GENERAL EXECUTION PLAN
Name of Bidder
:
PT. BRANTAS ABIPRAYA (Persero)
Bidder will submit a General Execution Plan describing how the Bidder intends to execute and
complete the Works.
The General Execution Plan will be prepared in the form of a written method statement together with
sketch layout drawings, covering, but not limited to, all pertinent aspect as listed below:
General
Overall Management and administration, such as;
(1) Material Procurement
(2) Quality Control and testing and monitoring of works
(3) Progress Control
(4) Safety control and accident prevention
(5) Environmental and Social considerations (including mitigation measures)
Construction Works
Describe the sequence of working, Dredging, loading and transportation including embankment methods,
the type and capacity of equipment to be deployed, staff and labor resources, temporary works, material
to be used and the construction duration for the following::
1) Mobilization and Preparatory Works
(i) Transportation of Contractor's Equipment
(ii) Contractor's Temporary Facilities
(iii) Maintenance of temporary access roads.
2)
Dredging Works
(i) Dredging method
(ii) Dredging under the Bridges
(iii) Construction Plan for daily storage of solid waste bigger than 30 x 30 cm
(iv) Construction plan for final disposal
(v) Hauling of Dredger sediment to CDF,
(vi) Garbage separation/removal/disposal
3)
Embankment Works
(i) Repair
(ii) Improvement.
Dredging and Embankment of River
MATERIAL PROCUREMENT
I.
PURCHASING PROCESS
The Person in charge of purchasing shall practice, based on the “purchasing procedures”, as
follow to ensure that the products to be purchased conform to the requirements and
specifications :
a. The suppliers/contractors, description and specifications of the materials and/or equipments
to be purchased shall be determined according to the effect to the design and the need for
the construction works.
b. The suppliers/contractors shall be evaluated and selected based on their competency to
manufacture and/or supply of the materials and/or equipment according to the requirements.
c. The procedures of selection, evaluation and re-evaluation shall be provided in the
“purchasing procedures”. Re-evaluation shall be made regularly to review the list of the
suppliers/contractors, etc.
The records of the evaluation results and necessary measures to be taken from the evaluation if
any shall be maintained.
II.
PURCHASING INFORMATION
The Person in charge of purchasing shall make clear and prescribe the information of the
products to be purchased in the purchase document. When necessary the following matters shall
be included :
a. Requirements on the products, procedures, processes and approval of the facilities.
b. Requirements on the eligibility including the qualifications of the members.
c. Requirements on the quality management system.
The Person in charge of purchasing shall confirm, before informing the suppliers/contractors,
that the purchasing requirements prescribed are appropriate.
III.
VERIFICATION OF PURCHASED PRODUCTS
The Person in charge of purchasing of the purchased products shall perform, based on the incompany inspection procedures, necessary inspection or other activities to verify the purchased
products to ensure that the purchased product satisfy the purchasing requirements.
IV.
LIST OF MATERIALS
The list of materials as follow:
No.
Material
Supplier
Location
1
Sheet Pile
Supplier Local
Local area (Jakarta)
2
Spun Pile
Supplier Local
Local area (Jakarta)
3
Concrete Ready Mix
Supplier Local
Local area (Jakarta)
Distance
to
the Site
Procurement On
Site
Procurement On
Site
Procurement On
Site
Table only for Sample
V.
TRANSPORTATION OF THE MATERIALS/EQUIPMENTS
The construction equipment/materials will be mobilized to the site by either trailer or Dump
Truck. The tired wheel equipment, such as Dump Trucks, Truck Mixers, etc. will be driven by
their own power. While some other small equipment like concrete vibrators, water pumps,
concrete mixers, generator sets, etc. will be mobilized by Trucks and heavy equipment by Trailler
via existing Public Road (Like Excavator, Pontoon, etc).
The equipments, plants and materials will be mostly supplied and mobilized from the origin place
through the national highway, province roads and regency roads until the stock yard material
area in the project location.
Dredging and Embankment of River
VI.
FLOW CHART OF PROCEDURE OF MATERIAL PROCUREMENT
Flow chart of Procedure of Material Procurement is as follows :
Start
Project
Planning/
Equipment/Metal
Works/General Cost of Head
Office, Region & Equipment
Division
- Goods Need Plan (RKB)
- RKB Recapitulation
Delayed
RKB is agreed by
Principals of Goods
Manager
No
Yes
Quotation
-
Vendor List
Supplier/Subcont Offering/
BA Bidding Evaluation
List of Price Comparison
Offering Negotiation
Agree
No
Yes
- Supplier Appointment
- Stipulating Order Transaction Agreement
Good Process of
Supplier/Subcontractor
Corection the Process
No
Inspection
Process OK?
Yes
Yes
Good Acceptance
Conformed to Spec
(Not Defect)
No
Yes
Warning
<3x
No
Data
BAST
Warehousing Procedures
No. 2-000-53-01
Procedures of Payment
Implementation No. 2-000-52-02
Finished
Dredging and Embankment of River
Terminate
Contract
QUALITY CONTROL, TESTING AND MONITORING OF WORKS
I.
GENERAL
The quality control activities shall be performed by means of checks, test and/or inspection in
accordance with project specification and drawings. This plan is established to secure the
requested quality, and to manage the quality of the Project.
II.
QUALITY CONTROL ORGANIZATION
QA and QC Department will be established in the Project Office and have two (2) duties. One is
the testing and another one is the inspection. QA/QC Department becomes the high independent
department from other construction departments, to secure the requested quality and to keep
fairness of the test and inspection results.
III.
TESTING
QA/QC Department shall carry out various tests, with regards to the quality of the material for
this construction project and the field condition before next construction process.
The Laboratory Team shall carry out tests in accordance with the project specification.
The guarantee that our product fulfill the quality standard according to the specification we will
assign a capable quality control staff in the engineering department, sufficient laboratory
equipment and tools, qualified material supplier, qualified materials, and also an exact working
method to result the quality product. Before the execution of the project we will order the
materials, in accordance with the requirement as designated in the technical specification. We
will also submit the brochures and certificate of testing of materials from the manufacturer to the
Engineer for approval. Generally, we will follow and fulfill the legal requirements, especially the
ASTM standard.
Each time of the materials arrival on site, we will do some related test to them. The test will refer
to the standards designated in the technical specification. In addition, the quality of the product
during the execution will be tested as well. The quality control staff will do those above tests,
and then the result will be reported to Engineer.
In the event that test could not be carried out by that equipment in our laboratory, the test will
be undertaken to a testing agency in accordance with the Engineer’s approval.
Dredging and Embankment of River
Standards testing will be used in this project as follows :
No.
Description
1
2
Embankment (Density Test of the Soil)
Portland Cement
3
4
5
Gradation of Fine/Coarse Aggregate
Admixture
Reinforcement Steel Bars (round deform
bars or plain round bars)
Concrete Works
6
7
8
9
10
Gabion :
- Wire
- Galvanizing
Asphalt Pavement
Gate and Accessories :
1. Casting :
- Iron Casting
- Steel Casting
- Bronze Casting
- Phosphor Bronze Casting
2. Forging
3. Mild Steel Plate, Steel Shapes and Bar
- Steel Plate/Shapes for Gate
- Steel Plate/Shapes for general structure
- Steel bolt, nut and washer
- Corrosion-resisting steel plate and bar
4. Protection, Cleaning and Painting
- Surface Preparation
5. Design Load and Stress
- Steel Member
Miscellaneous Works
- Welding
- Welding Electrodes
- PVC Weephole, PVC Pipe
- Timberworks and stoplog
- Elastic Sealant for Canal Lining
- Bituminous Binder
IV.
Standard Test to be Used
ASTM-D698
Indonesia Standard NI8, ASTM-C150 or British
Standard BS 12, or JIS R 5210
AASHTO T27
ASTM-C260 or JIS A6204
JIS G 3112 or SNI 07-2052-1990
AASHTO T22 & T23 or Peraturan Beton Bertulang
Indonesia (P.B.I.), 1971 N.I-2
AASHTO T65 or JIS G 3532, SWM-G3
AASHTO T65 or JIS GA5513
Article 7.03(b).6 of the Standard Specification of
Bina Marga
Standard Industry Indonesia (SII)
JIS G 5501, FC 250
JIS G 5101, SC 450
JIS H 5111, BC 6
JIS H 5113, PBC 2
JIS G 3201, SF 440 A
JIS
JIS
JIS
JIS
G 3101, SS 400 and JIS G 3106, SM 400
G 3101, SS 400
B 1180, B 1181 AND B 1256
G 4303, G 4304, G 4305, G 4306, G 4307
Svensk Standard SIS 055900 or “SSPC-SPIO”
JIS G 3101, SS 400 and JIS G 3106, SM 400
AWS “Code for Arc and Gas welding in Building
Construction” or JIS Z 3801 and/or AZ 3841
JIS Z 3211 or Z 3212
JIS K 6741 – 1975
PKKTs Standard (Peraturan Konstruksi Kayu
Indonesia, NI-5, 1961)
JIS A 5774
ASTM D 994 or ASTM D 1751 Standard
INSPECTION
QA/QC Department shall carry out various inspections, for material carried in, the result of
material test and field inspection during the execution of this project. The inspection team shall
carry out inspections in accordance with the project specification.
If the QA/QC Department detects non-conformance material or procedure, the QA/QC
Department can stop the work that corresponds. That non-conformance work shall be correct
immediately and can not be restarted without confirmation of the QA/QC Department.
Dredging and Embankment of River
V.
PROCEDURE OF INSPECTION AND TEST
Flow chart of Procedure of Inspection and Testing is as follows :
Start
Product/Goods Acceptance
Yes
Urgent
Positive Recall
No
Inspection and Test
Project Quality Plan
Providing Status Mark
of Inspection and Test
No
Ok ?
Yes
Providing Status Mark
of Inspection and Test
Applied Procedures
No. 2-000-60-03
Process “1”
No
Hold Point
Yes
Inspection and Test
Positive Recall
Project Quality Plan
No
Ok ?
Providing Status Mark of
Inspection and Test
Yes
Process “2”
Final Product
Project Quality
Plan
Inspection and Test
Ok ?
Applied Procedures
No. 2-000-60-03
Finished
In brief explanation of Inspection and Testing is as follows :
Inspection and test do for all materials/goods delivery by suppliers/ subcontractors refer to
technical specification as written in acceptance material of Project Quality Plan. The process of
product also checked sources preparation, sequence of process, and final product that written on
working process of Project Quality Plan
Dredging and Embankment of River
PROGRESS CONTROL
Firstly, the Contractor prepares the original construction program within several time (day) after
receiving the Letter of Acceptance. The program shall follow the requirements in the Specification and
Contract. Once the project schedule has been determined and construction is started, the CPM Plan must
be monitored and updated accordingly.
Weekly and monthly schedule with schedule meetings shall be utilized to maintain the original
construction schedule prepared by the CPM. The Contractor’s engineering and construction staffs shall
periodically monitor and check construction progress under the following monitoring procedure.
The effort to achieve the project goal will be strictly controlled with the above procedure. In case any
delay causes by our fault which threat to extension of overall time schedule, we will immediately take
action by supporting additional source required such as equipment and man power. So that the works
still remain could be completed the time proposed.
WEEKLY / MONTHLY PROGRESS
Milestones
Schedule
On Sch &
Complete?
N
o
Weekly/Monthly
Meeting
Caused
Yes
Ahead Sch
?
Countermeasure
N
o
Yes
Improvement
Progress
Next Activity
The above stage is similar to the PDCA method:
PLAN
DO
CHECK
ACTION
The effort to achieve the project goal will be strictly controlled with the above procedure. In case any
delay causes by our fault which threat to extension of overall time schedule, we will immediately take
action by supporting additional source required such as equipment and man power. So that the works
still remain could be completed within the time proposed.
Dredging and Embankment of River
Procedure of Progress Control to establish the schedule, there will be 4 (four) stage :
1. PLAN STAGE
2. CONSTRUCTION STAGE
3. EVALUATION STAGE
4. FOLLOW UP
-
Planning a method will be applied
Prepare of Construction Time Schedule
Estimate resource of material, man power & equipment
Control of Construction Schedule
Arrangement of material, labor, equipment & plant
Check progress and execute
Report to management, daily, weekly and monthly
Improve existing condition to precede the progress
Review the construction plant and refine the plant
In brief explanation of Weekly/Monthly Progress as follows:
Schedule or milestones of every activities always control day to day in order not behind schedule, if can
not be reached should be identified root cause and meet corrective/preventive action (could be discussed
in weekly/monthly meeting). The completed progress record on weekly/monthly report. If the schedule
on or ahead determined improvement be better then before
Dredging and Embankment of River
SAFETY CONTROL AND ACCIDENT PREVENTION
Safety Management Plan Program is established to complete the Project safely. The accident prevention
rules, safety programs Program shall be observed by all personnel engaged in construction work. The
primary purpose of this plan is to ensure that the safety rules and regulations are efficiently implemented
protecting all workers, staff and the public affected by this project against danger or possible injury both
minor and fatal.
Flow chart of Procedure of Health, Safety and Environment (HSE) Program is as follows :
Start
Establishing HSE
Program Unit
HSE Program Unit studies :
1. Regulations/ Legislation on HSE
Program
2. Contract Requirement
HSE Plan Program
Environment Aspect
Identification
HS Aspect
Identification
Inspection
Evaluation in
accordance with
the Plan
No
Review Prevention/
corrective Action and
Control
Yes
Report
Finished
In brief explanation of Safety Control Program is as follows :
Every projects have HSE Program Unit who responsible to identify hazard, determined prevention and
response of accident including reporting. Periodically HSE Program Unit review safety/HSE plan Program
it’s still relevant by site condition and changing construction method.
Detail safety control and accident prevention refers to “Working Safety Plan”.
Dredging and Embankment of River
HIV/AIDS PREVENTION PROGRAM
(a) Any workers who are under the Contractor's control and on the Site in connection with the Contract,
including any workers who are under the control of any person or entity to whom the Contractor has
sub-contracted any obligations under the Contract other than those responsibilities set out in this
Sub-Clause.
(b) The
1)
2)
3)
4)
HIV Prevention Program means an HIV prevention program such as :
Promotion of condom use
Test and treatment of Sexual Transmitted Infection (STI)
HIV/AIDS education through peer education
Volunteer Counselling and Testing.
(c) The Contractor is responsible for implementing an HIV Prevention Program among the Contractor's
Employees (and the local community) for the duration of the Contractor's contract and commencing
as soon as practicable after the Contractor's Employees arrive at the Site/s in conjunction with
occupational health staff of the Contractor and the local health authorities involved in HIV / AIDS
prevention.
(d) The Contractor may sub-contract with a Service Provider in the case that he/she will riot be able to
implement the Program; when sub-contracting with the Service Provider; the Contractor gives any
representative of the Service Provider and the Employer all reasonable access to the Site in
connection with the HIV Prevention Program.
(e) The Contractor instructs the Contractor's Employees to participate in the HIV Prevention Program in
the course of their employment and during their normal working hours or any period of overtime
provided for in the relevant employment contracts.
(f)
The Contractor does nothing to dissuade the Contractor's Employees from participating in the HIV
Prevention Program.
Reporting of Accidents
The Contractor shall report to the Engineer details of any accident within one day after its occurrence. In
the case of any fatality or serious accident, the Contractor shall notify the Engineer immediately by the
quickest available means.
Dredging and Embankment of River
ENVIRONMENTAL CONSIDERATIONS
I.
GENERAL
Environmental protection is one of our major concerns during any construction activity, and it is
PT. Brantas Abipraya (Persero)’s primary consideration in the Project, with the ultimate goal of
causing no harm to the environment.
PT. Brantas Abipraya (Persero) shall take all necessary measure to protect environment from the
incidents caused by construction activities.
PT. Brantas Abipraya (Persero) shall observe and comply with all Environmental Regulations
imposed by the Government of the Republic of Indonesia, or by those having jurisdiction over
the Site.
II.
TYPE OF IMPORTANT IMPACT TO BE MANAGED
Based on the result of environmental impact assessment as describe in its document, types of
important impact should be mitigated during each project stages, area is follow:
Important impact during Construction Stage
a. Social anxiety due to land acquisition
b. Air pollution (dust) caused by construction material transportation
c. Road damage caused by construction material transportation
d. Disturbance on traffic due to material transportation
e. Disturbance on terrestrial flora cause by land clearing and make access road to project
location
f. Environmental damage due to soil excavation in borrow areas
g. Service-water pollution cause by operating of base camp
III.
