10, 46% of the the percentage of students receiving at least one Foundation with scholarships to help them graduate. graduates received at least one Foundation scholarship. scholarship to 10% in assisting those students in completing their 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 9 last semester in order to graduate. Responsible Individual Achievement Actions 1.6.4.1 ACTION ONE: Annual Status - Awarded 375 scholarships totaling $405,432 for Spring and Summer 2012 Claudia Morris MET 1.6.4.2 ACTION TWO: Annual Status - This has been completed R. Brandeburg MET NOT MET Indicator Where is LSCC Today Target 1.6.5 The LSCC Athletic Department is effective During the 2009-10 year LSCC had an overall graduation rate The target completion rate for the student-athletes will be 70% when student-athletes complete the AA/AS of 60% and a successful transfer rate of 96%. or higher. For those student-athletes transferring to upper degree(s) or successfully transfer to upper (The 2009-10 state average was a 62% graduation rate; 73% division college/university, they will meet or exceed 80%. division institution within a 3 year period. transfer rate) Responsible Individual Achievement Actions 1.6.5.1 ACTION ONE: The LSCC Academic Report initial findings are accumulated at the end of the fall term and in June or each year Annual Status -Did not Matulia NOT MET meet the graduation goal. 1.6.5.2 ACTION TWO: The section 16 Academic Report is submitted to the FCSAA in September of each year Annual Status - Did not meet the target goal for graduation ( completed report for 2011-2012 will be in September) PARTIALLY MET Indicator Where is LSCC Today 2010-11 credit course withdrawal rate = 9.5%. Matulia NOT MET Target The 2014 target will be met when the percentage of students withdrawing from credit courses each semester is 9.5% or lower. 1.6.6 Academic Affairs is effective when students successfully complete credit and developmental courses not withdrawing before the semester ends. Responsible Individual Achievement Actions 1.6.6.1 ACTION ONE: Deans & chairs will be aware/monitor this percentage rate over the next academic year and will take actions to improve the rate if Sligh/Rager/Chairs NOT MET warranted Annual Status -Withdrawal rate for 2011-2012 is not yet available, but a plan for the new year will include assessing that rate and implementing a plan to work with faculty to improve withdrawal rates overall Data Not Yet Available PARTIALLY MET Indicator Where is LSCC Today Target 1.6.7 Improve Equity Accountability Measures Below in Black & Hispanic minorities in EAM and Targets: EAM increase one Black Male and one Hispanic Female; Faculty in faculty continuing contracts. increase one Black Male, one Hispanic Male and one Hispanic Female. Achievement Actions 1.6.7.1 ACTION ONE: Annual Status - Second black male faculty hired for Fall 2012. Responsible Individual G. Sligh PARTIALLY MET PARTIALLY MET Indicator Where is LSCC Today Target 1.6.8 Students who are tutored in particular courses earn Data not available for comparison. Need To be determined based on baseline information. higher grades than those who were not. baseline data. Responsible Individual Achievement Actions 1.6.8.1 ACTION ONE: Accutrack categories have been expanded to include more specific course designations – easier to track. (done) M. Kane Annual Status - Reports can be requested now based on the categories that were programmed. PARTIALLY MET 1.6.8.2 ACTION TWO: Reports will be generated by course name and compared with Banner grade records W. H-Erskine Annual Status - Accutrack 11 in being programmed over the summer and will be implemented in the fall semester allowing tracking of this parameter PARTIALLY MET 1.6.8.3 ACTION THREE: Special Case: Track Oral Report Spanish grades before and after Rosetta Stone use – project involving faculty S. Carrion and A Bruno M. Kane and LC. Annual Status - Lack of baseline data and inconsistencies in the final project forms from instructors rendered the data inconclusive. PARTIALLY MET PARTIALLY MET Indicator Where is LSCC Today Target 1.6.9 Tutored students return to school in the next semester in higher Data not available for comparison. Need To be determined based on baseline information. numbers than those who did not use the Learning Centers. baseline data. 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 10 Responsible Individual Achievement Actions W. H-Erskine 1.6.9.1 ACTION ONE: Pull activity reports in Accutrack using student IDs. Annual Status – Upgrade of the learning centers software tracking system will PARTIALLY MET allow data to provide baselines and target for next annual cycle 1.6.9.2 ACTION TWO: Merge results with banner query on returning students. Annual Status - See above 1.6.9.1 PARTIALLY MET 16.9.3 ACTION THREE: Produce baseline report on retention percentages. Annual Status – See above 1.6.9.1 Kane PARTIALLY MET NOT MET Indicator Where is LSCC Today Target 1.6.10 Those students testing into developmental courses that have an opportunity to be Project to begin fall of 2011. Baseline will be remediated will be successful in greater numbers than those who did not get help and who after determined 2012remediation and retaking the placement test will place at into the credit level course. 2013. Responsible Individual Achievement Actions 1.6.10.1 ACTION ONE: Administer diagnostic tests to students who score below a designated cutoff in PERT. I. Bowers Annual Status - Continued delays at the DOE and McCann - new target date is for fall 2012. Diagnostics can be ordered now. NOT MET 1.6.10.2 ACTION TWO: Work with Depart. Chairs to create remediation materials or plan. Kane & B. Hebrock Annual Status - Pearson online practices are recommended by the Math Dept. No decision made for English remediation yet. PARTIALLY MET 1.6.10.3 ACTION THREE: Track pre-and post-remediation scores in PERT (remediated and non-remediated attempts) to assess results. B. Hebrock Annual Status - Ready to go once the remediation process is approved by Dept. Chairs NOT MET MET Indicator Where is LSCC Today Target 1.6.11 Students return to the LCs for help regularly. Tracking available now. Returning students increase by 5%. Achievement Actions 1.6.11.1 ACTION ONE: Pull Accurtrac reports on repeat visits by subject using logins and hours of use. Annual Status - Reports indicate that 6% of the total visits in the spring semester were one time only visitors – 94% come back more than once. 1.6.11.2 ACTION TWO: Compare with next year’s values (fall to fall, spring to spring comparisons). Annual Status - Baseline values for 2011-12 are in place. Responsible Individual W. H-Erskine MET W. H-Erskine PARTIALLY MET M. Kane MET 1.6.11.3 ACTION THREE: Prepare report identifying areas of growth or decrease in traffic and hours. Annual Status - Fall 2011 traffic was up 4% from the previous year, but Spring showed a 17% decrease in traffic, due to reducing evening/Saturday hours a total of 11 hours in a week of 65 hours, or exactly 17%. PARTIALLY MET Indicator Where is LSCC Today Target 1.6.12 The Textbook Lending Library assists students in need. We served # students Increase number of books lent by 5% per year. Achievement Actions 1.6.12.1 ACTION ONE: Seek and encourage donations from students through LC, Web, SGA, etc. Annual Status - Many new editions for fall 2012 will deplete the library – no new books will be donated until the second semester. 1.6.12.2 ACTION TWO: Keep Lending Library information visible in LC, on Web, etc. Annual Status - Website presence, notices in Learning Centers in place. Advise Angler to publish dates. 1.6.12.3 ACTION THREE: Seek funding opportunities through Follett and other outside sources Annual Status - Received $2000 from Career and Technical for books that benefit their students, also $2000 from Mr. Scott’s funds. Responsible Individual B. Hebrock, NOT MET B. Hebrock MET B. Hebrock MET Strategic Goal II: COLLABORATE AND PARTNER TO ACHIEVE INSTITUTIONAL MISSION Goal - 2 Project 1: INCREASE IN FUNDRAISING AND GRANTS MET Indicator 2.1.1 The Foundation/Institutional Advancement are effective when regular, accessible and impact communications are in place to keep the donor base fully 3/6/2016 12:37 PM Where is LSCC Today The Foundation has an e-newsletter that is done quarterly, has an active website, over 600 friends on Facebook, plans to send at least one constant contact Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation Target The target for the next will be to identify additional friends to Facebook, add more people to receive the quarterly newsletter and constant contact messages, increase number 11 informed and engage in the progress of the College. message each month and invitations to the gala auction and other events. of participants to fundraising events. Achievement Actions Responsible Individual 2.1.1.1 ACTION ONE: Annual Status -3,168 subscribers for e-newsletter, 3,958 constant contact messages, 4,115 performing arts contacts, and 75 press Erin O’Steen releases have been sent out with 99% appearing in the media. MET MET Indicator Where is LSCC Today Target 2.1.2 The Foundation/Institutional Advancement is effective when we commemorate and gain The Foundation is in The target is identifying alumni of LSCC, a mechanism to support the future through annual events and possibly new events planned around the the planning stage nominate and name the college’s distinguished alumni anniversary designed to cultivate new donors and engage those who have benefitted from the process. and recognize at an event. College, services, etc. Responsible Individual Achievement Actions 2.1.2.1 ACTION ONE: Annual Status - Provided cupcakes and bottled water for graduation, distributed 173 pins and ribbons to the graduates and 193 coffee Claudia Morris table books to the graduates who applied to join the Alumni Association; Planning is underway for the Time Capsule Dedication on 11- 20; Alumni Wine & MET Cheese at the South Lake Campus on 8- 30; Alumni Wine & Cheese at the Sumter Campus on October 16; Distinguished Alumni Event on 10-25. MET Indicator Where is LSCC Today Target 2.1.3 Foundation/ Institutional Advancement are effective when we The target for the next (2 or 3 years) will be to identify the process to have more Board involvement to assist with fundraising efforts. begin raising investments for the four year degree program(s). Responsible Individual Achievement Actions 2.1.3.1 ACTION ONE: Annual Status - Held a board retreat & SWOT Analysis on 2/17 (27 in attendance); with a 22% increase in attendance for the January R. Brandeburg Annual Meeting; 28% increase for the 5/2 Board Meeting. 