PT PLN (Persero)

advertisement
Public Disclosure Authorized
Public Disclosure Authorized
INDONESIA
POWER TRANSMISSION DEVELOPMENT PROJECT
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Public Disclosure Authorized
Public Disclosure Authorized
E2365
V2
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
LIST OF CONTENT
E
Section I
Section II
Section III
Annex A
:
:
:
:
Annex B
:
Annex C
Annex D
Annex E
Annex F
Annex G
:
:
:
:
:
M
Introduction
Structure Of Environmental Management Plan (EMP)
Mitigation and Monitoring Plans
Brief Description of PLN Emergency Preparedness and
Response Procedures for Electric Power Substation
PLN Worker Health and Safety Plan for Electric Power
Substations
Institutional Arrangements for Environmental Management
Reporting Responsibilities
Supplementary Of EMP
Result of Public Consultation
Clipping Of Public Consultation
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION I
INTRODUCTION
The project will consist of two main components and several subcomponents as follows
:
COMPONENT 1: JAVA-BALI SYSTEM
Subcomponent A: Expand existing 500/150 kV Substation
Depok (West Java)
add 1 transformer bay
Pedan (Central Java) add 1 transformer bay
Krian (East Java) add 1 transformer bay
Balaraja (West Java) add 1 transformer bay
The expansions will all take place within the existing plant fence. There will be no land
acquisition, and mostly civil works to accommodate installation of the new equipment.
Subcomponent B:
(Millineum)
Construction
of
a
new
150/20
kV
Substation
The substation will be built on vacant land already owned by PLN. The land is
unproductive within an industrial park hosting a variety of industries (iron and steel mill,
food processing etc.). The substation will expedite power service to these industries.
Subcomponent C: Upgrade 150/20 kV Substations
Twenty two (22) substations will be upgraded by adding one (1) transformer bay,
except Sragen substation by adding two (2) transformer bays.
The expansions will all take place within the existing plant fence. There will be
no land acquisition, and mostly civil works to accommodate the installation of the
new equipment.
COMPONENT 2: SUMATRA SYSTEM
Subcomponent A: Reinforcement of 275/150 kV Substations
Lahat
Lubuk Linggau
Bangko
Muara Bungo
Kiliranjao
The reinforcement will involved the addition of one switchyard with transformer
bay at each of the substations, except Lahat (2 transformers) and
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
rearrangement/relocation of several transmission towers. Some land acquisition
will be required at each of the substations, and will be connected to a
transmission line to be constructed (linked project)
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Subcomponent B:
Upgrade 150/20 kV Substations
Ten (10) substations will be upgraded by adding one (1) transformer bay.
The expansions will all take place within the existing plant fence. There will be
no land acquisition, and mostly civil works to accommodate the installation of the
new equipment.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION II
STRUCTURE OF ENVIRONMENTAL MANAGEMENT PLAN (EMP)
In a generic sense, the environmental issues of several of the project subcomponents
are similar, and rather than present repetitive and identical mitigation and monitoring
plans, single generic plans for each of these types of projects will be presented.
Furthermore, since all subcomponents will be owned by PLN, the EMP aspects of:
institutional arrangements, occupational health and safety, and emergency
preparedness and response systems are established by corporate policy and will be the
same for all of the subcomponents.
However, each subcomponent is unique in the sense that: (a) it is situated at its’ own
unique location, (b) public consultations would involve different affected groups, and (c)
the outcome of the public consultation may present special environmental or social
issues.
As a result, the FEMP will assume the following format:
II.1 PROJECT DESCRIPTION
Very brief description of the nature of the investment and the physical location of the
project site (surrounding land use, nearest population centers, any areas of ecological
or cultural interest, rivers or lakes) for:
COMPONENT 1: JAVA-BALI SYSTEM
Subcomponent A:
1. Depok Substation (West Java)
It is located on Keadilan Road, Rangkapan Jaya, Pancoran Mas, West Java. The location is
surrounded by residents and private own garden. The residents is located about 25 m
across the road.
2. Pedan Substation (Central Java)
It is located in Pedan, Central Java. The location is surrounded by private own cassava
garden. Nearest local residents about 500 m.
3. Krian Substation (East Java)
It is located Sumput, Driyorejo, Sidoarjo, East Java. The location is surrounded by big scale
industrial area. Nearest local residents about 200 m.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
4. Balaraja Substation (West Java)
It is located on Kresek Road km 3.5, Merak Balaraja, Tangerang. The location is
surrounded by private own rice farm and near Jakarta-Merak Toll road. Nearest local
residents about 1 km.
Subcomponent B:
1. Millineum Substation (West Java)
It is located in Millenium Industrial Estate, Panongan, Tangerang. The location is
surrounded by steel industries. Nearest local residents about 3 km.
Subcomponent C:
1. Simpang Lima Substation
It is located in Gajah Mada Road, Semarang, Central Java. The location is
surrounded by commercial area and office.
2. Pati Substation
It is located on Panglima Sudirman Road, Pati, Central Java. The location is
surrounded by garden. Nearest local residents about 500 m.
3. Jekulo Substation
It is located on Kudus-Pati Road, Tenggeles, Mejobo, Central Java. The location is
surrounded by home industry. Nearest local residents about 50 m.
4. Beringin Substation
It is located on Patimura Road km 1.2, Salatiga, Central Java. The location is
surrounded by residential. Nearest local residents about 50 m.
5. Pekalongan Substation
It is located on Urip Sumoharjo Road, Pekalongan, Central Java. The location is
surrounded by home industry (Batik) and residential. Nearest local residents about
50 m
6. Secang Substation
It is located on Semarang Road, Secang, Magelang, Central Java. The location is
surrounded by private own garden and residential. Nearest local residents about 50
m.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
7. Pandean Lamper Substation
It is located on Unta Raya Road, Semarang, Central Java. The location is
surrounded by commercial area and office.
8. Lomanis Substation
It is located on MT Haryono Road, Cilacap, Central Java. The location is
surrounded by rice farm and residential. Nearest local residents about 50 m
9. Kentungan Substation
It is located on Kaliurang Road Km.7, Yogyakarta, Central Java. The location is
surrounded by residential and rice farm. Nearest local residents about 50 m.
10. Tambak Lorok Substation
It is located in Semarang, Central Java. The location is near Tanjung Emas harbour.
Nearest local residents about 2 km.
11. Wonosobo Substation
It is located on Tumenggung Joyonegoro Road, Tawang sari, Wonosobo, Central
Java. The location is surrounded by tobacco garden. Nearest local residents about
500 m.