ENVIRONMENTAL MANAGEMENT DURING CONSTRUCTION STAGE
Important negative impact of laborers mobilization is social anxiety.
a. Social Anxiety
1. Source of Impact
The source of impact is laborers mobilization and Dump Truck transportation from out
site area.
2. Impact Indicator
The impact indicator is social complaint and conflict in community cause by not excellent
with project activity.
3. Objective of Environmental Management
To prevent social anxiety this can stimulate social conflict between local laborers and
immigrated laborers.
4. Environment Management Effort
4.1. First priority of job opportunity should be given to the local laborers. This can be
done by giving clear information to local people concerning laborers needed by the
project.
4.2. To give information and guidance to immigrated laborers, concerning culture and
tradition of local people, in such away they can adapt with local social condition.
5. Location and Period of Environmental Management
Location : At project surrounding
Period
: Before and implementation of construction work
b. Road Damage
1. Source of Impact
The source of impact is increase of road usage due to material transportation.
2. Impact Indicator
The impact indicator is social complain community cause by damage road.
3. Objective of Environmental Management
Dredging and Embankment of River
The objective of Environmental Management is to prevent road damage.
4. Environment Management Effort
4.1. Dump Truck payload should be limited in accordance with road capacity.
4.2. Periodic road maintenance.
5. Location and Period of Environmental Management
Location : Along material transportation routes
Period
: During transportation work
c. Disturbance on Traffic
1. Source of Impact
The source of impact is increase of the traffic volume due to Dump Truck operation for
construction material transportation.
2. Impact Indicator
The impact indicator is traffic jam.
3. Objective of Environmental Management
The Objective of Environmental Management is to prevent traffic jam and accident.
4. Environment Management Effort
The Environment Management Effort is traffic control at certain place..
5. Location and Period of Environmental Management
Location : Along material transportation routes
Period
: During transportation work every day
d. Impact of Land Clearing
1. Source of Impact
The source of impact is land clearing for construction of Wharf and construction of
access road.
2. Impact Indicator
The impact indicator is lost of vegetation coverage.
3. Objective of Environmental Management
The Objective of Environmental Management is to rehabilitate vegetation coverage and
maintain local micro climate condition.
4. Environment Management Effort
The Environment Management Effort is :
4.1. To maintain the remaining tree crops and bush.
4.2. To plant tree crops in bare dray land.
5. Location and Period of Environmental Management
Location : Along material transportation routes
Period
: During transportation work every day
e. Impact of Soil Excavation at Borrow Area
1. Source of Impact
The source of impact is ground treatment at borrow area location.
2. Impact Indicator
The impact indicator is environmental damage allows :
Kep-Men LH No. Kep-43/MENLH/10/1996
3. Objective of Environmental Management
The Objective of Environmental Management is to minimize environmental damage.
Dredging and Embankment of River
4. Environment Management Effort
The Environment Management Effort is :
4.1. Grouted soil as specifications.
4.2. Grouted material as specification (approved material).
5. Location and Period of Environmental Management
Location : Canals
Period
: During construction stage
f.
Impact of Base Camp Operation
The important impact probably occurs is only charge of landscape which maybe results in
environmental damage.
a. Surface Water Pollution
1.
Source of Impact
The source of impact is liquid waste effluent from base camp.
2.
Impact Indicator
The impact indicator is oil and detergent content.
3.
Objective of Environmental Management
The Objective of Environmental Management is to prevent water pollution
especially oil and detergent content.
4.
Environment Management Effort
The Environment Management Effort is :
4.1. To minimize using soap detergent for clear and change with soap softness.
4.2. Prevent oil spill by storing oil in a special place.
4.3. Unused oil should be stored in a special container for recycle process further.
5.
Location and Period of Environmental Management
Location : At Base Camp
Period : During construction stage
b. Disturbance on Aquatic Biota
1.
Source of Impact
The source of impact is water pollution due to base camp operation (effluent of
liquid waste containing oil and detergent).
2.
Impact Indicator
The impact indicator is density and diversity of plankton and benthos and deviation
of fish population in the river.
3.
Objective of Environmental Management
The Objective of Environmental Management is to prevent disturbance on aquatic
biota at Wharf and surrounding.
4.
Environment Management Effort
The Environment Management Effort is prevent water pollution as mentioned in
point a above.
5.
Location and Period of Environmental Management
Location : At Base Camp
Period : During construction stage
Dredging and Embankment of River
PUBLIC CONSULTATION AND SOCIALIZATION (SOCIAL CONSIDERATIONS)
I.
GENERAL
The Contractor shall carry out Public Consultation and Socialization meeting with the farmers and
persons who will be influenced by the Works at each village prior to the commencement of the
tertiary and land development works in order to avoid conflict with farmers and persons
concerned and to get their understanding for the Works. The Contractor shall also invite their
participation into the tertiary and land development activities.
II.
MEETING
The meeting shall, at least, consist of two (2) stages namely stage I Meeting and Stage II
Meeting. The minimum requirement at respective meeting shall be as follows :
1.
Stage I Meeting
The target group shall be at village level at least one (1) month before the commencement
of the Works. The Contractor shall present and explain about the overall work schedule
and work method at the village level as follows :
a. Survey Works :
(i) staking out survey,
(ii) topographic survey for land development, and
(iii) route survey for Project location, and existing Road.
2.
b.
Work Method and Work Schedule :
(i) survey works,
(ii) construction of Dredged and Sheet Pile,
(iii) construction of related structures, and
(iv) land development works.
c.
Environment protection and safety program during the construction works.
d.
Participation of village people for the construction works.
Stage II Meeting
The target group shall be at tertiary canal or tertiary block level consequent to the Stage I
Meeting. The meeting shall be carried out at least one (1) week before the commencement
of the Works. The contents of meeting are same as that of Stage I Meeting and further
details of works and schedule shall be presented and explained to the persons concerned.
The overall schedule of the Public Consultation and Socialization meeting at respective
village shall separately be prepared and submitted to the Engineer for approval
synchronizing the Programmers prescribed in Clause 18 of the General Specifications
herein together with the Program.
The schedule and contents of Stage I Meeting and Stage II Meeting, including material for
the meeting, shall be submitted to the Engineer for approval (or concurrence) at least two
(2) weeks before the meetings unless otherwise directed by the Engineer. The results of
Public Consultations and Socialization shall be reported to the Engineer within two (2)
weeks after the meeting.
For this Socialization, Contractor also joint with local resident as Participation for this
Socialization
Dredging and Embankment of River
METHOD STATEMENT
Project Name
:
Province
Bidder Name
:
:
Dredging and Embankment of Ciliwung-Gunung Sahari Drain & Waduk Melati
Sub-Project
DKI Jakarta
PT. BRANTAS ABIPRAYA (Persero)
GENERAL
Generally, all construction of Dredging and Embankment of Ciliwung-Gunung Sahari Drain & Waduk
Melati Sub-Project, DKI Jakarta at construction begin, during construction and finish, contractor will
follow procedure / protocol which apply and have been specified in Project’s environment, ICB’s
procedures and Republic of Indonesia’s rules as specially.
1. IDENTIFICATION
1.1. Location & Access Road
The site is located in DKI Jakarta, Indonesia.
Project Location
Dredging and Embankment of River
ZOOM
Lokasi Pekerjaan
Gunung Sahari
Lokasi Pekerjaan
Waduk Melati
Dredging and Embankment of River
PLAN BY SATELITE
Notes;
- Image on below isn’t as real condition of Project location in this time
(condition at Tender time)
- Image on below only as mark of project location will be constructed
Indonesia
PROVICE OF DKI JAKARTA
PROJECT
LOCATION
Dredging and Embankment of River
ZOOM WADUK MELATI
Waduk Melati
Saluran Cideng (Length of
Dredging 1.260 m)
Dredging and Embankment of River
Saluran Gresik (Length of
Dredging 2.004 m)
ZOOM CILIWUNG GUNUNG SAHARI
Sheet Pile 4.832 m
Project Start
Dredging 5.100m
End Project
1.1.1. Existing Roads and Transportation Facilities
Access to the Site can generally be achieved via the network of public roads and streets
in the vicinity of Site.
The Contractor will use the existing road for the works.
The Contractor shall fully inform himself of the conditions of roads, traffic conditions and
traffic regulations with respect to gaining access to the Site for the purposes of
performing the Works and shall take all necessary actions to ensure availability of access
to the Site as required.
Dredging and Embankment of River
1.2. Planning of Construction / Work Plan
1. With Location Site are spread, Construction will be constructed as Frontal, mean that
construction at 1 location does not connections with others, only Equipment that connections.
Each Location site will use Equipment.
Flow Chart
START
Waduk
Melati
Dredging Work
Cideng and
Gresik Drain
Sahari Drain
Dredging Work (By
Man Power & Tools)
End Project (at Up
Stream)
At Sheet Pile Location
Earth Work
Embankment Work
(CCSP)
Embankment Work
(CCSP)
Dredging Work Up
Stream up to Down
stream
Hydro mechanical
Work
Other work as
according to the
Tender Document
Other work as
according to the
Tender Document
FINISH
WORK DIRECTION
Usually, Construction in the River Will Be Construction From Upstream River up to
Downstream River
Dredging and Embankment of River
Illustration for frontal construction in Gunung Sahari Drain
- All construction will be start from Up stream (Hulu) up to down stream (Hilir)
- Construction for Dredging Will be constructed Form End Project (STA. 5+100)
- Construction for Sheet Pile Will be constructed Form Jl. Mangga Besar (STA. 2+450) up to STA.
0+000)
- Construction Will be Fontal (at same time)
Dredging
1. Excavation
- Work for 24 hour
2. Hauling and Handling
- Work at 22.00 – 05.00 wib
Embankment Work (CCSP)
1. Hauling and Handling
- Work at 22.00 – 05.00 wib
Dredging and Embankment of River
2. Hauling and Handling
- Work at 22.00 – 05.00 wib
2.
Scope Of Works
2.1. Project Description:
Dredging and Embankment of Ciliwung-Gunung Sahari Drain & Waduk Melati Sub-Project, DKI
Jakarta.
Time for Completion is 730 days and Defects Notification Period is 180 days
The main elements of the Works to be completed under this package shall consist of, but not
be limited to, the following:
2.1.1. Dredging Works
(i) Dredging method
(ii) Dredging under the Bridges
(iii) Construction Plan for daily storage of solid waste bigger than 30 x 30 cm
(iv) Construction plan for final disposal
(v) Hauling of Dredger sediment to CDF,
(vi) Garbage separation/removal/disposal
2.1.2. Embankment Works
(i) Repair
(ii) Improvement.
CCSP
2.1.3. Other Works:
- Works Item as according to BQ and To the Drawing
3. Equipments
List of Minimum Equipments required for Construction (upon request tender documents)
Equipment
Floating Hydraulic excavator with spuds or equivalent ³
Mobile hydraulic excavator
Floating barges minimum 20 m³
Tug and Push boats
Dump Truck – Cap. 11 ton
Bulldozer with capacity 0.75 m³
Minimum Number of Units
3 ( Three )
3 ( Three )
9 ( Nine )
3 ( Three )
As Needed
2 ( Two )
Work equipment used (type, number and capacity) is actually in accordance with Attachment of "List
Of Construction Plant " which is an integral part of the Bid Documents
Dredging and Embankment of River
4. TECHNICAL CONCTROL / SITE MANAGEMENT and TRAFFIC MANAGEMENT
TECHNICAL CONCTROL
Technical Control is a process of activities performed to ensure the results of work in accordance in
the contract documents. Result and Quality will be realized in the form of Premary hand Over
Certificate (PHO) Final Hand Over (FHO).
In Technical Control, Before – During – After (Begining – Process construction – Finish), as according
to;
4.1. Work Contract
Work Contract, Bill of Quantity, Tender Drawing, Technical Specifications, payment procedures
and measurements, Addendum Contract (if any). And reference the Technical Regulations
Construction and procurement of construction,
4.2. Engineering
Activities include and are not limited to the measurement / calculation, checking of Work Site,
Approved of Shop Drawing and As built Drawing and approval of construction materials,
documentation, Quality Control Plan (QCP), test, inspection and checks for Construction.
Process of approval and the procurement of materials, regulations and Determined Permit as
requirements.
4.3. Construction Management
This Construcstion Management is Managed by Project manajement that consist of main
Personal. Team of Project management will draft of Construction Stage refers to Stage
Construction in the Contractr document. Next, based of Stage / Sequence Construction will be
made Construction Method as Payment Item as Bill of Quantity. It was to get how to effective
and effcient based on Existing site and Controlling risk during contruction until Finish
4.4. Site Management
This activity is an arrangement of placement of equipment, materials and labor of accordance
with the sequence of work and working methods to be applied.
4.5. Construction Stage / Sequence of Construction
Sequence of Construction is a sequence of physical Construction and it’s very important and as
a basis for mobilization / demobilization of personnel, equipments, materials, as according to
kind, capacity and schedule when needed
4.6. Construction Method
Based on the Sequence of Construction then made construction methods in detail in
accordance with technical of construction and other determined specified in the contract
documents. Mean of Construction Method to determine of Equipments, materials, and labor to
goal of plan of target productivity and also function for quality control and control of
construction schedule to get the target of commitment contracts.
Construction Method each Works Item are test & Commisioning (Ok & No) and continue, that
became Construction as according to the tender document (BQ, Shop Drawing & technical
specification) and on time / as time schedule
4.7. Quality Control Plan
Quality Control Plan is activity of making shop drawings, procurement and mobilization of
materials, equipment and skilled personnel selection process.
4.8. Safety and Health of Work (K-3)
Safety and Health for Labor or other wise determined should be ensured with Made of Team
K3 Project
4.9. Others Determined Standard (Like; socialization, etc)
Dredging and Embankment of River
Flow Chart of Technical Control / Site Management
START
Work Contract
Permit
Learn of Contract
Coordination with Owner &
Consultant Supervision
Survey & Measurement
Notes :
Construction of next work item
Engineer & MC0
CONSTRUCTION
No
Ok
Request
No
Ok
Construction of next work item,
etc
No
Ok
FINISH
Request of next work Item
No
Ok
Dredging and Embankment of River
No
Ok
Request of next work Item , etc
Construction of work item
Construction of
work item
= Cek :
- Shop Drawing &
BQ
- Technical
Specification
(include Inspection
& Test  Quality
Control
- Approved
Consultan
Supervision &
Owner
FLOW CHART OF CONTRUCTION
START
Coordination with Owner
& consultant supervision
(Koordinasi dg Pihak
Owner & Konsultan
Penawas)
Understanding of contrac
rules
No
Understanding of contrac
rules (Pemahaman Syarat
Kontrak)
Permit with 3d party
(Perijinan dg Pihak
Terkait)
Check
Yes
Scope of Works (Scope
Pekerjaan)
Input from Owner &
consultant supervision
(Masukan dari Pihak
Owner & Konsultan
Penawar)
Socialization Pra
Construction
No
Check
Yes
Check with owner of Scope
of contract
Primary Hand Over (Serah
terima Pekerjaan)
(PHO)
Maintenance
(Pemeliharaan)
No
Check
Yes
Yes
Construction of scope of
contrac (as conctruction
flow chart & BQ)
Field Engineering
(Pembuatan Gambar
Pelaksanaan)
Check
Yes
Shop Drawing (Gambar
Pelaksanaan)
Construction (Pelaksanaan
Pekerjaan)
No
As Build Drawing
Check
Yes
Check
Yes
Dredging and Embankment of River
FINISH
Final hand Over (Serah
Terima Akhir) /
(FHO)
FINISH
No
No
No
Prepair
TRAFFIC MANAGEMENT
With Work site without disturb of Traffic Existing, the Traffic Management and Construction can be
execute at same time
Traffic using Rubber Cone as border between work site and traffic existing.
Traffic Sign
 Rubber cone
Fabrication of Rubber cone. Form as according to technical specification, continued placing on
determined location as signs / bottle neck of the traffic.
 Flagman
Flagman is placed on all construction that disturbing of traffic flow.