27th Annual Gala Auction had 88% board attendance, which is the largest % ever. MET MET Indicator Where is LSCC Today Target 2.1.4 Foundation/Institutional Advancement The Foundation has been presenting the Annual Gala The target for the Gala is to exceed the number of attendees by 5% and the is effective when special events actively Auction for the past 26 years. The 27th Annual Gala is net revenues by 5%. The target for the Golf Tournament is to increase the sponsored by and/or indirectly supported by scheduled for April 14, 2012. The 13th Annual Golf number of participants by 3% and the net revenues by 5%. The target for the the Foundation to fund and continue to Tournament will be held on Sept. 16 and the Annual Professionals’ Seminar is to increase the participants by 3% and to track any funding significant endowments. Professionals’ Seminar is scheduled for August 26. gifts that result from their attending. Responsible Individual Achievement Actions 2.1.4.1 ACTION ONE: Annual Status - The 27th Annual Gala Auction netted $63,361 which is $2,300 more than 2011; we had 340 in attendance compared to R. Brandeburg 308. The Performing Arts Series was another sold out season and resulted in $8,000 more in revenue. MET MET Indicator Where is LSCC Today Target 2.1.5 Foundation/Institutional Advancement is effective Foundation has been raising funds for FGIC Match for the Target for next 2 years is to increase the amount of when we provide opportunities for advancement for targeted past five years. In 2009, the Foundation raised $37,000 and scholarships for FGIC and minorities based on the demographic audiences. received a match of $37,000 for students in this target group. State’s figures. Responsible Individual Achievement Actions 2.1.5.1 ACTION ONE: Annual Status - LSCC was allocated to receive $8,498 in the FGIC Scholarship Match, we raised $15,000 and received $13,749. R. Brandeburg Established a new partnership between the UCF Foundation, Johnson Scholarship Foundation, Brevard CC, Seminole and Valencia College Foundations. MET PARTIALLY MET Indicator Where is LSCC Today Target 2.1.6 The Office of Planning & The number of grants being The target will be met when a monthly report is generated that includes projected out timelines for Institutional Effectiveness is successful submitted has significantly new opportunities that align to the strengths, need and distinctions of the institution and its when there is a proactive system in place increased, the Office has programs. that identifies, meets the needs, engages, submitted 8 grants in the When there is a centralized working process that establishes equitable and clearly articulated encourages and energizes all stakeholders last 6 months, bringing in procedures for supporting and determining fiscal and physical resource use in preparing proposals to actively engage in competitions for $000.000, which is more grants. 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 12 external funding. than the whole of the last year. PIE has a process currently being piloted, evaluation and improvements will be made next year When the number of competitive proposals submitted to funding agencies significantly increases. When clearly articulated data criteria and procedures are set in place to recognize individual program distinctions, needs current strengths, future plans in order to engage in and support collaborative efforts to write more grants. When a proactive calendar is available that identifies future funding opportunities projected for the next 18 months. The Office of Planning & Institutional Effectiveness is successful when we proactively identified and capitalized upon new sources of public and private support through multiple funding sources. Achievement Actions 2.1.6.1 ACTION ONE: A centralized working process will be designed that establishes equitable and clearly articulated procedures for supporting and determining fiscal and physical resource use in preparing proposals grants. Annual Status – A new process is in place and can be found on the PIE webpage 2.1.6.2 ACTION THREE: PIE will have and carry out procedures to recognize individual program distinctions, needs, current strengths, future plans of the different Annual Status - NOT MET – based on the work currently being done to put data collection methods in place to track grants and dollars awarded we will be better prepared to complete this next year 2.1.6.3 ACTION FOUR: the grants manager will develop and successfully maintain a grants opportunity calendar for the college Annual Status - NOT MET – we were not able to provide the effort to complete this action – we will work on this for next year – the idea is proving to be more difficult than we anticipated with the quick nature of grant submissions etc. Responsible Individual Lisle, Cripe MET Lisle, Cripe PARTIALLY MET Lisle, Cripe NOT MET Goal 2 - Project 2: ENHANCE & EXPAND PARTNERSHIPS WITH UNIVERSITIES, COLLEGES, AND INDUSTRY PARTIALLY MET Indicator 2.2.1 The Youth Outreach Department is effective when participants acquire LSCC sponsored college credits through their involvement in the projects’ “Summer Bridges” transition program. Achievement Actions Where is LSCC Today Ten YOD graduates are in the process of enrolling in LSCC’s Summer B term. Target Increased allocation reflecting the increase in tuition costs. Responsible Individual 2.2.1.1 ACTION ONE: (Spring 2012) Identify up to ten YOD Senior graduates to participate in “Summer bridge” component, which consists of participants enrolling in 6 Cortes credit hours during LSCC Summer B term. Nine YOD graduates enrolled in the 2011 Summer B term. Six of these nine students completed the Summer Bridge program. MET Activity for 2011-12 academic years will transpire in the spring and summers of 2012. Annual Status - Latest available completion outcome (summer 2011) was provided above in the “Mid-term status” and was met 2.2.1.2 ACTION TWO: (Summer 2012) oversee and monitor the registration and performance of up to f10YOD graduates enrolled in LSCC’s Summer B term. Cortes Annual Status - A total of 5 YOD high school graduates have been recruited to participate in the YOD Summer Bridge program. Due to low enrollment numbers at LSCC, PARTIALLY the Director of Financial Aid advised that it would be preferred to not utilize all funds under this program. Additionally, the Upward Bound program has no seniors MET graduating this year. These factors contributed to the current count of 5 participants (instead of 10) for the YOD Summer Bridge program. PARTIALLY MET Indicator Where is LSCC Today Target 2.2.2 Career and Technical Education Programs are Health Information Mgmt. ICD-10 training schedule The target will be met when 100%^ of the students enrolled in effective when healthcare training programs are expanded has been developed and will be proposed to hospital ICD0-10 workshops complete their training programs. through university and industry partnerships. partners for approval. Responsible Individual Achievement Actions 2.2.2.1 ACTION ONE: Timeline and schedule of proposed training activities have been developed and reviewed with CFHA personnel on 8/1/11. Rager/ Ziesemer Annual Status - Online A&P/Disease processes course status: AHIMA, FHIMA and Gatlin/Ed2Go all have these types of fully online courses available so it isn’t MET cost effective to develop a version more focused on what is needed for ICD10 coding. Mail List/Survey Status: Have permission to use the Lake-Sumter Medical Society member email list to send surveys and an Advisory Member is trying to get permission for both CFHA and FHW lists as well. However, the Federal Government announced postponing the implementation date from October 1, 2013 to October 1, 2014 so a physician practices survey is premature at this point. The hospitals in this area, however, are continuing with the training they have arranged through consultants and AHIMA/FHIMA toward ICD10 because they don’t want to lose the momentum. 