12. Klaten Substation
It is located on Gumulan village, Klaten, Central Java. The location is surrounded by
rice farm. Nearest local residents about 2 km
13. Solo Baru Substation
It is located in Sukoharjo, Surakarta, Central Java. The location is surrounded by
private own garden and residential. Nearest local residents about 1 km
14. Semanu Substation
It is located in Gunung Kidul, Yogyakarta. The location is surrounded by private own
garden and residential. Nearest local residents about 50 m
15. Sragen Substation
It is located on Sragen, Yogyakarta. Two (2) power transformers will be installed
here. The location is surrounded by middle industry and residential. Nearest local
residents about 50 m.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
16. Ungaran Substation
It is located on Jendral Sudirman Road Km 23 Ungaran, Central Java. The location
is surrounded by big industry (food and beverage) and residential. Nearest local
residents about 300 m
17. Sanggrahan Substation
It is located on Sanggrahan, Magelang, Central Java. The location is surrounded by
garden and residential. Nearest local residents about 100 m
18. Gombong Substation
It is located on Puring Kalitengah Road, Gombong, Central Java. The location is
surrounded by garden and residential. Nearest local residents about 100 m
19. Majenang Substation
It is located on Majenang Road, Central Java. The location is surrounded by wood
plantation, rubber garden and home industry (furniture). Nearest local residents
about 100 m
20. Blora Substation
It is located on Gatot Subroto Road, Blora, Central Java. The location is surrounded
by garden and residential. Nearest local residents about 100 m
21. Bumiayu Substation
It is located in Pegojenang village, Bumiayu, Brebes, Central Java. The location is
surrounded by garden and residential. Nearest local residents about 100 m
22. Rawalo Substation
It is located in Bayeman village, Rawalo, Banyumas, Central Java. The location is
surrounded by rice farm. Nearest local residents about 1 km
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
COMPONENT 2:
SUMATRA SYSTEM
Subcomponent A:
1.
275 kV Lahat Substation
Land for extension of Lahat substation is on the coffee plantations that are owned by the
local community. It is located in South Sumatra Province, Lahat Regency, Pagar Agung
Sub District. The development of the 275 KV Lahat Main Substations is part of the
expansion of the existing Lahat Main Substation that will require land in the width of + 3,1 ha
in a coffee, rubber and fruit plantation area owned by the community. Aside from the Main
Substation building land for the relocation line outside the existing Main Substation land for
4 electric towers with a area of @ 900m2 is also required. Two towers at the exsisting
location of main substation and the other two outside.
2.
275 kV Lubuk Linggau Substation
Lubuk Linggau substation is located in South Sumatra Province, Musi Rawas Regency,
Lubuk Linggau West Sub District. The development of the 275 KV Lubuk Main Substations
is part of the expansion of the existing Lubuk Main Substation that will be built on an empty
lot that is available in the existing power station area. Land needed to be acquired is the
electric tower land for 3 electric towers with a area of @ 900m2 for the line relocation. The
area surrounding the Main Substation is an empty lot over grown with underbrush. It is
located quite far from the settlement areas.
3.
Bangko Substation
Bangko substation is located in Jambi Province, Merangin Regency, Bangko Sub District.
The development of the 275 KV Bangko Main Substations is part of the expansion of the
existing Bangko Main Substation that will be built on an empty lot that is available in the
existing power station area. Land needed to be acquired is the electric tower land for 2
electric towers with a area of @ 900m2 for the line relocation. One tower at the exsisting
location of main substation and the other outside The area surrounding the main substation
is an empty lot over grown with underbrush.
4.
Muaro Bungo Substation
Muaro Bungo substation is located in Jambi Province, Bungo Tebo Regency, Muaro Bungo
Sub District. The development of the 275 KV Muara Bungo Main Substations is part of the
expansion of the existing Muara Bungo Main Substation that will be built on an empty lot
that is available in the existing power station area. The area surrounding the main substation
is an empty lot over grown with underbrush.
5.
Kiliranjao Substation
Kiliranjao substation is located in West Sumatra Province, Regency Sijunjung, Sie Langsek
Sub District. The development of the 275 KV Kiliranjao Main Substations is part of the
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
expansion of the existing Kiliranjao Main Substation that will be built on an empty lot that is
available in the existing power station area. Land needed to be acquired is the electric tower
land for 3 electric towers with a area of @ 900m2 for the line relocation. The area
surrounding the Main Substation is an empty lot over grown with underbrush.
Subcomponent B:
1. Baturaja Substation
It is located in Baturaja District, South Sumatra. The location is surrounded by
garden and residential. Nearest local residents about 100 m
2. Pagar Alam Substation
It is located in Pagar Alam District, South Sumatra. The location is surrounded by
tea, coffee plantation and residential. Nearest local residents about 500 m
3. 150 kV Lahat Substation
It is located in Pagar Agung, Lahat, South Sumatra. The location is surrounded by
garden and residential. Nearest local residents about 100 m
4. Prabumulih Substation
It is located in Prabumulih District, South Sumatra. The location is near oil refinery
and gas area which is 10 km from the substation. Nearest local residents about 500
m.
5. 150 kV Lubuk Linggau Substation
Lubuk Linggau substation is located in South Sumatra Province, Musi Rawas Regency,
Lubuk Linggau West Sub District. The area surrounding the Main Substation is an empty lot
over grown with underbrush. It is located quite far from the settlement areas.
6. Sungai Penuh Substation
It is located in Merangin District, Jambi Province. The location is near rice farm and
residential. Nearest local residents about 500 m.
7. Simpang Empat Substation
It is located in Simpang Empat District, West Sumatra Province. The location is near
rice farm and residential. Nearest local residents about 500 m.
8. Payakumbuh Substation
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
It is located in Payakumbuh District, West Sumatra Province. The location is near
garden and residential. Nearest local residents about 100 m.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
9. PIP Substation
It is located in West Sumatra Province. The location is near industrial area. Nearest
local residents about 1 km.
10. Padang Luar Substation
It is located in Padang Luar District, West Sumatra Province. The location is near
garden and residential. Nearest local residents about 100 m.
II.2 PUBLIC CONSULTATION
Public consultation was conducted in project locations for the new Millineum substation
in Java and some 275 kV substations in Sumatra which will require land acquisition. For
other substations, as the environmental and social impacts are limited, the public
consultations were conducted virtually. That is;
•
•
•
The FEMP in local language was made available in PLN’s project offices in Java
and Sumatra, and in PLN’s website;
Announcements were published in local newspapers and website to request
comments from project affected people, as well as general public;
Affected people and public were given ten days to comment on the FEMP and
raise concerns, if any.
COMPONENT 1
Subcomponent
A
Depok
Pedan
Krian
E
M
Announcemen
t
Media Date
Consultation
Locatio
n
Februar Februa virtually
y 12th, ry
2010
12th,
2010
Februar Februa virtually
y 12th,
ry
2010
12th,
2010
Februar Februa virtually
ry
y 12th,
2010
12th,
P
EMP
Affected
Groups
Attending
Environme
nt/Social
Issues
Raised
February 12th,
to 22, 2010
General
public
No issues
raised.
