Section The Economic Benefits of Greenways V Section V: The Economic Benefits of Greenways Knox to O a k R id ge G reen wa y Stu d y 62 Section VI The Economic Benefits of Greenways Introduction Greenways provide a variety of amenities including open space, vegetated corridors, attractive views, recreation opportunities, and multi-use connectivity. It’s no surprise that these amenities often have direct impacts on neighboring property values. In a 2002 survey by the National Association of Realtors and National Association of Home Builders, trails were selected as the second most desired community amenity by 2,000 home buyers1. Trails consistently rank in the top five amenities desired by home buyers and rank “important to very important” just behind highway access. Trails outranked neighborhood playgrounds and pools as coveted neighborhood amenities. As consumers continue to demand access to greenways, properties adjacent to greenways will be in high demand. Property Values on the Rise National & Regional Data “Median priced homes increase in value by an average of $3,200 if within 5,000 feet of a greenway” —Greenways and Greenbacks: The Impact of the Catawba Regional Trail on Property Values in Charlotte, North Carolina 63 The nation’s longest and oldest paved Rail-Trail, the Silver Comet Trail (SCT), extends 61.5 miles and connects seven cities in Georgia. The economic impact of this trail system is estimated at $2 million in annual property tax gains and $182 million in increased property values2. A planned expansion of the project would double the length and produce an estimated return on investment of $4.64 in direct and indirect economic benefits for every $1 spent. One reason why greenways increase property values is that consumers place a premium on access to greenways as a space for recreation, socializing, and commuting. A 2007 Texas study that statistically modeled 10,000 real estate transactions estimated that greenways add a 5% purchase premium3. The closer a property is located to a greenway, the more its value is boosted by proximity to the trail. A 2007 study on the impacts of the Catawba Regional 1 Rails to Trails Conservancy. (2002). Home Buyers Sold on Trails. Rails to Trails Magazine. Washington, D.C.: Rails to Trails Conservancy 2 Econsult Solutions, Inc. (2013). Silver Comet Trail Economic Impact Analysis and Planning Study. Bike Walk Northwest Georgia (BWNWGA). 3 Huffman, P. A. (2009). The Relative Impacts of Trails and Greenbelts on Home Price. Journal of Real Estate Finance and Economics, 408419. Section V: The Economic Benefits of Greenways Knox to O a k R id ge G reen wa y Stu d y Trail on property values in Charlotte, North Carolina, concluded that median priced homes increased in value by an average of $3,200 if within 5,000 feet of the greenway4. A 2008 study at the University of Cincinnati’s School of Planning analyzed 376 properties that sold near the Little Miami Scenic Greenway in Ohio. Their results showed that single-family residential property values increase by $7.05 for every foot closer the property is located to the greenway5. Knoxville & Knox County Trends Real estate agents working in Knox County are well aware of greenway impacts on properties for sale. Sales Agent Robin Aggers from Coldwell Banker stated that “most clients love the idea of green space and walking/biking trails and are willing to pay a little more for the home based on the location.” She believes that an increase in the range of $10-25k would be appropriate for a home adjacent to a greenway6. Christine McInerney, Lead Agent of The McInerney Team, has noticed the increasing trend of biking in Knoxville. Although it’s difficult to quantitatively determine impacts on property values because of so many variables, she recognizes greenways as a big selling feature of homes and communities. Island Home in South Knoxville, West Hills, and Sequoyah Hills are all examples of neighborhoods that promote their proximity to greenways to potential buyers as selling points. Figure 52—Example of a residential development incorporating a greenway into the design. Image courtesy of Dan Burden According to McInerney’s experience, not all greenways and parks are created equal. Longer stretches of greenways, like the Third Figure 53—Third Creek in Knoxville. One Knoxville