The flag man instructing and manage of traffic flow that passing and around the construction.
rambu-rambu lalu lintas lainnya
Access Road
Existing Road
Others Equipments Will be Mobilized via Existing Road (Dump truck, Excavator, etc)
Dredging and Embankment of River
Hauling and Handling
Dredging and Embankment of River
5. DETAIL CONSTRUCTION METHOD
5.1. General
1. Mobilization / Preliminary Works
Description
Upon the signing of the contract, the contractor for with initiate site activities by first
mobilizing and demobilizing (preliminary works) of works including :
1.1. Mobilization of the contractor’s personal who are competent and experienced,
consisting of office staff site personal as according to the key personnel list proposed
within the bid offer documents.
Dredging and Embankment of River
1.2. Procurement of site facilities / Contractor’s Temporary Facilities according to the
specifications in the tender documents such as : Board of directors with dimension as
according in BQ, the contractor’s office, the material warehouse, material storage, site
water supply, communication apparels , the project’s name board, and other facilities
required.
Measure just for sample ( no reference), Real measure as determined or as field condition.
Base Camp
6
7
5
8
KETERANGAN :
9
Jalan
Kerja
1
8
4
3
2
1. Kantor Kontraktor
2. Mess Pekerja
3. Laborat
4. Gudang
5. Musholla
6. Kantin
7. Klinik
8. Motor pool
9. Pos Jaga
10. Tandon Air
10
Image above only lustration of ” Construction of Base Camp” in the Project. Measure and real form as Field condition and needed
CONTRACTOR FACILITIES / KEET DIRECTION
DIREKSI KEET
Image above only lustration of ” Construction of Direction keet” in the Project. Measure and real form as Field condition and needed
Dredging and Embankment of River
BENGKEL KERJA/WORK SHOP
GUDANG/STORAGE
> Worshop and office Fabrication
Gudang/Storage
Image above only lustration of ” Construction of Storage and work shop” in the Project. Measure and real form as Field condition and
needed
BARAK PEKERJA/BASE CAMP
Image above only lustration of ” Construction of Labor Living” in the Project. Measure and real form as Field condition and needed
Dredging and Embankment of River
This project, Base on location Project ( Waduk melati and Gunung Sahari Drain), contractor
will build on 2 location
ILUSTRASI;
Main Contrator keet /
Main base camp
Field Contractor Keet
/ Sub Base camp
Main Base camp  on west sahari drain
- Argument : Free way location (there is Existing Road flexible
pavement)
- Contractor keet can be rent for any building on there.
Base Camp / Site Installation
1. Problem
- Plan of Base Camp in Empty Space that already
Owner is Left side / Left of existing road.
2. Solution
- Contractor will rent from the owner while in the process of rent will
be assistant by Owner and other determined.
- If Possible, Contractor keet can be rent for any building on there.
Base
river)
Camp
Dredging and Embankment of River
(west
Notes;
- Main Base Camp = 1Unit
- Sub Base camp = 1 Unit
Sub Base Camp
Base Camp / Site Installation
1. Problem
- Plan of Base Camp in Empty Space that already
Owner is Left Waduk / West side waduk.
2. Solution
- Contractor will rent from the owner while in the process of rent
will be assistant by Owner and other determined.
-
After Approved by both of parties, contractor will constructed of
base camp with accessories required
-
Around location of base camp will be given zinc fence as a barrier
(with entrance-exit) are painted and given a logo contractors and
other symbols required
-
If Possible, Contractor keet can be rent for any building on there.
Base
Camp
waduk)
(west
Dredging and Embankment of River
1.3. Board of Project name and Fence of Base Camp
Board of Project name
Board of Project name made of Multiplex or Aluminum Plate and Frame of wood beams
inscribed project name, project number, Project Cost, Fiscal Year and name of contractor
or determined in accordance with the technical specifications.
Base Camp’s Fence.
Base camp Needed Fence with determined Location (near / close with
public ). Fence is made by zinc waves minimum 180 to 200 cm of the
soil surface with a wood frame or other specified technical
specifications. Safety fence is intended to facilitate surveillance and
patrolling the incoming material and facilitate the control of the
environment and out of base camp.
Material and Tools were needed for this work :
a. Materials : Borneo Wood 5/7, Zinc waves BJLS 32, paint and anchor
b. Tools
Construction Method :
- Cutting of Kaso wood as according to Height of Plan of fence as base of fence,
forming as determined so that fence can stand up.
- Installing of Fence on kaso wood already stand around base Camp
- Painting the fence with contras color.
1.4. Mobilization of equipment among others : genset, theodolite and water pass,
Excavator, Pontoon Service Crane, etc, as required in the tender document.
1.5. Site Survey Works
Description :
Initial survey to check the reference poles (Bench Mark Point) will be performed jointly
with the Consultant and the Engineer immediately after the contract is signed or after the
issuance of Notice to Proceed.
The measurement will include:
 Checking of reference points (BM) by measuring the polygon and water pass in order to
find the actual (x,y,z) coordinate of the BM points, which will be compared to the BM
points data as seen on the drawing, from where could be seen weather it is still in good
condition or not.
 The construction/installation of the temporary BM to facilitate staking out during
performance of work.
 Surveying must be carried out by Surveying team using equipment as follows :
- The Total Station or EDM for the measuring of polygon.
- Automatic Wild Nak level complete with its static and measuring aluminum measuring
rods (4m) for the water pass measurement.
 The result of Measurement will be reported to the Consultant and the Engineer for
comments and approval.
 Further, the result of measurement will be applied for preparation of shop drawing,
calculation MC0 volume (special for existing structure), also as reference for
implementation of the physical work.
 MC0 include;
- Pre construction
- Survey
- Field identifications  Structure existing
Dredging and Embankment of River
FLOW CHART
PENGECEKAN TITIK
REFERENSI BM (BENCH MARK)
PEMBUATAN DAN
PEMASANGAN PATOK-PATOK
TBM ( TEMPORARY BENCH
MARK), JIKA DIPERLUKAN
PENGUKURAN KONDISI
EXISTING
SURVEY DAN PENANDAAN
LOKASI PEKERJAAN.
1.6. Traffic Management
For construction, The traffic using traffic sign.
 Signs from wood/wooden plate
At first The signs from wood/wooden plate made as according to technical specification
and placing on determined location. Execution using labors and tools (hammer, saw,
etc)
 Rubber cone
Fabrication of Rubber cone. Form as according to technical specification, continued
placing on determined location as signs / bottle neck of the traffic.
 Flagman
Flagman is placed on all construction that disturbing of traffic flow.
The flag man instructing and manage of traffic flow that passing and around the
construction.
1.7. Water Supply Work Water and Electricity Work
Water Supply by boring well or PDAM, for working and water in Base camp environment,
clean water from sludge, oil and other chemicals for the purposes of sanitary workers.
Waste Discharge / Dirt, with the waste stream into a Septic tank
Supply of electric by temporary connecting of PLN during construction or supply electric
with self by Genset with enough power during construction
1.8. Documentation and Project Administration
During project needs a portrait photo documentation of construction from 0% to 100%,
which is collected in an album for weekly and monthly reports or determined according to
technical specifications and will be submitted to the project owner.
All administration of the project; Contract work, Licensing, Shop drawings, Work Request ,
Work Progress in daily, weekly and monthly, correspondence, As build drawing, Archiving,
documents relating to the Construction, etc carried out by the contractor with systematic,
neat and accurate to implement procedures that exist on ISO’s Standard by Contractor’s
ISO Standard
1.9. Environmental response and Licensing / Permit
Contractor will permitting that relates directly or indirectly to the Related Parties, either
Party Government and private parties / outside Government Agencies (also relevant
parties around the project / socialization), It is important to ensure of "Clear of process "
Construction in order to get “on time schedule / schedule of Construction. In the Permit
Process, contractor will require cooperation and assistance of owner to facilitate of
permitting process related.
Dredging and Embankment of River
1.9.1. Construction of Work Permit
In this construction, we also implement standardized procedures in accordance
with the quality system owned and inform / permits each stage will perform the
work, so in the future does not happen the things that are not desirable and to
avoid disassembly work resulting in delays and increased costs .
1.9.2. Shop Drawing, As Built Drawing and Documentation
- Each Constructions begins with making the proposed shop drawings for
approval Supervisory Consultant.
- Shop Drawing made by the Site Engineer (each field) and signed by the Project
Manager prior to submission to Consultant Supervisor.
- Approved Shop Drawing Supervision Consultant is distributed to each Project
manager respective as a reference of each construction type.
- The construction of each type will drawn in As Built Drawing.
- Stage Documentation of Each Construction type for purposes of the project
report.
- Activity-making shop drawings, as built drawings, documentation of ongoing
since the project started until the end of the project.
1.9.3. Construction Materials
To maintain of Quality Control, the materials that will be used in this construction,
should be proposed sample for approval by Consultant Supervisor
All material to be used in this construction completed by manufacturer’s
specification as brochure and also referring to technical specification and technical
procedure.
In this construction, contractor will be prepared and made the specimen as
according to standard determined
1.10. Construction Method to Goal of Work construction as “On Time & Quality as
according to technical specification”
 Early Finishing of Time Schedule (Percepatan Waktu Pelaksanaan Pekerjaan)
To Early Finishing of Construction (as time schedule) and fully determined Quality as
according to technical specification, The contractor will be powered (Labor,
Equipment, Example: Concrete By Ready Mix, All construction will use good
Condition of Equipment  work Estimate on schedule & Quality.
1.11. Site Management
With one package and area, the mobilization of equipment & Personil / labor will
Clear (undifficult) / make less times.
Equipments puts in base camp an soon as posible to mobilized into work site while
the construction will begin
-
Traffic Management  Start – During – Finish
Supplying & Handling of The Material
1. CCSP, Spun Pile and Embankment Material
- Supplying by good Supplier
2.
Concrete
- Supplying by Batching Plant  Ready Mix
- Supplying by Concrete Mixer
Dredging and Embankment of River
1.12. Transportation of Contractor’s Equipment
- Transportation for construction will be transported at midnight (about 22.00 up to
05.00 wib clock)
- Transportation using existing road and some place that already have owner 
permitted
1.12.1. Location at Waduk Melati
Problem
- Some existing road already Owner
- Many resident that using the existing road
Solution
- Contractor will permitted from the owner while in the process mobilization and
process during construction. Permitted for third party will be assistant by Owner
and other determined.
- After Approved by both of parties, contractor will using the existing road
- Any damage to existing structure & existing road or facilities that is caused by
Contractor’s operational, contractor will be repaired to the pre-project condition
at the contractor’s expense (even more better)
1.12.2. Location at Gunung Sahari Drain
- Access to the Site can generally be achieved via the network of public roads
and streets in the vicinity of Site. Existing Road, which links with other main
trunk roads, passes close to the site.
-
A long the Gunung Sahari drain Rivers, there exist maintenance roads all along
on both sides except some part of the reaches.
1.13. Maintenance of Temporary Access Facilities
- The Contractor can use the existing maintenance road for the works.
-
The Contractor shall fully inform himself of the conditions of roads, traffic conditions
and traffic regulations with respect to gaining access to the Site for the purposes of
performing the Works and shall take all necessary actions to ensure availability of
access to the Site as required.
Dredging and Embankment of River
-
For Some existing road already Owner, The Contractor will permitted from the owner
while in the process mobilization and process during construction. Permitted for third
party will be assistant by Owner and other determined.
-
Existing Bridge (if Any)
Notice;
At Begining Project, existing bridge that need to add support using WF Profile that estimate can be
strengthing of Existing Bridge. This Bridge will be used for Access Road
Strength by WF
Profile
Bridge existing
1.14. Other
a. Diversion Chanel / Management System of Drainase
Generally, this project does not need Diversion Chanel.
For determined location, if necessary a Diversion chanel (costruction was conected with
water existing), the contractor will make a diversion chanel with dimension of drainage
as volume of water existing
Next, if Project is finish, the diversion chanel will be return to existing condition.
b. Dewatering/unwatering
For determined location, if necessary a Dewatering (costruction was conected with
water existing), the contractor will make a dewatering by Sand bag, and water will
pump to out site by water pump.
c. Protection construction
Generally, this project does not need
protection Construction
For determined location, if necessary a Protection
Construction, Specialy excavation work that
possible have slide down, contractor will make a
Protection Construction by Dolken on excavation
side (between excavation location and existing)
Dolken will installed / pilling each
± 0.3 m
Dredging and Embankment of River
d. Other Mobilization
- Communication equipments supplying
- Make and supplying As built Drawing.
- Other equipment as according to Tender Document
5.2.
Detail Construction
5.2.1. Preparation and General Work  Already Description on Previous Page
Survey & Measurement
Personal Mobilization
Equipment Mobilization
Etc (as List Equipment)
Electrical supplying
Documentation
Shop Drawing & As Built Drawing
Dredging and Embankment of River
Water Supplying
Others works as according tender document
(BQ)
5.2.2. Safety Tools ( using by labors) /Peralatan K3 dipakai oleh pekerja Proyek
There are several tools that are used to protect a person from
accidents or hazards that may be going on in the construction
process. This equipment shall be used by some one who
works in a construction environment. This equipment shall be
used by some one who works in a construction environment.
Health and safety are two very important things. There fore,
all companies shall provide all necessary equipment/personal
protective equipment or personal protective equipment (PPE),
as according to below:
1. Work Clothes / Dungarees
The purpose of work wear is to protect the human body again the effects of
an unhealthy or that could harm the body. Cause Character of the project site
construction, which generally reflects the harsh conditions of work clothes
should be used is also not the same as the clothing worn by employees who
work in the office. The company clearly understands this problem generally
provide as many as 3 pairs in each year.
2. Safety Shoes
Safety shoes is foot protection. All Labors should wear shoes with thick soles
to be able to freely walk without getting hurt by sharp objects or possessed
by the dirt from the bottom. Face of shoe should be loud enough for foot does
not hurt when falling objects from above.
3. Work Glasses
Safety glasses are used to protect eyes from dust wood, stone, or metal debris
floating in the breeze blow. That the dust particles are so small that some
times are not visible to eye. Therefore, eyes need to be protected. Welder is
Usually use this glasses for welding
4. Gloves
Gloves are required for certain types of jobs. The main purpose is the use of
gloves to protect hands from hard objects and sharp for its activities. One of
the activities that require lifting gloves are reinforced steel, wood, etc
5. Helm
Helmet is important to use as head wear, and is a must for any construction
workers to use it properly according to the rules. This helmet is used to
protect the head from the dangers that come from above, such as no goods,
either equipment or construction material falling from above. Indeed, we often
see the discipline of labors to use is still low which can certainly harm
themselves.
Dredging and Embankment of River
6. Ears Plug
This tool is used to protect the ears from the sounds issued by a machine that
has the volume quite loud and noisy. Sometimes the effect is for the long
term, if every day hear the noise without earplugs.
7.
Fire extinguisher Lightweight (APAR= Alat Pemadam Api Ringan)
If there is a fire in the workplace, immediate action is taken to extinguish a
fire light as the initial action. If not sufficient, please contact The fireman.
8. First Aid
In case of accidents both light-and heavy construction workers, first aid should
be done on the project. Contractors are required to provide drugs that are
used for first aid. First Aid standard equipment on the project and it must be
provided by contractor, perhaps mandatory. Remember preventive measures
are much better and cheaper than was incident.
9. Signs and Safety Instructions
Signs and Safety Instructions was performed at the beginning and during the
work progress (Construction Period). Signs and instructions posted on site
where the sign is and is useful as a sign / warning workers or others.