2.2.2.2 ACTION TWO: Development and promotion of ICD 10 training activities through LSCC’s continuing education department. Ziesemer /Diggs 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 13 Annual Status - Survey has been postponed. NOT MET 2.2.2.3 ACTION THREE: Assess effectiveness of training programs. Ziesemer/ Diggs Annual Status - Implementation of training will begin late 2012 or early 2013 NOT MET MET Indicator Where is LSCC Today Target 2.2.3 The LSCC Athletic Department During the 2009-10 year LSCC studentThe annual target will be met when 100% of all student-athletes complete a minimum of 2 is effective when student-athletes athletes 90% of all student-athletes community service activities and 5 departmental (program) activities, including: participate in community service completed a minimum of 5 community departmental fundraising activities and/or other college related activities. A minimum of two activities; college related student service activities. One student-athlete per student=athletes per team will represent the athletic department at all College Wide activities, departmental fundraising team was represented at the College-Wide meetings. A minimum of 5 student=athletes per team will represent their respective sport on activities, student recognitionmeetings. The LSCC Athletic program hosted the All=Conference Academic Team. A minimum of two student-athletes per team will be academic awards and other three student life activities and collaborated represented on the All-State (FCSAA) Academic Team. A minimum of one student-athlete recognition related to college, with Student Government and Student Life from the LSCC athletic program will be represented on the NJCAA Academic All-American community, conference, state and on Fall (Boys and Girls Club Fall Festival) and Team. A minimum of one student-athlete per team will receive a student life “leadership” national levels/associations. Spring Community Activities (Wing Fest). award at the annual spring awards ceremony. Responsible Individual Achievement Actions 2.2.3.1 ACTION ONE: LSCC Athletic Highlights , Section 16 Report, and Federal Equity Report – Academic Report in May of each year Annual Status Matulia Complete/information with VP MET 2.2.3.2 ACTION TWO: Mid-Florida Conference, FCSAA, and NJCAA Academic Qualifiers submitted in May of each year Annual Status - Completed Matulia MET 2.2.3.3 ACTION THREE: Who’s Who among American Colleges and LSCC Student Life Awards in May of each year Annual Status - Target met Matulia Complete/Information with VP MET MET Indicator Where is LSCC Today Target 2.2.4 The Youth Outreach Department is effective when Starting to compile a list of participants that have SGA funded YOD Alumni Association, also serving additional first it establishes a functioning LSCC YOD Alumni graduated from high school in the past four years generation LSCC students who had not been participants of YOD in Association. and are currently enrolled at LSCC. high school. Responsible Individual Achievement Actions 2.2.4.1 ACTION ONE: (Summer/Fall 2011) Compile a directory of all YOD alumni currently enrolled at LSCC. A directory consisting of 80 former YOD participants Siegrist currently enrolled at LSCC has been compiled. Vision and mission statements have been drafted. Individual goals have been identified. Objectives still pending. A formal Request for Charter will be submitted on November 28th, including a petition with signatures from ten YOD alumni. MET Annual Status - A directory consisting of 95 Laker-Mail and personal home-email addresses from YOD graduates enrolled at LSCC and other interested LSCC students has been compiled. Email blasts have been sent to this directory to promote several activities that have already been sponsored by the YOD Alumni Association. 2.2.4.2 ACTION TWO: (Summer/Fall 2011) Draft a mission statement, goals/objectives, and recruitment strategy. Draft mission and Vision Statements submitted to Shelton AVP on 11/23/11 for review. MET Annual Status - Mission & Vision statements for the association have been drafted and approved by SGA. The Association acquired its official Student Club Charter on December 13, 2011. Information about the YOD Alumni Association was disseminated to currently enrolled YOD alumni via Laker Mail, flyers and Marquee announcements at all three campuses. Information sessions about the Association were held on February 14th and 15th at all 3 campuses. A “Kick-off” ceremony and orientation program (funded by SGA) held on April 9th in the Magnolia Room drew approximately 30 prospective new members. SGA Executive Board members were also in attendance for support of the Association. 2.2.4.3 ACTION THREE: (Spring 2012) Assign an advisor and schedule at least two meetings to begin incorporating an elected executive board and sub-committees to Cortes/Shelt prepare association’s constitution and fundraising efforts. on Annual Status - The entire YOD Staff has collaborated to develop, complete and submit a constitution for the Association, which was ultimately approved by the SGA. MET Sub-committees comprised of YOD staff were organized to address: Recruitment, Selection of Officers, Induction/Orientation and Retention. Felicia Shelton has agreed to serve as the Association’s advisor. As a result of these efforts, four YOD alumni were identified as the Alumni Association’s Executive Board, following an extensive application and interview process. These executive board members have officially met on four occasions in April and May 2012. Following the Kick-off 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 14 ceremony and Orientation program, the YOD Alumni Association has sponsored several activities that included a “Study Hall” group session with snacks/refreshments, which drew over 25 students to peer-study and jointly prepare for final exams. Association members also gathered to compete on a fun “Scavenger Hunt” that included clues scattered throughout the Leesburg campus. Members of the YOD Alumni Association are scheduled to chaperone, conduct several workshops and panel discussions with hundreds of current middle school and high school students who will be visiting LSCC to attend the upcoming YOD summer programs. MET Indicator Where is LSCC Today Target 2.2.5 Foundation/Institutional Advancement is effective when the Alumni Implementation for the Alumni Association Target for next 2 years is to have 20% of the alumni Association is operational; enlisting new Alumni members; and developing and membership and enrollment. members of the Alumni Association. programs for regular giving. Responsible Individual Achievement Actions 2.2.5.1 ACTION ONE: Annual Status -28 payed dues; 28 bricks have been sold; developed on-line brick order form and on-line giving for alumni. Claudia M MET MET Indicator Where is LSCC Today Target 2.2.6 Foundation/Institutional The Foundation has a 41 member Board of The target for next (2 or 3 years) year(s) will be met when we maintain at least 40 board Advancement is effective when Directors and numerous investors to the members and increase their participation by 5% reaching out to investors/potential relationships and partnerships Foundation and College. Total Amount raised in investors through newsletters, marketing materials, invitations to Foundation events and help reach fundraising goals. 2010 was $921,700 plus an additional $600,000 in social media. Build and increase relationships in South Lake County and Sumter County. investment earnings. Responsible Individual Achievement Actions 2.2.6.1 ACTION ONE: The 2011 Annual Campaign goal was to raise $225,000. R. Brandeburg Annual Status - When the campaign ended on December 31, 2011 raised $250,211. In 2011 the Foundation raised $1,550,633 plus an additional $102,530 in MET investment earnings. 2.2.6.2 ACTION TWO: Annual Status - Erin graduated from Leadership Lake in May; Claudia has been invited to serve a three-year term on the Leadership R. Brandeburg Sumter Advisory Board; Rosanne chaired the Job Readiness Program through the Leesburg Chamber presented to the seniors at Leesburg High School; Rosanne MET served on the Florida College System Foundation; Florida Council for Resource Development; Educational Foundation; Take Stock in Children; Lake County Chamber Alliance. She attended Leesburg Chamber Breakfasts, South Lake Chamber Breakfasts, participated in the South Lake Chamber Golf Tournament, volunteered for the Educational Foundation Golf Tournament, Lifestream Behavioral Center, Beacon College, Children’s Advocacy Center, Boys and Girls Club, United Way events. MET Indicator Where is LSCC Today Target 2.2.7 The Office of Planning & Institutional Effectiveness is successful when 2010=1011 funding opportunities = 00. The target will be met when the number state collaborative we increase our leadership or collaborative connections in statewide funding opportunities LSCC takes advantage of increases by initiatives that support increased financial assistance for the college. 2. Responsible Individual Achievement Actions 2.2.7.1 ACTION ONE: The grants manager will engage proactively, talking, meeting with other FCS schools, join state group to develop relationships to Lisle, Cripe MET increase collaborative grant opportunities Annual Status - – we did increase the number of grants submitted, including the latest grant with Pensacola Strategic Goal III: BUILD EXCELLENCE IN PROGRAMS AND SERVICES FOR ALL Goal 3 - Project 1: IMPLEMENT SERVICE EXCELLENCE PROGRAM NOT MET Indicator 3.1.1 Student Development is effective when SD staff titles, reporting lines and job descriptions ensure organizational efficiency and student access to resources and staff. 3/6/2016 12:37 PM Where is LSCC Today There have been no recent unit reviews or position audits Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation Target Year 1 – Review & update all SD job descriptions, identify what position descriptions need to be audited by HR, seek out national best practices & Florida College system data, and develop a proposal for Cabinet. 15 Responsible Individual Achievement Actions 3.1.1.1 ACTION ONE: Offer “Completion by Design” training for Student Development Staff.