real estate agent said that the connectivity of this greenway is a draw to Creek Greenway, tend to be more desirable to clients than short home buyers. Image courtesy of www.letsmove.org stretches of separated greenways with on-road sections, and people will often wait for these properties to be listed. McInerney recently had several clients relocate from West Knoxville to the Sequoyah Hills area just to be closer to greenways for commuting7. Public/Private Partnerships The Business Advantage It’s not just home buyers who are demanding greenways. Business communities are also benefiting from them. The Swamp Rabbit Trail, a 17.5-mile rails-to-trails greenway in Greenville, South Carolina, had instant impacts on the surrounding Greenville economy based on a survey of businesses within 250 yards of the trail that was conducted at Furman University. Multiple businesses opened as a result of the trail being built. Multiple businesses also changed locations to be closer to the trail, resulting in an average range of 30%-50% increase in sales with the move. All businesses surveyed within the 250 yards showed an increase in sales with an average increase of 47%8. 4 Munroe, H. C. (2007). Greenways and Greenbacks: The Impact of the Catawba Regional Trail on Property Values in Charlotte, North Carolina. Southeastern Geographer, 118-137. 5 Karadenis, D. (2008). The Impact of Trails on Single-family Residential Property Values. Cincinnati: University of Cincinnati, School of Planning. 6 Aggers, R. (2014, October 1). Economic Impacts of Greenways in Knox County. (D. Chandler, Interviewer) 7 McInerney, C. (2014, October 1). Economic Impacts of Greenways in Knox County. (D. Chandler, Interviewer) 8 Reed D.J. (2013). Greenville Health System Swamp Rabbit Trail Impact Study. Greenville: Furman Study. Section V: The Economic Benefits of Greenways Knox to O a k R id ge G reen wa y Stu d y 64 Private/public partnerships are becoming more common as residents and businesses see positive returns on investment. Colorado beer producer New Belgium Brewing Company located its East Coast brewery in Asheville, North Carolina, partly in support of the company’s environmental ethic, as well as its company bike culture. One of the stipulations with building along the French Broad River was the City would construct a greenway on a donated easement that ran through the property. When construction is complete, the company is likely to have invested an estimated $150 million in Western North Carolina’s economy. Tennessee Precedents The following are examples of Tennessee greenways that exhibit noteworthy public/private partnerships in planning, funding and/or construction. The Tweetsie Trail Greenway Length 4.5 miles constructed, 10 miles total planned (longest rails-to-trails in Tennessee) Gravel Fines Trail Connections Founders Park in Johnson City to Downtown Elizabethton, TN Destinations Shopping, Business, Parks, Restaurants, Golf Course Funds Raised All private money $800,000 to date Big Idea Eventually connect to Roan Mountain Unique Features Refurbished train depot 65 The first section of the Tweetsie Trail opened on August 30, 2014, after eight years of planning and private donations. A master plan was accepted by Johnson City in 2012 with an original price tag of almost $6 million. Johnson City put together the Tweetsie Task Force to tackle fundraising, raising $800,0009 to date to construct 4.5 miles of trail. Property owners donated land and easements, while individuals, businesses, and local governments donated money and materials, from single bricks and benches to entire bridges. The iconic gateway sign at the trailhead was donated by Snyder’s Signs, and the materials for the entrance to the trail were donated by General Shale. One local business that pushed planning efforts forward was Tupelo Honey Café. The owner approached Johnson City and promised to build a restaurant in the old train depot if a greenway connection was built. The cafe owner purchased the vacant depot and refurbished it, adding not only jobs but also a destination on the trail. Other local businesses were in step to take immediate advantage of the Tweetsie Trail after construction. One apartment complex along the trail changed their name from Cedar Grove View to Tweetsie Trail Village Apartments after construction of the trail was complete. The owner, Sammy Hubbard, said that they have experienced noticeably more calls inquiring about vacancies since the trail was constructed, and they consistently have to turn potential renters away. They are considering raising rents at the beginning of next year10. 