Wilton Hill Founded in Partnership Planning Statement And Draft Heads of Terms for Planning Obligations (s106 Agreement) Affordable Housing Statement (OurEnterprise) Cultural Heritage Statement (Terence O’Rourke) Sustainability Statement (Redrow Homes) Prepared by Terence O’Rourke 7 October 2013 Planning statement Wilton Hill: founded in partnership Preface A community founded on partnership Redrow Homes Ltd (RHL) has formed a Partnership with OurEnterprise (OE) and the Wilton Community Land Trust (WCLT) to create a new neighbourhood at the former Erskine Barracks. The aim is to incorporate the best possible mix of ingredients for a sustainable community integrating with Wilton. Prior to selling the site to RHL, the MoD obtained outline planning consent for 450 dwellings and three hectares of land for employment uses. Although this extant consent could be implemented by RHL and is in accordance with many of the council’s planning policies, the Partnership considers that it would fail to deliver a development that the community could be proud of. Therefore, the Partnership is promoting a planning application that aims to achieve better community outputs and enhanced sustainability benefits. The proposal is bespoke, and has evolved with genuine community engagement. Its sustainability credentials are in excess of industry standard and the wide-ranging initiatives are addressed under the social, economic and environmental themes. For instance: Social: creation of a Partnership to genuinely engage the local community in both influencing the planning application proposal, and taking ownership of and managing the community facilities. Key components of the proposal reflect social objectives, for instance the provision of a range of dwelling sizes and types, and initiatives to support those in need of care. Environmental: a reduction in carbon levels of 25% across the site, well ahead of the Part L uplift 2010, deferred until 2014 and which will also secure in excess of the 10% renewable energy generated on or near the site, as suggested in the South Wiltshire Core Strategy. Even though the method of assessing the sustainability of homes is expected to change in 2014, the partners are committed to delivering a development above industry standard, supported by a comprehensive range of measures which broadly correlate to the criteria necessary to achieve Code for Sustainable Homes Level 4. Economic: provision of job opportunities and business support to local people. The Enterprise Hub is to be owned and managed by the WCLT. The Hub will also complement the veteran housing initiatives that seek to support veterans back into jobs, and businesses that locate on the remainder of the employment site. Planning statement Wilton Hill: founded in partnership RHL is committed to improving the energy efficiency of its homes and already meets high performance standards. It is part of a team with Liverpool John Moors University, investigating heat loss through building fabric and retrospective improvement of the energy performance of aged stock. It has contributed to, and continues to be actively involved in the Zero Carbon Hub industry-wide research to ensure that as-built performance meets design expectations. Wilton Hill will benefit from RHL’s expertise in this area, as well as making a valuable contribution to the industry as a whole through dissemination of lessons learned during its construction. The employment provision is a bespoke concept, rather than just provision of land for an office park that may or may not be taken up by businesses (as in the extant consent). Instead it is a carefully considered offer that blends the history of the site as a military base with specific facilities and opportunities for the local community. Benefits are derived from the jobs provided as well as the accommodation delivered. Careful attention has been given to providing a range of quality homes. The proposal provides for young people moving onto the property ladder, families and single occupants, elderly people, young veterans in need of care and support back into work, and for older veterans. The Partnership’s planning application proposal may not conform with the detail of all the council’s planning policies, however, national and local policies for delivering a choice of high quality homes and sustainable development are wholeheartedly met. In addition the approach to community engagement and reaching levels of carbon reduction far exceed policy requirements. On balance the new proposal enables a more imaginative solution for the site to come forward and makes a greater contribution towards creating an integrated and successful neighbourhood for Wilton. The proposal contained in the planning application has been influenced by objectives to achieve social benefits for the community. The Partnership is committed to its delivery. It aspires to build a successful community that will become part of Wilton, and the Community Land Trust is well positioned to have an enduring remit in its long-term future. Planning statement Wilton Hill: founded in partnership 4 Planning statement Wilton Hill: founded in partnership Contents 1.0Introduction and planning policy context for delivery 2.0The proposal bespoke to the community 3.0 Sustainability benefits 4.0The planning application a hybrid 5.0 Draft heads of terms for planning obligations (s106 legal agreement) 6.0 Summary Appendices A1 Affordable Housing Statement A2 cultural heritage Statement A3 Redrow homes sustainabilty statement 5 Planning statement Wilton Hill: founded in partnership 1.0 Introduction and planning policy context for delivery Introduction: a Partnership approach facilitates community place-making and delivers clear social benefits. This planning statement accompanies a hybrid planning application submitted by Redrow Homes Ltd (RHL) in partnership with OurEnterprise (OE) and Wilton Community Land Trust (WCLT). Section 4 explains the components of the hybrid application. The responsibilities of each of the three partners are: The planning application seeks consent for a proposal that provides a broad mix of residential accommodation, including homes for local people, specialist care provision for veterans, and bespoke community facilities located towards the centre of the site comprising an Enterprise Hub and associated employment generating uses. Redrow Homes Ltd is an award winning national housing developer, which prides itself on delivery high quality developments. OurEnterprise is a social enterprise company that is managed on commercial principles but is socially geared to deliver benefits to local communities. Wilton Community Land Trust is an independent, non-profit organisation which empowers the local community to create long-lasting social, economic and environmental improvements in Wilton, Quidhampton and Burcombe. Prior to selling the site to RHL, the MoD gained outline planning consent in February 2013 for the demolition of the military buildings and erection of 450 houses and 3 hectares of employment land. RHL could implement the existing outline planning permission. Instead however, the Partnership seeks to deliver a significantly improved scheme that meets the needs of the local community, 6 Redrow Homes Ltd • O verall commercial sustainability of the development • Delivery of housing and infrastructure services • Release of land for and funding to OurEnterprise and the WCLT OurEnterprise Delivery of veteran’s supported housing and care home • Delivery of commercial uses • Wilton Community Land Trust • Delivery of the Enterprise Hub • Delivery of enterprising opportunities across the site (eg green space management and managing community food growing area) • Management of community initiatives Planning policy context The proposal for Wilton Hill meets national and local planning policy objectives for the delivery of sustainable development. The National Planning Policy Framework (NPPF) defines sustainable development as containing three dimensions: social, economic and environmental. The NPPF also contains a presumption in favour of sustainable development. Section 3 of this statement sets out the Partnership’s key initiatives under the three sustainability themes and should be read alongside the Energy Report, RHL’s Sustainability Statement in Appendix 3 and the Design and Access Statement. The Wilton Hill proposal has been Planning statement Wilton Hill: founded in partnership progressed giving careful consideration to each of the sustainability themes, and delivering sustainable development is a genuine objective of the