-1- BHP Billiton – Latin America Presentation to Analysts April, 2004 -2- Brazil Aluminium Carbon Steel Materials Development -3- Brazil – Introduction • Population: 178 million (5th in the world) • Area: 8,515,000 Km2 • GDP per capita: US$2,961 • Life expectancy: 69 years • The pace of economic recovery has moderated; labor market conditions weak • Interest rate in decline (16% p.a.); inflation under control • Exports at record levels, supporting the currency -4- Brazil – Macroeconomic Figures 2002A 2003A 2004F 1.9% - 0.2% 3.5% 12.5% 9.3% 5.3% 3.53 2.89 3.10 Interest rate (average) 19.1% 23.2% 14.9% Unemployment (average) 11.7% 12.4% 11.7% Trade balance (US$ Billion) 13.1 24.8 25.4 Foreign Direct Investment (US$ Billion) 16.6 10.1 15.0 Net Public Sector Debt (% of GDP) 55.5 58.2 57.6 GDP Growth Inflation rate (IPCA) Exchange rate (end of period) Source: Citigroup -5- Brazil – Country Risk Premium Country risk back to 1998 level & Exchange Rate Stable 2400 4.0 Election concerns 3.5 1800 3.0 1500 2.5 1200 2.0 550 Basis Points (Apr 13th) 900 1.5 600 1.0 300 0.5 0 Jan-01 Apr-01 Jul-01 Oct-01 Jan-02 Apr-02 Country risk premium S ource: IPEA – www.ipea.gov.br Jul-02 Oct-02 Jan-03 Apr-03 Jul-03 Oct-03 Exchange Rate (R$/US$) Jan-04 0.0 Apr-04 R$/US $ Basi s Point 2100 -6- Assets: MRN Aluminium Carbon Steel Materials ALUMAR PARÁ MARANHÃO S AMARCO (GERMANO) MINAS GERAIS ESPÍRITO SANTO S AMARCO (PONTA UBU) RIO DE JANEIRO VALES UL -7- Structure BHP Billiton PLC BHP Billiton Ltd Billiton Aluminium Holdings BV BHP International Finance Corp. Corp. BHP Billiton Metais SA BHP Billiton Brasil Ltda 14.8% 45.49% 50% MRN Valesul ALUMAR Samarco (Incorporated JV) (Incorporated JV) JV) (Unincorporated Unincorporated JV) (Incorporated JV) JV) CVRD ALCOA CBA ALCAN N. HYDRO 40.0% 18.2% 10.0% 12.0% 5.0% Bauxite CVRD 54.51% CVRD 46.34% 36.0% Aluminium Refinery ALCOA ABALCO ALCAN 35.1% 18.9% 10.0% Alumina Smelter ALCOA 53.66% Aluminium Iron ore 50% -8- Revenue and EBIT Contribution (US$ million) 2000 / 2001 2001 / 2002 2002 / 2003 Revenue 548 504 616 EBIT 166 136 193 -9- BHP Billiton Brazil’s Mission To Add Value to BHP Billiton Businesses in Brazil – Be the custodian of the BHP Billiton Charter with emphasis on HSEC Zero Harm – Active participation in JV Leadership, Business Improvement and Growth – Provide Finance, HR, Legal, IT and Administrative support – Local knowledge supports individual CSG needs – Promote standardization and alignment of JVs with BHP Billiton’s best practices Aluminium CSG (Total Production in ‘000t in fiscal years) S Smelter z Mine z Refinery z Suriname z Alumar MRNz S Mozal S Hillside SSBayside S Valesul Worsleyz Production ('000 tonnes) 1999/00 2000/01 2001/02 883 981 Alumina 1,878 Bauxite 5,744 Aluminium 2002/03 2003/04 2004/05 992 1,074 1,250 1,300 2,939 3,942 4,092 4,200 4,300 9,795 13,097 13,669 14,000 14,000 -10- -11- BHP Billiton Aluminium and Alumina Production How our portfolio might look in 2010, after harvesting brownfield potential Aluminium Production Alumina Production 1700.0 6200.0 1500.0 5200.0 1300.0 4200.0 1100.0 900.0 3200.0 700.0 2200.0 500.0 1200.0 300.0 99/00 00/01 Hills ide 01/02 Mozal 02/03 03/04 Bay side 04/05 Alumar 05/06 09/10 Valesul 200.0 99/00 00/01 01/02 02/03 Worsley 03/04 Suriname • M ozal III • Worsley to 4.1m tpa • Hillside III – add 54 pots • Alumar to 3.3mtpa • Current to at least 350kA • Suriname to 2.3m tpa 04/05 Alumar 05/06 09/10 -12- MRN • • • • Bauxite mine located in Pará state, set up in 1974 Expansion to 16mtpa capacity in 2003 