9 Casey, T. (2014, September 2). Tweetsie task force talks trek turnout, troubles, more. Johnson City Press. 10 Hubbard, S. (2014, September 30). Tweetsie Trail Name Change. (D. Chandler, Interviewer) Section V: The Economic Benefits of Greenways Knox to O a k R id ge G reen wa y Stu d y The Maryville-Alcoa Greenway This first section of the Maryville-Alcoa Greenway was completed in 1998. Funding was provided by an $850,000 federal grant. Private partners also contributed to the greenway, including Blount Memorial Hospital, Alcoa Inc. and other local businesses. Donations were worth $300k in value, including easements and land donations. Total project cost to date is $2,979,02011. Figure 54—The Maryville-Alcoa Greenway Image courtesy of www.knoxnews.com The greenway has been a valuable marketing tool to lure business interests in the immediate area. Ruby Tuesday moved corporate headquarters to be on the edge of the greenway after considering several cities in 1999. Samuel E. Beall, III, chairman and CEO, stated, “I was very impressed with the beauty of the park, which helps provide a sense of community to this area, as well as the many benefits it provides to our more than 300 employees.”12 ProNova Solutions, a medical research company, announced a $52 million investment in its corporate headquarters along with research laboratories. The project is situated on 26 acres of Pellissippi Place, a mixed-use development park at the end of Pellissippi Parkway directly accessible via a greenway. This project has the potential to lead to several thousand jobs in the region. Blount Partnership, the business development agency for the county, promotes greenways as a community benefit to relocating or expanding within the county. Bryan Daniels, President and CEO, said that not only were greenways and walkability a selling point for the expansion of ProNova, but for other businesses as well13. 11 12 13 US Department of Transportation, Federal Highway Administration, “Enhancing America’s Communities: A Guide to Transportation Enhancements,” Greenway Trail, p. 32, 2002. Rails to Trails Conservancy. (2003). Economic Benefits of Trails and Greenways. Washington, D.C.: Rails to Trails Conservancy. Daniels, B. (2014, October 7). ProNova Expansion. (D. Chandler, Interviewer) Length Main Spine is a 10-mile paved trail Springbrook Park in Alcoa to Bicentennial Greenbelt & Sandy Springs in Maryville Destinations Shopping, Business, Nature Areas, Fitness Stations, Picnic Pavilions Funds Raised Total Project Cost $2,979,020; Federal: $1,681,000; Match: $1,298,020; 11 Big Idea Eventually connect to Great Smoky Mountains National Park Unique Features Views of Greenbelt Lake Figure 55—The Maryville -Alcoa Greenway Image courtesy of www.siteselection.com Section V: The Economic Benefits of Greenways Knox to O a k R id ge G reen wa y Stu d y 66 Section VI 67 Cost Estimates Section VI: Cost Estimates Knox to O a k R id ge G reen wa y M a s ter P la n Section VI Cost Estimates Phase 1 EndsDutchtown Road/ Parkway Interchange 3 Individual phases have detailed costs broken out in the following pages. Some of the bigger ticket items include: Phase 2 Ends-Pellissippi State Community College Oak Ridge Highway E AS Cost estimates are based on construction and permitting. It does not include land acquisition costs, which can be significant and are hard to predict until land owner outreach is conducted. The goal should be to acquire right-ofway through donations of land or easements when possible to help manage cost. * Phase 3 Ends-North side of Solway Bridge PH Costs For Construction and Permitting PHASING DIAGRAM * * Phase Terminus PH AS Preferred Route Existing Greenways E2 * * E1 S HA P North Cedar Bluff Road Dutchtown Road Recommended Trailheads Figure 56—Potential Cost Per Phase (Construction & Permitting) TOTAL COST COST PER LINEAR FOOT COST PER MILE TOTAL MILES Phase 1: The Southeastern Corridor $3,415,000 $116 $610,000 5.6 • Cross Creek trailhead (~$103,000) Phase 2: The Central Corridor $1,212,000 $104 $551,000 