Partnership. the military use of the site and providing care to old and young veterans, integrated with supporting younger veterans back into work. The NPPF states that applications for planning permission must be determined in accordance with the development plan unless material considerations indicate otherwise. Whilst the proposal accords with key objectives and policies of the development plan, the proposal does not wholly comply with the detail of some local planning policies. This is due to a combination of factors such as site constraints, abnormal costs of development, and the Partnership’s goal of delivering a bespoke proposal that meets today’s community needs. The special nature of this scheme is a material consideration to be fully taken into account in the consideration of the planning application. Another key objective of the council’s policy is to engage the community and to have strong community involvement. This aspect is unique to the project and the community engagement activity is set out in the accompanying Statement of Community Involvement. As an overview, with regard to the adopted South Wiltshire Core Strategy, the proposed development will: • • • The current, adopted planning policy document covering the Erskine Barracks site is the South Wiltshire Core Strategy (February 2012). This is being subsumed into the Wiltshire Core Strategy, which was subject to examination by an Inspector during the summer of 2013. The relevant policies in both documents; (core policy 2 strategic allocations (SWCS) and core policy 20 spatial strategy (WCS)) identify the site for the provision of 450 homes including employment land covering 3 hectares. The planning application proposal meets the strategic allocation policy requirements through provision of a blend of Redrow homes, retirement homes and accommodation delivered through a Registered Provider. The approach to delivering jobs on the employment part of the site is bespoke. It relates to the objectives of providing community support and employment opportunities; reflecting 7 • • • eliver houses and employment land in D accordance with core policy 1 Accommodate about 450 dwellings which is the strategic allocation identified under core policy 2 and the site development template Accommodate 3ha hectares of employment land as set out under core policy 2 and provision for local job opportunities. The accompanying employment report provides context for the jobs relocated from Erskine Barracks Provide housing that meets bespoke needs that align with the principles of affordable housing core policies 3 and 10 which takes into account material considerations. Refer to appendix 1 that sets out the bespoke affordable housing proposal Incorporate water efficiency measures in excess of the requirements of houses constructed to level 4 of the Code for Sustainable Homes, and the requirements of core policy 19 Be implemented in accordance with a Code of Construction Practice which aims to protect groundwater and surface water quality in relation to the River Avon Special Area of Conservation catchment. Adherence to the plan and site specific method Planning statement Wilton Hill: founded in partnership • • • • • • statement would ensure compliance with core policy 20 and this is anticipated to be delivered through discharge of condition Comprise a scale and mass of buildings that is sympathetic to Wilton conservation area and a layout that will conserve and enhance views into and out of the Wilton conservation area, including Wilton House and Park Preserve the amenity of the existing residential properties to the east of the southern part of the site through carefully considered design at the boundaries to the site Site and orientate dwellings to protect the amenity of future residents from railway noise Retain the opportunity to use the existing footbridge between the north and southern parts of the site, as well as creating new links between the site and Wilton Be accompanied by a travel plan and incorporate vehicular accesses into the site from The Avenue Retain the open character of the land to the east of the development site and enhances the site’s frontage with The Avenue Some policies are met in part. For instance, not all trees can be retained as required by policy, and to mitigate this a biodiversity and landscape strategy will create character and habitat value. This is a challenging site in terms of the topography and the layout respects as far as possible the existing landscape, topographical, and ecological assets. It makes provision for new landscape planting set within the context of a landscape and biodiversity strategy. Full compliance with Lifetime Homes core policy 18 is not achieved because complying with all of the 16 standards would jeopardise the 8 number of residential units that can be accommodated on the site and affect the financial sustainability of the project. Priority has instead been given to delivering a bespoke package of housing for all ages and a range of employment initiatives within the context of achieving a sustainable development. The submitted flood risk assessment demonstrates that the proposed development will not be at risk from flooding and will not increase the risk of flooding elsewhere. The submitted transport and infrastructure assessments demonstrate that the proposed development will not place an undue burden on existing or proposed services and facilities, the existing or proposed local road network or other infrastructure. In summary, the proposal accords with a range of local planning policies and in particular meets a broad range of sustainability objectives. Planning statement Wilton Hill: founded in partnership 2.0 the proposal bespoke to the community The site The application site, which is approximately 13.48 hectares, is divided into two parts by the railway line. The southern part of the site extends to about 3.83 hectares and northern part to 9.65 hectares. 9 The northern edge of the site is only approximately 0.5 km from the Wilton centre (a 10-minute walk). Wilton shopping village is located approximately 100m to the south west, and the Salisbury Park and Ride lies to the west. Fields with views across to Salisbury lie to the east. Planning statement Wilton Hill: founded in partnership Public engagement The proposal has been brought forward by the Partnership, in particular following community engagement over the summer 2013, including a public exhibition in July, a series of meetings and topic workshops during August and a follow-up community event in September. The accompanying Statement of Community Involvement sets out the detail of the participation. The Partnership is encouraged by the level of participation achieved and the conclusions drawn from the discussions. In particular there is a good level of support for the master plan proposal and the sustainability credentials of the scheme. Pre-application consultation has also taken place with officers of Wiltshire Council. 10 Planning statement Wilton Hill: founded in partnership The proposal The proposal consists of the following: • Demolition of existing buildings • 292 residential dwellings (C3) • Approx. 40 retirement homes (C3) • Mixed use community / employment core including: »» Enterprise Hub »» Café and community facilities (eg leisure, medical etc) »» Neighbourhood retail Tetlow King Masterplan 11 • »» Space for other employment initiatives eg commercial produce growing »» Training facilities »» Veteran supported accommodation units provided by a Registered Provider (C2), in part including job support and training »» Care home A pprox. 