February 12th,
to 22, 2010
General
public
No issues
raised.
February 12th,
to 22, 2010
General
public
No issues
raised.
Date
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Balaraja
Subcomponent
B
Millineum
Februar
y 12th,
2010
2010
Februa virtually
ry
12th,
2010
Elshint
a
Radio
Februar
y 12th,
2010
February 12th,
to 22, 2010
General
public
No issues
raised.
Janua Millineu
ry 27th m
2010
January 29th
2010
Tenants
around
Millineum
insdustrial
estate
No
environmen
tal social
issues
raised.
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
General
No issues
Subcomponent
C (22)
Simpang Lima
Februar
y 12th,
2010
Pati
Februar
y 12th,
2010
Jekulo
Februar
y 12th,
2010
Beringin
Februar
y 12th,
2010
Pekalongan
Februar
y 12th,
2010
Secang
Februar
y 12th,
2010
Pandean
Lamper
Lomanis
E
Februar
th
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
y 12th,
2010
Februar
y 12th,
2010
Kentungan
Februar
y 12th,
2010
Tambak Lorok
Februar
y 12th,
2010
Wonosobo
Februar
y 12th,
2010
Klaten
Februar
y 12th,
2010
Solo Baru
Februar
y 12th,
2010
Semanu
Sragen (2
transformers)
Februar
y 12th,
2010
Februar
y 12th,
2010
Ungaran
Februar
y 12th,
2010
Sanggrahan
Februar
y 12th,
2010
Gombong
E
M
P
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
EMP
to 22, 2010
public
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Februar
y 12th,
2010
Majenang
Februar
y 12th,
2010
Blora
Februar
y 12th,
2010
Bumiayu
Februar
y 12th,
2010
Rawalo
COMPONENT 2
Subcomponent
A
275 kV Lahat
Media
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Februa
ry
12th,
2010
Date
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
virtually
February 12th,
to 22, 2010
General
public
No issues
raised.
Locatio
n
Informal consultation was conducted on
January 21st-22nd 2010. The affected
groups consist of 14 families who own the
land, 8 were available for consultation.
While the informal consultation took place
with other local residences from the
surrounding
area. Questionnair were
presented to the people and discussed
with PLN representatives.
275 kV Lubuk
Linggau
February
08th, 2010
February
08th, 2010
Virtually
Bangko
February
08th, 2010
February
08th, 2010
Virtually
Muara Bungo
February
08th, 2010
February
08th, 2010
Virtually
E
M
Date
P
EMP
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
Local
Electromag
residences netics
and land radiation
owners
issue
The
damage of
entrance
road
will
disturb
transportati
on to grave
yard
location.
General
No issues
public
raised
General
public
No issues
raised
General
public
No issues
raised
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Kiliranjo
February
08th, 2010
February
08th, 2010
Virtually
February
08th, 2010
February
08th, 2010
Virtually
Pagar Alam
February
08th, 2010
February
08th, 2010
Virtually
Prabumulih
February
08th, 2010
February
08th, 2010
Virtually
150 kV Lahat
February
08th, 2010
February
08th, 2010
Virtually
150 kV Lubuk
Linggau
February
08th, 2010
February
08th, 2010
Virtually
Sungai Penuh
February
08th, 2010
February
08th, 2010
Virtually
Simpang
Empat
February
08th, 2010
February
08th, 2010
Virtually
PIP
February
08th, 2010
February
08th, 2010
Virtually
Payakumbuh
February
08th, 2010
February
08th, 2010
Virtually
Padang Luar
February
08th, 2010
February
08th, 2010
Virtually
Subcomponent
B (10)
Baturaja
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
February
08th, to
18, 2010
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
General
public
No issues
raised
Any Environment/Social Issues raised would be included in the Supplementary EMPs
for the individual Subcomponents (see Annex E).
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION III MITIGATION AND MONITORING PLANS
•
GENERIC MITIGATION and MONITORING PLAN 1 (No Land Acquisition, Existing Substation Site)
COMPONENT 1:
JAVA-BALI SYSTEM
Subcomponent A:
Depok Substation (West Java)
Pedan Substation (Central Java)
Krian Substation (East Java)
Balaraja Substation (West Java)
Subcomponent C:
Twenty two (22) substation upgrades
COMPONENT 2:
SUMATRA SYSTEM
Subcomponent B:
Ten (10) substation upgrades
Environment
impact
During construction
The construction site will be sprinkled with
Minor,
water, especially for hot, dry and windy
Included in
conditions.
construction
contract
Dust
E
Mitigation actions
MITIGATION PLAN
Costs
M
P
EMP
Responsible
Construction
Contractor,
PT.PLN
PIKITRING
Start
End
In the
beginning
of
constructio
n
After
completion of
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Audible noise
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
PCB
(polychlorinate
d biphenyls)
Oil spill or
leaks from
construction
equipment
Mitigation actions
Costs
Construction activities will be performed only
during normal working hours (from 8 a.m. till 6
p.m.). If construction activities have to be
performed before or after the specified time
limits, the local society must be notified about it
at least one week in advance.
To be removed by license contract to places
specially allocated for landfills, approved by
local authorities
No cost
Tender documents shall prohibit procurement of
equipment containing PCB
Repair leaking vehicles or do not permit on
work site
Contaminated soils will be removed and
disposed to sites approved by local authorities
Responsible
Start
End
Construction
Contractor
PT.PLN
PIKITRING
In the
beginning
of
constructio
n
After
completion of
construction
Minor,
Included in
construction
contract
Construction
Contractor
PT.PLN
PIKITRING
In the
beginning
of
constructio
n
After
completion of
construction
No cost,
Included in
construction
contract
Minor,
Included in
construction
contract
Construction
Contractor
PT.PLN
PIKITRING
Construction
Contractor
PT.PLN
PIKITRING
After
equipment
is delivered
After all
equipment is
delivered
In the
beginning
of
constructio
n
After
completion of
construction
Oil sorbents will be kept on-site to contain any
spills
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Worker safety
from existing
electromagneti
c fields
Audible noise
E
M
Mitigation actions
Costs
Worker hours will be limited in accordance with
WHO exposure limits:
Minor,
Included in
construction
contract
EMF Intensity (kV/M)
time (min)
Up to 5
5-10
10-20
20-25
>25
Admissible exposure
EMP
Construction
Contractor
PT.PLN
PIKITRING
Start
In the
beginning
of
constructio
n
End
After
completion of
construction
No limits
Up to 180
Up to 30
Up to 10
Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
During Operation
Bidding documents specify noise level for
Minor,
transformer and the cooling fan standard below
Included in
76 dBA
Operation
Cost
P
Responsible
PLN P3B Java
Bali and PLN
P3B Sumatra
(operation and
maintenance
unit)
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
EMF
Mitigation actions
All high voltage equipment will be wire-fenced
or placed in enclosures. Max EMF intensity
allowed outside the protected area will be 5
kV/m.