2.2 • Other trailheads (Average ~$20,000) Phase 3: The Northern Corridor $4,160,000 $145 $770,000 5.4 • The greenway itself, with average construction costs of $601,000 per mile • A Sinking Creek bridge (~$41,000) • Stormwater controls • Fencing and retaining walls PHASE TOTAL: $8,787,000 Total Cost For Construction & Permitting 13.2 • The cantilevered pedestrian walkway on the Solway Bridge (~$560,000) Planning, design, permitting, and engineering have been incorporated into these costs. However, not all costs can be predicted, and cost estimates are based on known issues and proposed design features. Connector routes were not figured into these costs unless an immediate crossing could be designed and built as part of the greenway. Section VI: Cost Estimates Knox to O a k R id ge G reen wa y M a s ter P la n 68 Phase 1: The Southeastern Corridor Probable Cost Estimate January 2015 Cost estimates are preliminary and subject to change Units Quantity LS 1 LF SF CY SF MI 29506 6126 226 390 5.58 Mid-block crossing (Cross Park Drive) Mid-block crossing (Fox Lonas Road) Mid-block crossing (Christian Academy Boulevard) Mid-block crossing with island to connect to Parkwest Medical Center (Sherrill Boulevard) Mid-block crossing (Mabry Hood Road) Mid-block crossing (Investment Drive) EA EA EA EA EA EA 1 1 1 1 1 1 $770.00 $770.00 $770.00 $13,520.00 $770.00 $770.00 $770 $770 $770 $13,520 $770 $770 Four-way Crossing Improvements- Dutchtown Road/ Parkway Interchange EA 2 $3,000.00 $6,000 Intersection improvements for all crossings (truncated domes and ramps) EA 12 $3,500.00 SUB-TOTAL $42,000 $65,370 SF EA 480 2 $85.00 $1,200.00 $40,800 $2,400 EA SF EA LS EA 1 3000 16 1 1 EA EA EA 1 2 1 Mobilization Mobilization (includes mobilization for all work like grading, greenway, street crossings, drainage, etc.) Cost Per Unit $51,386 SUB-TOTAL Costs notes: $51,386 2% of construction cost $51,386 Grading & Greenway Construction 12' asphalt new 6' concrete expansion (10' total sidewalk) Excavation/ earthwork for sidewalk expansion Retaining Wall Stormwater BMPs/Storm drainage Street Crossings $60.00 $32.00 $7.00 $35.00 $60,000.00 SUB-TOTAL $1,770,360 $196,032 $1,582 $13,650 $334,800 includes base course & typical earthwork 1,021 LF @ 6' wide 1,021 LF @ 1' deep and 6' wide anticipated 3' avg. height $2,316,424 Costing is for high visibility crosswalks Note: Dutchtown Road already has improvements Drainage Crossings Bridge (Sinking Creek crossing) 24" Culverts (2 crossings near Sinking Creek) SUB-TOTAL 1 bridge @ 40' @ 12' clear deck $43,200 Cross Creek Trailhead Information/map kiosks Paved parking lot for six cars Bollards or stone monuments (at intersections) Landscape/Plantings Enhancements Bicycle Rack $7,500.00 $20.00 $1,250.00 $15,000.00 $800.00 SUB-TOTAL $7,500 $60,000 $20,000 $15,000 $800 $103,300 Overlooks Decking at major sinkhole Interpretive Signage Decking at pond near Dead Horse Lake Golf Course $20,000.00 $3,000.00 $15,000.00 SUB-TOTAL $20,000 $6,000 $15,000 $41,000 Planning, Design, Permitting & Engineering Permitting* LS 1 $3,000.00 Flood study / No-rise permitting Construction Documents & Engineering (includes everything but permitting and surveying) LS 1 $8,000.00 Surveying LF $8,000 $314,482 12% 29506 $0.78 SUB-TOTAL SUBTOTAL 15% Contingency Italicized cells indicate items considered as an element that will require design & engineering $3,000 TOTAL $23,015 $348,496 $2,969,176 $445,376 $3,414,553 *Anticipated permitting includes erosion control, right-of-way encroachments, regulatory environmental (buffer encroachment, stream crossing, etc), Units: EA= each LS= lump sum LF= linear foot TN= ton SY= square yard MI= Mile Notes: 1.) Cost estimate does not include: landowner outreach, traffic impact studies, land acquisition, wetland determination/delineation, potential rock and unsuitable soils excavation, permitting fees, utility coordination, attorney costs, transactional fees and taxes 2.) Trail costs are based on historic project costs with varying conditions. Costs include clearing and grubbing, paving, base, geogrid, minor storm drain pipe, erosion control features, plantings, signs, pavement markings, minor modular retaining walls. 3.) This section includes estimates for major retaining walls (taken into account under "Grading" cost per unit). 