(ongoing) Annual Status - In progress 75% complete, will be C. Brady PARTIALLY 100% complete by end of appraisal cycle on 8/30/12 MET 3.1.1.2 ACTION TWO: Designate a completion by Design (DBD) taskforce in Student Development. Annual Status - not yet started Scott/Harris/Brady NOT MET 3.1.1.3 ACTION THREE: Develop Student Development Student Learning Outcomes. Annual Status - not yet started Scott/Harris/Brady NOT MET MET Indicator Where is LSCC Today Target 3.1.2 Student Development is effective when the Today Student Development has not Year 1 – Open the new testing space, monitor student use & student and faculty OSD testing facility is fully operational and we offer fully been implemented our new OSD satisfaction, respond to issues, and offer an open house for students and staff. students with disabilities the best opportunity for testing center facility since Year 2 & 3 – Continue to monitor, evaluate and modify services and/or processes as academic success while meeting ADAA guidelines. construction is still ongoing. needed. Responsible Individual Achievement Actions 3.1.2.1 ACTION ONE: Open the new testing space & respond to emerging issues. Annual Status - Completed, opened 8/23/11 R. Poole MET 3.1.2.2 ACTION TWO: Offer an open house for students and staff. (spring semester) Annual Status - Completed R. Poole MET 3.1.2.3 ACTION THREE: Monitor student use & student and faculty satisfaction. (ongoing) Annual Status - Completed R. Poole MET MET Indicator Where is LSCC Today Target 3.1.3 The LSCC Athletic Department The Athletic Department hosts: The annual Golf Classic, The Sports Leadership Program, Increase participation in intramural activities by is effective when Athletic Teams, and the Wing Fest/Craft Show, each year and is open to all students, faculty, staff and 10%; increase participation at the Golf Classic, athletic staff members, and community. The Annual Golf Tournament raised $20,000 in sponsorships, with 102 Sports Leadership Program and Wing Fest/Craft intramural activities exhibit participants; the Sports Leadership Program generated 75 attendees; the Wing Show, both in sponsorships and participants, by excellence and provide services for Fest/Craft Show raised over $2,000 with 8 sponsors and 220 attendees. The Athletic 10%; increase numbers of participants in open all students, college employees, and Department conducts one intramural activity per week and provides open gym/weight gym/weight room hours, by 10%. community constituents. room hours during college operational hours (as posted on the website and on campus). Responsible Individual Achievement Actions 3.1.3.1 ACTION ONE: Unit Reviews are submitted to Vice President of Business Affairs in May of each year Annual Status - Completed. Matulia MET 3.1.3.2 ACTION TWO: Student-Athlete evaluation of services and results of findings are complete in May of each year Annual Status - Completed. Matulia MET 3.1.3.3 ACTION THREE: Golf Tournament (September); Wing Fest (March); Sports Leadership Program (November and April) Matulia MET Annual Status - Participation was increased in all areas; met the target. ( The Sports Leadership Program was postponed during the 2011-2012 year) MET Indicator Where is LSCC Today Target 3.1.4 Career Development Services is effective when all career We do not currently track all career-development Year 1 – The target for 2011-12 will be met when a Career development planning and tracking is centralized using function using one form of advanced technology. Services Management System license is purchased / advanced technology via the use of a Career Services Rather, we collect this information in a implemented, staff training is completed and live use of the Management System as outlined in the “Progress” state of the fragmented manner and are still in our infancy in software for our constituents is launched. Completion by Design program. collecting this data. Responsible Individual Achievement Actions 3.1.4.1 ACTION ONE: Research Career Mgt systems & submit proposal/seek approval from Technology Comm. & Cabinet. Annual Status - Completed Pearson/Brady MET 3.1.4.2 ACTION TWO: Purchase system, train staff and implement across the College. (completed) Annual Status - Completed 10/11 Pearson MET 3.1.4.3 ACTION THREE: Monitor and track system usage, technology issues, staff/faculty feedback. (ongoing) Annual Status - Completed O. Pearson MET PARTIALLY MET Indicator Where is LSCC Today Target 3.1.5 The Facilities Department/College operate Presently the College Building Department and Building The target for 2011-12 is to secure an in-house, Board approved more efficiently and cost effectively when Official work is accomplished at a rate of approximately Building Official, thereby providing LSCC with a Building Department excellence in service is improved. $9,000/annually plus additional costs as applied. and improved efficiency. Responsible Individual Achievement Actions 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 16 3.1.5.1 ACTION ONE: Formal Training will be provided and time to attend training for Building Official Courses Annual Status - It appears that Rob might be Ball/Estes MET able to reserve a seat in a class before December but cannot be confirmed at this time. We continue to access this difficult training. 3.1.5.2 ACTION TWO: On the job training will be provided (two weeks) with present contracted Building Official Ball/Estes Annual Status - Rob has participated in a number of real-time inspection experiences with Alpha Inspections. While he will continue to do so; he is presently PARTIALLY MET considered adequately trained in this area and the status should be of this Action should be considered complete. 3.1.5.3 ACTION THREE: Once training is complete and approved by UBC Board; Individual will be presented to LSCC Board for approval Ball/Este Annual Status - Awaiting completion of Action Item #1. This overall project will roll-over into next year before being completed. NOT MET PARTIALLY MET Indicator Where is LSCC Today Target 3.1.6 The College operates more safely and efficient when best The original Emergency Management Plan is in The target for this indicator is complete revision of the practices for response to emergencies are logical and relevant. place but portions of the plan are now outdated. Emergency Management Plan by the end of 2011-12. Responsible Individual Achievement Actions 3.1.6.1 ACTION ONE: First edit will remove unnecessary subject matter, add new information, and correct basic errors Annual Status - Additional Ball changes/edits will be necessary before truly complete. PARTIALLY MET 3.1.6.2 ACTION TWO: Revised document will be posted on the web site for feedback Annual Status - Awaiting final draft. Ball PARTIALLY MET 3.1.6.3 ACTION THREE: Final edit based on feedback and permanent posting of document on web site Annual Status - To be completed after final edit Ball PARTIALLY MET NOT MET Indicator Where is LSCC Today Target 3.1.7 LSCC is effective when students express Student survey administered by the libraries via Survey monkey Departmental survey administered by Institutional Effectiveness satisfaction with library resources and services. last conducted Spring 2009 overall satisfaction level 79.6%. Office with 80% of respondents satisfied. Responsible Individual Achievement Actions 3.1.7.1 ACTION ONE: Library staff will consult with the Executive director Planning/IE to refine survey and distribute to students Norton/English Annual Status - Library staff refined survey questions, which were approved by the Executive Director Planning/IE. PARTIALLY MET 3.1.7.2 ACTION TWO: Survey will be administered in the Spring of 2012 Annual Status - Survey will be administered in mid-to late Spring semester 2012 Norton/English NOT MET 3.1.7.3 ACTION THREE: Survey results will be analyzed and reported to the VP of Academic and Student Services Norton/English Annual Status - Due to the large volume of surveys requested from the PIE office, a link to the online library survey was e-mailed to students at end-of-term NOT MET on May 3. As of May 16, there were no responses. The survey will need to be distributed in March or early April in the Spring 2013 semester. MET Indicator Where is LSCC Today Target 3.1.8 Foundation/Institutional Advancement is effective when all those The target is to participate in the Service Excellence associated with the Foundation and Advancement work to provide excellent Initiative by building and expanding internal and external service to all stakeholders both internal and external to the College. relationships. Responsible Individual Achievement Actions 3.1.8.1 ACTION ONE: Brandeburg/O’Stee Annual Status The Foundation staff completed the Service Excellence Training. They are responsive, collaborative, respectful and cooperative to all customers. n/Morris/Genereux Erin O’Steen serves on the Cont Improvement Comm. Erin and Marlene Genereux received recognition in the Service Excellence newsletter. Erin is the Chair of MET the Ad Hoc Committee Structure, a service excellence recommendation and Marlene Genereux is the MAP Representative. MET Indicator Where is LSCC Today Target 3.1.9 Continuing Education/Computer Institute is effective when 100% excellence 98% standard of excellence 100% standard of excellence. rate of satisfaction for overall evaluation/rating at meeting student’s needs. Responsible Individual Achievement Actions 3.1.9.1 ACTION ONE: Evaluation surveys will be administered to classes implemented in Fall 2011. Annual Status - Evaluations surveys have been Diggs, Green, Torman administered throughout the Spring term at the conclusion of each class and summaries were done for each CRN. MET 3.1.9.2 ACTION TWO: Survey results will be analyzed and included in the annual report, which will be completed by December 2011. Diggs, Green, Torman 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 17 Annual Status - The surveys were analyzed and the overall standard of excellence percentage for Spring term is 99.06% MET 3.1.9.3 ACTION THREE: Complete surveys during second semester; analyze data and submit report to the VP of Academic & Student Affairs by May Diggs, Green, Torman 2012. Annual Status - The surveys were analyzed and the overall standard of excellence percentage for Spring term is 99.06% MET PARTIALLY MET Indicator Where is LSCC Today Target The target for 2012 will be at 70%, 2013 will be at 75%, 2014 will be 3.1.10 PIE is successful when it completes 66% of all reports submitted had 100 or below information editsat 85% and submits USDOE, FLDOE data and 97% of reports were submitted on time _____________________________________ reports with a low percent (under 100) of Jan-Jun -100%, July – June 97% 2012 will be at 98%, 2013 will be at 99%, 2014 will be at 100% informational