Costs
Responsible
Start
End
Minor,
Included in
Operation
Cost
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
Minor,
Included in
Operation
Cost
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
Minor,
Included in
Operation
Cost
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
For security reasons the following stationary
protection will be used:
Prevent soil
and ground
water
contamination
as a result of
oil leak
Fire prevention
E
M
• shielding-sheds over the disconnector
operating mechanisms,
• circuit breaker control cubicles,
• terminal boxes;
• shielding-sheds over walkways of routine
inspection
• Warning signs in areas of high
electric/magnetic field strength
Installation of oil collectors, made in compliance
with standard design solutions of precast
concrete and reinforced concrete elements, the
bottom – monolith reinforced concrete slab
made of sulfate-resistant cement. Improved
damp proof shall be done underneath the slab.
Grass at substation territory shall be mowed;
mowed grass shall be removed from the
territory of a substation. Plants shall not be
removed by pesticides
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Solid wastes
Mitigation actions
Costs
Responsible
Start
End
Solid wastes shall be transported to special
disposal places, approved by local government
authorities.
Minor,
Included in
Operation
Cost
Minor,
Included in
Operation
Cost
Included in
Operation
Cost
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
PLN P3B JB
and PLN P3B
S
During
operation
Continuous
Emergency
Preparedness
and Response
See Annex A: PLN Emergency Preparedness
and Response Plan for Electric Power
Substations
Worker Health
and Safety
See Annex B: PLN Worker Health and Safety
Plan for Electric Power Substations
MONITORING PLAN
Monitoring
parameter
Environment
impact
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Included
in
construc
tion
contract
Constructio
n
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
During construction
Dust
E
Daily
inspection
M
P
Constructio Visual inspection
n site and
access road
EMP
Daily
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Audible noise
dB( )
Constructio
n site and
access road
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
PCB
(polychlorinate
d biphenyl)
E
M
Monitoring
method
Monitoring
schedule
Measurements Monthly or if there
to be done
are complaints
under the
contract with
specialized
company
holding a license
and owing a
certified
laboratory.
Clarification
Prior to
Visual inspection Prior to granting
access to
of
access to
Contractor’ construction
construction site
s license
site
expiration
date
Invoice for
At delivery Visual inspection When equipment
equipment
site
has been
delivered
P
EMP
Cost
Responsib
le
Start
End
Included
in
construc
tion
contract
Constructio
n
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
Included
in
construc
tion
contract
Constructio
n
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
Included
in
construc
tion
contract
Constructio
n
Contractor
PT.PLN
PIKITRING
Arrival of
equipment
Arrival of
equipment
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Oil spill or
leaks from
construction
equipment
Vehicles
inspected
for leaks
On-Site
Visual
Weekly or if there
are complaints
Included
in
construc
tion
contract
Constructio
n
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
On-Site
Visual
Weekly
Included
in
construc
tion
contract
The
beginning of
construction
The end of
construction
Start of
operation
Continuous
Contaminat
ed soil
removed
Worker safety
from existing
electromagneti
c fields
Sorbents
stored onsite
Worker
exposure
limits
followed
Constructio
n
Contractor
PT.PLN
PIKITRING
During operation
dbA
E
M
2 meters
from
equipment
P
EMP
Noise meter
Semi anually or If
there are
complaints
Included
in
Operatio
n Cost
PLN P3B
JB, PLN
P3B S
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Audible noise
Usage of
ear
protectors
by the
personnel
Electric and
Magnetic
Field
intensity
Control of
workers at
substation
site
Visual
Semi anually
In the area
of operation
and at the
fence
Electro meter
and Gauss
meter
Over the
surface and
underneath
the oil
containing
equipment
At
substation
site
Possible leaks
will be inspected
visually
EMF
Prevent soil
and ground
water
contamination
as a result of
oil leak
Fire
prevention
E
Oil stains
Formation
of intensive
plant cover
M
P
EMP
Visual
Cost
Responsib
le
Start
End
Included PLN P3B
in
JB, PLN
Operatio P3B S
n Cost
Start of
operation
Continuous
Semi anually
Included PLN P3B
in
JB, PLN
Operatio P3B S
n Cost
Start of
operation
Continuous
daily
Included PLN P3B
in
JB, PLN
Operatio P3B S
n Cost
Start of
operation
Continuous
Approximately
Included PLN P3B
in
monthly
JB, PLN
(depending on
Operatio P3B S
rainfall conditions) n Cost
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Solid wastes
The
storage
area
At
substation
site
Visual
Daily
Emergency
Preparedness
and Response
Requireme
nts of
Emergency
Preparedne
ss and
Response
Plan
Requireme
nts of
Worker
Health and
Safety Plan
At
substation
site
Visual
As required by
Plan
Included
in
Operatio
n Cost
Included
in
Operatio
n Cost
At
substation
site
Visual
As required by
Plan
Worker Health
and Safety
E
M
P
EMP
Responsib
le
Start
End
PLN P3B
JB, PLN
P3B S
During
operation
Continuous
PLN P3B
JB, PLN
P3B S
During
operation
Continuous
Included PLN P3B
in
JB, PLN
Operatio P3B S
n Cost
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
•
MITIGATION and MONITORING PLAN 2 (Land Acquisition, Adjacent to Existing Substation Site)
COMPONENT 2:
SUMATRA SYSTEM
Subcomponent A:
Lahat
Lubuk Linggau
Bangko
Muara Bungo
Kiliranjao
Environment
impact
During construction
Land acquisition will be implemented prior to
To be
construction. The RAP is there to guide the
determined
implementation: the consultation with the assets
according
owners is to be done, compensation will refer to
Indonesia law
the market price and negotiated forms and and world bank
value.
resettlement
Physical construction will not be done until after
policy
the land acquisition (compensation payment) is
finished
Land
acquisition
E
Mitigation actions
MITIGATION PLAN
Costs
M
P
EMP
Responsible
Start
End
PT. PLN
Pikitring SBS
Consultatio
n
Pre
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Soil erosion on
the substation
territory
Prepare drainage channel in order to avoid
flood in rainy day.
All vegetation will be removed mechanically or
manually – no pesticides will be used.
The construction site will be sprinkled with
water, especially for hot, dry and windy
conditions.
Dust
Audible noise
Accidental Find
of Culturally
Significant
Artifacts
E
Mitigation actions
M
Construction activities will be performed only
during normal working hours (from 8 a.m. till 6
p.m.). If construction activities have to be
performed before or after the specified time
limits, the local society must be notified about it
at least one week in advance.