10. clothing buoy
Clothing buoy Should be wear for construction Period for construction on at
water
Dredging and Embankment of River
FLOW CHART OF CONSTRUCTION
START
Contract
Mobilization
Survey & Measurement
Shop Drawing
Construction Method
Earth Work and
Demolishing of Structure
Existing (if any)
No
Cek
Ok
Waduk Melati
Cideng & Gresik Drain
Traffic Management
Traffic Management
Next Flow Chart will be
described on next page
Next Flow Chart will be
described on next page
FLOW CHART OF
DREDGING WORK
&
FLOW CHART OF CCSP
FLOW CHART OF
MANUAL DREDGING
WORK
No
Cek
No
Ok
Gunung Sahari Drain
End Project (at Up Stream)
At Sheet Pile Location
Traffic Management
Traffic Management
Next Flow Chart will be
described on next page
Next Flow Chart will be
described on next page
FLOW CHART OF
DREDGING WORK
FLOW CHART OF CCSP
&
FLOW CHART OF
DREDGING WORK
Cek
Ok
No
No
Cek
Ok
Cek
Ok
Next Flow Chart will be
described on next page
FLOW CHART OF
REVETMENT
No
Cek
Ok
FINISH
Dredging and Embankment of River
DETAIL FLOW CHART
FLOW CHART of DREDGING WORK
START
Determined & Measurement
of work site
Determined Access Road
into Work Site
Mobilization of Equipments
& Personal
Excavation of river’s sediment /
waduk’s sediment by Excavator
on Pontoon & Temporary Disposal
Separation the Garbage
No
Cek
Handling The material by Dump
truck
Ok
Delivery and transport into
Determined Disposal Area
Handling The material by Dump
truck
Dumping in disposal area
Delivery and transport into
Determined Disposal Area
Dumping in disposal area
FINISH
FINISH
“If determined”
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
Dredging and Embankment of River
FLOW CHART of DREDGING WORK UNDER BRIDGE
START
Determined & Measurement
of work site
Determined Access Road
into Work Site
Mobilization of Equipments
& Personal
Blow sediment by Water Jet
Separation the Garbage
No
Cek
Ok
Handling The material by Dump
truck
Excavation by Excavator in other
side of bridge
Handling The material by Dump
truck
Delivery and transport into
Determined Disposal Area
Delivery and transport into
Determined Disposal Area
Dumping in disposal area
No
Cek
Ok
Dumping in disposal area
FINISH
FINISH
“If determined”
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
Dredging and Embankment of River
FLOW CHART OF CCSP
Finished Earth Work
No
Ok
START
Order & Manufacture By Supplier /
Sub Contractor
Equipment Mobilization (Crane with
Vibro Hammer)
No
Check
Yes
Delivery of Sheet Material on Trailer
Transportation of Sheet Pile
setting out Of location Pilling
Guide Beam Installation
Placed Sheet Pile on Work Site /
stock area
Pilling Process
pemancangan
Installation of Sheet Pile on Vibro
Hammer (Pilling equipment)
Pilling
No
Check
Yes
Finished Pilling / Piled Sheet Pile
FINISH
Dredging and Embankment of River
Capping Beam
FLOW CHART OF REVETMENT
Finished of CCSP Work &
Cofferdam
No
Chek
Ok
START
Pile Driven
Fabrication of Pile
No
No
Chek
Chek
Ok
Ok
Back Filling
Structure Excavation & Cut
Top Pile
Delivery
No
No
Chek
Chek
Ok
Ok
Sand & Lean Concrete
FINISH
No
Chek
Capping Beam For sheet Pile
& revetment
Ok
Pile Cap (Reinforcing, Form
work and Concreting )
No
Chek
No
Ok
Chek
FINISH
Ok
Boring an install Anchor on
Existing Abutment
No
Chek
Ok
Structure Revetment (include
hole for drain)
No
Chek
Ok
Dredging and Embankment of River
FLOW CHART of REINFORCING STEEL
START
List Bending of Bar
(BAR BENDING)
Delivery bar material from supplier and transportation
into site work
Stock deposit of material/storage
Check of material
-Strength Test
OK
Result
No
Get another
material
Material Weighing
Fabrication & Installation
Cutting and Bending
Installation on site
Check :
-
Diameter
Amount
Location
Repair
No
Result
Ok
FINISH
Ready to be concreted
Dredging and Embankment of River
FLOW CHART of CONCRETE WORK
1. Preparation
Check of Material
NO
Get another material
Result
YES
Make trial mixture
NO
Test
Make another Mixture
YES
Concreting at Site
Dredging and Embankment of River
2. Preparation at site
Preparing of structure :
Check dimension, elevation
Check form work of concrete
Check of Bar (amount, dimension, form)
Check material which embedded (if any)
Preparing of equipment and material :
Preparing of material (amount &
quality)
Preparing equipment (vibrator)
Preparing tools (light, pump, tend, etc)
Concreting prepare :
Batching Plant, Gutter ,etc.
Man power
Check Of
Concrete
Take
Cube
Concrete mixing
Concreting & compacting
Concrete
Curing
Removal of form work
Check Result
Reject
Good
Repair
Good
Age 28 day Test
Work is Accepted
Dredging and Embankment of River
Checking Of Cube
Take concrete cube
7 day test and otherwise
determined in the technical
specification
NO
Good
Result
Evaluation
Repair Mixture
28 day Test
NO
Result
Work is Continued
Good
Work is Accepted
Evaluation
Take sample from structure
NO
Dismantle
Dredging and Embankment of River
Test
Good
Work is accepted
Notes :
Repair mixing (if any)
Better method of working
etc.
DETAIL CONSTRUCTION OF
WORKS ITEMS
Dredging and Embankment of River
CONSTRUCTION METHOD FOR DERDGING WORK
- Construction;
1. Location;
 Construction on 2 Site , Waduk Melati, Cideng Drain, Gresik Drain and Gunung Sahari Drain
Dredging Works
- Dredging and Disposal
- Excavated garbage
Assumption:
1. Work by heavy equipment ( mechanically), Labors and Tools
2. Work location :Gunung Sahari Drain and Waduk Melati as according to the Drawing and BQ
Description
This work have to include all excavation in the line, grade, slope and elevation shown on the Drawing,
boundary, removal, transportation, dumping and Spreading and grading in disposal area.
At construction process, if Any damage to existing structure or facilities that is caused by Contractor’s
operational, contractor will be repaired to the pre-project condition at the contractor’s expense
All Construction will be executed as according to determined Technical specification in tender document
Works Sequences :
1. Work of Preparation include :
- Preparation of Shop Drawing till get approval from Engineer
- Preparation of Equipments work and man power / Labors
2. Measurement
Before excavation started, must be done work of Measurement to know elevation and boundary plan
excavation.
3. Excavation
Excavation must be done according to height line, grade, slope and elevation which is shown in
Drawing.
Work Equipment;
1. Excavator
2. Pontoon
3. Floating Barge
4. Dump truck
5. Tools
Dredging and Embankment of River
FLOW CHART of DREDGING WORK
START
Determined & Measurement
of work site
Determined Access Road
into Work Site
Mobilization of Equipments
& Personal
Excavation of river’s sediment /
waduk’s sediment by Excavator
on Pontoon & Temporary Disposal
Separation the Garbage
No
Cek
Handling The material by Dump
truck
Ok
Delivery and transport into
Determined Disposal Area
Handling The material by Dump
truck
Dumping in disposal area
Delivery and transport into
Determined Disposal Area
Dumping in disposal area
FINISH
FINISH
“If determined”
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
Dredging and Embankment of River
Dredging, Sheet Pile & Capping Beam FOR waduk melati
- Work Location
Work Direction
Construction;
- All Construction Will be constructed from Up Stream up to Down stream
- At first, Common excavation will construction
- Continue by Sheet Pile Construction
Dredging
Dredging and Embankment of River
Sheet Pile Construction
Dredging
Work Direction
1. Temporary Disposal
Temporary Disposal for Red Area
Using Drain Existing
Temporary Disposal for Yellow Area
using Container
Dredging and Embankment of River
Dredging for Red Area
Handling Excavated material into Temporary Disposal
Excavated Material
Traffic Handling to
disposal area
Handling Location
Temporary
Disposal
Excavated Material
Garbage
Separation Garbage
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for this
method for floating Garbage
Dredging and Embankment of River
-
Movable Floating barges by Tug boart
Access Road;
- Problem
1. Existing Access Road already Owner by Third party.
- Solution
1. Contractor will coordination to using that road from the owner.
2. Mediator by Project owner if needed
3. Any damage to existing structure & existing road or facilities that is caused by Contractor’s
operational, contractor will be repaired to the pre-project condition at the contractor’s expense
(even more better)
4. Handling and hauling of material excavated and garbage at mind night from 22.00 wib up to
05.00 wib
Existing Road Owner by
third party
Routes for Dredged Material ;
Jl. Kebon Kacang
Jl. MH. Thamrin
Jl. Merdeka Barat
Jl. Majapahit
Jl. Juanda
Jl. Ciliwung Gunung Sahari
Dredging and Embankment of River
Handling and Hauling into disposal area
- Excavated Material will be transported into disposal, Spreader and grading. Handling Material, Truck’s
Dump must be equipped by Water Seal during transportation process, so that no debris of Excavated
material on access road.
-
Traffic management with traffic lights that have been there (intersection lights) and will be assisted
with traffic management by contractor
-
Contractor will request and permissions using Ancol’s land to using access road for disposal of
excavated material  determined to the tender document
-
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
 Bantar Gebang
Illustration
Spreading excavated material on disposal area
Dredging and Embankment of River
Dredging for Yelow Area
- Excavated material will be used Container
- Temporary Placed Container on Left Side ( West Side) of Melati basin
- Separated Garbage by man and tool on temporary Disposal (Container)
- Use separator /screen to separate large size solid waste
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for this
method for floating Garbage
- Container is Steel Plate and Profil L
- Work is 24 hour
- Movable Floating barges by tug boat
1.2 m
2.4 m
1.2 m
Dredging and Embankment of River
Handling
-
Separated Garbage by man and tool on
temporary Disposal (Container)
Hauling to disposal area
- Work is 22.00 wib up to 05.00 wib
- Access Road;
Problem
1. Some of Existing Access Road already Owner by Third
party. There is Border by Fence
Solution
1. Contractor will coordination to using that road from
the owner.
2. Mediator by Project owner if needed
3. Any damage to existing structure & existing road or
facilities that is caused by Contractor’s operational,
contractor will be repaired to the pre-project condition
at the contractor’s expense (even more better)
4. Handling and hauling of material excavated and
garbage at mind night from 22.00 wib up to 05.00
wib
Dredging and Embankment of River
Existing Road
Owner by third
party
Design Container Unit that open in Side system based from Drag Line Method.
Spreading excavated material on disposal area
Type, capacity, Labor and Material
Description
: Dredging and disposal
1) Labour
3) Production /
-
Foreman
=
-
Skill Labor
=
-
Labor
=
1
3
2) Material
-
Non
Schedule
Item no
hour /day 4)
m3
8
=
21.00
m3
/hour
Equipments
-
Excavator Long Arm
=
=
168
m3
/day
-
Pontoon
=
3 Unit
-
Floating Barge
=
10 Unit
-
Steel Container
=
50 Unit
-
Tug Boat
=
3 Unit
-
Service Crane 15-25 ton
=
3 Unit
-
Dump Truck 16t
=
7 Unit
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
Dredging and Embankment of River
301
3 Unit
Dredging, Sheet Pile & Capping Beam FOR GUNUNG SAHARI DRAIN
Sheet Pile 4.832 m
Dredging 5.100m
Construction Plan
Stage 1
- All construction will be start from Up stream (Hulu) up to down stream (Hilir)
- Construction for Dredging Will be constructed Form End Project (STA. 5+100)
- Construction for Sheet Pile Will be constructed Form Jl. Mangga Besar (STA. 2+450) up to STA.
0+000)
- Construction Will be Fontal (at same time)
Dredging and Embankment of River
EXISTING
WEST SIDE
Site Visit on West Side River;
- At many place, Existing link Road for parking vehicle
- Almost for Business Area and residents
- Many Building
- Difficult for hauling
- Many Electric Cable
- On same place, that side of river, there is Existing
Building as semi permanent and permanent
- High Social cost
- Possible for Contractor’s Office
Dredging and Embankment of River
EAST SIDE
Site Visit on East Side River;
- Existing structure are 2 kind of them, there are 3 m
and 5 m
- Existing is Pedestrian road (Trotoar) and Planting
- Some building as Gazebo
- For Hauling can be reach from Existing Road
- There are re-condition for temporary disposal after
construction
Routes for Dredged Material ;
Jl. Pos / Dr Sutomo
Jl. Ciliwung Gunung Sahari
Jl. RE. Martadinata
Jl. Pelabuhan Ratu 1
Jl. Raya Ancol Baru
Dredging
Type 1
1. Excavation & Hauling
- Work at 22 – 05.wib
- Movable Floating barges by winch
Separation Garbage
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for
this method for floating Garbage
Type From Floating barge min 20 m³ directly into Dump Truck by Mobile Excavator
- Work can be happen, if Dredged material in temporary disposal has been finished loaded, and
Construction of Dredging still continue.
1. Excavation
2. Hauling and Handling
Side of River
Excavation
Lumpur
Temporary Place
Dredging and Embankment of River
Loading
Into Disposal Area
Dumping
Side View
Top View
Side View
Top View
Type 2
Loading to temporary placed
- Excavator on Pontoon for
excavation
- Excavated material
disposed on temporary
disposed on Temporary
Disposal by Floating
Barge (Oil drum and
Woo)
- Other Excavator loading
excavated material into
dump truck
- Dump truck delivery of
excavated material into
determined disposal area
Dredging and Embankment of River
1. Excavation
- Work 24 Hour
- Movable Floating barges and Temporary Floating Barges from Oil Drum by winch
Separation Garbage
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for
this method for floating Garbage
2. Hauling and Handling
- Work at 22.00 – 05.00 wib
- Garbage separation will be executed on Temporary Disposal and put on temporary garbage box by
Labor and tools
Dredging and Embankment of River
-
Temporary Floating Disposal by Oil Drum, Wood, Board wood and Plastic to cover of Wood
Movable Floating barges and Temporary Floating Disposal from Oil Drum by winch
1.5 m
Max 50 m
3m
Type, capacity, Labor and Material
Description
: Dredging and disposal
1) Labour
3) Production /
-
Foreman
=
-
Skill Labor
=
-
Labor
=
1
3
2) Material
-
Non
Schedule
Item no
hour /day 4)
m3
8
=
29.00
m3
/hour
Equipments
-
Excavator, 0.8m3
=
=
232
m3
/day
-
Pontoon
=
2 Unit
-
Floating Barge
=
18 Unit
-
Excavator, 0.8m3
=
1 Unit
-
Dump Truck 16t
=
5 Unit
-
tools
=
1 Ls
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
Dredging and Embankment of River
201
2 Unit
DREDGING UNDER THE BRIDGES
- Construction From Up stream up to down stream
- Construction in this location will be 2 Stage
1. Blow of Sediment /dredged material under Bridge Using Water Injection. Water Injection take
water from river via Pipe intake and will blow on work site via Pipe Out Put
2. The material that moved will be dredged by excavator in other side
3. Movable Floating barges and Temporary Floating Disposal from Oil Drum by winch
Down Stream
Up Stream
Work Direction
Excavator take / excavation of
sediment removal (have been blew
by Water Injection)
Direction of Moving Sediment
Water Injection
Dredging and Embankment of River
FLOW CHART of DREDGING WORK UNDER BRIDGE
START
Determined & Measurement
of work site
Determined Access Road
into Work Site
Mobilization of Equipments
& Personal
Blow sediment by Water Jet
Separation the Garbage
No
Cek
Ok
Handling The material by Dump
truck
Excavation by Excavator in other
side of bridge
Handling The material by Dump
truck
Delivery and transport into
Determined Disposal Area
Delivery and transport into
Determined Disposal Area
Dumping in disposal area
No
Cek
Ok
Dumping in disposal area
FINISH
FINISH
“If determined”
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
Dredging and Embankment of River
DREDGING ON
- Gresik Drain
- Cideng hulu drain
Assumption
- Construction by labor and Tools
- Temporary Disposal by Container
Equipment;
@ Location
- Container
=
- Dump Truck =
- Mobile Crane =
- Labor
5
2
1
=
Unit
Unit for Cideng drain and 1
Unit
20 Person
Container
1.2 m
2.4 m
1.2 m
Dredging and Embankment of River
Unit for Gresik
Illustration
Dredged Material
-
Lansir & Loading
Garbage separation will be executed on Temporary Disposal and put on temporary garbage box by Labor
and tools
Spreading excavated material on disposal area
-
Labor and Tools
Placed Dredged material on temporary disposal
(river bank)
Dredging and Embankment of River
To loading / bring of dredged material into temporary
disposal
On Location where Loading and estafet by wagon can be executed, Dredeg can be assiten by Temporary
floating (made by bambo and wood)
Hauling at 22.00 up to 05.00 wib
Dredging and Embankment of River
Dumping and spreading on CDF
FLOW CHART OF MANUAL DREDGING WORK
START
Penentuan & Pengukuran
Lokasi Pekerjaan
Penentuan Akses ke lokasi
Pekerjaan
Mobilisasi Peralatan &
Personil
Pek. Pengerukan Lumpur oleh
Pekerja & Alat bantu
No
Temporary placed Ex. Material
kerukan di atas Bantara kali
Cek
Ok
Loading oleh Pekerja + alat bantu
ke gerobak (langsir) & Dari
gerobak ke dalam bak dump truck
Transportasi material ex. Kerukan ke
lok. pembuangan / disposal area
Dumping di lokasi pembuangan /
disposal area
FINISH
Perapian di damping Area oleh
Buldozer & Excavator
No
Cek
Ok
FINISH
Dredging and Embankment of River
“Item ini di bayar tersendiri”
CONSTRUCTION PLAN FOR DAILY STORAGE OF SOLID WASTE (Bigger than 30 x 30 cm)
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for this
method for floating Garbage
- Time for Construction are 2 kind of work
1. Construction that can be done for 24 hour
Waduk Melati
1.1. Using existing Drain for temporary disposal
Handling Excavated material into Temporary Disposal
Excavated Material
1.2. Using Container
Gunung Sahari Drain
1.3. Temporary Disposal
Dredging and Embankment of River
2. Construction that can be done only on 22.00 up to 05.00 local time
Waduk Melati
2.1. Using existing Drain for temporary disposal
Hauling and dumping into Disposal
2.2. Using Container
Hauling and dumping into Disposal
Gunung Sahari Drain
2.3. Temporary Disposal
Hauling and dumping into Disposal
2.4.