edits along with external Tammy did we meet this-YES entity surveys on or before the required due date. Responsible Individual Achievement Actions 3.1.10.1 ACTION ONE: PIE will continue to hold campus stakeholders meetings to discuss data validity, context, content, and accuracy until a confidence level Castello/IT/PIE is met Annual Status - The PIE office has engaged in 30 data clean-up , accuracy meetings PARTIALLY MET 3.1.10.2 ACTION TWO: PIE will work to improve communication between committees and decisions that impact data accuracy Castello/Lisle Annual Status - MET - Tammy and Kristy have met with many individuals and presented at many committee meetings providing data for decision-making. PARTIALLY MET There is a clear shift beginning in the college culture, however work still need to be done. MET Indicator Where is LSCC Today Target 3.1.11 Establish Service Excellence Program for employees. Required training 100% Attendance Target: 100% Evaluation Score 3.8 out of 5.0 (Excellent) Satisfaction Target: 4.0 out of 5.0 Responsible Individual Achievement Actions 3.1.11.1 ACTION ONE: Provide basic training courses in service excellence to supervisors and their employees Tim Kane, Tracey Annual Status - Completed training for all staff (including temps, tutors) 201 total with an overall course satisfaction score of 4.8 out of 5.0. Hoff MET 3.1.11.2 ACTION TWO: Integrate appropriate changes from SE Committees necessary to support culture change into HR processes Tim Kane Annual Status -100% of staff job descriptions include Service Excellence requirement; Orientation for New Employees web-Blackboard course launched; MET Expanded Cabinet approves Computer & MS Skills Testing for Employees proposal; HR Searches include Service Excellence question(s) from an approved bank; HR key staff have weekly presence at Claremont and monthly at Sumter sites; Employee Performance Evaluation with SE Standards and Ratings Rubric prototype completed and approved by Expanded Cabinet. HR approved to complete the same for all other evaluation forms except for faculty. MET Indicator Where is LSCC Today Target 3.1.12 IT is effective when the annual cycle of technology The IT department is taking 90+ days The IT department will reduce its total refresh installations times by refresh is effectively rolled-out. longer than planned to deliver & install PC 30 days this year, with a target of meeting 100% of planned laptop, desktop and server computers. installation times for subsequent years. Responsible Individual Achievement Actions 3.1.12.1 ACTION ONE: Continue to track and monitor purchases and installations Annual Status - All equipment for refresh has been purchased. All Guiler/Johnson equipment has been installed except for the new voice equipment, which will be installed in June. The hold up on delivery is due to the manufacturer. MET 3.1.12.2 ACTION TWO: Create a more detailed installation plan with milestone dates more clearly defined. Annual Status - A detailed installation plan for the Guiler/Johnson switching equipment was created and implemented and was under budget. The remaining refresh is voice equipment, which will be installed in June. MET 3.1.12.3 ACTION THREE: Effectively execute the new installation plan Annual Status - Even though we had a delay in the delivery of our equipment, we did Guiler/Johnson still meet our installation goals. The amount of new PC equipment purchased this year was much lower than it has been in previous years. We will continue MET our hone efforts and improve on this important process. MET Indicator Where is LSCC Today Target 3.1.13. Provide leadership to ensure that all components of the The Administrative Council and Board of Trustees have Target will have been met when there are no unmet College community are working to implement the College’s been briefed on components of the 2010-2011 Annual goals identified in the College’s Annual Equity Plan. Annual Equity Plan. Equity Plan noting unmet goals and benchmarks. _________________________________________________________________________________________________________________________________ 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 18 Achievement Actions 3.1.13.1 ACTION ONE: Increase of minorities in faculty, EAM categories and increase in minority faculty members with continuing contract Annual Status -Two minority male instructors were hired, one Economics instructor, January, 2012 and one Microbiology instructor for 2012-13 fiscal year. Equity Council remains a work in progress. President briefed Administrative Council on key components of the Annual Equity report and copies of the Annual Equity Report were distributed to key contributors. Additionally, the Expanded Cabinet members were provided copies of the report. Responsible Individual Mojock/Hamilton MET Goal 3 - Project 2: MANAGE BUDGET TO MINIMIZE USE OF RESERVES MET Indicator Where is LSCC Today Target 3.2.1 Career Development Services is effective As of July 1, 2011, CDS will have its own dedicated budget. Partial Year 1 – The target for 2011-12 will be met when we when it has a dedicated budget that is adaptive to funding has been finalized; however, a final budget approval is still secure a budget for operational expenses and emerging needs. pending for the remaining estimated operational expenses. maintain it. Responsible Individual Achievement Actions 3.2.1.1 ACTION ONE: Secure a CDS budget for fiscal year 2011-12. (Completed). Annual Status - Completed C. Brady MET 3.2.1.2 ACTION TWO: Continue to track, monitor and evaluate CDS services and programs for student, alumni and community impact. O. Pearson MET Annual Status - Completed 3.2.1.3 ACTION THREE: Submit & secure expansion request for regular budget allocation in FY 2012-13 budget cycle in Planning Council. (not yet started) Brady/Pearson Annual Status - Completed MET MET Indicator Where is LSCC Today Target 3.2.2 The College operates more efficiently and Reduction of kilowatt usage at a time of rising energy By end of fiscal year 2011-12 the target would be to further reduce responsible in relation to cost when maximization costs have been experienced in the past few years; KWh consumption of energy use by 2%-3% below 2010-11 levels. of technology is utilized to its fullest capability. however, additional reductions may still be possible. Responsible Individual Achievement Actions 3.2.2.1 ACTION ONE: Analysis of 2010-2011 energy use and expenditures to pinpoint direction of energy savings effort Annual Status - Significant savings Ball / Siemens were realized this year. Complete for this FY. MET 3.2.2.2 ACTION TWO: Make adjustments to Chiller’s, building controls, and college lighting controls Annual Status - Complete Ball MET 3.2.2.3 ACTION THREE: Revisit adjustment areas in ALC, Apogee, and Trane software systems and spreadsheets to compare and adjust for overall yearly Ball/programmer savings Annual Status – Complete. MET 3.3 Strategic Goal 3 - Project 3: IMPROVE EFFECTIVENESS OF ENROLLMENT MANAGEMENT PLAN – FOCUS ON SUMTER CAMPUS PARTIALLY MET Indicator 3.3.1 Student Development is effective when there is an accurate academic record keeping system including educational goal setting, degree audit and completion tracking that is secure for use with distance learning students and non-distance learning students. Where is LSCC Today Today LSCC does not currently track this indicator using advanced technology. A secure mechanism for advising distance learning students is currently not available. Online advising currently consists of using email and Facebook to communicate our message, deadlines and events. Target The target for the next 3 years will be met when a method for online advising students has been identified and implemented and which enable advisors to send and store advising guides, goal setting plans, graduation audits, and advising session notes using a secure electronic environment. Research available systems, work with IT & DL, submit budget request during 2012-13 cycle & secure funding. Achievement Actions 3.3.1.1 ACTION ONE: Research & identify a method for online advising student that enables advisors to send and store advising guides, goal setting plans, graduation audits, and advising session notes using a secure electronic environment. (Collaborate training completed 11/18/11) Annual Status - Completed Training took place in October 2011, November 2011, April 2012 & May 2012, pilot in progress full implementation for fall 2012 3.3.1.2 ACTION TWO: Develop & submit budget request during 2012-13 cycle & secure funding to implement an online advising method. (not yet started) Annual Status – Completed 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 19 Responsible Individual Scott/Harris /Brady/ Nathanson/ Guiler MET Scott/Harris /Brady/ Nathanson/ Guiler MET 3.3.1.3 ACTION THREE: Secure the system, pilot, test and assess the system. (not yet started) Scott/Harris /Brady Annual Status - Not yet started, waiting on budget approval, research and exploration continues PARTIALLY MET PARTIALLY MET Indicator Where is LSCC Today Target 3.3.2 Student Development is Today, we have some data regarding both learning outcomes and overall student Year 1 – Develop an NSO workgroup responsible for effective when the New satisfaction. redesigning our current online and live NSO program to be Student Orientation program Of the 1255 FTIC and DE Students who participated in NSO for fall 2010, the average piloted for summer 2012 starters & full implementation for successfully transitions and fall 2012 starters. accuracy rate on the pre-test assessment for learning outcomes of the online portion orients new students to the of NSO was 75%. – Post-test accuracy increased to that of 91%. Update Learning Outcomes to include and/or evaluate the enrollment and registration entire multi-module program. Of the 143 Students who participated in a NSO satisfaction survey for fall 