ISO 14001 and OHSAS 18001 certifications Reserves of 800 million tonnes -13- MRN Production Process O PERATI O N SEQ U EN CE ST RIPPIN G REFO RESTA TIO N TAI LLIN G DI SPO SA L EX CAVA TIO N AN D H AU LAG E WA SH IN G MIN E CRUSHED BA UX ITE CRUSHI NG WA SH ED BAU X ITE BEN EFI CI AT IO N CAR L OA DI NG RA IL WA Y TRA NSPO RTA TIO N RA I LWA Y CA R DU MPER PO RT WET BA UX I TE DRYIN G D RY BA UX ITE SHI PLO ADER -14- Valesul • • • • • Primary aluminium smelter, capacity 93ktpa Joint Venture with CVRD, commissioned in 1982 Equity in 4 hydro power plants – approx. 40% of needs ISO 9002, ISO 14000 and BS 8800 certification Focus on VAP (billet & primary alloys) -15- Alumar • Consortium (UJV) with Alcoa, Alcan and Abalco • Comprises: • Alumina refinery – 1.35mtpa (36% BHP Billiton, 54% Alcoa associate companies, 10% Alcan) • Aluminium smelter – 375ktpa (46% BHP Billiton, 54% Alcoa) • ISO 9002, ISO 14001 and OHSAS 18001 certification -16- Alumar Refinery Expansion • Refinery debottlenecking from 1.35mtpa to 1.5mtpa approved • Alumar Consortium members studying a further expansion to 3.3mtpa • Decision expected late 2004 with first additional production late 2006 • Estimated unit capital cost of approx. US$400/t capacity and reduction in cash operating costs make this a very attractive project -17- Brazil Carbon Steel Materials -18- Samarco Americas Europe Sales breakdown 2003 (100% export market) China Other Asia Af rica / Middle East • Joint Venture with CVRD – 26 years of operations • Two industrial facilities linked by the longest iron ore slurry pipeline in the world • Extensive iron ore reserves • 2 Hydroelectric power plants produces 30% of Samarco needs • ISO 9002, ISO 14001 and OHSAS 18001 certification -19- Samarco Expansion • Brown field expansion project pre-feasibility study being carried out • 50% capacity increase: from 14mtpa to 21mtpa • Capital requirement - US$550 million • Decision foreseen around first quarter 2005 and first additional production targeted for third quarter 2007 -20- Brazil Other Activities -21- Exploration and Development Opportunities Minerals Commodity Region Copper, Silver, Lead & Zinc Pará, Bahia & Maranhão Iron Ore Minas Gerais Bauxite Pará/Amazonas Copper-Nickel Mato Grosso/ Rondônia Petroleum • Acquired Block BM-C-24 located at Campos Basin (off Rio de Janeiro State) in June 2002 • Evaluating exploration potential -22- Suriname Growth -23- Location ± Suriname ATLANTIC OCEAN Nickerie ! Paramaribo ! Moengo Paranam ! GUYANA ! ! Onverd ach t Alb in a ! Apoera ! GUY ANE Bakhuis Exploration Concession Area SURINAME km 0 20 40 60 80 100 -24- Bakhuis Exploration • Commenced a $8.5 million exploration program • Targeting approx. 300 Mt+ bauxite by end 2005 • Hill type bauxite situated in Western Suriname • Historic exploration estimated 300 – 400 Mt • Quality issues with historic data – new exploration under way -25- Integration (Aug 2003) of BHP Billiton & Alcoa Interests • Old BMS − bauxite miner with 45% equity interest in alumina refinery (Suralco operated) – Lelydorp III Mine (BMS −76 %, Suralco − 24%) – Coermotibo Mine (Suralco − 100%) – Mine closures in 2006/7 • New BMS − alumina producer (45% interest in mines and refinery) – BMS manages bauxite mining, Suralco manages alumina refining – Continuity (planning successor mines well advanced) – Growth: – Paranam refinery expansion from 1.95mtpa to 2.2mtpa underway (first production early 2005) – Bakhuis – Synergies – Alignment of shareholder equities – Alignment of processes – Focus on output