69 Section VI: Cost Estimates Knox to O a k R id ge G reen wa y M a s ter P la n (12% of Construction) Phase 2: The Central Corridor Probable Cost Estimate January 2015 Cost estimates are preliminary and subject to change Mobilization Mobilization (includes mobilization for all work like grading, greenway, street crossings, drainage, etc.) Units Quantity LS 1 LF 3616 Cost Per Unit $18,243.50 SUB-TOTAL Costs notes: $18,244 2% of construction cost $18,244 Grading & Greenway Construction 12' asphalt new 10' asphalt new Retaining Wall (total for all of phase) Fencing (total fencing for all of phase) Stormwater BMPs/Storm drainage LF SF LF MI 5707 3810 1260 1.77 Marked crossing (Dutchtown Road and Sanctuary Lane) Mid-block crossing (Sanctuary Lane) Mid-block crossing (Bob Gray Road) Marked crossing (Centervue Crossing Way) Mid-block crossing (Carmichael Road) EA EA EA EA EA 1 1 1 1 1 Intersection improvements for all crossings (truncated domes and ramps) EA 8 Street Crossings Drainage Crossings / Bridges $60.00 $45.00 $35.00 $100.00 $60,000.00 SUB-TOTAL $770.00 $770.00 $770.00 $770.00 $770.00 $3,500.00 SUB-TOTAL $216,960 $256,815 $133,350 $126,000 $106,200 From north of Bob Gray Road to existing Pellissippi Greenway. Includes base course & typical earthwork. Anticipated 3' avg. height $839,325 $770 $770 $770 $770 $770 $28,000 1 bridge @ 40' @ 12' clear deck Sanctuary Lane at Dutchtown Road already has improvements $31,850 24" Culverts EA 1 $1,200.00 $1,200 Bridge Retrofit- Bob Gray Road separated pedestrian lane and restriping LS 1 $16,500.00 $16,500 EA LS EA 1 1 1 LS 1 12% 11480 SUB-TOTAL From Dutchtown Road to Bob Gray Road. Includes base course & typical earthwork Includes jersey barrier divider, restriping and fencing. $17,700 Trailhead Near Covenant Health Information/map kiosks Landscape/Plantings Enhancements Bicycle Rack Planning, Design, Permitting & Engineering Permitting* Construction Documents & Engineering (includes everything but permitting and surveying) Surveying LF $7,500.00 $15,000.00 $800.00 SUB-TOTAL $3,000.00 $0.78 SUB-TOTAL SUBTOTAL 15% Contingency Italicized cells indicate items considered as an element that will require design & engineering TOTAL $7,500 $15,000 $800 $23,300 $3,000 $111,650.22 (12% of Construction) $8,954 $123,605 $1,054,023 $158,103 $1,212,127 *Anticipated permitting includes erosion control, right-of-way encroachments, regulatory environmental (buffer encroachment, stream crossing, etc), Units: EA= each LS= lump sum LF= linear foot TN= ton SY= square yard MI= Mile Notes: 1.) Cost estimate does not include: landowner outreach, traffic impact studies, land acquisition, wetland determination/delineation, potential rock and unsuitable soils excavation, permitting fees, utility coordination, attorney costs, transactional fees and taxes 2.) Trail costs are based on historic project costs with varying conditions. Costs include clearing and grubbing, paving, base, geogrid, minor storm drain pipe, erosion control features, plantings, signs, pavement markings, minor modular retaining walls. 3.) This section includes estimates for major retaining walls (taken into account under "Grading" cost per unit). Section VI: Cost Estimates Knox to O a k R id ge G reen wa y M a s ter P la n 70 Phase 3: The Northern Corridor Probable Cost Estimate January 2015 Cost estimates are preliminary and subject to change Units Quantity LS 1 12' asphalt new LF 19788 $60.00 $1,187,280 10' asphalt new Fencing (total fencing for all of phase) Stormwater BMPs/Storm drainage LF LF MI 7400 3985 5.16 $45.00 $100.00 $60,000.00 $333,000 $398,500 $309,600 EA EA EA EA EA EA EA 1 1 1 1 1 1 12 24" Culverts EA 2 Solway Pedestrian Bridge Cantilever- Using an FRP (fiber reinforced polymer) Decking System, including steep support structure, deck, and railing SF 8500 Solway access Ramp LF 508 EA EA EA 1 1 1 EA SF LS 1 3000 1 LS LS 1 1 12% 28440 Mobilization Mobilization (includes mobilization for all work like grading, greenway, street crossings, drainage, etc.) Cost Per Unit $62,755.24 SUB-TOTAL Grading & Greenway Construction Street Crossings Mid-block crossing (Solway Road near Greystone Apartments) Mid-block crossing (Solway Road to Soccer Fields) Marked crossing (George Light Road) Mid-block crossing with island (Solway Road near Parkway interchange) Marked crossing (Guinn Road) Mid-block