2010, 80% process at LSCC, academic indicated “agree” or “strongly agree” that their overall satisfaction with the online Revise the live advising segment of NSO in order for planning, educational goal component of NSO was excellent. -88% indicated “agree” or “strongly agree” that their distance learning students to participate without coming to setting, and student support overall satisfaction with the live advising component of NSO was excellent. campus. A secure electronic environment would be services and resources, and is needed in order to deal with personal data and/or test accessible to students in a We do not have formal NSO learning outcomes. scores utilized during this segment of NSO. hybrid and/or online format. We have no fully online NSO program for DL students. Responsible Individual Achievement Actions 3.3.2.1 ACTION ONE: Develop an NSO workgroup responsible for redesigning current online & live NSO program to be piloted for summer 2012 starters & C. Scott/ T. Harris full implementation for fall 2012 starters. (not yet started) Annual Status – 1. In progress, delayed due to Collaborate pilot project implementation Rocker/ C. Brady Advisor workgroup met May 201 2. Katie Evans from Distance Learning staff has agreed to assist with the new online NSO module 3. We will pilot PARTIALLY MET improvements for fall starters, with a workgroup continuing to make improvements in the fall for spring starters 3.3.2.2 ACTION TWO: Update Learning Outcomes to include and/or evaluate the entire multi-module program. (not yet started) Annual Status - In Scott/Harris /Brady progress, delayed due to Collaborate pilot project NOT MET 3.3.2.3 ACTION THREE: revise the live advising segment of NSO in order for distance learning students to participate without coming to campus. Scott/Harris /Brady (Collaborate training completed 11/18/11) (other tasks not yet started) Annual Status - Completed, in pilot for summer starters MET MET Indicator Where is LSCC Today Target 3.3.3 Career and Technical Education Programs Discussions have been held with UCF and hospital partners. The target will be met when an agreement with UCF has been are effective when students enroll in a BSN Still in exploration stage; no formal agreement has been approved and the DOE application and SACS prospectus have program. developed. been approved. Responsible Individual Achievement Actions 3.3.3.1 ACTION ONE: Meeting was held on 3/23/11 with UCF Nursing staff to discuss concurrent BSN program. Annual Status - MOU has been approved. Wacker/ Rager MET Program will be implemented in Fall 2012 3.3.3.2 ACTION TWO: LSCC nursing students were surveyed in April 2011 to determine interest in concurrent BSN program. Annual Status -24 students Griffin submitted applications to the UCF concurrent program (seat capacity is 20); 16 additional students were interested MET 3.3.3.3 ACTION THREE: Submission of DOE application and SACS prospectus. Annual Status – Completed with approval Wacker/ Rager MET PARTIALLY MET Indicator Where is LSCC Today Target 3.3.4 LSCC is effective when students Today’s headcount: Summer 2010 -2553, Fall 2010 – 4886, Spring – 4623 The target will be met when enrollment headcount successfully enroll in credit courses that meet is … their educational, career and personal Today’s 201-11 FTE – 3260.8 (FCS projection for 2010-11 was 3273, which enrichment goals. we did not make. We are down 12.2) Responsible Individual Achievement Actions 3.3.4.1 ACTION ONE: Complete CTE pilot project on student records review and follow-up. Rager/ Weasel Annual Status - Progress has been made in the following program areas: HIM, EDT, Criminal Justice, Fire Science, and Early Childhood. PARTIALLY MET 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 20 3.3.4.2 ACTION TWO: EMC assessment of FTE projections. Rager/ PIE staff Annual Status - Fall 2011 enrollment headcount for the district was 4,946 (48 less than Fall 2010) and FTE was 1441.47 (9.40 less than Fall 2010). Spring PARTIALLY MET Term 2012 enrollment charts indicate that headcount increased over last spring by 95 and FTE decreased by .56. Summer A, AE enrollment has declined by 3.8%; students are still registering for Summer B classes. Subcommittees have been established to recruit students for Summer B and Fall 2012 classes. 3.3.4.3 ACTION THREE: Determine FTE projections in all discipline areas. Annual Status - Will carry this action item forward to 2012-13 NOT MET Rager/Sligh/Dept. Chairs and Program Managers MET Indicator Where is LSCC Today Target 3.3.5 The admissions office is effective We had slightly over 500 students attend this event. 1- To communicate to the schools and parents of this event. when we hold a successful college night 2- To increase the number of attendance by 5% and students, parents and vendors are Presentation satisfaction average for questions is 85%. The 3- To increase the previous year’s attendance by 5%. satisfied. lowest was related to how long the presentation was. 4- To increase the previous year’s attendance by 5%. 5- 2015’s target will be met when we have increased the first year’s attendance by 20%. Responsible Individual Achievement Actions 3.3.5.1 ACTION ONE: Develop Marketing Plan – Send out invitations to colleges and HS students/parents. D. Marvel Annual Status - Completed Letters were sent in English and Spanish to all Lake and Sumter county high school juniors and seniors. 992 letters were sent to MET Sumter County high school students and 6036 letters were sent to Lake County high school students. 3.3.5.2 ACTION TWO: Survey vendors and survey students/parents in the presentations. D. Marvel Annual Status - Completed Surveys were distributed to 66 vendors and to all students and parents that attended the LSCC presentations. MET 3.3.5.3 ACTION THREE: Survey results will be analyzed and reported. We will also have an approximate number count of attendance. D. Marvel Annual Status - Completed 52 survey were received from vendors with 100% satisfaction. All 52 responded that they would love to come back to LSCC’s MET College Night event. 79 student/parent surveys were received. 61 (77%) stated that they would not change anything in the presentation. Providing handouts with important information was the 2nd highest comment received from the student/parent surveys. MET Indicator Where is LSCC Today Target 3.3.6 The Admission In 2010 LSCC (we had 4 attendees) was not very successful in communicating this 1-To communicate to the schools and parents of this event. Office is effective event to the high school students and parents. LSCC relied heavily on one delivery 2-To increase the number of attend ace by 5%. when we hold a method to get this information out (The HS guidance counselors). In 2011 we 3-To increase the previous year’s attendance by 5%. successful Go Higher expanded our delivery methods in getting this information out to the students and 4- To increase the previous year’s attendance by 5%. Get Accepted parents and had our most successful GHGA event in LSCC history. (We had 109 5- 2015’s target will be met when we have increased the first year’s Campaign. students). Go Higher Get Accepted event scheduled for February 28, 2012. attendance by 20%. Responsible Individual Achievement Actions 3.3.6.1 ACTION ONE: Develop Marketing Plan – Send out invitations to colleges and HS students/parents. (Spring 2012) K. Colborne/ Annual Status - Complete Leesburg Campus hosted a Go Higher - Get Accepted information session on February 28, 2012. Marketing materials from FACTS.org D. Marvel and FDOE were distributed to all high schools within Lake and Sumter Counties. The event served the highest number of students in its history with over 200 MET students and additional family members in attendance from Lake and Sumter counties. 3.3.6.2 ACTION TWO: Survey students / parents during the presentation. (Spring 2012) D. Marvel Annual Status - completed A survey was not conducted for this event due to there being no Director of EM as the time the event was being prepared and held. NOT MET 3.3.6.3 ACTION THREE: Survey results will be analyzed and reported. We will also have an attendance count. (Spring 2012) D. Marvel Annual Status - Complete Over 200 students/parents attended. The Foundation provided 40 $25 application fee scholarships. 10 laptops were utilized by MET Financial Aid which serviced over 125 students with their FASFA application. Over 150 scholarship brochures were handed out by the Foundation. PARTIALLY MET Indicator Where is LSCC Today Target 3.3.7 LSCC is effective when the college student population LSCC Student Lake & Sumter Counties Population Data: The target for 2014 is met when the total student is representative of the counties’ overall population it Black 11.0% - Hispanic 12.0% - Asian 2.7% population percentage meets and or exceeds the 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 21 serves, including the proportion of minority groups and gender specifications. Achievement Actions Pacific Islander/Haw 0.01% Two or more ethnicities 0.5% Unknown 7.3% Women 58% - Men 42% representative population of the counties served. Responsible Individual 3.3.7.1 ACTION ONE: LSCC will work with minority organizations that target minority groups (i.e. college Reach Out, college events, etc.) to help educate these groups Marvel on enrollment processes. Annual Status - As of April 30th, 78 seniors from the CROP and Talent Search programs (no seniors in Upward Bound this year) completed a Senior Update Report (survey). Nearly 80% (62 of 78) of these surveyed YOD seniors are minority students. Approximately 45% of all the respondents indicated that PARTIALLY LSCC was either their 1st or 2nd choice for PSE. Continued follow-up with these recent high school graduates is ongoing during the summer months. YOD staff will MET continue to facilitate admission, financial aid application and enrollment assistance to students who choose to attend LSCC. A selection committee awarded a total of six $1,000 scholarships to YOD graduates who will be enrolling at LSCC. Coincidently, 5 of the 6 scholarship recipients are minority and the YOD office is currently working with them to process their YOD scholarship and other financial aid awards. 