All construction activity works shall be
suspended until found artifact is inspected by
provincial office of Ministry of Tourism and
Culture and official permission to continue
works is issued.
P
EMP
Costs
Responsible
Start
End
included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
After
beginning of completion of
construction construction
included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
After
beginning of completion of
construction construction
No cost
Construction
Contractor PT.
PLN Pikitring
SBS
After
In the
beginning of completion of
construction construction
included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
After
beginning of completion of
construction construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
PCB
(polychlorinate
d biphenyls)
Mitigation actions
Costs
Responsible
Start
End
To be removed to places specially allocated for
landfills, approved by local authorities
Minor,
Included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
After
In the
beginning of completion of
construction construction
Tender documents shall prohibit procurement of
equipment containing PCB
No cost,
Included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
After
equipment
is delivered
Oil spill or leaks Repair leaking vehicles or do not permit on
from
work site
construction
equipment
Contaminated soils will be removed and
disposed to sites approved by local authorities
Minor,
Included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
After
In the
beginning of completion of
construction construction
After all
equipment is
delivered
Oil sorbents will be kept on-site to contain any
spills
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Worker safety
from existing
electromagneti
c fields
Audible noise
E
M
Mitigation actions
Costs
Worker hours will be limited in accordance with Minor,
WHO exposure limits:
Included in
construction
EMF Intensity (kV/M)
Admissible exposure contract
time (min)
Up to 5
No limits
5-10
Up to 180
10-20
Up to 30
Up to 10
20-25
>25
Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
During Operation
Bidding documents specify noise level for
Minor,
transformer and the cooling fan standard below
Included in
76 dBA
Operation
Cost
P
EMP
Responsible
Construction
Contractor PT.
PLN Pikitring
SBS
Start
End
In the
After
beginning of completion of
construction construction
PLN P3B S
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
EMF
Mitigation actions
Costs
All high voltage equipment will be wire-fenced
or placed in enclosures. Max EMF intensity
allowed outside the protected area will be 5
kV/m.
Minor,
Included in
Operation
Cost
For security reasons
protection will be used:
the
following
M
P
EMP
Start
End
PLN P3B S
During
operation
Continuous
Included in
Operation
Cost
PLN P3B S
During
operation
Continuous
Included in
Operation
Cost
PLN P3B S
During
operation
Continuous
stationary
• shielding-sheds over the disconnector
operating mechanisms,
• circuit breaker control cubicles,
• terminal boxes;
• shielding-sheds over walkways of routine
inspection
• Warning
signs
in
areas
of
high
electric/magnetic field strength
Prevent soil
Installation of oil collectors, made in compliance
and ground
with standard design solutions of precast
water
concrete and reinforced concrete elements, the
contamination
bottom – monolith reinforced concrete slab
as a result of oil made of sulfate-resistant cement. Improved
leak
damp proof shall be done underneath the slab.
Fire prevention Grass at substation territory shall be mowed;
mowed grass shall be removed from the
territory of a substation. Plants shall not be
removed by pesticides
E
Responsible
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Solid wastes
Emergency
Preparedness
and Response
Worker Health
and Safety
Mitigation actions
Costs
Solid wastes shall be transported to special
disposal places, approved by local government
authorities.
See Annex A: PLN Emergency Preparedness
and Response Plan for Electric Power
Substations
See Annex B: PLN Worker Health and Safety
Plan for Electric Power Substations
Included in
Operation
Cost
Included in
Operation
Cost
Included in
Operation
Cost
Responsible
Start
End
PLN P3B S
During
operation
Continuous
PLN P3B S
During
operation
Continuous
PLN P3B S
During
operation
Continuous
MONITORING PLAN
Monitoring
parameter
Environment
impact
E
M
P
Place of
monitoring
EMP
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Consultation
6 (six) month
after the
LARAP
implementatio
n.
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
During Construction
Monitoring will be done during the implementation of the land
acquisition (LARAP)
Monitoring will be conducted at all sites where land acquisition
and assets compensation take place, at every stage of LARAP
implementation (consultation, inventory, negotiation, etc.)
The method is to see the conformity of the implementation with
the LARAP: consultation process, compensation scheme,
certification, handling mechanism, etc. as provided in the LARAP
document.
Land
acquisition
Soil erosion on Evidence of
the substation
soil
territory
errosion
Dust
E
Daily
inspection
M
P
Substation
site
minor
PLN
Pikitring
SBS and
independe
nt team
Visual inspection Daily, during rainy Included Constructio
day
in
n
construc Contractor
tion
PLN
contract Pikitring
SBS
Constructio Visual inspection
Daily
Included Constructio
n site and
in
n
access road
construc Contractor
tion
PLN
contract Pikitring
SBS
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Audible noise
dB( )
Constructio
n site and
access road
Accidental
Find of
Culturally
Significant
Artifacts
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
E
M
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Measurements Monthly or if there Included Constructio
to be done
are complaints
in
n
under the
construc Contractor
contract with
tion
PLN
specialized
contract Pikitring
company
SBS
holding a license
and owing a
certified
laboratory.