crossing (Sparks Road) Intersection improvements for all crossings (truncated domes and ramps) Drainage Crossings / Bridges Pellissippi State Community College Trailhead Information/map kiosks Landscape/Plantings Enhancements Bicycle Rack Solway Trailhead Information/map kiosks Paved parking lot for six cars Landscape/Plantings Enhancements Planning, Design, Permitting & Engineering Permitting* Flood study / No-rise permitting Construction Documents & Engineering (includes everything but permitting and surveying) Surveying LF SUB-TOTAL $770.00 $770.00 $770.00 $13,520.00 $770.00 $770.00 $3,500.00 SUB-TOTAL $2,228,380 $770 $770 $770 $13,520 $770 $770 $42,000 $59,370 850' long x 10' wide. Price quoted to Equinox by manufacturer Composite Advantage in 2014 $146,812 Anticipated 8' asphalt with 4' walls and rails $7,500.00 $15,000.00 $800.00 SUB-TOTAL $7,500.00 $20.00 $15,000.00 SUB-TOTAL $3,000.00 $8,000.00 $0.78 SUB-TOTAL $744,212 $7,500 $15,000 $800 $23,300 $7,500 $60,000 $15,000 $82,500 $3,000 $8,000 $384,062.07 $22,183 $417,245 $3,617,763 $542,664 $4,160,427 *Anticipated permitting includes erosion control, right-of-way encroachments, regulatory environmental (buffer encroachment, stream crossing, etc), Units: EA= each LS= lump sum LF= linear foot TN= ton SY= square yard MI= Mile Notes: 1.) Cost estimate does not include: landowner outreach, traffic impact studies, land acquisition, wetland determination/delineation, potential rock and unsuitable soils excavation, permitting fees, utility coordination, attorney costs, transactional fees and taxes 2.) Trail costs are based on historic project costs with varying conditions. Costs include clearing and grubbing, paving, base, geogrid, minor storm drain pipe, erosion control features, plantings, signs, pavement markings, minor modular retaining walls. 3.) This section includes estimates for major retaining walls (taken into account under "Grading" cost per unit). Section VI: Cost Estimates From Solway Park to project terminus. Includes base course & typical earthwork. $595,000 $289.00 Knox to O a k R id ge G reen wa y M a s ter P la n From Pellissippi State Community College to Solway Park. Includes base course & typical earthwork $70.00 15% Contingency 71 2% of construction cost $2,400 SUB-TOTAL TOTAL $62,755 $62,755 $1,200.00 SUBTOTAL Italicized cells indicate items considered as an element that will require design & engineering Costs notes: (12% of Construction) Section VII Overall Corridor Recommendations Section VII: Overall Corridor Recommendations Knox to O a k R id ge G reen wa y M a s ter P la n 72 Section VII Overall Corridor Recommendations Partnerships Partner With Business , Religious, and School Leaders. Employment centers and churches are major stakeholders and landowners in the corridor. Both partners should be involved early in the process for support and to initiate negotiations on potential easements. Of special note are two health-related corporations, Covenant Health and Parkwest Medical Center, which may be key supporters of the greenway. An outreach action plan should identify these type of partners that can be funders, advocates, and provide easement donations. Partner With West Knox Utility District. Much of the preferred route and connectors overlap with existing sewer utilities. Joint use of sewer easements is encouraged. This typically requires agreement with both the landowner and the utility district. A master agreement with the district will be helpful in outlining guidelines to sewer easement use and can also serve as a memorandum of understanding. Partner With Non-Profits. Non-profits can have a critical role to play. Some non-profits that could play a role include the Foothills Conservancy (securing and monitoring easements), the Trust for Public Land (funding), and the Legacy Parks Foundation (funding, holding and monitoring easements), or others identified in the outreach action planning process. Planning Form a Greenway Committee That Moves This Plan Forward. This committee can use existing Technical Advisory Committee members, and can incorporate additional partners as needed, such as influential leaders in the business community, non-profits, and others. Working groups of the committee can coalesce the many individual moving parts of this plan into reality. Incorporate This Plan Into