3.3.7.2 ACTION TWO: LSCC will work with gender based organizations that target minority groups (i.e. Boy Scouts, Girl Scouts, etc.) to help educate these groups on D. Marvel/ enrollment processes. R. Cortez Annual Status - The Director of EM resigned in fall 2011 and there was no staff member in the Admissions dept. to work on this goal during the spring semester. NOT MET 3.3.7.3 ACTION THREE: LSCC will devise a system to monitor the % of this minority and gender populations and compare ii to the % in the overall population. LSCC D. Marvel/ could devise a system to follow them through their 1st semester (i.e. use other departments as a resource like CROP, Talent Search, Upward Bound, etc.). R. Cortez Annual Status - Exceeded target for all categories except other ethnicities. Black non-Hispanic – 10.3% compared to 9.7% in district; Hispanic 12.1% compared to 10.6 in district, Other Ethnicities 4.5% compared to 5.1 in district. Women 62.3% compared to 50.6 in district. MET MET Indicator Where is LSCC Today Target 3.3.8 Continuing Education is effective when all students that enroll in licensure programs complete Statistics need to be calculated. Maintain percentages. the course (CNA, Security Officer Training, and RE online). Responsible Individual Achievement Actions 3.3.8.1 ACTION ONE: Analyze student completion data for classes implemented in Fall 2011. Diggs Annual Status - Rosters detailing completion have been collected from the instructors, are stored in notebooks and completion rate has been analyzed. MET 3.3.8.2 ACTION TWO: Submit annual report to the VP of Academic & Student Affairs by December 2011. Annual Status - Licensure programs were completed at Diggs the following percentage rate: C.N.A. 100%; Security Officer 100%; RE Online 100%; FCCPC 100%; Phlebotomy 99.97% MET 3.3.8.3 ACTION THREE: Second semester complete and data gathered by May 2012. Annual Status - The information was collected, analyzed. Reports are housed in Diggs the Continuing Ed Office. Licensure programs were completed at the following rate: C.N.A. 97.92%; Security Officer 93.33%; RE Online 100%; FCCPC 100%; Phlebotomy 93.07% MET MET Indicator Where is LSCC Today Target 3.3.9 Continuing Education is effective when over 950 Kids’ College Students 499 registered in Leesburg. 450 registered in Leesburg. participate/enroll in Kids College for both sites to include Clermont and Leesburg 482 registered in Clermont. 500 registered in Clermont. Responsible Individual Achievement Actions 3.3.9.1 ACTION ONE: Evaluation reports completed August 2011. Diggs /Green Annual Status - Evaluations were collected during June and July 2011. Reports were completed in August 2011 and are being used in the planning process for 2012. MET 3.3.9.2 ACTION TWO: Statistical and budgetary reports completed August 2011. Green Annual Status - Data collected was used in preparing for KC 2012. In the process of registering for KC 2012. MET 3.3.9.3 ACTION THREE: Implement findings into planning for KC 2012 from December 2011-April 2012. Annual Status - New location for Clermont KC 2012 was Green secured – Windy Hill Middle School. New classes added for KC 2012 – 20 for Leesburg and 22 for Clermont; total of 78 classes offered in Clermont and 89 classes offered in MET Leesburg. A total of 193 sections are being offered in Leesburg KC 2012. A total of 172 sections are being offered in Clermont KC 2012. MET Indicator 3.3.10 Marketing and Recruitment at the Sumter Campus is effective when the College actively markets and is visibly present to Sumter Community 3/6/2016 12:37 PM Where is LSCC Today LSCC circulates a variety of Admissions, Student Services, Dual Enrollment, Financial Aid and Foundations marketing materials at the three Sumter high schools and participates in Sumter County events including high school awards programs high school visitations, and Sumter Leadership and other Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation Target Expanded and increased circulation of LSCC publications, degrees and program offerings, marketing and public relations materials and other related content to a wider variety of target venues by at least 50% 22 constituents. Sumter Chamber of Commerce events. Achievement Actions 3.3.10.1 ACTION ONE: Attended Beef & Boogie Festival Nov 4, 5, 2011; 33 inquiries; admission, academic programs, BRC offerings, dual enrollment, DirectConnect Annual Status - Action item completed; preparing for 2012-13 participation/registration for this event. 3.3.10.2 ACTION TWO: Circulate Continuing Education and Computer Institute course catalog to targeted Sumter venues by January 2012 Annual Status -1) CE & CI schedules placed at six locations; 2) Updated sites materials on 05/31/12; registration guides have now been placed at six locations. 3.3.10.3 ACTION THREE: Increase communication with the Sumter Advisory Committee and their participation in promoting and marketing LSCC by Summer 2012. Annual Status - Foundation and College Relations added SAC to their newsletter distribution. Responsible Individual Tanya Harris-Rocker MET Tanya Harris-Rocker MET Tanya Harris-Rocker MET MET Goal 3 - Project 4: CREATE NEW PROGRAMS & INCREASE PARTICIPATION IN PDC & CET MET Indicator Where is LSCC Today Target 3.4.1 Establish the 2011-12 employee professional development 74.8%, 3.8 out of 5.0 Completion target: 80%, Increase Target: 5% program through the PDC and CET. Responsible Individual Achievement Actions 3.4.1.1 ACTION ONE: Using Survey data and PDC Advisory Council direction develop pd curriculum. Annual Status - Final employee development stats are: Tim Kane, Tracey 1094 faculty and staff (duplicated) attendance at PD offerings. Total of 3184 pd hours; overall learner course satisfaction score of 4.8 out of 5.0 for Excellent. Hoff Average per employee of 2.9 hours of pd; 142 specific pd offerings with 106 unduplicated offerings. 99% of regular employees (243) completed the required MET Preventing Violence in the Workplace training; 100% of new hires completed Preventing Sexual Harassment in the Workplace course within 30 days of hire. 3.4.1.2 ACTION TWO: Provide employee pd accomplishment reports Tim Kane w/IT Annual Status - Produced 106 quarterly PD reports for Administrators and about faculty PD to Chairs using a semi-automated system. Continue to work with IT support (Mark DeMilio) to have a fully automated employee self-serve PD completion report. MET Strategic Goal IV: CREATE AND SUSTAIN A CULTURE OF CONTINUOUS IMPROVEMENT PARTIALLY MET 4.1 Strategic Goal 4 - Project 1: DEVELOP CAPABILITY FOR DATA MINING & ANALYSIS TO SUPPORT DATA DRIVEN IMPROVEMENTS MET Indicator Benchmark Where is LSCC Today Target 4.1.1 The Office of Planning & The success rate of this indicator is 26 of all surveys are processed and The target for 2012 will be 50%, We reached 59.8%. Institutional Effectiveness is demonstrated when 100% of all approved centrally. Do not have process in 2013 will be 75% and 2014 will be 95% of all surveys successful when all surveys surveys are carrying out a centralized place including forms, process for are processed and approved centrally. Centralized conducted on-campus are processed process through PIE. submitting, approval and launching. process in place for survey procedures. and approved centrally. Responsible Individual Achievement Actions 4.1.1.1 ACTION ONE: Create appropriate forms and process representative of a centralized process. Annual Status - completed PIE MET 4.1.1.2 ACTION TWO: Provide opportunity and means for PIE staff to increase knowledge and skill for Class Climate Survey software. Lisle Annual Status - PARTIALLY MET – we are still working to review new software or will stay with ClassClimate with more training opportunities PARTIALLY MET 4.1.1.3 ACTION THREE: Evaluate current surveys for accuracy and provide consultation on new/developing surveys Lisle Annual Status - 85 surveys have been evaluated and developed to collect data for continuous improvement across all aspects of the college. MET PARTIALLY MET Indicator Where is LSCC Today Target NOT MET 4.1.2 PIE is successful when data has been No process is in place for When aggregate data is run and we have full confidence that it is accurate and valid. Continue to cleaned and there is confidence in the local data. triangulation of data. evaluate all data entry points for entry accuracy and IT data report accuracy. Responsible Individual Achievement Actions 4.1.2.1 ACTION ONE: Evaluate data reports for accuracy. Annual Status - The PIE office including the State Report Coordinator has engaged in the analysis of PIE, IT every report sent to the state and federal government MET 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 23 4.1.2.2 ACTION TWO: Provide leadership in bringing data stakeholders together to discuss data reports. Annual Status – over 150 meetings to fix data issues Lisle have taken place. PARTIALLY MET 4.1.2.3 ACTION THREE: Review data entry methods for all aspects of institutional processes. Annual Status - we still have data entry issues and we need a full Lisle/Castello review and more automated processes. Waiting for the Flow Analyst position to be hired, trained and on-board. NOT MET PARTIALLY MET Indicator Where is LSCC Today Target 4.1.3 IT is effective when all critical and editorial data errors are collected, Unknown, collecting data. Produce report and work through process issues to reviewed and analyzed to indicate campus wide process issues. improve data accuracy. Responsible Achievement Actions Individual 4.1.3.1 ACTION ONE: Continue to assist IE in its review of institutional data and processes. D. Guiler/D. Annual Status - Great progress has been made in working with PIE to improve the college’s understanding and use of its data. A good example of this is the better Phillips understanding the institution now has about its DE students, and their fiscal impact. The college is also continually improving its understanding of how our MET students are processed through their programs. 