5,780 sqm of employment floorspace (B1, B2, B8), including potential for community energy centre (eg Combined Heat and Power) Planning statement Wilton Hill: founded in partnership A broad range of homes Paragraph 50 of the NPPF requires local planning authorities to deliver a wide choice of high quality homes, widen choice for home ownership and create sustainable, inclusive and mixed communities. homes, and including semi-detached properties and detached dwellings. • • • • • RHL aims to meet this objective, through provision of a range of different types of homes. In particular, to provide choice to the existing community of Wilton who may for instance be seeking starter homes for children, or be looking to either up size or downsize. Provision is made in particular for: • Those seeking market homes across the spectrum, from starter units to large family homes • The elderly community (both veteran and non-veterans) • Those in need of care and requiring a home delivered through a Registered Provider. Residential homes – use class C3 RHL will deliver 292 residential dwellings. There will be a good mix across the site to meet a range of needs, from starter homes and flats through to large family 12 4 x 2 bed apartments 5 13 x 2 bed houses 86 x 3 bed houses 135 x 4 bed houses 4 x 5 bed houses 182 dwellings will be provided on the northern part of the site and110 on the southern part. Four blocks of flats and higher density smaller dwellings are located on the southern part of the site closest to Wilton, with the lower density, larger family housing to the north. Retirement apartments – use class C3 An area of approx 3,537m2 has been identified on the southern part of the site for the provision of a retirement apartment scheme which is envisaged could accommodate approximately 40 units. Affordable homes and homes for veterans – use class C2 Wiltshire Council has a target to facilitate 40% of new homes (C3) to be affordable. This actual number will be based on site- Planning statement Wilton Hill: founded in partnership specific considerations. At Wilton Hill the nature of the brownfield site (which brings higher costs) and the Partnership’s bespoke consideration of local needs is delivering this in a different way, alongside wider community benefits. The focal point for the Partnership’s proposal is a mixed-use community and employment core on 3 ha of land immediately to the north of the railway line. A key element will be the Enterprise Hub, which will be linked to the veterans’ facilities. This area will provide for a range of uses, aiming to facilitate economic activity and delivering social gain, and includes initiatives linked to the provision of homes for veterans delivered through Registered Providers. Homes, care and support, training and meaningful work opportunities will be provided for veterans. The site presents a unique opportunity given its previous military use and there was strong support for this proposal during consultation with the local community. Affordable care and support will be provided to assist vulnerable veterans (who may suffer from physical or mental disability) to integrate back into society. 13 This will be delivered through a range of types of accommodation and is likely to include: • • • • • • 0 unit “Hub” for rent for single 3 veterans who need support to make the transition back into the community with work and accommodation established. Six bedroom clusters with lounge and kitchen and training space on the ground floor. Care will also be delivered in this accommodation where appropriate. (Average stay 1-2 years). Funded by charitable contributions and Social Investment – saving both NHS and local authority in excess of £1 million annually. 22 rented apartments – all available on a “Wilton First” basis for local people and veterans 14 live work units – available on a “Wilton First” basis for local people and veterans 4 adapted houses – on “Wilton First” basis for local people and veterans 60-room unit care home for all ages is being discussed with operators and charities. Family housing (quantum to be agreed) Planning statement Wilton Hill: founded in partnership The units (with the exception of the care home) will be delivered by a Registered Provider and OurEnterprise. This represents about 28% of the total number of residential units (462 units in total, based on 292 Redrow homes, approximately 40 market retirement homes, and 130 units as set out above). The intergenerational nature of the proposal assists in promoting the integration of older and younger veterans, which offers therapeutic benefits for all and a single point for care from those who recognise the specific needs of the forces community. micro businesses, businesses in need of grow-on space, and opportunities for apprenticeships, mentoring and work experience for the local community and veterans on site. With a gross floor area (GFA) of approximately 1,800 sqm the Enterprise Hub will be located in the centre of the commercial and community core and will incorporate: • • • The close proximity of the Enterprise Hub to the accommodation maximises the opportunity for training and employment for ex-service veterans with the potential for tailored packages with local employers and on-site training and enterprise opportunities. The Enterprise Hub and commercial facilities The accompanying employment report provides a context to explain that many of the people who were employed at the barracks were relocated, and that the type and number of new jobs that are anticipated to be brought forward through the employment initiatives are appropriate for the site and the wider proposal. Enterprise Hub and workspace units – Use class B1, D1 and other ancillary uses The Enterprise Hub, promoted by and to become the base for WCLT, will provide a location for meeting and business collaboration. It will be a centre for training and facilitating business start-ups, and will include a range of flexible workspaces of different sizes. The work-spaces will provide for new 14 • • • Open meeting areas that can double up as exhibition space and as a community facility Workstations within an open plan layout Bookable private meeting rooms Smart flexible meeting/training/ conference space A n integral café Potentially a crèche, gym and other community services and facilties The workspace units (use class B1) will be located in close proximity to the Enterprise Hub and offer additional purpose built flexible space for businesses, extending to approximately 650 sqm GFA. Employment land – use class B1 / B2 / B8 In addition to the Enterprise Hub and workspace units, provision is also included for approximately 2,000 sqm (GFA) of general B1 / B2 / B8 employment space, to accommodate local businesses with greater space requirements. This part of the site could accommodate the CHP or district heating facility. Neighbourhood retail store – use class A1 Provision is made for a neighbourhood retail store of approximately 400 sqm GFA with potential for veterans accommodation. Planning statement Wilton Hill: founded in partnership Green infrastructure, biodiversity and open space Green infrastructure A strong ‘green infrastructure’ framework will provide a rich habitat as well as helping to define the character of the development. The design and inclusion of specific features are influenced by the findings of the ecology studies, and the strategy is set out in the Design and Access Statement. The green infrastructure strategy has the following objectives. To: • • • • nhance the biodiversity of the site E Soften the effects of the development in views from the local area Provide an appropriate interface with the local context Contribute to making the development an attractive place to live Local native planting will be an important element of the landscape strategy, particularly in relation to biodiversity and the interface with the countryside. Within the development, native planting will be augmented with other appropriate nonnative species traditionally used within residential areas of villages. These plants will provide additional colour, variety and interest as well as providing biodiversity value. Habitats and biodiversity The habitat report identifies a relatively low ecological interest so the strategy is to maintain and where possible enhance opportunities for wildlife in accordance with the 2006 NERC Act and planning policy and guidance (Section 7). Separate reports for the ongoing reptile and bat survey work will be available 15 on completion of the fieldwork (end of September 2013) and will be submitted within the determination period. The findings of the surveys are nevertheless taken into account in the master plan proposal. The following features are incorporated into the master plan design: • • • • • • • • • reen corridors across and around the G site through retention of hedgerows, tree lines and site boundary vegetation where possible, and additional planting Semi-natural habitats such as speciesrich hedgerows, scrub and tree planting complemented by rough and meadow grassland habitats. This is particularly pertinent to the northern edge where it abuts the off-site mature broadleaved woodland. Areas of rough grassland in open spaces to contain wildflower meadow or herb-rich grassland Drainage swales and ponds to create a variety of wetland habitats to incorporate wet grassland (i.e. a dry attenuation basin), ephemeral pools and permanent open water Bat roosting opportunities and bird boxes on buildings and retained trees Log/brash piles to provide habitat for