Directly from Pontoon Barge (assumption top of sediment that contain of garbage already
excavated on day time and separation on temporary disposal)
Hauling and dumping into Disposal
Dredging and Embankment of River
CONTRUCTION PLAN FOR FINAL DISPOSAL
- Handling and hauling of material excavated and garbage at mind night from 22.00 wib up to 05.00
wib.
-
Access to the Site can generally be achieved via the network of public roads and streets in the vicinity
of Site.
-
The Contractor will use the existing road for the works.
Design Route for Hauling and Handling into CDF
Routes for Dredged Material ;
 Jl. Kebon Kacang
 Jl. MH. Thamrin
 Jl. Merdeka Barat
 Jl. Majapahit
 Jl. Juanda
 Jl. Ciliwung Gunung Sahari
-
The Contractor shall fully inform himself of the conditions of roads, traffic conditions and traffic
regulations with respect to gaining access to the Site for the purposes of performing the Works and
shall take all necessary actions to ensure availability of access to the Site as required.
-
The dredged materials shall be properly disposed in the designated Confined Disposal Facility (CDF) at
Ancol without retribution cost.
-
The garbage to Bantargebang, the bidder must include the retribution cost and follow the cost
regulation of Bantargebang. They can find out the cost per ton or per truck by themselves to
Bantargebang.
-
During Handling and Hauling dredged Material into
Confined Disposal Facility (CDF) at Ancol Area,
contractor will be prepare of Water tank truck for
cleaning of existing road routes from fall dredged
material during transported
-
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
 Bantar Gebang
-
All truck / vehicles transporting the dredged material will be equipped with Global Positioning
System as instructed, for monitoring purpose. All Truck will be Recording.
-
Daily report that mention ;
 Type of truck
 License plate number
 Time of truck depature from the loading location
 Time arrival at the deposit area in CDF Ancol
Dredging and Embankment of River
HAULING OF DREDGED SEDIMENT TO CDF
- Handling and hauling of material excavated and garbage at mind night from 22.00 wib up to 05.00
wib.
-
Access to the Site can generally be achieved via the network of public roads and streets in the vicinity
of Site.
-
The Contractor will use the existing road for the works.
-
The Contractor shall fully inform himself of the conditions of roads, traffic conditions and traffic
regulations with respect to gaining access to the Site for the purposes of performing the Works and
shall take all necessary actions to ensure availability of access to the Site as required.
- Dredged Material will be transported into disposal, Spreader and grading. Handling Material, Truck’s
Dump must be equipped by Water Seal during transportation process, so that no debris of Excavated
material on access road.
-
Traffic management with traffic lights that have been there (intersection lights) and will be assisted
with traffic management by contractor
-
Contractor will request and permissions using Ancol’s land to using access road for disposal of
excavated material  determined to the tender document  Confined Disposal Facility (CDF) at
Ancol Area
-
Measurement and Payment
Payment for dredging and disposal (garbage excluded)
will be made at the negotiated and approved Contract
unit price per m3 defined in the Bill of Quantities,
multiplied by the total m3 of verified and weighted
volume (say 35% of the dumped volume plus 65% of the
dredged volume, ratio subject to change). No payment
shall become due to the Contractor for over dredging or
excess dredging which exceeds the allowable over depth.
-
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
 Bantar Gebang
-
All truck / vehicles transporting the dredged material will be equipped with Global Positioning
System as instructed, for monitoring purpose. All Truck will be Recording.
-
Daily report that mention ;
 Type of truck
 License plate number
 Time of truck depature from the loading location
 Time arrival at the deposit area in CDF Ancol
Dredging and Embankment of River
GARBAGE SEPARATION / REMOVAL/DISPOSAL
Separation;
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator  Usually for this
method for floating Garbage
Temporary Disposal for
Garbage
Temporary Disposal for
Dredge Material
Disposal
- The garbage to Bantargebang, the bidder must include the retribution cost and follow the cost
regulation of Bantargebang. They can find out the cost per ton or per truck by themselves to
Bantargebang.
- Garbage Material will be transported into disposal (bantargebang). Handling Material, Truck’s Dump
must be equipped by Water Seal during transportation process, so that no debris of Garbage on
access road.
Dredging and Embankment of River
EMBANKMENT WORKS / CONSTRUCTION METHOD FOR CCSP
On Waduk Melati
On Gunung Sahari
@ 14 m
@ 15 m
Description;
- Structure Type W 450 B1000 (@ 15m and 14 m)
- Work of CCSP is conecction with Revetment work  Finished of CCSP will continue with Revetment
Work
- Construction;
1. Location;
 Construction on 2 Site , Waduk Melati and Gunung Sahari
 Waduk melati

= @ 15 m
 Gunung Sahari = @ 14 m
2. Other
 Based of The drawing on Gunung Sahari Site, Work site divide to 2 side of River. West River
(left side) and East River (Right side).
 Contractor will construction this work by some Group of Works
 Frontal on Waduk Melati and Gunung Sahari
Dredging and Embankment of River
CONSTRUCTION OF SHEET PILE (ALL LOCATION ON WADUK MELATI / MELATI BASIN)
Refer to Tender Document, Work Stage / Construction Plan will be Constructed as bellowing Drawing
1. Temporary Stock Pile for Sheet Pile
Temporary Stock
Pile
-
Based the Work Location, Stock Pile Possible Placed on Side of East of Waduk Melati
Start Point for Handling Material and Equipment From Upper location as describe at Image bellowed.
From Starting Point, The material will be to site by Pontoon and service Crane
Any damage to existing structure or facilities that is caused by Contractor’s operational, contractor will
be repaired to th pre-project contition at the contractor’s expense (even more better)
Handling the material at mind night from 22.00 wib up to 05.00 wib
Point for Mob. & Handling
Material etc
Plan of Stock Pile
Plan of Stock Pile
Dredging and Embankment of River
Delivery and handling The Material
Temporary Stock
Pile
Dredging and Embankment of River
2. Stage Construction
Pilling
Temporary Stock Pile
CUT TOP PILE ( with leveling as according to the drawing)
LEAN CONCRETE
Dredging and Embankment of River
REINFORCING STEEL
FORM WORK (BY MULTIPLEX AND WOOD)
Concreting
- Concreting by Ready mix
- Compaction
by
Concrete
Vibratory
- Concreting by Truck mixer on
Ponton
Dredging and Embankment of River
CONCRETING
Concreting of West
Side of
Waduk
melati
Directly from Truck
Mixer via Gutter
Concreting
Side of
melati
Dredging and Embankment of River
of East
Waduk
FINISH
-
Removal Form work
Installation on next location (side of existing capping beam)
Detail of Capping Beam
Capping Beam
- Reinforcing Steel
- Form Work
-
Dredging and Embankment of River
Concreting as
according to the
drawing and
technical
specification
Finish
Detail Construction Of CCSP Work
Assumption:
1. Work by Heavy Equipment (Machinery)
2. Location :As according to the drawing
3. Material CCSP (type as according to the drawing)
Description
1. Site Work Preparation
- Work site made with good level that a Crane can stand up goodly
- Crane stand up above plate of form which in the form of steel plate 1,5 x 6 meter or On pontoon in
position that Piling should be on water
2. Stake point of Pilling
- Stake point of pilling of Concrete Corrugated Sheet Pile is executed by surveyor which is approved
/ agreed by Consultant Supervisor
3. Fabrication of Material sheet pile
- Fabrication / manufacturing of Concrete sheet pile is formed after the drawing has been approved
by Consultant supervisor.
- Delivery to work site
4. Pilling
- Excavation by labor to get form of pilling
-
Made of guide beam on pilling position using steel material WF type with elevation distance from
sub grade 1 to 2 meter, before pilling is executed
-
Guide beam is made with strength enough that can supporting of moment when pilling is executed
and stabile
-
Piling founded by vertical and monitored with measuring instrument ( Theodolite) and yarn in 2
direction which each other vertical
-
Before pilling, pile with Vibro hammer have to in position of sentries
-
Concrete Sheet pile is vibrated by Vibro hammer is and the Sheet pile will be pilled into ground
cause of gravitation moment and weight of Sheet pile it selfand also helped by Water Jet Pump
that spraying water, that mean this construction to easyly andalso helped byWaterJetPump
thatspraying waterwhichis intendedtosoften of soileasierPilling proccess
-
Vibratory is executed as sequence.
-
At pilling time, between one of Steel Sheet pile and each other of side (has been pilled) if there is
gap, can be near by trek beam.
Dredging and Embankment of River
-
Pilling is executed until a Sheet pile reach deepness elevation plan as according to the drawing.
Pengadaan dan
Transportasi Material
Sheet Pile
Dredging and Embankment of River
Type, capacity, Labor and Material
Description
: Driving of Corrugated Pre-stressed concrete pile W 450
1) Labour
3) Production /
-
Foreman
=
-
Skill Labor
=
-
Labor
=
1
3
2) Material
-
hour /day 4)
Item no
m
8
=
7.00
m
/hour
Equipments
-
Crane On track 25 ton
=
2 Unit
=
56
m
/day
-
Vibro Hammer
=
2 Unit
-
Generator Set 50-70 KVA =
2 Unit
-
Pontoon
=
2 Unit
-
tools
=
1 Ls
Concrete Corrugated Sheet Pile
Schedule
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
Dredging and Embankment of River
342
FLOW CHART OF CCSP
Finished Earth Work
No
Ok
START
Order & Manufacture By Supplier /
Sub Contractor
Equipment Mobilization (Crane with
Vibro Hammer)
No
Check
Yes
Delivery of Sheet Material on Trailer
Transportation of Sheet Pile
setting out Of location Pilling
Guide Beam Installation
Placed Sheet Pile on Work Site /
stock area
Pilling Process
pemancangan
Installation of Sheet Pile on Vibro
Hammer (Pilling equipment)
Pilling
No
Check
Yes
Finished Pillingi / Piled Sheet Pile
FINISH
Dredging and Embankment of River
Capping Beam
Concrete Reinforcement
- Reinforcing Steel Bar
Assumption :
1. Work manually Labors and tools (bar bender and bar cutter)
2. Work Location : Structure Concrete
Description :
1. Reinforced steel Material become delivered from factory / supplier to work Site with
quality and dimension of the reinforcing steel as according to technical specification.
Otherwise determined to the drawing, used steel bar with quality as according to technical
specification and the shop drawing
Characteristic
Characteristic
Characteristic
Characteristic
Yield
Yield
Yield
Yield
Strength
Strength
Strength
Strength
of
of
of
of
U24
U32
U39
U48
=
=
=
=
2.400
3.200
3.900
4.800
kg/cm²
kg/cm²
kg/cm²
kg/cm²




Soft
Middle
Hard
Hard
2. Material put down at stock area (storage).
3. Continued assembled of reinforced steel / manufacturing, that is in the form of needed
measurement of length, cutting with bar cutter and bending with bar bender and done at
the time of cold temperature (as according to ACI.315 procedure or other wise determined
by technical specification).
4. After that Reinforced steel is compiled / to be attached as according to drawing execution
and his cross is bound by strength with bend rat wire / Tie Wire.
Tie wire for fastening reinforcement is annealed steel wire conforming to AASHTO M32 –
90 or other wise determined by technical specification
5. Steel reinforcing is placed so that the minimum clear covering of concrete over the
outermost edge of the main steel bar is as follows.
5.1. 3.5 cm for concrete not exposed to weather or to
ground water (for example, bottom of deck slab).
5.2. 7.5 cm for all submerged concrete which cannot be
made accessible, for inaccessible concrete in which
failure due to rusting of reinforcement could cause
loss of life or of the structure, for concrete placed
directly against the ground of rock, or for concrete
subjected to sewerage or other corrosive liquids.
Minimum Cover over Reinforcing Steel for Exposed but
Accessible Concrete
Dredging and Embankment of River
Size of Reinforcing Bar to be
Covered
(mm)
16 mm bar and smaller
19 mm & 22 mm bars
25 mm bar and large
Minimum Clear
Cover
(cm)
3.5
5.0
6.0
Dredging and Embankment of River
FLOW CHART of REINFORCING STEEL
START
List Bending of Bar
(BAR BENDING)
Delivery bar material from supplier and transportation
into site work
Stock deposit of material/storage
Check of material
-Strength Test
OK
Result
No
Get another
material
Material Weighing
Fabrication & Installation
Cutting and Bending
Installation on site
Check :
-
Diameter
Amount
Location
Repair
No
Result
Ok
FINISH
Ready to be concreted
Dredging and Embankment of River
-
CONCRETE
Assumption :
1. Work use mechanical equipment
2. Work Location : Structure Concrete
Considerations for producing a good concrete work
- The quality of the concrete depends a great proportion of the materials
used such as cement, sand, aggregate and water
- Lack of cement in the concrete mix causes less qualified and weak
- Too much water leads to poor concrete quality
- It is important to measure and add gravel and sand separately to create a
quality solid concrete
- Always use a clean gravel
Eguipment:
- Batching Plant + Truck Mixer
- Tools
Construction of Concrete
Reinforcing Steel
Description :
Equipment ;
- Batching Plant & Truck Mixer
- Concrete Vibratory
- Tools
A. Work Preparation.
A.1. The Work consist of the construction of all concrete structure
A.2. The Mixture material (cement, sand, aggregate) are delivered from supplier to work
location and storage. Concrete Production by Batching Plant.
It’s delivered to work location in the form of concrete ready mix and delivered by
Truck mixer.
During delivery, mixer cylinder in truck mixer continue to rotate to mixing the mixture
with rotation which is qualified so that the condition of the mixture has good quality
and it’s not run dry.
For storage of cement, done a special treatment. It’s storage in a weatherproof sheet
that is airtight, and has araised wooded floor (about 30 cm), which is covered with
polyethylene sheeting. At all times stack of cement bags to be kept covered with an
envelope of polyethylene sheeting.
A.3. Used Concrete quality as according to concrete quality which asked in tender
document and relative to Standard as below;
- AASHTO T141, T23, T126, T22
- Another Standard as asked/ as according to tender document
A.4 Used Portland cement type as according to request of tender document.
Type of Portland cement conforming to AASHTO M85 except type IA, IIA, IIIA and IV
or other wise determined by technical specification. Unless other wise permitted by
the engineer, air-entraining admixtures shall not be used or other wise determined by
technical specification.
Dredging and Embankment of River
A.5. Water used in mixing, curing, or other designated is clean, and free from harmful
matter such as oil, salt, acid, alkali, sugar, or organic materials.
Water tested in accordance with, and meet the requirements of AASHTO T26, other
wise determined by technical specification.
A.6 Coarse Aggregate, Which used ( measure / dimension) as according to request of
specification in tender document ( relative concrete standard of SNI 032-2816-1992
and AASTHO or other wise determined by technical specification) and have got
approved by Directors.
Aggregate is clean and free from Mud, other smooth particle, alkali and materials
organic / substance able to destroy quality of concrete.
Aggregate consist of clean, hard, durable particles obtained by crushing rock or
boulders, or by the screening and washing (if necessary) of natural river gravel and
sand.