Future Planning Documents. Examples include future revisions of the Tennessee Technology Corridor Development Authority’s (TTCDA) Comprehensive Development Plan and Design Guidelines, and the Knoxville/Knox County MPC’s Northwest County Sector Plan, which is being revised in conjunction with this study. Land Acquisition Utilize and Catalogue Water Quality Buffers/Required Easements. Knox County requires development to maintain buffers along water bodies. These required buffers may be good places for negotiated/donated easements. Documentation of easements between Knox County and the City of Knoxville are not centrally located, so in the future a combined effort to record any easements that may benefit the greenway should be documented in one place for use in greenway planning. Negotiate Right-of-Way for the Greenway in Future Developments. A donated easement should be encouraged and incentivized for any future development. Office parks, schools, apartments and planned unit developments (PUDs) are perfect candidates for this. Study Greenway Alignment Needed in the TDOT Right-of-Way (ROW) Early On. Initiating a detailed design greenway study for the Pellissippi Parkway ROW sooner will accommodate what may be a lengthy negotiation process with TDOT. Once detailed design is completed, agreements with TDOT should be secured. This will also identify if there will be any need to utilize private lands in steeper areas. 73 Section VII: Overall Corridor Recommendations Knox to O a k R id ge G reen wa y M a s ter P la n Acquire Bigger Swaths of Greenway Corridor Along Environmentally Sensitive Land. These lands have a wider array of funding sources available for environmental protection. Landowner incentives could also allow flexibility in development if larger swaths of unusable lands were donated (i.e. the floodplain). Preserving larger swaths where sinkhole and floodplains are problematic could be a cost savings to the County by preventing future flooding. Create a Landowner Outreach Program. There are limited areas within the corridor that may require negotiated easements with individual residential and commercial land owners. Working with multiple smaller landowners can be challenging and a strategy around this should be developed. Strategy, process, protocol, and outreach goals should be identified immediately. Getting ahead of hearsay and misconceptions is a valuable time investment with a potential bigger payoff of getting landowners who are willing to negotiate. “Big Ideas” Redevelop Solway Into a Thriving Waterfront Commercial District, Showcasing the Greenway. The redevelopment would promote small-scale commercial development that capitalizes on the asset of its Melton Hill Lake waterfront, using the greenway as a lakefront promenade. Examples could include waterfront restaurants, offices, and retail. Develop Sponsors for Greenway Sections. Find businesses, non-profits, and churches that will sponsor sections of the greenway. Sponsorship could include funding greenway construction and/or maintenance of the greenway. Identify “Pocket Parks” Along The Greenway. These parks could be the trailheads identified in this study or small parks built as part of future developments or through donated lands. These are small parks with opportunity for benches, public art, small playgrounds or other basic features. Locating pocket parks should occur in future planning/ design phases. Design Connectors Can Be As Vital As the Greenway Itself. Connectors enable the greenway to be used as a transportation route. Connectors in this study were identified to ensure connections to schools, future greenways, and existing bicycle and pedestrian facilities. Design Matters. Creating a sense of place and identity of the greenway through hardscape, landscape, built structures, and signage can make this greenway a regional icon. Gateway treatments near trailheads, adjacent to commercial development, and near major road intersections can be a great way to do this. Work With TTCDA to Develop Greenway Design Guidelines. This can be included in a revision of TTCDA’s Design Guidelines. Additionally, requirements for inclusion of dedicated greenway easements should be considered in those Guidelines. Section VII: Overall Corridor Recommendations Knox to O a k R id ge G reen wa y M a s ter P la n 74