invertebrates, amphibians and reptiles Nectar- and pollen-rich species and fruit- and nut- producing trees and shrubs within the green framework Native species where possible, and sourced from stock of local provenance Native hedging used as boundary features to residential, public open space and site curtilages Sensitive use of lighting to avoid adverse effects on nocturnal wildlife (e.g. restrictions on lighting in public areas to the minimum levels required for safety, use of hooded and bollard lighting, use of low/ high pressure sodium unless glass glazing is proposed etc). The site is Planning statement Wilton Hill: founded in partnership predominantly used by pipistrelles and Noctule bats which are relatively light tolerant although more light sensitive species i.e. Brown Long-eared and myotis bats have been recorded in lower numbers. Open space A linear park will provide the setting for childrens’ formal play areas that will contain play equipment. The park will also function as a trim trail. In addition a financial contribution (s106) will be made towards the improvement of local play facilities. town Wilton centre. Specific off-site measures include: • New bus stops on The Avenue • A shared 3m wide cycle path on the eastern side of The Avenue • Increased off-street parking on the west side of The Avenue for residents • The re-location of the pelican crossing on King Street to improve links to the play area and Wilton town centre • Localised widening of the A36 roundabout on the exits to The Avenue and Salisbury Cultural heritage The Design and Access Statement sets out an analysis of the site and its relationship with Wilton House and Park. The design principles for the site respects the cultural heritage of these assets and this is in particular reflected in the protected views of the landscape treatment to the edges of the site. With regard to archaeology, it is anticipated that planning approval will be conditioned to ensure an appropriate method for addressing the potential for securing on-site archaeology. For further information refer to appendix 2. Access The northern part of the site will be served by two vehicular accesses from The Avenue. There will also be a single primary vehicular access into the southern site. The retirement development will be served from a separate access from The Avenue. Pedestrian and cycle routes will run through the site, linking to the proposed footpath through to the Fugglestone Red development to the north, and through to 16 The traffic impact associated with the proposed development is planned to be significantly lower at the three roundabout junctions than that for the extant consent, and the works proposed are proportionate. Two separate travel plans have been submitted. The residential travel plan is more detailed, being associated with the detailed part of the planning application. The employment travel plan sets a framework associated with the outline planning application. The travel plans aim to encourage residents and site occupants to use more sustainable modes of traffic. The residential travel plan is seeking to achieve a 10% reduction in single occupancy vehicular trips. Further details of the highway proposals are included within the transport assessment. Planning statement Wilton Hill: founded in partnership Infrastructure and associated works Drainage An addendum to the Flood Risk Assessment and water study that were submitted as part of the previous planning application for the site accompanies the planning application. The FRA and water study from the previous planning application are being assigned to RHL. The site is in Flood Zone 1 so is unlikely to flood. The development will be implemented in accordance with a Code of Construction Practice. A method statement will outline and implement measures which will protect groundwater and surface water quality, and will aim to avoid and reduce the potential environmental impacts/ effects on water quality within the River Avon Special Area of Conservation catchment. The surface water the strategy is gravity fed sewers with an outlet to the pond. The pond will infiltrate (soakaway) with the remaining capacity required overflowing into a cellular storage tank, which in turn will also infiltrate. In addition there will be some plot soakaways which will be either traditional or “formpave” drives. For the southern parcel the ponds will infiltrate and act as above ground storage for high rainfall events. Foul drainage Regarding foul drainage for the northern part of the site, the infrastructure which includes Marchment Close and Thorton Crescent, became adopted in October 17 2012. In general terms the drainage will be routed through the centre of the site, crossing the railway and leaving the site to the south east and joining the existing Wessex Water network. The existing sewers will be diverted and upgraded to adoptable standard. The foul drainage for the southern site will be directed to the south west boundary where it will join the existing Wessex Water network is located near the roundabout which joins The Avenue and Salisbury Road. District heating The barracks had a form of district heating, however it is not possible to utilise this in the current scheme. This is due to a range of practical difficulties for instance relating to quality and condition of the infrastructure, location of the boiler house and associated pipework which would severely constrain the layout and oil fuelling and would significantly impact on the carbon emissions generated on the site. The employment land has the potential to accommodate a combined heat and power (CHP) facility or district heating system, and this will be taken forward for consideration. Further information is contained in appendix A. Planning statement Wilton Hill: founded in partnership 3.0 Sustainability benefits The planning application proposal has been prepared with the objective of maximising sustainability benefits across the site, through a range of initiatives identified under the three themes of sustainability: social, economic and environmental. • • • The aim is to deliver benefits across these themes, and so embrace sustainability as broadly as possible. Some key ingredients under each theme are set out below. Social • • • • • enuine community involvement and a G Partnership approach Providing housing and job opportunities for local people Supporting veterans Providing accommodation that meets the needs of an ageing population Delivering community assets with a high level of community ownership thereby empowering the local community Economic • • • • roviding Enterprise Hub and bespoke P employment initiatives Providing construction jobs Generation of additional spend in the local area to support local services Providing opportunities for apprenticeships and preference for contractors who have apprentices Environmental • • • • 18 e-using previously developed land R Providing a walkable, low carbon neighbourhood within walking distance of convenience stores, employment opportunities and Wilton town centre Providing good access to buses Providing enhanced cycle / pedestrian routes to Wilton town centre, childrens’ play areas and the proposed Fugglestone Red development Incorporating a landscape and biodiversity strategy embedded in the master plan design Providing solar pv panels to the majority of homes (where they are not compromised by orientation or overshadowing) Providing an Enterprise hub to BREEAM Excellent standard In particular, RHL is at the forefront of initiatives to deliver homes to high sustainability credentials. For instance, it is part of a project team with Liverpool John Moores University, investigating heat loss through building fabric and retrospective improvement of the energy performance of aged stock and it has contributed to, and continues to be actively involved in the Zero Carbon Hub led, industry wide research to ensure that as-built performance meets design expectations. Wilton Hill will benefit from RHL’s work in this arena, as well as making a valuable contribution to the industry as a whole through dissemination of lessons learned during its construction. RHL is also committed to ethical and sustainable procurement and is an industry leader with regard to sourcing sustainably produced timber products. RHL’s proposed energy strategy will deliver carbon emission savings of 25%, well in advance of uplifts to Building regulations Part L which have been deferred to 2014, as well as on site renewable energy contribution ahead of that proposed by the South Wilts Core Strategy. RHL’s sustainability proposals taken as a whole will deliver a scheme which meets or, in some instances, exceeds the requirements to meet the Code for Sustainable Homes level 4. However, it is not proposed to formally obtain certification through the Code as it has Planning statement Wilton Hill: founded in partnership been recommended for withdrawal by the recent Housing Technical Standards review. RHL’s initiatives will be delivered as an integral part of the wider development for the site, and in order to achieve the best possible sustainability outcomes. For further information refer to the Energy Statement and RHL’s Sustainability Statement in appendix 3. 