4.1.3.2 ACTION TWO: Improve State submission process such that reports are ready for review within a week of the submission start date. Guiler/ Phillips Annual Status - The timing and submission process of the state database has improved, but new requirements brought about by the addition of our new 4 year PARTIALLY degree programs, and the states tweaking for accommodation of the SLDS project all help to make this a moving target. MET 4.1.3.3 ACTION THREE: Improve reliability and consistency of funding report (i.e. Perkins). Annual Status - A great deal of progress has been made this year Guiler/Phillips towards improving data reliability and consistency, but we still have a long way to go. It is also anticipate that the new PIE “Completion Agenda Database” and the PARTIALLY new IT Workflow Analyst will greatly improve the college’s data accuracy and reporting capabilities. MET PARTIALLY MET Indicator Where is LSCC Today Target 4.1.4 IT is effective when the “drop The last several terms of drop for non-payment processes have all had issues: The IT department will process 100% of all for non-payment” process completes Issues have existed in both program functionality and “hold” application. future drops smoothly without any issues without technical or coordination or concerns. Largest issues caused when students are dropped inappropriately. issue Some students dropped inappropriately had problems getting into filled classes, often needing overrides. Caused extra work for staff and students. Responsible Individual Achievement Actions 4.1.4.1 ACTION ONE: Fully document and flow chart existing “Drop for non-payment” process. Annual Status - Complete. Guiler/Phillips MET 4.1.4.2 ACTION TWO: Analyze and modify “Drop for no-payment” process for efficiency and reliability. Annual Status - Minimizing the number of drops has Guiler/Phillips allowed us to improve our efficiency with this process. However, a tendency remains to continually do last minute “fine tuning” to the process by adjusting MET hold amount thresholds or applying new or different criteria. 4.1.4.3 ACTION THREE: Evaluate and adjust modifications. Annual Status - We held all B ONLY term students this year for the Summer A & AE drop, which was Guiler/Phillips an improvement over all previous years. But, less tinkering with the process in general will provide more stable results, and lessen the chance for errors. PARTIALLY MET PARTIALLY MET 4.2 Strategic Goal 4 - Project 2: ADOPT CONTINUOUS IMPROVEMENT INITIATIVES AT ALL LEVELS OF THE INSTITUTION PARTIALLY MET Indicator 4.2.1 Career and Technical Education Programs are effective when each CTE program integrates and assesses student learning outcomes for continuous improvement. Where is LSCC Today 2010-11 Academic Year Percentages --Program with SLO s =____% --Programs use SLO data for continuous improvement initiatives = ____% Target The 2014 target will be met when all CTE program managers’ collets, analyze, make data driven decisions, and create improvement strategies around the best practices of continuous improvement. Achievement Actions 4.2.1.1 ACTION ONE: Review and update CTE program SLO’s. Annual Status - Additional progress needs to occur will carry this item forward to 2012-13. 4.2.1.2 ACTION TWO: Analyze program SLO data and include in program reviews. Annual Status - Additional progress needs to occur -- will carry this 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 24 Responsible Individual Rager / Program Mgrs. PARTIALLY MET Rager / Program Mgrs. action item forward to 2012-13. PARTIALLY MET 4.2.1.2 ACTION THREE: Schedule SLO training for current and new faculty. Annual Status - Additional training sessions will be scheduled with PIE staff in Rager / Program Mgrs. 2012-13. PARTIALLY MET MET Indicator Where is LSCC Today Target 4.2.2 The Athletic Dept. creates and sustains a culture of continuous Current the department The department will have all performance surveys evaluated for improvement when the LSCC Athletic Program utilizes results from the; Student- uses data to analyze validity and reliability and will make changes to evaluator surveys if Athlete Orientation surveys; Student-Athlete evaluation of Coaching Staff, performance and indicated. The department will use the data collected and analyze and Athletic Trainer, and Athletic Director; Exit surveys from sophomores that have continuous will indicate on the Annual Plan actions taken for continuous completed degree requirements or athletic eligibility at LSCC. improvement. improvement based on data findings. Responsible Individual Achievement Actions 4.2.2.1 ACTION ONE: Orientation surveys are completed at the end of the fall term. Annual Status - Orientation surveys were completed; Matulia recommendations for improved services are in action MET 4.2.2.2 ACTION TWO: Exit Survey results for sophomores are completed by the end of the spring term Annual Status – Completed Matulia MET 4.2.2.3 ACTION THREE: Student-Athlete evaluation of services and coaching staff are completed at the end of the spring term Matulia MET Annual Status - Surveys complete and information collected for continuous improvement of program; All coaches, athletic trainer and Director PARTIALLY MET Indicator Where is LSCC Today Target 4.2.3 PIE is successful when all data/reports are In general departments and committees have begun to The target for 2012 will be 60% of LSCC committees and produced and explained so all stakeholders understand State and Federal requirements and departments understand the current State and Federal data understand and are therefore more effective in documentation but there are significant issues with data and reports. using data to make informed decisions. In addition, accumulation. Larger percent of reports requested are done so through PIE. the office will proactively seek to improve current LSCC does currently meet the Federal & State reporting Beginning process will focus on “key” internal decisions making data reports and generate new ones to encourage requirements. However, reports requiring internal decisions reports. Second will be departmental Improvement and third a culture of continuing improvement. are not readily available and data accuracy is an issue campuses appearance. Responsible Individual Achievement Actions 4.2.3.1 ACTION ONE: Provide data review interpretation reports and presentations to the campus population. Annual Status - although great efforts have Lisle, PIE NOT MET been made, progress is slow, but has made a difference. There is a noticeable shift in the college culture but work still needs to be done 4.2.3.2 ACTION TWO: Liaison to IT to provide content background to the data being run. Annual Status -faculty and staff have been requesting data more Lisle, IT MET frequently, so they can make a change or improvement. Key internal reports are being sent and read by more staff and faculty PARTIALLY MET Indicator Where is LSCC Today Target 4.2.4 The Office of Planning & Institutional Effectiveness is successful Many campus stakeholders embrace This indicator is achieved when there is a truly embraced when employees are committed to open communication, collaboration continuous improvement and being culture of continuous improvement across all pertinent and transparency within planning, priority setting and decision making. reflective practitioners, others do not. campus activities. Responsible Individual Achievement Actions 4.2.4.1 ACTION ONE: Further develop campus-wide and program level indicators that not only evaluate quantity but quality of daily operations. Lisle, PIE Annual Status - the recent Planning Council budget planning meeting is a good example of progress in accomplishing this indicator PARTIALLY MET PARTIALLY MET Indicator Where is LSCC Today Target 4.2.5 PIE is effective when (according to the SACS, Institutional Effectiveness The target will be met when 100% of all appropriate areas within the requires (CS 3.3.1), the Institution has a process for identifying expected college use measureable performance indicators to ensure that outcomes, assessing the extent to which it achieves these outcomes, and institutional improvement is achieved and documented. provides evidence of improvement based on analysis of the results in each of When the data analysis of Institution indicators supports the College’s the following areas: educational programs, including: student learning mission and decision-making processes. outcomes; administrative support services; educational support services; When there are clear metrics and qualitative data for evaluating indicator 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 25 research within its education mission, if appropriate; and community and public service within its education mission, if appropriate. outcomes. Achievement Actions 4.2.5.1 ACTION ONE: Work with all programs to design, collect, analyze data that provides information that allow for celebration of successes and action for improvement. Annual Status - Progress has been made and will continue over the next two years of the three year 2010-2013 Strategic Plan 4.2.5.2 ACTION TWO: Assist with a more fully developed institution-wide focus on student learning outcomes including Student Affairs. Annual Status - Progress has been made and the new employee in the CAL position will help to move progress forward. 3/6/2016 12:37 PM Lake Sumter Community College | 2011-2012 Annual Management Plan Year-End Evaluation 26 Responsible Individual Lisle NOT MET Lisle, Brady PARTIALLY MET