Evidence of Constructio Visual inspection
Something is
Included Constructio
found
in
artifacts
n site
n
construc Contractor
tion
PLN
contract Pikitring
SBS
Clarification
Prior to
Visual inspection Prior to granting Included Constructio
access to
in
n
of
access to
Contractor’ construction
construction site construc Contractor
s license
tion
PLN
site
expiration
contract Pikitring
SBS
date
P
EMP
Start
End
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
PCB
(polychlorinate
d biphenyl)
Invoice for
equipment
At delivery
site
Visual inspection
When equipment
has been
delivered
Included
in
construc
tion
contract
Oil spill or
leaks from
construction
equipment
Vehicles
inspected
for leaks
On-Site
Visual
Weekly or if there
are complaints
On-Site
Visual
Weekly
Contaminat
ed soil
removed
Worker safety
from existing
electromagneti
c fields
E
M
Sorbents
stored onsite
Worker
exposure
limits
followed
P
EMP
Responsib
le
Constructio
n
Contractor
PLN
Pikitring
SBS
Included Constructio
in
n
construc Contractor
tion
PLN
contract Pikitring
SBS
Included
in
construc
tion
contract
Constructio
n
Contractor
PLN
Pikitring
SBS
Start
End
Arrival of
equipment
Arrival of
equipment
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
During Operation
Audible noise
EMF
Prevent soil
and ground
water
contamination
as a result of
oil leak
E
dbA
2 meters
from
equipment
Noise meter
Semi anually or If
there are
complaints
Included PLN P3B S
in
Operatio
n Cost
Start of
operation
Continuous
Usage of
ear
protectors
by the
personnel
Electric and
Magnetic
Field
intensity
Control of
workers at
substation
site
Visual
Weekly
Included PLN P3B S
in
Operatio
n Cost
Start of
operation
Continuous
In the area
of operation
and at the
fence
Electro meter
and Gauss
meter
Semi anually
Included PLN P3B S
in
Operatio
n Cost
Start of
operation
Continuous
Over the
surface and
underneath
the oil
containing
equipment
Possible leaks
will be inspected
visually
daily
Included PLN P3B S
in
Operatio
n Cost
Start of
operation
Continuous
Oil stains
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Fire
prevention
Formation
of intensive
plant cover
At
substation
site
Visual
Solid wastes
Prevent soil
contaminati
on
At
substation
site
Visual
Emergency
Preparedness
and Response
Requireme
nts of
Emergency
Preparedne
ss and
Response
Plan
Requireme
nts of
Worker
Health and
Safety Plan
At
substation
site
Visual
At
substation
site
Visual
Worker Health
and Safety
E
M
P
EMP
Monitoring
schedule
Cost
Responsib
le
Approximately
Included PLN P3B S
monthly
in
(depending on
Operatio
rainfall conditions) n Cost
Daily
Included PLN P3B S
in
Operatio
n Cost
As required by
Included PLN P3B S
Plan
in
Operatio
n Cost
As required by
Plan
Included PLN P3B S
in
Operatio
n Cost
Start
End
During
operation
Continuous
During
operation
Continuous
During
operation
Continuous
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
•
Environment
impact
Land use on
the substation
territory
Dust
Audible noise
GENERIC MITIGATION and MONITORING PLAN 3 (No Land Acquisition, New Site)
COMPONENT 1:
JAVA-BALI SYSTEM
Subcomponent B: Millineum Substation
MITIGATION PLAN
Mitigation actions
Costs
Responsible
Start
During Construction
Remove any fertile soil layer and store it in the
Minor, Included
isolated area under plastic cover to prevent
in construction
erosion and protect from surface waters. After
contract
construction is complete the fertile soil layer will
be placed back to its original location and
original vegetation will be restored.
All vegetation will be removed mechanically or
manually – no pesticides will be used.
The construction site will be sprinkled with
water, especially for hot, dry and windy
conditions.
Construction activities will be performed only
during normal working hours (from 8 a.m. till 6
p.m.). If construction activities have to be
performed before or after the specified time
limits, the local society must be notified about it
at least one week in advance.
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ End
Construction
Contractor
PT. PLN
Pikitring JBN
In the
beginning
of
constructi
on
After
completion of
construction
Minor,
Included in
construction
contract
Construction
Contractor
PT. PLN
Pikitring JBN
After
completion of
construction
No cost
Construction
Contractor
PT. PLN
Pikitring JBN
In the
beginning
of
constructi
on
In the
beginning
of
constructi
on
After
completion of
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Accidental Find
of Culturally
Significant
Artifacts
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
PCB
(polychlorinate
d biphenyls)
Mitigation actions
Costs
Responsible
All construction activity works shall be
suspended until found artifact is inspected by
proper authorities and official permission to
continue works is issued.
Minor,
Included in
construction
contract
Construction
Contractor
PT. PLN
Pikitring JBN
To be removed by license contract to places
specially allocated for landfills, approved by
local authorities
Minor,
Included in
construction
contract
Construction
Contractor
PT. PLN
Pikitring JBN
Tender documents shall prohibit procurement of
equipment containing PCB
No cost,
Included in
construction
contract
Minor,
Included in
construction
contract
Construction
Contractor
PT. PLN
Pikitring JBN
Construction
Contractor
PT. PLN
Pikitring JBN
Oil spill or leaks Repair leaking vehicles or do not permit on
from
work site
construction
equipment
Contaminated soils will be removed and
disposed to sites approved by local authorities
Start
End
In the
beginning
of
constructi
on
In the
beginning
of
constructi
on
After
completion of
construction
After
equipment
is
delivered
In the
beginning
of
constructi
on
After
completion of
construction
After all
equipment is
delivered
After
completion of
construction
Oil sorbents will be kept on-site to contain any
spills
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Worker safety
from existing
electromagneti
c fields
Mitigation actions
Costs
Worker hours will be limited in accordance with
WHO exposure limits:
EMF Intensity (kV/M)
time (min)
Up to 5
5-10
10-20
20-25
>25
Admissible exposure
Minor,
Included in
construction
contract
Responsible
Construction
Contractor
PT. PLN
Pikitring JBN
Start
In the
beginning
of
constructi
on
End
After
completion of
construction
No limits
Up to 180
Up to 30
Up to 10
Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
Audible noise
During operation
Bidding documents specify noise level for
Minor,
transformer and the cooling fan standard below
Included in
76 dBA
Operation
Cost
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ PLN P3B JB
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
EMF
Mitigation actions
All high voltage equipment will be wire-fenced
or placed in enclosures. Max EMF intensity
allowed outside the protected area will be 5
kV/m.
Costs
Responsible
Start
End
Minor,
Included in
Operation
Cost
PLN P3B JB
During
operation
Continuous
Minor,
Included in
Operation
Cost
PLN P3B JB
During
operation
Continuous
PLN P3B JB
During
operation
Continuous
For security reasons the following stationary
protection will be used:
• shielding-sheds over the disconnector
operating mechanisms,
• circuit breaker control cubicles,
• terminal boxes;
• shielding-sheds over walkways of routine
inspection
• Warning signs in areas of high
electric/magnetic field strength
Prevent soil
Installation of oil collectors, made in compliance
and ground
with standard design solutions of precast
water
concrete and reinforced concrete elements, the
contamination bottom – monolith reinforced concrete slab
as a result of oil made of sulfate-resistant cement. Improved
leak
damp proof shall be done underneath the slab.
Fire prevention Grass at substation territory shall be mowed;
mowed grass shall be removed from the
territory of a substation. Plants shall not be
removed by pesticides
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ Minor,
Included in
Operation
Cost
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Solid wastes
Mitigation actions
Costs
Responsible
Start
End
Solid wastes shall be transported to special
disposal places, approved by local government
authorities.
Minor,
Included in
Operation
Cost
Minor,
Included in
Operation
Cost
Minor,
Included in
Operation
Cost
PLN P3B JB
During
operation
Continuous
PLN P3B JB
During
operation
Continuous
PLN P3B JB
During
operation
Continuous
Emergency
Preparedness
and Response
See Annex A: PLN Emergency Preparedness
and Response Plan for Electric Power
Substations
Worker Health
and Safety
See Annex B: PLN Worker Health and Safety
Plan for Electric Power Substations
MONITORING PLAN
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Minor,
Included
in
construc
tion
contract
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
The
beginning of
construction
The end of
construction
During Construction
Land use on
the substation
territory
Methods
and place
of fertile
soil storage
Fertile soil
storage
areas
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ Visual inspection
Weekly, during
site preparation
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Dust
Daily
inspection
Audible noise
dB( )
Non-toxic solid
wastes (metal,
packing and
used
equipment,
etc.)