Aggregate the used also conform with the other property specification given in table
in technical specification.
A.7. Sand /fine aggregate the used is sand result of stone crushed or natural sand which
got from river / source of nature and have got approvalof directors and have tested
Clean sand, free from clay, rock, materials of organic and alkali and other materials
able to destroy quality of concrete.
used sand ( measure / dimension) as according to request of technical specification in
tender document and have got approval of directors.
B. Mixing and production
B.1. The material proportional of Mix design using method of determined standard in
technical specification and in accordance with the limits given in table in technical
specification in tender document.
B.2. Trial mix done and result of it will be made reference making of concrete at the time
of work in work site and witnessed by directors.
Trial mix as according to request of technical specification in tender document and get
the engineer’s approval.
B.3 Mix Property Requirements as according to technical specification in tender document.
B.4. Mixing :
B.4.1. The Concrete is mixed in a mechanically operated machine (Batching Plant)
B.4.2. The mixer is equipped with adequate water storage and device for accurately
measuring and controlling the volume of water used in each batch.
B.4.3. The mixer is first charged with the catches aggregates and cement, and the
mixer started, before any water is added.
B.4.4. The time of mixing is measured from the moment water is introduced into the
material dry mix.
C. Placement.
- As preparation, work location of concreting cleared from garbage, wood cutting, bend
rat, nail and other garbage with vacuum cleaner, compressor and or water.
-
Form work coated internally with mould oil till covering all surface. Leakage of form
work been checked and repaired. Construction joint with concreting before all have
been coating with cal bond or cement water and also form work free from water pond.
Dredging and Embankment of River
Before concreting instruction, all permission the needed have been managed and
agreed by directors / owner and work supervisor.
-
For the Concrete of ready mix, concreting done by mechanically, from truck mixer pass
gutter. Concrete shall not be dropped freely into form work heights greater than 150
cm. So it’s not happened dissociation between the weight aggregate with concrete
pasta, (segregation).
-
Compaction helped with adequate selected vibrator type mechanically in number.
Vibrator pipe inserted into the wet concrete vertically so that it penetrate to the bottom
of the freshly placed concrete and provides consolidation throughout the full depth of
section and it’s not to happened air pocket. Vibrator do not hit shutter or bar except
cover of concrete.
FLOW CHART of CONCRETE WORK
1. Preparation
Check of Material
NO
Get another material
Result
YES
Make trial mixture
NO
Test
Make another Mixture
YES
Concreting at Site
Dredging and Embankment of River
2. Preparation at site
Preparing of structure :
Check dimension, elevation
Check form work of concrete
Check of Bar (amount, dimension, form)
Check material which embedded (if any)
Preparing of equipment and material :
Preparing of material (amount &
quality)
Preparing equipment (vibrator)
Preparing tools (light, pump, tend, etc)
Concreting prepare :
Batching Plant, Gutter ,etc.
Man power
Check Of
Concrete
Concrete mixing
Take Concrete
Cube
Concreting & compacting
Curing
Removal of form work
Check Result
Reject
Good
Repair
Good
Age 28 day Test
Work is Accepted
Dredging and Embankment of River
Checking Of Cube
Take concrete cube
7 day test and otherwise
determined in the technical
specification
NO
Good
Result
Evaluation
28 day Test
Repair Mixture
NO
Result
Work is Continued
Good
Work is Accepted
Evaluation
Take sample from structure
NO
Dismantle
Dredging and Embankment of River
Test
Good
Work is accepted
Notes :
Repair mixing (if any)
Better method of working
etc.
WADUK MELATI PUMP
- Special Construction;
This Waduk melati Pump, for outlet of pump should be cross of Train Rail existing
-
Construction Plan
Contruction Method for this Point will be used JACKING SLURRY (FULL JACK) method
Umumnya pemasangan pipa jacking diaplikasikan pada kondisi-kondisi lapangan seperti :
- Melintang dibawah jalan raya yang padat (jalan tol, jalan kolektor, dll)
- Melintang dibawah jalan rel K.A.
- Saluran dibawah sungai (Syphon)
- Pipa dengan installasi yang sangat dalam (lebih dari 5m)
Pelaksanaan Pekerjaan Jacking Pipa
1. Pembuatan Driving / Receiving Pit /
SKALA : TANPA SKALA
DETAIL KONSTRUSI PENDUKUNG GALIAN
DENGAN TEROWONGAN
TANPA SKALA
SISTIM PENURAPAN UNTUK TANAH LABIL
TANPA SKALA
UNTUK SEMUA PENYOKONG
I
TANPA SKALA
Adalah pekerjaan galian tempat untuk peralatan dan mesin jacking guna mendorong pipa secara
horizontal, konstruksi starting/driving pit berukuran;
Perkuatan dinding pit menggunakan Material sesuai dengan gambar diatas
Disamping itu di dalam driving pit juga dilengkapi dengan block beton untuk dead man, pondasi
mesin, lantai kerja.
2. Pekerjaan Boring & Jacking
Pekerjaan pengeboran tanah dapat dilakukan dengan mesin, akan tetapi memungkinkan juga
dilakukan secara manual apabila diameter pipa cukup besar untuk akses pekerja galian dan kondisi
tanah cukup stabil.
Dredging and Embankment of River
Urutan pelaksanaan pekerjaan jacking
2.1. Persiapan Starting Pit & Ariving Pit
Starting/Driving Pit adalah titik dimana Peralatan Mesin dipasang guna mendorong pipa selama
pekerjaan jacking dilakukan. Sedangkan titik tujuan dinamakan Arriving Pit/Receiving Pit, yang
digunakan untuk mengangkat kembali mata bor & pilot tube.
Secara berturutan dan bila dimungkinkan Arriving Pit akan menjadi Starting pit untuk pekerjaan
jacking section berikutnya.
Struktu Perkuatan
Dinding Tanah
Deadman/
Concrete Trust Wall
Pondasi
ARRIVING PIT
STARTING PIT
RECEIVING
PIT
Pekerjaan
persiapan
ini antara lain adalah : pembuatan perkuatan dinding DRIVING
galian,PITpembuatan
deadman untuk menahan thrusting block, pembuatan lantai pondasi untuk guide-rail
7.00
Concrete Thrust
Wall
Pressure plate
Concrete Pipe
Main Jack
1.40
Cutter Edge
Dudukan/Pengarah
Jacking Pipe
2.40
Thrust Ring
6.00
Dredging and Embankment of River
Steel Sleeper
Arah Jacking
2.2. Installasi Mesin Jacking
Setelah pekerjaan Starting Pit & Arriving selesai, mesin jackin mulai dipasang, Tipe Mesin
Jacking yang dipilih perlu disesuaikan dengan ukuran diameter pipa, dan kapasitasnya
disesuaikan dengan gaya dorong yang diperlukan.
Pada umumnya peralatan mesin jacking terdiri dari: trusting block / hydraulick jack, guide rails,
steel pressure plate, power pack, steel trusting ring, jacking shield / pilot tube, conveyor belt /
slurry hose, dan control panel untuk operator mesin.
Control Panel
Power Pack
STARTING PIT
Hydraulic
Jack
Laser
Steel Thrust
Ring
Guide Rails
Steel Pressure
Plate
2.3. Pemasangan Pilot Tube / Jacking Shield
Pilot Tube / Jacking Shield adalah berupa silinder baja yang dipasang pada ujung pipa jacking
dimana Mata bor terpasang.
Mata Bor **)
Pilot Tube
STARTING PIT
**) untuk ekskavasi tanah dengan cara manual biasanya mata bor diganti dengan
driving collar (steel collar yang didesain khusus untuk menembus tanah).
ARRIVING PIT
Dredging and Embankment of River
2.4. Pekerjaan pemboran dan jacking awal
Setelah pilot tube dan mata bor terpasang, maka pekerjaan pemboran tanah dimulai dan
setelah pilot tube masuk kedalam tanah, maka pipa pertama dipasang, kemudian pemboran
dilakukan secara menerus sementara pipa didorong perlahan
Pipa -1
2.5. Pekerjaan pengangkutan tanah
Steel Collar
Selanjutnya untuk pipa ke-2, ke-3 dan selanjutnya sampai menuju ke arriving pit. Pekerjaan
pengeboran
berturutan
/ bersamaan.
ARRIVING PIT dan pekerjaan mendorong pipa dilakukan secara STARTING
PIT
Pembuangan tanah hasil dari pemboran dibuang melalui conveyor, untuk type mesin lainnya
biasanya untuk diameter kecil, tanah hasil pengeboran dicampur dengan air sehingga
berbentuk slurry dan dibuang melalui pipa pembuangan.
Pembuangan tanah untuk cara manual dapat digunakan trolley.
Kecepatan pemasangan pipa jacking tergantung pada diameter pipa dan kondisi tanahnya,
umumnya 1 s/d 6 pipa per hari (8 jam kerja).
ARRIVING PIT
Dredging and Embankment of River
STARTING PIT
2.6. Pekerjaan Jacking tahap akhir
Setelah pipa jacking pertama sampai ke arriving pit, maka pilot tube dan mata bor di angkat,
dan mesin jacking dipindahkan ke section berikutnya.
ARRIVING PIT
STARTING PIT
Stage Construction
4
3
1
2
2
Dredging and Embankment of River
1
Construction Stage
1. Construction Pipe Out let under Rail Train
2. Temporary Cofferdam by Steel sheet Pile
3. Pump House with Accessories (Civil Work and Mechanical Work)
4. Installation of Pump Unit as according to the drawing
Pompa Sumersible
Sebelumnya Pekerjaan Gedung / Sipil untuk Pekerjaan Rumah Pompa telah selesai dikerjakan sesuai Gambar
Kerja
1.1. Sebelum dilaksanakan pekerjaan fisik di lapangan, langkah kerja awal adalah ;
1. Pengecekanpekerjaan dilapangan, apakah terdapat perbedaan dengan dokumen kontrak atau
tidak.
pekerjaan dilapangan, apakah terdapat perbedaan dengan dokumen kontrak atau tidak.
2. Pembuatan Shop drawing untuk pekerjaan yang bersifat pengadaan dan pemasangan
unit baru, misal untuk pekerjaan pengadaan dan pemasangan pompa (Submersible).
3. Pengajuan bahan untuk dievaluasi dan disetujui oleh pihak proyek.
4. Pengajuan rencana jadwal pelaksanaan pekerjaan.
1.2. Pengadaan material utama Mekanikal-Elektrikal meliputi ;
1. Pengadaan Pompa Subersible Kapasitas dan Tipe sesuai tender dokumen.
2. Pengadaan Panel control pompa Submersible dengan starting Softstarter.
3. Pengadaan material bantu ; Pipa buang stainless steel 304 atau ditentukan lain sesuai spesifikasi
teknis dengan diameter sesuai gambar Kerja, cat, saklar, stop kontak dan lampu penerangan.
4. Pengadaan Bar screen Kasar, Bar screen Halus untuk Pompa
Submersible, pengadaan melalui proses pabrikasi yang dilakukan di bengkel.
5. Pengadaan Ring, Piston, Radiator Seal dan klep untuk Diesel Engine Iveco
6. Pengadaan Bush Bearing dan Flexible coupling untuk existing screwpump,
pengadaan material ini melalui proses pekerjaan machining di bengkel;.
1.3. PEMASANGAN POMPA SUBMERSIBLE
Pemesan 3 (tiga) unit pompa Submersible akan membutuhkan dan selama jangka waktu ter
sebut pekerjaan yang dapat dilakukan di lapangan adalah sebagai berikut ;
-
Pabrikasi Screen Halus inlet Pompa Submersible
sesuai ukuran di lapangan dan
sesuai dengan shop drawing yang disetujui proyek.
Pabrikasi Maintenance pompa Submersible sesuai
shopdrawing yang disetujui Konsultan.
Pabrikasi Panel Control Pompa Submersible dengan star
ning Soft Starter.
Pemasangan Guide Rail yang terbuat dari Pipa stainles
steel (jika dipersyaratkan).
Pemasangan Pompa Submersible dengan bantuan Man
ual Crane dan Guide rail yang sudah terpasang.
Dredging and Embankment of River
-
Pemasangan Panel Kontrol Pompa Submersible.
-
Pemasangan/koneksi kabel daya dan kabel kontrol dari motor pompa submersible ke panel kontrol.
-
Pemasangan water level control dan penarikan kabelnya ke panelkontrol pompa.
-
Pompa submersible dapat diuji (testing and commissioning).
1.4. PEKERJAAN PEMELIHARAAN PERALATAN BANTU
Peralatan bantu yang harus diperbaiki dan dilakukan perawatan sesuai kontak antara lain ;
1. Manual Crane
2. Pintu masuk ruang pompa
3. Bar screen kasar dan halus
4. Bar screen submersible pump.
Pekerjaan pemeliharaan untuk Manual crane antara lain ;
1. Pembersihan rantai angkat (Lifting chain)
2. Pemeliharaan Gear Trolley (membersihkan dan memberi Gemuk), mengganti Ger
Trolley bila diperlukan.
3. Pembersihan dan pengecatan kembali End Carriage
4. Pemberian gemuk pada Bearing End Carriage.
5. Pembersihan dan pengecatan kembali Girder
6. Pembersihan dan pengecatan kembali Runway Beam.
7. Pemeliharaan pada Lifting hoist.
8. Pembersihan dan pengecatan kembali Runway Rail.
9. Pembersihan rantai untuk Traversing.
Dredging and Embankment of River
SLIDE GATE
Proses Urutan Pemasangan Pintu Air;
1. Guide Frame
Guide frame akan dipasang dengan urutan pemasangan frame dasar,frame samping ,lintel beam
dengan uraian sebagai berikut :
1.1. Seal Beam (Frame Dasar )
 Sebelum pelaksanaan pemasangan pastikan kondisi , lokasi yang akan dipasang dalam
kondisi kering atau bebas dari air bila kondisi Penempatan seal beam masih ada air buat
kisdam sehingga untuk menampung air dan alihkan air tersebut sehingga tidak
mengganggu proses pemasangan seal beam.
 Masukan seal beam kedalam block
outnya dengan menggunakan alat
angkat yang tersedia dan alat bantu
lainnya
jika
diperlukan
untuk
kemudahan proses penyetelan dan
penyesuaiannya
sesuai
dengan
gambar yang disetujui
Gambar hanya sebagai Ilustrasi pekerjaan Pemasangan Pintu air. Dimensi,
ukuran sesuangguhnya sesuai tender dokumen
Dredging and Embankment of River
 Setel seal beam sesuai dengan gambar kerja perhatikan : kelurusan dan kerataan seal
beam .
 Pastikan elevasi permukaan seal beam usahakan perhatikan toleransinya.
 Pertahankan posisi seal beam dengan baik terhadap toleransi yang ditentukan ketika
pengecoran tahap kedua dilaksanakan.
12.
Frame Samping(side Frame)
 Masukan frame samping kedalam blok outnya dengan
menggunakan alat angkat yang tersedia dan alat bantu
lainnya jika diperlukan untuk kemudahan proses
penyetelan dan penyesuaiannya sesuai dengan gambar
yang disetujui.
Gambar hanya sebagai Ilustrasi pekerjaan Pemasangan Pintu air. Dimensi,
ukuran sesuangguhnya sesuai tender dokumen
 Setel frame dasar dengan frame samping sesuai dengan gambar kerja yang telah
disetujui
 Setel frame samping sesuai dengan gambar kerja perhatikan terhadap clear span ,
kerataan ,senter line ,dan datum line yang telah ada..
 Tetapkan frame dasar dengan frame samping dengan pengelasan sesuai dengan
procedure pengelasan yang telah disetujui.
 Tetapkan frame samping dengan Angkor yang ada dengan system tack weld.
 Setelah selesai proses pemasangan guide frame ,akan diadakan pemeriksaan secara
bersama dengan Pengawas Proyek ,dan Konsultan untuk dilanjutkan pelaksanaan
pengecoran kedua (second concrete)
 Selama dalam proses pengecoran akan selalu diawasi oleh Kontraktor Mekanikal untuk
menyakinkan tidak berubahnya suatu dimensi dari frame.
 Pemeriksaan ulang setelah dilakukan pengecoran yang telah dilaksanakan oleh kontractor
meyakinkan tidak ada perubahan dimensi.