19 Planning statement Wilton Hill: founded in partnership Hybrid planning application boundary Area within outline planning application Area within detailed planning application 20 Planning statement Wilton Hill: founded in partnership 4.0 the planning application A hybrid The planning application is a hybrid application. This presents some of the proposal in detail and the remainder in outline. • • RHL’s residential scheme is submitted in detail. The extant consent permits housing to come forward on the site as a priority, and the Partners’ planning application is submitted on the same basis. RHL will begin to deliver the homes as soon as possible, anticipated to be Spring 2014. The remainder of the planning application is in outline. This is to enable OE and the WCLT to continue to work on the detail of the Enterprise Hub, the veterans’ accommodation and the commercial elements. The plan shows the area of the site to which the detailed elements relate and those to which the outline proposal relate. In addition to this planning supporting statement, the planning application form, certificates, redline boundary the following documents have been submitted in support of the application, as agreed during pre application consultation with Wiltshire Council: • • RHL’s residential elements include: • Demolition of the existing buildings • 292 dwellings • Access and off-site highway improvements • Other associated site-wide infrastructure works Elements of the scheme submitted in outline (approximately 3ha) include: • Mixed use community employment core including: »» Enterprise Hub »» Café and community facilities (eg leisure, medical etc) »» Neighbourhood retail »» Space for other employment initiatives eg commercial produce growing »» Training facilities »» A pprox. 70 veteran supported accommodation units (C2), in part including job support and training »» Potential for a 60-unit care home (C2) 21 A pprox. 5,780 ha of employment floorspace (B1, B2, B8), including potential for community energy centre (eg combined heat and power) Retirement homes (C3) approximately 40 units • • • • • • • • • • • • • lanning application drawings P Design and access statement, including sustainability credentials Statement of community involvement Tree survey and arboricultural impact appraisal and method statement Ecological appraisal (including extended phase 1 habitat survey, a phase 1 bat survey, and a badger survey) Employment report Transport assessment and residential travel plan and framework employment travel plan Flood risk assessment (addendum statement) Water study (addendum statement) Ground condition assessment report Ground condition desktop report A ir quality assessment Noise and vibration assessment Outline waste audit Energy Report Planning statement Wilton Hill: founded in partnership Affordable housing and cultural heritage statements are included as appendices to this Supporting Statement. Environmental impact assessment (EIA) The proposal was subject to a formal request for an Environmental Impact Assessment (EIA) screening opinion. The council confirmed that the proposal does not constitute development for which an EIA would be required. Confirmation of this was received on 29 July 2013 (ref: 13/01633/SCR). Phasing Subject to planning permission being granted, it is intended that construction of a first phase of Redrow housing will commence in spring 2014. In order to facilitate this, demolition of the existing buildings is likely to be before the end of 2013, carried out under a separate prior notification planning application procedure. The CLT and OurEnterprise components of the planning application will follow the submission of reserved matters, likely to be made in 2014. 22 Planning statement Wilton Hill: founded in partnership 5.0 draft heads of terms for planning obligations (s106 legal agreement) This information is provided without prejudice to further discussions between the applicant and the local planning authority. Statement of principles The proposal for development at Wilton Hill promoted by Redrow Homes Ltd (RHL), OurEnterprise (OE) and Wilton Community Land Trust (WCLT) is for the creation of a new community set within a high quality environment than fully integrates with Wilton, and that delivers a full range of sustainability benefits. Prior to development an agreement will be entered into pursuant to s106 of the Town and Country Planning Act 1990 (“the Agreement”). RHL will enter into this agreement with Wiltshire Council. The Agreement will identify appropriate triggers that will secure the provision of accommodation delivered through a Registered Provider. In addition to the provisions made in the s106, RHL will be providing 3 hectares of land to the north of the railway for OE and WCLT’s projects, as well as funding to support the WCLT and OE. It is currently envisaged that the WCLT will receive funding to maintain and manage the community initiatives, and including for instance management of the landscape and play trail. An appropriate mechanism will be included in the Agreement, including a default measure should the role of the WCLT change. 23 Preliminary scope for the s106 Agreement • • • • • • • ffordable housing A Financial contribution towards primary and secondary education Provision for the maintenance and upkeep of open space and the play trail Financial contribution towards provision of off site open space Financial contribution towards improvements to the strategic highway network Improvements to the local highway network Financial contribution towards the footpath link to Fugglestone Red Planning statement Wilton Hill: founded in partnership 7.0 Summary The planning application is submitted in the context of the local plan allocation for housing and employment uses, and the NPPF’s presumption in favour of sustainable development. This statement demonstrates that the principles of sustainable development are evident in the Partnership’s proposal. Across the three themes of sustainability: social, economic and environmental a level of attainment is reached that all Partners are proud of and in particular the WCLT will have a lasting role in fostering and evolving the new community at Wilton Hill. 24 Planning statement Wilton Hill: founded in partnership Appendices 25 Planning statement Wilton Hill: founded in partnership 26 Planning statement Wilton Hill: founded in partnership A1 Affordable housing statement Introduction South Wilshire Core Strategy policy 3 (February 2012) and the emerging presubmission Wiltshire draft Core Strategy policy 43 (February 2012) have a target to deliver 40% of new homes as affordable. The policies acknowledge that there will be some flexibility in the provision negotiated and the affordable housing being delivered at Wilton Hill is one element of a community proposal that together will deliver greater benefits to existing and new residents of Wilton. OurEnterprise will deliver the affordable homes through a Registered Provider. The partnership will deliver an affordable housing level of around 25% to 30% which provides a balanced proportion in relation to the wider community facilities being promoted within the core area of the site, and fits with the range of housing being delivered by Redrow Homes Ltd (from starter units through to family homes). The objective is to deliver a high quality sustainable place-making development that meets a range of community objectives. Public consultation has consistently shown over 80% support for our proposals. The new scheme delivers a balanced mix of housing for local people and delivers real social innovation with a bespoke social offer for veterans and additional community facilities. This is a vast improvement on the extant planning permission. OE proposes a co-housing model that enables a high degree of community interaction and gives veterans a real opportunity to integrate, work with the community and give something back. The housing will also focus on prevention, delay and reduction of more intensive care services (and institutional care) which will 27 bring substantial savings to both the NHS and Social Services budgets and is in line with the new National Care Bill. There will also be a priority for veterans in Wilton and the surrounding area. There will be commissioning opportunities for Wiltshire Councils’ Veterans’ Care if required, but this facility is not reliant on council funding. We are also pursuing a “Hub and Spoke” model for Wilton Hill. The two Hubs planned here will provide: 1. A hub for general local housing (potentially run and managed by a community organisation) that will identify local housing needs, respond to local conditions and develop small scale affordable schemes in the locality. 