Place of
monitoring
Monitoring
method
Constructio Visual inspection
n site and
access road
Constructio
n site and
access road
Clarification
Prior to
of
access to
Contractor’ construction
s license
site
expiration
date
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ Measurements
to be done
under the
contract with
specialized
company
holding a license
and owing a
certified
laboratory.
Visual inspection
Monitoring
schedule
Cost
Daily
Minor,
Included
in
construc
tion
contract
Monthly or if there Minor,
are complaints
Included
in
construc
tion
contract
Prior to granting
access to
construction site
Minor,
Included
in
construc
tion
contract
Responsib
le
Start
End
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
The
beginning of
construction
The end of
construction
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
PCB
(polychlorinate
d biphenyl)
Invoice for
equipment
At delivery
site
Visual inspection
When equipment
has been
delivered
Arrival of
equipment
Vehicles
inspected
for leaks
On-Site
Visual
Weekly or if there
are complaints
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
Arrival of
equipment
Oil spill or
leaks from
construction
equipment
Minor,
Included
in
construc
tion
contract
Minor,
Included
in
construc
tion
contract
The
beginning of
construction
The end of
construction
On-Site
Visual
Weekly
The
beginning of
construction
The end of
construction
Contaminat
ed soil
removed
Worker safety
from existing
electromagneti
c fields
Sorbents
stored onsite
Worker
exposure
limits
followed
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ Minor,
Included
in
construc
tion
contract
Constructio
n
Contractor
PT. PLN
Pikitring
JBN
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Included
in
Operatio
n Cost
PLN P3B
JB
Start of
operation
Continuous
During Operation
dbA
2 meters
from
equipment
Noise meter
Semi anually or If
there are
complaints
Usage of
ear
protectors
by the
personnel
Electric and
Magnetic
Field
intensity
Control of
workers at
substation
site
Visual
Semi anually
Included PLN P3B
in
JB
Operatio
n Cost
Start of
operation
Continuous
In the area
of operation
and at the
fence
Electrometer
and Gauss
meter
Once after
substation
commissioning to
verify the
compliance with
the design
parameters
Included PLN P3B
in
JB
Operatio
n Cost
Once, in the
beginning of
operation
Continuous
Audible noise
EMF
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Prevent soil
and ground
water
contamination
as a result of
oil leak
Fire
prevention
Oil stains
Possible leaks
will be inspected
visually
daily
Formation
of intensive
plant cover
Over the
surface and
underneath
the oil
containing
equipment
At
substation
site
Solid wastes
The
storage
area
At
substation
site
Visual
Emergency
Preparedness
and Response
Requireme
nts of
Emergency
Preparedne
ss and
Response
Plan
At
substation
site
Visual
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ Visual
Cost
Responsib
le
Start
End
Included PLN P3B
in
JB
Operatio
n Cost
Start of
operation
Continuous
Approximately
Included PLN P3B
in
monthly
JB
(depending on
Operatio
rainfall conditions) n Cost
Daily
Included PLN P3B
in
JB
Operatio
n Cost
As required by
Included PLN P3B
Plan
in
JB
Operatio
n Cost
During
operation
Continuous
During
operation
Continuous
During
operation
Continuous
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoring
Monitoring
method
Monitoring
schedule
Cost
Responsib
le
Start
End
Worker Health
and Safety
Requireme
nts of
Worker
Health and
Safety Plan
At
substation
site
Visual
As required by
Plan
Included
in
Operatio
n Cost
PLN P3B
JB
During
operation
Continuous
˜‹”‘‡–ƒŽ ƒƒ‰‡‡– Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX A: BRIEF DESCRIPTION OF PLN EMERGENCY PREPAREDNESS AND
RESPONSE PROCEDURES FOR ELECTRIC POWER SUBSTATIONS
Pro-SMK3-009_Tanggap Darurat Kebakaran ( Fire Emergency Respons )
This procedure consists of action required fire emergency respons, explosives or
any emergency situation, and serious injury to workers in company operation.
Pro-SMK3-011_Informasi Keadaan Darurat (Emergency Situation Information)
This procedure consists of potential emergency situation that may happen in
PLN operation and maintenance unit. The following information should be
always in notice board at the substation, emergency and first aid officer name,
contact phone number, emergency ecvacuation map.
Pro-SMK3-012_Keadaan Darurat (Emergency Situation)
This procedure consists of Fire, Explosion, Bomb Threat, suspect package,
Hazardous material spill/toxic emissions, threat of riot, motor vehicle accident,
and other hazard.
Pro-SMK3-005_Pelatihan dan Kompetensi (Training and Competence)
This procedure describe the responsibility of administration and Human
Resource Department to implement the procedure : to assess capacity and
training needs as well as the guidance to train the operational staffs.
Pro-SMK3-001_Identifikasi Bahaya (Hazards Identification)
This procedure describe how to identify hazards, risk assessment including how
to manage risk as result of activities, product and services.
Pro-SMK3-010_Pertolongan Pertama Pada Kecelakaan (First Aid Procedures for
Accidence)
This procedure describe regulation and first aid facility in company to ensure
emergency situation is handled properly when worker injured or sick during work
including visitor to the premises.
Pro-SMK3-013_Pengelolaan APAR (Management of Fire Fighting Equipment)
This procedure describe the technical and administrative information on fire
fighying equipment require for all employee in particular to relevant personel
related to procurement and maintenace.
˜‹”‘‡–ƒŽƒƒ‰‡‡–Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Pro-SMK3-014_Penyelidikan Kecelakaan (accident Investigation)
This procedure consist of reporting procedure during incidents, accidents, and
occupational sickness to the PLN stafs, contractor and visitor.
Pro-SMK3-015_Pelaporan Bahaya (Hazard Reporting)
Hazard report aplies to reporting to any health and safety issues except for
worker injury. This procedure applies to all stafs and contractors.
˜‹”‘‡–ƒŽƒƒ‰‡‡–Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX B: PLN WORKER HEALTH AND SAFETY PLAN FOR ELECTRIC POWER
SUBSTATIONS
Reference of PLN procedure
Pro-SMK3-016_Inspeksi K3 tempat kerja (Working Area Inspection)
This procedure consist of work area inspection for all department area, reporting,
evaluation, and follow up of inspection result.
Pro-SMK3-023_Rambu-Rambu K3 (Occupational Health and Safety Signs)
This procedure applies to all signs regarding health, safety and environment
both permanent and temporary.