Dredging and Embankment of River
2. Gate Leaf
 Rakitlah seluruh kompenen-komponen daun pintu seperti karet perapat serta kelengkapan
lainnya sesuai dengan gambar kerja yang telah disetujui


Sesuaikan daun pintu terhadap gate frame pada posisi
yang benar sesuai dengan gambar yang disetujui dan
toleransi yang ditentukan.
Pasang Pintu Air pada frame yang telah tersedia.
Dredging and Embankment of River
CONSTRUCTION OF SHEET PILE (GUNUNG SAHARI) / Embankment works
- Repair
- Improvement
Refer to Tender Document, Work Stage / Construction Plan will be Constructed as bellowing Drawing
Sheet Pile 4.832 m
Dredging 5.100m
Construction Plan (Construction Sheet Pile & Dredging)
Stage 1
- All construction will be start from Up stream (Hulu) up to down stream (Hilir)
- Construction for Dredging Will be constructed Form End Project (STA. 5+100)
- Construction for Sheet Pile Will be constructed Form Jl. Mangga Besar (STA. 2+450) up to STA.
0+000)
- Construction Will be Fontal (at same time)
Dredging and Embankment of River
Sheet Pile & Capping Beam FOR GUNUNG SAHARI DRAIN
- Work Location
Work Direction
Construction;
- Construction Will be constructed from Up Stream up to Down stream
- On Location, there are many Existing Bridge.
- Construction on between 2 Existing Bridge, the Sheet Pile will be constructed for 2 side river up to
finish. It’s goal for Minimal Mobilized of using Works equipments
Illustration
Existing
Bridge
Existing
Bridge
Dredging and Embankment of River
Jl. Gunung Sahari ( East Side)
Jl. Gunung Sahari ( East Side)
Construction
Sheet Pile
(Stage 1)
Existing
Bridge
Construction
Sheet Pile
(Stage 2)
Existing
Bridge
1. Temporary Stock Pile
Temporary Stock
Pile
Temporary Stock
Pile (if Possible)
-
Based the Work Location, Stock Pile Possible Placed on East Side River (Side of Jl. Gunung Sahari)
Placed of Sheet Pile on Existing Trotoar and Side of river (if possible)
Any damage to existing structure or facilities that is caused by Contractor’s operational, contractor will
be repaired to th pre-project contition at the contractor’s expense (even more better)
For Construction on West River, The material will be handling from East Side using Ponton
Handling the material at mind night from 22.00 wib up to 05.00 wib
Dredging and Embankment of River
Dredging and Embankment of River
Dredging and Embankment of River
2. Stage Construction
Pilling
CUT TOP PILE ( with leveling as according to the drawing)
Dredging and Embankment of River
FORM WORK
- Assumption no Flying Capping Beam / can be temporary embankment for construction
- Design
CUT TOP PILE ( with leveling as according to the drawing)
LEAN CONCRETE
Dredging and Embankment of River
REINFORCING STEEL
FORM WORK (BY MULTIPLEX AND WOOD)
Concreting
- Concreting by Ready mix
- Compaction
by
Concrete
Vibratory
- Concreting by Truck mixer on
Ponton
Dredging and Embankment of River
Based the Work Site and Assumption Capping Beam is Flying / no land for placed Form Work, Contractor
will design Form Work as Below
NOTICE;
- Refer to the drawing;
-
-
Problem;
 Sheet pile on Both of Side The River
 Almost capping beams will be Constructed
on location there are no land for placed
Form work or only one side to placed of
form work  Flying Capping beam
 Possible need to temporary supporting for
installs the form work
Solution / Modification
 Form work will be constructed
temporary supporting
 Form work is Knock down system
 Form work by Plate steel
 Design As bellowing;
SUPPORT BY STEEL Ø 16MM as TIE ROD
Capping Beam
Sheet Pile
Water Level
Land
by
River Bed
SUPPORT BY CANAL
Remark;
Fastened by L and
Nut
Double Canal
C.200.75.20 & Wood
5/7
Steel Ø 16 or more as
tie rod
Dredging and Embankment of River
Wood 5/7 attach to
sheet pile on Tie Rod
Ø 16mm
Wood 5/7 for base for
board 25 mm
Wood board 25 mm
Form
form
as
sheet
Reinforcing Steel
Dredging and Embankment of River
pile’s
Tie Rod Ø 10mm as
Fastener
Hollow 40/40 as
Supporting / Fastener
Form Work By steel
Plate & Strength with
Hollow 40/40
Locker for form work
-
Kind of Concreting Process
Directly From Truck Mixer
Dredging and Embankment of River
Assisted by Ponton
Concreting by Ready
mix
Compaction
by
Concrete Vibratory
FINISH
-
Removal Form work
Closing hole for Tie Rod Ø 16mm by cement Grouting
Installation on next location (side of existing capping beam)
-
Capping Beam as segmental
for 10 m (as to the drawing)
Between capping beam will
be installed by Water stop
as Expantion Joint
-
Dredging and Embankment of River
REVETMENT ON EXISTING ABUTMENT
1. Steel Sheet Pile and Sand bag (Cofferdam)
2. Drying / Dewatering
3. Piling and Lean concrete
4. Structure Revetment
Formwork and Concreting)
(Anchor,
Reinforcing,
5. Back Filling
FINISH
Dredging and Embankment of River
Detail of Capping Beam
Capping Beam
- Reinforcing Steel
- Form Work
-
Concreting as
according to the
drawing and
technical
specification
Finish
Dredging and Embankment of River
Detail Construction Of CCSP Work
Assumption:
1. Work by Heavy Equipment (Machinery)
2. Location :As according to the drawing
3. Material CCSP (type as according to the drawing)
Description
1. Site Work Preparation
- Work site made with good level that a Crane can stand up goodly
- Crane stand up above plate of form which in the form of steel plate 1,5 x 6 meter or On pontoon in
position that Piling should be on water
2. Stake point of Pilling
- Stake point of pilling of Concrete Corrugated Sheet Pile is executed by surveyor which is approved
/ agreed by Consultant Supervisor
3. Fabrication of Material sheet pile
- Fabrication / manufacturing of Concrete sheet pile is formed after the drawing has been approved
by Consultant supervisor.
- Delivery to work site
4. Pilling
- Excavation by labor to get form of pilling
-
Made of guide beam on pilling position using steel material WF type with elevation distance from
sub grade 1 to 2 meter, before pilling is executed
-
Guide beam is made with strength enough that can supporting of moment when pilling is executed
and stabile
-
Piling founded by vertical and monitored with measuring instrument ( Theodolite) and yarn in 2
direction which each other vertical
-
Before pilling, pile with Vibro hammer have to in position of sentries
-
Concrete Sheet pile is vibrated by Vibro hammer is and the Sheet pile will be pilled into ground
cause of gravitation moment and weight of Sheet pile it selfand also helped by Water Jet Pump
that spraying water, that mean this construction to easyly andalso helped byWaterJetPump
thatspraying waterwhichis intendedtosoften of soileasierPilling proccess
-
Vibratory is executed as sequence.
-
At pilling time, between one of Steel Sheet pile and each other of side (has been pilled) if there is
gap, can be near by trek beam.
-
Pilling is executed until a Sheet pile reach deepness elevation plan as according to the drawing.
Dredging and Embankment of River
Pengadaan dan
Transportasi Material
Sheet Pile
Dredging and Embankment of River
Type, capacity, Labor and Material
Description
: Driving of Corrugated pre-stressed concrete pile W 450
1) Labour
3) Production /
-
Foreman
=
-
Skill Labor
=
-
Labor
=
1
3
2) Material
-
hour /day 4)
Item no
m
8
=
7.00
m
/hour
Equipments
-
Crane On track 25 ton
=
4 Unit
=
56
m
/day
-
Vibro Hammer
=
4 Unit
-
Generator Set 50-70 KVA =
4 Unit
-
Pontoon
=
4 Unit
-
tools
=
1 Ls
Concrete Corrugated Sheet Pile
Schedule
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
Dredging and Embankment of River
232
At determined location, Sheet pile will be strength with Anchor
Location: STA. 0+000 s/d STA. 0+367.50
Description;
- Finished Sheet pile, at location where sheet pilet Tie rod/anchor will be installedin pit / hole sheet pile
that has been provided (pit / boring by ConcreteDrill)
- Material of TieRod Steel D25 (coating withgrease) inserted into hole.
-
Construction Reinforcement Concrete Beam ( 0.2 x 0.2 K225) on Front of CCSP as according to the
drawing
-
At the end of threaded TieRod, Bolt was given. Next bolt in will be installed with tied.
-
Other side of sheet pile, will be installed of Tie rod with as same as squence work.
- Next, Both of end tie rod wll be united / connected by "Turn buckle". This turn buckle beside as
conecting, as fasteners to (beside a bolt on sheet pile it self)). After Tie rod installed and tension /
tightness is obtainedby Caping Beam as according to the drawing.
-
Continue with construction on Tie rod that cross section as according to the Drawing ( Sand Gravel,
Rigid Concrete, etc)
Dredging and Embankment of River
5
1
5
3
4
2
Stage;
1. Pilling of Sheet Pile
2. Pilling Back Pile . Cut top pile both of Them (Sheet Pile & Back Pile)
3. -
Hole for Sheet pile dan Back Pile to insert tie rod Ø 25mm.
Inserted tie road Ø 25mm.
Reinforcement concrete 20x20 k 225 on Face of Sheet Pile and Pile cap on Back Pile
4. -
Stressing Tie rod by "Turn buckle"
Concrete Cover 0.2 m x 0.2 m K225
5. -
Capping Beam
Dredging and Embankment of River
Pilling Works
Assumption:
1. Work by Heavy Equipment (Mechanic)
2. Location :As according to the drawing
Description
1. Site Work Preparation
- Work site made with good level that a Crane can stand up goodly
- Crane stand up above plate of form which in the form of steel plate 1,5 x 6 meter.
2. Stake point of Pilling
- Stake point of pilling of Pile constructed by surveyor which is approved / agreed by Consultant
Supervisor
3. Fabrication of Material Steel Pipe pile
- Fabrication / manufacturing of pile material is formed after the drawing has been approved by
Consultant supervisor.
- Delivery to work site
4. Pilling
- Piling vertical stand and monitored by measuring instrument ( Theodolite) and yarn in 2 direction
which each other vertical
-
Pile Material should be in Centre Position before Pilling by Diesel Hammer / Pilling Machine
-
As cushion will be used with good wood or plywood that substitute periodically
-
Top Pile (Pile head) should be protected from directly impact of hammer by wood pad or plywood’s
10 cm thick
-
Each Pile given mark by contras color each interval 20 until 50 cm and recorded by directly. Record
of Driving form start up to end in “Pile Driving Log” that signed bu Supervisor consultant
-
Continue Pile Driven will be constructed until reach “Pile Penetration” as determined by Consultant
supervisor and refer to determined “Set” without closing of “Ram Stroke” that as Assumed critical
by “Manufacturer”
-
Connection between Spun Pile by Electrode Las AWS E-6013 or otherwise determined as according
to the technical specification
-
Before “Final Penetration”, was made determined Calendar on millimeter paper block that put on
pile material and taking of Pile’s Final Set and should be got approval from Director / Consultant
Supervisor at first
-
For sequence of Next Pile Driven will follow Pile driven sequence that approved by Consultant
Supervisor
-
Pilling done until get Final set (S) as according to the specification (elevation planed)
-
Pilling can using Pile Follower if the last pile don’t reach elevation plan
Dredging and Embankment of River
Material Procurement
- Material by Supplier with
dimension, strength, and
form as ordering by
contractor
(refer
to
technical specification)
- Delivery material into work
site, and placed on stock
pile
Pile Driven
Equipments;
1. Crane with Pile Hammer
2. Tools
Construction
- First Pilling with first Pile, After
determinate
vertical
and
horizontal point
- Connection of first pile and
second pile as according to the
drawing
and
engineer
construction
- Pilling done until get Final
set (S) as according to the
specification
(elevation
planed)
- Pilling
can
using
Pile
Follower if the last pile don’t
reach elevation plan
Dredging and Embankment of River
1. Pemasangan Tiang pancang pada alat
Pancang
2. Pemancangan tiang pancang
3. Penyambungan Tiang pancang
4. Tiang pancang selesai/telah
Terpancang
5. Pemotongan Kepala Pile/Cut top pile
6. Pemasangan besi angkur dan stoper
DETAIL CUT TOP PILE
Construction Method :
 Pemotongan Tiang Pancang diawali dengan melakukan pemotongan
elevasi top kepala tiang dengan menggunakan gerinda potong yang
dimaksudkan untuk menunjukkan batas potongan agar pembobokan
rapi tidak melewati batas potongan.
 Diatas batas potongan tersebut pembobokan tiang dilakukan secara
manual (Godam, Betel dsb) hingga batas besi tulangan yang harus
masuk ke poer .
 Kemudian besi dipotong menggunakan gergaji besi dan sisa tiang
dibuang ke disposal area.
 Untuk tiang pancang baja, pemotongan dapat menggunakan Mesin
Las.
Dredging and Embankment of River
Cut Top Pile
Cut top pile can be
constructed after loading test
has been done after
determinde location
FLOW CHART OF PILLING DRIVEN
START
Delivery of Pile Material on Trailer
setting out Of location Pilling
Transportation of Pile
Approved
Placed of Pile on stock area
Pilling Process
Installation of Pile on Pilling
equipment
Cek
No
Yes
Pile Driven
Cek
No
Yes
Connection of Spun Pile by Welding
Machine
Cek
No
Yes
Finished Pile
Pile Driven
Cek
Cut top pile
FINISH
Dredging and Embankment of River
Yes
No
FLOW CHART OF CCSP
Finished Earth Work
No
Ok
START
Order & Manufacture By Supplier /
Sub Contractor
Equipment Mobilization (Crane with
Vibro Hammer)
No
Check
Yes
Delivery of Sheet Material on Trailer
Transportation of Sheet Pile
setting out Of location Pilling
Guide Beam Installation
Placed Sheet Pile on Work Site /
stock area
Pilling Process
pemancangan
Installation of Sheet Pile on Vibro
Hammer (Pilling equipment)
Pilling
No
Check
Yes
Finished Pillingi / Piled Sheet Pile
FINISH
Dredging and Embankment of River
Capping Beam
FLOW CHART OF REVETMENT
Finished of CCSP Work &
Cofferdam
No
Chek
Ok
START
Pile Driven
Fabrication of Pile
No
No
Chek
Chek
Ok
Ok
Back Filling
Structure Excavation & Cut
Top Pile
Delivery
No
No
Chek
Chek
Ok
Ok
Sand & Lean Concrete
FINISH
No
Chek
Capping Beam For sheet Pile
& revetment
Ok
Pile Cap (Reinforcing, Form
work and Concreting )
No
Chek
No
Chek
Ok
FINISH
Ok
Boring an install Anchor on
Existing Abutment
No
Chek
Ok
Structure Revetment (include
hole for drain)
No
Chek
Ok
Dredging and Embankment of River
Concrete Reinforcement
- Reinforcing Steel Bar
Assumption :
1. Work manually Labors and tools (bar bender and bar cutter)
2. Work Location : Structure Concrete
Description :
1. Reinforced steel Material become delivered from factory / supplier to work Site with
quality and dimension of the reinforcing steel as according to technical specification.
Otherwise determined to the drawing, used steel bar with quality as according to technical
specification and the shop drawing
Characteristic
Characteristic
Characteristic
Characteristic
Yield
Yield
Yield
Yield
Strength
Strength
Strength
Strength
of
of
of
of
U24
U32
U39
U48
=
=
=
=
2.400
3.200
3.900
4.800
kg/cm²
kg/cm²
kg/cm²
kg/cm²




Soft
Middle
Hard
Hard
2. Material put down at stock area (storage).
3. Continued assembled of reinforced steel / manufacturing, that is in the form of needed
measurement of length, cutting with bar cutter and bending with bar bender and done at
the time of cold temperature (as according to ACI.315 procedure or other wise determined
by technical specification).
4. After that Reinforced steel is compiled / to be attached as according to drawing execution
and his cross is bound by strength with bend rat wire / Tie Wire.
Tie wire for fastening reinforcement is annealed steel wire conforming to AASHTO M32 –
90 or other wise determined by technical specification
5. Steel reinforcing is placed so that the minimum clear covering of concrete over the
outermost edge of the main steel bar is as follows.
5.1. 3.5 cm for concrete not exposed to weather or to
ground water (for example, bottom of deck slab).