2. A veterans’ Hub that will provide expert care, housing and employment opportunities on site but also create a number of satellite “spokes” within a 2 mile radius of Wilton Hill. The savings to the NHS, local authority and new value created for the local economy outperform the extant consent considerably and the proposed reduction in the number of units on the current permission must be understood in that context. The affordable housing The affordable housing offer is as follows: • 30 unit “Hub” for Rent for single veterans (and some of the more vulnerable veterans in the community) who need support to make the transition back into the community with solid work and accommodation provided. Six bedroom clusters with lounge and kitchen and training space Planning statement Wilton Hill: founded in partnership on the ground floor. Care will also be delivered in this accommodation where appropriate. (Average stay 1-2 years). Funded by charitable contributions and Social Investment – saving both NHS and Local Authority in excess of £1 million annually. This will also generate a guaranteed 30 new jobs for unemployed vulnerable veterans as each resident will have the guarantee of a sustainable job in return for their training and rehabilitation. Communal living – dining will take place in a central hub and community run café where residents across the site will be encouraged to mix. In addition, veterans staying here may have the opportunity to get involved in site specific employment initiatives such as work to maintain the grounds, building maintenance and participation in a wide range of community building initiatives. • • • • 22 rented apartments – all available on a “Wilton First” basis for local people and veterans 14 live work units – available on a “Wilton First” basis for local people and veterans 4 adapted houses – on “Wilton First” basis for local people and veterans Family housing (quantum to be agreed) All of the above will be delivered by a Registered Provider and OurEnterprise. • 28 60-bed care home for veterans. We are still in discussion with operators and charities but currently the mix looks like a 30-room unit for care for all ages (veterans get priority) who have serious care needs and where this cannot be delivered in the home, and another 30-bed spaces for elderly veterans – this will also have a Wilton First policy. There will be commissioning opportunities for the council in this facility and it will be operated with a social enterprise ethos with profits being covenanted to subsidise the care and make it as affordable as possible. Further details We believe this represents a significant opportunity for Wiltshire Council to work in partnership with the community to deliver an exemplary, socially innovative scheme and secure substantial investment for social projects across Wiltshire. The social objectives of the affordable housing at Wilton Hill are the following: 1. A democratic, locally driven approach, working in partnership with Wiltshire Council, to provide affordable housing with a “Wilton First” policy and a greater emphasis on shared ownership properties for local people and co-housing models for more vulnerable groups. 2. A purpose built veterans’ rehabilitation co-housing facility which will assist the council in meeting its core objectives of the Wiltshire Civil Military Integration Partnership. 3. A platform for on-going partnership between Wiltshire Council and locally driven affordable housing projects through OurEnterprise (eg self build and community build schemes). 4. Affordable business space, childcare and community supported services which will benefit both the current Wilton Hill scheme and the wider community. OurEnterprise is also looking to provide a 40-place community owned and operated childcare facility, particularly aimed at supporting working parents. Office accommodation will also be provided by the Wilton Community Land Trust. Planning statement Wilton Hill: founded in partnership All of the social uses of the buildings will be protected by social covenants that will secure the social uses of the accommodation in perpetuity. Place making is also a key element of the entire scheme and the affordable provision proposed is balanced with the existing town and is sensitive to the existing local community and its aspirations for high quality affordable housing in a community-owned and managed setting. Further detail concerning the veterans’ accommodation: • 180,000 troops fought in Afghanistan and Iraq and of those at least 8,500 will develop problems • In the 18-24 year old category those with a military background are three times more likely to commit suicide • 25% of all single homeless people are veterans • The Veterans Hub at Wilton is a UK first in trialling a community based approach to helping more vulnerable veterans – no model exists like it anywhere. It has high-level support from Ministers, the local MP and the military community, as well as prominent groups in Wiltshire. • If this model works it could be replicated in other parts of Wiltshire and across the UK and provide a very effective model that will also save local councils and the NHS substantial sums as it is not reliant on funding from them. • It is not a “veterans’ ghetto”. The social mission of this accommodation is to successfully place more vulnerable veterans back into the community, give the community a serious role in helping veterans to rehabilitate and give veterans the opportunity to give back to those communities who help them. • Currently the public sector does not have the capability, expertise or finance to deliver this kind of much-needed 29 • • • facility and we believe prevention is better than cure. The Veterans Hub will be delivered by a Social Sector Partnership which will include an RSL and expert military charities who will contribute funding, referrals and operation of the facility, including Alabare, Wiltshire Council’s largest provider of supported housing. Some of the dwellings will be adapted and some will be adapted live/ work units. These will also be open to others on the council list, with a priority for those who require adapted accommodation. The care home will provide for elderly veterans and also be open to non veterans (some of the military charities will secure bed spaces) Wiltshire Council has a Civilian Military Integration Partnership with seven core objectives: • • • • • • • To identify and respond to the changing military ‘footprint’ in the county To quantify and maximise the economic contribution of the military to the county. To enable the realignment of service provision by the Council and its partners to meet the changing needs of the military, their families (known as dependants) and veterans. To capatalise on opportunities for regeneration and building sustainable communities in areas with a military presence. To ensure the county continues to remain an attractive location for our Armed Forces and long-term investment by the MoD To encourage local communities to support Armed Forces through the Wiltshire Community Covenant To assist Service leavers, and redundees in particular, in career transition and into employment in Wiltshire, helping soldiers back into society. Planning statement Wilton Hill: founded in partnership Wiltshire also launched its Armed Forces Community Covenant in August 2011 with the specific aim: “to encourage local communities to support the Service community in their area and nurture understanding and awareness amongst the public of issues affecting the Armed Forces Community.“ This model provides know how, capital and revenue to play a key role in delivering all of the above objectives by providing a credible structure for communities and beneficiaries to work together on a very special and unique scheme. It is ready to be delivered now, with key partners and beneficiaries already identified. 