Pro-SMK3-021_Lock Out Tag Out
This procedure consists of installation activities of lock out and tag out system
for equipment and machinery during maintenance or break down.
Pro-SMK3-022_Pengendalian APD (Control of Self Protection Equipment)
This procedure applies to all self protection equipment used by worker, visitor,
contractor or other in working area with potential hazards.
Pro-SMK3-027_Pemantauan Lingkungan Kerja (Monitoring of Working
Environmet)
This procedure applies for monitoring of working environment due to impact of
electromagnet radiation in switch yard area.
Pro-SMK3-026_Pemantauan Kesehatan (Health Monitoring)
This procedure applies to all worker in PLN in particular working in area with
potential toxic hazards.
Pro-SMK3-030_Penanganan Masalah K3 (Occupational Health and Safety Issue
Management)
This procedure is to manage all issues related to occupational health and safety
in an effective and rapid way.
Pro-SMK3-032_Penanganan Bahan Beracun dan Berbahaya (Management of
Hazardous Material)
This procedure is to manage all aspects related to hazardous material including
safe handling, storage and transportation of hazardous materials.
˜‹”‘‡–ƒŽƒƒ‰‡‡–Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX C: INSTITUTIONAL ARRANGEMENTS FOR ENVIRONMENTAL
MANAGEMENT
Action
Monitoring Data Collection
Construction
Institutional Responsibility
Construction Contractor /PT.PLN
(Persero) PIKITRING
Operation
Operation (from “Monitoring Plan” by PLN
P3B JB and P3B S)
Data Analysis
Construction
Operation
Environmental Report Preparation
Construction
Construction Contractor , PT.PLN
(Persero) PIKITRING
Operation PT.PLN (P3B JB and P3B S)
Construction Contractor / PT.PLN
(Persero) PIKITRING
Operation
Operation PT.PLN (P3B JB and P3B S)
Environmental Report Receipt/Frequency (Who receives report/how often)
Construction (PLN Head Office and Environment Department/6 months)
Operation (PLN Head Office and Environment Department/6 months)
Management Action
Construction
PT.PLN (Persero) PIKITRING
Operation
PT.PLN (Persero) P3B
Note : Monitoring the implementation of the document Environmental
Management Plan (EMP) will be conducted by environmental staff in the unit
responsible for activities related to ( PT.PLN PIKITRING and PT. PLN P3B ) with
the budget by PT.PLN Persero).
˜‹”‘‡–ƒŽƒƒ‰‡‡–Žƒ ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX D REPORTING RESPONSIBILITIES
Report Type
Site
environment
management
Primary Report
By
Contractor
To
PLN
Pikitring
Environment Environment PLN
performance staff of
Pikitring
monitoring
Pikitring
during
construction
Environment
performance
monitoring
during
operation
E
M
Environment P3B
Staff of P3B
P
EMP
Frequency
Once
before
construction
begin and
monthly
thereafter
Monthly
Six-monthly
Secondary Report
Tertiary Report
By
-
To
-
Frequency
-
By
-
To
-
Frequency
-
PLN
Pikitring
PLN Planning
Dept/Environment Dept
Sixmonthly
PLN
Planning
Dept
WB
Sixmonthly
P3B
PLN
Environment
Dept
Annually
-
-
-
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX E SUPPLEMENTARY EMP
275 KV LAHAT SUBSTATION SUPPLEMENTARY MITIGATION PLAN
Mitigation actions
Costs
Responsible
Environment
impact
The damage of
entrance road
will disturb
transportation
to grave yard
location.
Environment
impact
Monitoring
parameter
The damage
of entrance
road will
disturb
transportation
to grave yard
location.
E
During Construction
Maintain the existing road so not to disturb the
Include in
grave yard site
Construction
Cost
Local
complains
M
P
Place of
monitoring
Project site
EMP
MONITORING PLAN
Monitoring
Monitoring
method
schedule
During Construction
Communication
Continuous
with local people
Construction
contractor PT.
PLN Pikitring
SBS
Start
End
In
Beginning
of
constructi
on
In end of
construction
Cost
Responsib
le
Start
End
Include
in
Constru
ction
Cost
Constructio
n
contractor
PT. PLN
Pikitring
SBS
In Beginning
of
construction
In end of
construction
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
MILLENIUM SUBSTATION SUPPLEMENTARY MITIGATION PLAN
Mitigation actions
Costs
Responsible
Environment
impact
Start
End
During Construction
Environment
impact
Monitoring
parameter
Place of
monitoring
MONITORING PLAN
Monitoring
Monitoring
method
schedule
Cost
Responsib
le
Start
End
During Construction
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX F
RESULT OF PUBLIC CONSULTATION
1. Public consultation for the Lahat substation conducted by informal consultations on the date of 21 to 22 January
2010 in approximately the location of the Lahat substation, precisely Pagar Agung Village, District Lahat, South
Sumatra. Consultation conducted by distributing questionnaires and asked to answer 8 of 14 pemilk projectaffected land and the residents around the site. FAQ sheets distributed to participants and discussed with
representatives of PLN. Existing environmental issues in the community during the consultation is the problem of
electric and magnetic fields from transmission towers and so when the construction does not damage the existing
road so as not to disturb the grave yard.
The response from the responsible dissemination PT.PLN PIKITRING SBS: In the construction of the Lahat main
substation there is no tower that was built for the relocation of the path, will pass through the residential population
and to answer the second environment issue , the construction contract documents construction and electricity
transmission networks main substation mentioned that any damage caused by the development / construction
activities during the responsibility will be the third party (contractor) including roads to the project site, so if any
damage will be repaired by the contractor as before.
2. Public consultation for the Millennium substation performed by Formal Consultation (Socialization) held on January
29, 2010 at the Millennium Industrial Estate between representatives of PLN, Developer and Tenant Millennium
Industrial Estate. Socialization is done by asking the opinion about the construction of the Millennium Master relay
to the Millennium Industrial Estate Tenant and residents in the surrounding region. There are no environmental
issues in the implementation of the relay location due to socialization Mother Millennium is located in the Industrial
Estate. Participants expect the development of socialization Main substation implemented immediately to support
productivity and electricity factory and surrounding areas area.
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX G
CLIPPING OF PUBLIC CONSULTATION
Sriwijaya POST, February 8th 2010
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
Suara Merdeka, February 11th 2010
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
http://www.pln-pikitringsbs.co.id/index.php?option=com_content&view=category&layout=blog&id=2&Itemid=3
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
E
M
P
EMP
ƒ‰‡
PT PLN (Persero)
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru – Jakarta 12160
Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234
Fax. (021) 7221330, Kotak Pos 4322/KBB
http://www.plnpijbn.co.id/home.php?mod=newsdetail&id=403
E
M
P
EMP
ƒ‰‡
Download