30 Planning statement Wilton Hill: founded in partnership A2 cultural heritage statement This statement is made in support of the Partnership’s application with regard to consideration of cultural heritage assets and potential effects arising from development proposals. A desk based historic environment report was produced by Entec in April 2011 and submitted as supporting information to the previous planning application for Erskine Barracks (ref S/2011/517/OL). The report was produced in accordance with best practice guidance as detailed in the Institute for Archaeologists Standards and guidance for archaeological deskbased assessments (IfA 2008). The baseline remains unaltered with no additional survey or archaeological investigation within the application area or on land immediately adjacent to result in any change. This desk based report is available from the Historic Environment Record (HER) maintained by Wiltshire Council (WC). The report’s inclusion within the HER is testament to its endorsement as a comprehensive document that adequately assesses the historic environment of the site and immediate environs. The validity and detail provided on the known and suspected cultural heritage resource has been approved and endorsed as a suitable and valid document by WC Archaeologist (WCA). A copy of this letter dated 9 October 2012 is attached over the page. The local and national planning policy referred to in the Entec report also remains valid and relevant to the new application at Wilton Hill. In the correspondence from WCCA, clarification is given as to the validity of the findings and the suitability of a planning condition to appropriately deal with potential on-site archaeology where it may survive. This 31 clarification is presented in light of the subsequent publication of the NPPF since the production of the report in April 2011, which referred to PPS5. There are no nationally designated heritage assets within the application site. The southern end of the Wilton Hill site lies adjacent to Wilton Conservation Area and Wilton House registered park and garden further south. The site on Wilton Hill is within an area of special archaeological importance as defined in the Salisbury Local Plan. None of the buildings on site are of local or national architectural value or interest, and are not protected by any designation. There are no specific architectural survey requirements prior to demolition to facilitate the proposals. All measures will be in place to ensure the recommended archaeological site investigations are undertaken by a suitably qualified archaeological contractor in line with an agreed programme of work, endorsed and approved by Wiltshire Council Archaeologist. John Trehy, BA MIfA Archaeologist / Associate Director Terence O’Rourke Ltd Planning statement Wilton Hill: founded in partnership 32 Planning statement Wilton Hill: founded in partnership Recommendation: Full condition (WL026) No development shall commence within the area indicated (proposed development site) until: A written programme of archaeological investigation, which should include on-site work and off-site work such as the analysis, publishing and archiving of the results, has been submitted to and approved by the Local Planning Authority; and The approved programme of archaeological work has been carried out in accordance with the approved details. REASON: To enable the recording of any matters of archaeological interest. Further Recommendations: The work should be conducted by a professionally recognised archaeological contractor in accordance with a written scheme of investigation agreed by this office and there will be a financial implication for the applicant. If you have any further questions please do not hesitate to contact me. Yours sincerely Clare King Assistant County Archaeologist Direct Line: 01249 705503 Fax Number: 01249 705527 Email: clare.king@wiltshire.gov.uk 33 Planning statement Wilton Hill: founded in partnership A3 Sustainability Statement Environmental Management System Redrow Homes Ltd has a proven track record of delivering sustainable development of the highest quality design, underpinned by comprehensive policies and procedures and sound environmental practice. Minimising our own impacts on the environmental is central to our sustainability policy. We have a group-wide environmental management system in place to ensure: prevention of pollution; legal compliance; resource efficiency; excellent communication and continual environmental improvement. The information is updated annually and published on Redrow’s intranet system and is accessible to all staff. It comprises general environmental standards which offer best practice guidance, details of basic applicable legislation and advice on appropriate actions and is structured to be easily understood and practical to use on site. Performance is monitored by the in-house Health and Safety team. This information is supported by a more detailed register of key environmental legislation. • • • • Redrow also considers the ethical environmental performance of its suppliers and sub-contractors. A partnering approach is adopted that clearly sets out the expectations from all parties and covers issues such as sourcing of materials, transportation and delivery, packaging, health and safety, workforce competency and training and welfare as well as pricing and payment terms. • Ethical Procurement and supply chain Redrow embraces the principles of lean construction by maximising the value delivered to the customer whilst minimising waste, improving production certainty for our suppliers and accelerating the construction process • 34 Waste streams from site are reported on in monthly Board documents to enable targeting of reduction and improvement. Redrow works with manufacturers to reduce or recycle waste and to reduce the environmental impact of its operations. Redrow has worked closely with British Gypsum to reduce the waste generated on site from plasterboard. On many of our sites, plasterboard is now delivered to site pre-cut to length and surplus board is available to be recycled. Redrow manages the supply chain at all stages to streamline processes and to ensure appropriate products are built into our homes. Redrow has embraced E-commerce through paper-less ordering and payment systems and also provide ‘just in time’ deliveries. Redrow’s currently diverts in excess of 93% of construction waste from landfill. • • In contracting with Redrow, they also agree to work in accordance with Redrow’s Waste Management Policy and within the requirements of Redrow’s membership of the World Wildlife Fund (WWF) UK Forest and Trade Network organisation, as well as meeting our requirements for a customer focussed, professional service. We currently source 99.53% of our timber from within Category 3 “Licensed Source” to Category 5 – “ Credibly Certified” and our performance in this specific area has been recognised in the NextGeneration Climate Change Benchmarking analysis as being one of the best in our sector. Information relating to the environmental Planning statement Wilton Hill: founded in partnership • • performance of all our materials and product suppliers is collated, to ensure they are meeting their environmental obligations and are conforming to Redrow’s. Additionally, every six months we carry out a comprehensive performance review of our suppliers, which includes many aspects of performance, including the amount and type of packaging used in deliveries to site. Where possible, Redrow specifies products and materials that generate the least environmental impact, including timber from managed plantations, aggregates from the closest quarries and non-toxic paints. Proposed Specification The development proposals embrace all aspects of sustainable development as set out by the National Planning Policy Framework ( NPPF), including social , economic and environmental aspects. Social and Economic factors are dealt with in detail outside this document. With respect to environmental factors, the existing Outline Consent requires the development to meet Code for Sustainable Homes Level 3. However, the Code is one of the standards covered by the recent Housing Technical Standards review which is part of the Government’s red-tapecutting initiatives. The recommendations of the review committee are currently subject to a consultation published by DCLG and these include withdrawal of the Code. It is therefore considered inappropriate that the sustainability objectives for the development should be measured using a potentially obsolete standard. Nevertheless, in the absence of finalised guidance or alternative standards, Redrow is proposing a specification which will broadly correlate to the criteria necessary to achieve Code for Sustainable Homes level 4, but in a number of respects substantially exceed that requirement. 35 Inter alia: • The new proposed specification offered by Redrow commits to a 25% reduction in carbon levels well ahead of 2013 Building Regulations Part L (a proposed lift of 6% improvement in carbon emissions) which has in any case been deferred until 2014. • The site energy strategy will also secure on site renewable energy generation in excess of the 10% target proposed in the South Wiltshire Core Strategy. • We are in negotiation with the Malaby Biogas plant at Warminster to secure food waste collection from the site which will be used to generate electricity offsite and may assist in kickstarting food waste collection in the general Wilton area. • We are also investigating the potential for use of biomass fuel for CHP or district heating in the mixed use development, sourced from a company using heat from the Malaby plant in the fuel preparation process. Both of these initiatives provide opportunities for management by the CLT. • We will offer the site to the Zero Carbon hub for assessment as part of the most important Design v As-built project work currently in hand. Learning from Wilton Hill will thus inform and improve the delivery process of future energy efficient schemes for the industry as a whole. Comparison with the Code for Sustainable Homes A comparison has been drawn which indicates the proposals in detail and the corresponding score which would be achieved under the Code. For the purposes of scoring Ene 1 and Ene 2 criteria a Redrow detached housetype has been used which achieves conservative scoring. The scoring indicates that Code for Sustainable Homes Level 4 would be achieved. See table overleaf. Planning statement Wilton Hill: founded in partnership Comparison of Proposed Site Sustainability Specification with Code for Sustainable Homes Criteria Issue Energy and Carbon Dioxide Emissions Max Code Credits Site score Energy Strategy Ene1 Ene2 Ene3 Ene4 Ene5 Ene6 Dwelling Emission Rate ( DER) Fabric Efficiency ( FEE) Energy Display Devices Drying Space Energy Labelled White Goods External Lighting 10 9 2 1 2 2 3.5 4.4 2 1 1 2 Ene7 Low/Zero Carbon (LZC) Technologies 2 1 Ene8 Ene9 Cycle Storage Home Office 2 1 sub total weighting 1.17 2 1 17.9 20.94 Water Wat1 Wat2 Indoor Water Use External Water User 5 1 sub total weighting 1.50 4 1 5 7.5 Materials Mat1 Mat2 Mat3 Environmental Impact of Materials Sourcing Materials - Basic Building Elements Sourcing Materials - Finishing Elements 15 6 3 12 4 3 sub total weighting 0.30 19 5.7 Surface Water Run-off Sur1 Management of Surface Water Runoff 2 2 Sur2 Flood Risk 2 sub total weighting 0.55 2 4 2.2 Waste Was1 Was2 Was3 Storage of Non-recyclable / Recyclable Waste Construction Site Waste Management Composting 4 3 1 sub total weighting 0.80 4 3 1 8 6.4 Pollution Pol1 Pol2 Global Warming Potential of Insulants NOx Emissions 1 3 sub total weighting 0.70 1 3 4 2.8 Health & Well-being Hea1 Hea2 Hea3 Daylighting Sound Insulation Private Space 3 4 1 sub total weighting 1.17 3 4 1 8 9.36 Management Man1 Man2 Man3 Man4 Home User Guide Considerate Constructors Scheme Construction Site Impacts Security 3 2 2 2 sub total weighting 1.11 3 2 2 0 7 7.77 Ecology Eco1 Eco2 Eco3 Eco4 Eco5 Ecological Value of Site Ecological Enhancement Protection of Ecological Features Change in Ecological Value of Site Building Footprint 1 1 1 4 2 sub total weighting 1.33 Total achieved score CSH Level 1 1 1 2 0 5 5.33 68 4 36 Planning statement Wilton Hill: founded in partnership Assumptions Made Homes - 25% improvement to Carbon emissions over Part L 2010 ( Part L 2013 deferred to 2014 - 6%) with fabric contribution of 12% improvement. Energy Contribution from renewable technologies will be 14% (10% proposed by South Wiltshire Core Strategy) We are in negotiation with Malaby Biogas for food waste collection to be used to generate electricity offsite. Mixed Use - CHP system designed to achieve a 25% improvement in carbon emissions and 10% energy contribution, augmented if necessary by PV. We are in negotiation with Malaby Biogas with regard to supply of biomass fuel to the site which has employed heat from the Malaby plant in its processing of the biomass fuel. Homes to be provided with electric car charging points. The site will be offered to the Zero Carbon Hub for aseesment as part of the ongoing Government supported project to ensure as-built performance meets design expectations. ( Zero Carbon Hub DvAB project). Learning from the Wilton site will thus contribute to informing the delivery process of future energy efficient schemes for the industry as a whole. Typical Redrow mid-range housetype ( Warwick) Typical Redrow mid-range housetype ( Warwick) Smart meters will be provided in all homes Rotary dryers to be provided within gardens Information on energy labelling to be provided in Home User Guide Specification includes low energy external lighting with daylight sensors PV where practical for homes, potential for CHP in Enterprise Hub and Veterans’ accommodation, potential export of food waste to Malaby biogas for offsite electricity generation with possible contractual supply linkage to the site. All dwellings will be provided with safe secure, adequately sized secure cycle storage Home office locations will be provided in all homes Water specification which is limited to 90 litres/person/day ( CL 4 105 l/p/d) Rainwater butts will be provided in gardens Basic building elements in the general specification are all rated A+ to D in the Green Guide to Specification Providers of basic building elements have environmental management certification in line with Code guidance Providers of finishing elements have environmental management system certification in line with Code guidance RHL are members of WWF GFTN- In 2012 99.53% of timber products we used classified as “Licensed source,Progressing to Certification or Credibly Certified” “Surface water strategy will comprise: Gravity fed sewers with outlet to the pond. The pond will infiltrate (soakaway) with the remaining capacity required overflowing into a cellular storage tank which in turn will also infiltrate. There will be additional plot soakaways which will be either have traditional or permeable drive surfacing. For the Southern parcel the ponds will infiltrate and act as above ground storage for high rainfall events. Flood risk assessment shows that site is within Zone 1 - low probability ( Technical Guidance to NPPF) Internal recycle bins to be provided within kitchens. Food waste collection and delivery to Malaby Biogas under negotiation SWMP developed in accordance with Code requirements with commitment to divert at least 90% waste from landfill Composting bins provided to homes (excluding apartments) All insulation products will have GWP less than 5 Boilers specified will have Nox emissions below 40 mg/kWh Daylight calculations will be carried out by Redrow Homes Ltd Party walls built to Robust Detail E-WM-22/23 ( Exceeding Building Regulation minimum standards by 5db) private garden spaces will conform to BS8300 - Design of buildings and their approaches to meet the needs of disabled people - Code of practice. Home User Guides will be provided for all homes Site will be registered with the Considerate Constructors Scheme prior to commencement. Minimum score of 35 points to be attained Standard policies GSTAN.03 and GSTAN.07 implemented on site. Energy and water meter readings will be recorded monthly by site manager SBD not required Key and additional recommendations of the ecologist to be implemented on site Existing ecological features will be adequately protected during the construction work Assumed minor uplift in ecological value of site No credits 37 Mapping based upon the 2011 - 2012 Ordnance Survey 1:10,000 and 1:50000 scale raster map with the permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office, © Crown copyright. Terence O’Rourke Ltd. Licence No. AL100017826 and WSP 100048755. Aerial mapping provided by Getmapping plc London 3 Whitcomb Street London WC2H 7HA Bournemouth Everdene House Deansleigh Road Bournemouth BH7 7DU Telephone 0203 664 6755 Email enquiries@torltd.co.uk www.torltd.co.uk © Terence O’Rourke Ltd 2013 Document designed by Terence O’Rourke Ltd Wilton Hill Founded in Partnership