5.2. 7.5 cm for all submerged concrete which cannot be
made accessible, for inaccessible concrete in which
failure due to rusting of reinforcement could cause
loss of life or of the structure, for concrete placed
directly against the ground of rock, or for concrete
subjected to sewerage or other corrosive liquids.
Minimum Cover over Reinforcing Steel for Exposed but
Accessible Concrete
Dredging and Embankment of River
Size of Reinforcing Bar to be
Covered
(mm)
16 mm bar and smaller
19 mm & 22 mm bars
25 mm bar and large
Minimum Clear
Cover
(cm)
3.5
5.0
6.0
Dredging and Embankment of River
FLOW CHART of REINFORCING STEEL
START
List Bending of Bar
(BAR BENDING)
Delivery bar material from supplier and transportation
into site work
Stock deposit of material/storage
Check of material
-Strength Test
OK
Result
No
Get another
material
Material Weighing
Fabrication & Installation
Cutting and Bending
Installation on site
Check :
-
Diameter
Amount
Location
Repair
No
Result
Ok
FINISH
Ready to be concreted
Dredging and Embankment of River
-
CONCRETE
Assumption :
1. Work use mechanical equipment
2. Work Location : Structure Concrete
Considerations for producing a good concrete work
- The quality of the concrete depends a great proportion of the materials
used such as cement, sand, aggregate and water
- Lack of cement in the concrete mix causes less qualified and weak
- Too much water leads to poor concrete quality
- It is important to measure and add gravel and sand separately to create a
quality solid concrete
- Always use a clean gravel
Eguipment:
- Batching Plant + Truck Mixer
- Tools
Construction of Concrete
Reinforcing Steel
Description :
Equipment ;
- Batching Plant & Truck Mixer
- Concrete Vibratory
- Tools
A. Work Preparation.
A.1. The Work consist of the construction of all concrete structure
A.2. The Mixture material (cement, sand, aggregate) are delivered from supplier to work
location and storage. Concrete Production by Batching Plant.
It’s delivered to work location in the form of concrete ready mix and delivered by
Truck mixer.
During delivery, mixer cylinder in truck mixer continue to rotate to mixing the mixture
with rotation which is qualified so that the condition of the mixture has good quality
and it’s not run dry.
For storage of cement, done a special treatment. It’s storage in a weatherproof sheet
that is airtight, and has araised wooded floor (about 30 cm), which is covered with
polyethylene sheeting. At all times stack of cement bags to be kept covered with an
envelope of polyethylene sheeting.
A.3. Used Concrete quality as according to concrete quality which asked in tender
document and relative to Standard as below;
- AASHTO T141, T23, T126, T22
- Another Standard as asked/ as according to tender document
A.4 Used Portland cement type as according to request of tender document.
Type of Portland cement conforming to AASHTO M85 except type IA, IIA, IIIA and IV
or other wise determined by technical specification. Unless other wise permitted by
the engineer, air-entraining admixtures shall not be used or other wise determined by
technical specification.
Dredging and Embankment of River
A.5. Water used in mixing, curing, or other designated is clean, and free from harmful
matter such as oil, salt, acid, alkali, sugar, or organic materials.
Water tested in accordance with, and meet the requirements of AASHTO T26, other
wise determined by technical specification.
A.6 Coarse Aggregate, Which used ( measure / dimension) as according to request of
specification in tender document ( relative concrete standard of SNI 032-2816-1992
and AASTHO or other wise determined by technical specification) and have got
approved by Directors.
Aggregate is clean and free from Mud, other smooth particle, alkali and materials
organic / substance able to destroy quality of concrete.
Aggregate consist of clean, hard, durable particles obtained by crushing rock or
boulders, or by the screening and washing (if necessary) of natural river gravel and
sand.
Aggregate the used also conform with the other property specification given in table
in technical specification.
A.7. Sand /fine aggregate the used is sand result of stone crushed or natural sand which
got from river / source of nature and have got approvalof directors and have tested
Clean sand, free from clay, rock, materials of organic and alkali and other materials
able to destroy quality of concrete.
used sand ( measure / dimension) as according to request of technical specification in
tender document and have got approval of directors.
B. Mixing and production
B.1. The material proportional of Mix design using method of determined standard in
technical specification and in accordance with the limits given in table in technical
specification in tender document.
B.2. Trial mix done and result of it will be made reference making of concrete at the time
of work in work site and witnessed by directors.
Trial mix as according to request of technical specification in tender document and get
the engineer’s approval.
B.3 Mix Property Requirements as according to technical specification in tender document.
B.4. Mixing :
B.4.1. The Concrete is mixed in a mechanically operated machine (Batching Plant)
B.4.2. The mixer is equipped with adequate water storage and device for accurately
measuring and controlling the volume of water used in each batch.
B.4.3. The mixer is first charged with the catches aggregates and cement, and the
mixer started, before any water is added.
B.4.4. The time of mixing is measured from the moment water is introduced into the
material dry mix.
C. Placement.
- As preparation, work location of concreting cleared from garbage, wood cutting, bend
rat, nail and other garbage with vacuum cleaner, compressor and or water.
-
Form work coated internally with mould oil till covering all surface. Leakage of form
work been checked and repaired. Construction joint with concreting before all have
been coating with cal bond or cement water and also form work free from water pond.
Dredging and Embankment of River
Before concreting instruction, all permission the needed have been managed and
agreed by directors / owner and work supervisor.
-
For the Concrete of ready mix, concreting done by mechanically, from truck mixer pass
gutter. Concrete shall not be dropped freely into form work heights greater than 150
cm. So it’s not happened dissociation between the weight aggregate with concrete
pasta, ( segregation).
-
Compaction helped with adequate selected vibrator type mechanically in number.
Vibrator pipe inserted into the wet concrete vertically so that it penetrate to the bottom
of the freshly placed concrete and provides consolidation throughout the full depth of
section and it’s not to happened air pocket. Vibrator do not hit shutter or bar except
cover of concrete.
FLOW CHART of CONCRETE WORK
1. Preparation
Check of Material
NO
Get another material
Result
YES
Make trial mixture
NO
Test
Make another Mixture
YES
Concreting at Site
Dredging and Embankment of River
2. Preparation at site
Preparing of structure :
Check dimension, elevation
Check form work of concrete
Check of Bar (amount, dimension, form)
Check material which embedded (if any)
Preparing of equipment and material :
Preparing of material (amount &
quality)
Preparing equipment (vibrator)
Preparing tools (light, pump, tend, etc)
Concreting prepare :
Batching Plant, Gutter ,etc.
Man power
Check Of
Concrete
Concrete mixing
Take Concrete
Cube
Concreting & compacting
Curing
Removal of form work
Check Result
Reject
Good
Repair
Good
Age 28 day Test
Work is Accepted
Dredging and Embankment of River
Checking Of Cube
Take concrete cube
7 day test and otherwise
determined in the technical
specification
NO
Good
Result
Evaluation
Repair Mixture
28 day Test
NO
Result
Work is Continued
Good
Work is Accepted
Evaluation
Take sample from structure
NO
Dismantle
Dredging and Embankment of River
Test
Good
Work is accepted
Notes :
Repair mixing (if any)
Better method of working
etc.
OTHERS SUPPORTING OF CONSTRUCTION
1.
Cooperation with the Supplier for Material Construction and Specific subcontractors
The Contractor shall cooperate with Competent of Sub contractors and Supplier in their field
and with approval directors / Owner. Regularly and periodically, contractor will evaluate the
work and materials, where the results of the evaluation to be a reference for during
Construction
if the results of evaluation of sub-contractors and Suppliers are satisfactory (Refer to technical
specifications), Contractor will continue to use services of sub-contractors and suppliers during
Construction process, otherwise it will look for a replacement contractor and other parties who
are competent in their field and with the approval of board of directors / Owner
2.
Quality and quantity Control
- To ensure implementation of quality control used Quality Management System Standard
ISO (International Standard) which is owned by the contractor include:
▪ Make Creating Project Quality Plan.
▪ Make Construction’s Procedures.
▪ Make Work Instructions.
▪ Make Inspection and Test Plan
-
-
3.
To ensure that any material to be used has to meet the requirements of the specification
and the production process has complied with the procedures specified in the
requirements specification and any outcome of any work actually meets the
requirements of the specification and drawings, required a Project Quality Plan (Project
Quality Plan) by Technical Specifications.
To ensure the implementation of the Quality Assurance system, need a means of quality
control is to perform Internal Quality Audit and External Quality Audit conducted
periodically during the contract period.
Technical Aspects of Safety and Security Asset
In this construction, specially in technical aspects of safety, contractor will implement
"Procedure of Implementation of K-3".
For Operating Procedures K-3 and Labor, Contractor / Service Provider using the
procedures specified work and has received Certificate Management System Occupational
Health and Safety from the Department of Labor of the Republic of Indonesia and OHSAS
Certificates.
In terms of security of assets, contractor will work with the relevant security forces, the
internal security of the use of a reliable force in the field.
Insurance Program will also provided at starting time, during construction and final
construction of project according technical specification / tender documents.
Dredging and Embankment of River
LOGO / SIMBOL – SIMBOL K3
KESELAMATAN DAN KESEHATAN KERJA
KESELAMATAN
KERJA
5.
KESEHATAN
KERJA
Critical anticipation
To ensure of Construction can be completed on time, time perion as determined by Time
Schedule, translated again to schedule two (2) weekly, weekly to daily.
Monitoring of daily Schedule will be executed every day and always in "Up Date" by
Construction on work site, if delay of construction on that day, delay should be replaced
the next day, for example by adding working hours or other means so that delays can be
met.
Dredging and Embankment of River
CLOSING
For the construction that not be detailed in this construction Method, will be constructed as according to;
- All detail and construction sequence will reference and as according to Construction Sequence was
described in “technical specification” in tender document, include the addendum document (if any),
which apart of tender document
-
All construction, with form, dimension, type, detail as according to the drawing (shop Drawing)
-
All construction reference and use and will
meet all standards specified in the "Technical
Specifications" in the tender document including additional documents / addendum (if any) and other
applicable standards in the Republic of Indonesia.
-
Construction will be done by experts in their field
-
Construction will get maximum results, precision and neat in accordance to technical specifications
and the drawing.
Jakarta, 16th July 2013
PT. BRANTAS ABIPRAYA (Persero)
IR. HERMAN DWI HARYANTO
Regional II Manager
Dredging and Embankment of River
LAYOUT PLAN OF TEMPORARY WORKS AND FACILITIES
1. Proposed Location and Layout of Office, stores, Contractor’s Equipments areas and Access
This project, Base on location Project ( Waduk melati and Gunung Sahari Drain), contractor will build
on 2 location
ILUSTRASI;
Main Contrator keet /
Main base camp
Field Contractor Keet
/ Sub Base camp
Main Base camp  on west sahari drain
- Argument : Free way location (there is Existing Road flexible
pavement)
- Contractor keet can be rent for any building on there.
Base Camp / Site Installation
1. Problem
- Plan of Base Camp in Empty Space that already
Owner is Left side / Left of existing road.
2. Solution
- Contractor will rent from the owner while in the process of rent will
be assistant by Owner and other determined.
- If Possible, Contractor keet can be rent for any building on there.
Base Camp (west
river)
Dredging and Embankment of River
Notes;
- Main Base Camp = 1Unit
- Sub Base camp = 1 Unit
Sub Base Camp
Base Camp / Site Installation
1. Problem
- Plan of Base Camp in Empty Space that already
Owner is Left Waduk / West side waduk.
2. Solution
- Contractor will rent from the owner while in the process of rent
will be assistant by Owner and other determined.
-
After Approved by both of parties, contractor will constructed of
base camp with accessories required
-
Around location of base camp will be given zinc fence as a barrier
(with entrance-exit) are painted and given a logo contractors and
other symbols required
-
If Possible, Contractor keet can be rent for any building on there.
Base Camp (west
waduk)
Dredging and Embankment of River
Contractor’s Temporary Facilities according to the specifications in the tender documents such
as : Board of directors with dimension as according in BQ, the contractor’s office, the material
warehouse, material storage, site water supply, communication apparels , the project’s name
board, and other facilities required.
Measure just for sample ( no reference), Real measure as determined or as field condition.
Base Camp
6
7
5
8
KETERANGAN :
9
Jalan
Kerja
1
8
4
3
2
1. Kantor Kontraktor
2. Mess Pekerja
3. Laborat
4. Gudang
5. Musholla
6. Kantin
7. Klinik
8. Motor pool
9. Pos Jaga
10. Tandon Air
10
Image above only lustration of ” Construction of Base Camp” in the Project. Measure and real form as Field condition and needed
CONTRACTOR FACILITIES / KEET DIRECTION
DIREKSI KEET
Image above only lustration of ” Construction of Direction keet” in the Project. Measure and real form as Field condition and needed
Dredging and Embankment of River
BENGKEL KERJA/WORK SHOP
GUDANG/STORAGE
> Worshop and office Fabrication
Gudang/Storage
Image above only lustration of ” Construction of Storage and work shop” in the Project. Measure and real form as Field condition and
needed
BARAK PEKERJA/BASE CAMP
Image above only lustration of ” Construction of Labor Living” in the Project. Measure and real form as Field condition and needed
Dredging and Embankment of River
Access Road for Base Camp on Waduk melati
- Access to the Site can generally be achieved via the network of public roads and streets in the vicinity
of Site.
2. Contractor’s Loading Areas
- Loading Are for Material CCSP and Dredged material around the site
Waduk Melati
- Construction of Dredging Work
Dredged Material
Dredging and Embankment of River
-
Construction of Handling and hauling of Dredged Material
Work at 22.00 – 05.00 wib
Using existing Drain for temporary disposal
Hauling and dumping into Disposal
Using Container
Hauling and dumping into Disposal
-
Construction of CCSP
Work at 22.00 – 05.00 wib
Dredging and Embankment of River
Gunung Sahari
- Construction of Dredging Work
Work 24 Hour
- Hauling and Handling
Work at 22.00 – 05.00 wib
Dredging and Embankment of River
-
Construction of CCSP
3. Location of Temporary access Roads and Pipeline routes is any
- Access to the Site can generally be achieved via the network of public roads and streets in the
vicinity of Site.
-
The Contractor will use the existing road for the works.
-
The Contractor shall fully inform himself of the conditions of roads, traffic conditions and traffic
regulations with respect to gaining access to the Site for the purposes of performing the Works
and shall take all necessary actions to ensure availability of access to the Site as required.
4. Traffic Diversions
- In this Project, there is no Diversions, Only Traffic Management for Handling and Hauling to
disposal area
Dredging and Embankment of River
5. Location of all temporary Connections for electricity, water and sewage, and
6. Facility areas required for both on-site and off-site
1. Board of Project name and Fence of Base Camp
Board of Project name
Board of Project name made of Multiplex or Aluminum Plate and Frame of wood beams inscribed
project name, project number, Project Cost, Fiscal Year and name of contractor or determined in
accordance with the technical specifications.
Base Camp’s Fence.
Base camp Needed Fence with determined Location (near / close with
public ). Fence is made by zinc waves minimum 180 to 200 cm of the
soil surface with a wood frame or other specified technical
specifications. Safety fence is intended to facilitate surveillance and
patrolling the incoming material and facilitate the control of the
environment and out of base camp.
Material and Tools were needed for this work :
a. Materials : Borneo Wood 5/7, Zinc waves BJLS 32, paint and anchor
b. Tools
Construction Method :
- Cutting of Kaso wood as according to Height of Plan of fence as base of fence, forming as
determined so that fence can stand up.
- Installing of Fence on kaso wood already stand around base Camp
- Painting the fence with contras color.
2. Water Supply Work Water and Electricity Work
Water Supply by boring well or PDAM, for working and water in Base camp environment, clean
water from sludge, oil and other chemicals for the purposes of sanitary workers. Waste Discharge /
Dirt, with the waste stream into a Septic tank
Supply of electric by temporary connecting of PLN during construction or supply electric with self
by Genset with enough power during construction
3. Environmental response and Licensing / Permit
Contractor will permitting that relates directly or indirectly to the Related Parties, either Party
Government and private parties / outside Government Agencies (also relevant parties around the
project / socialization), It is important to ensure of "Clear of process " Construction in order to get
“on time schedule / schedule of Construction. In the Permit Process, contractor will require
cooperation and assistance of owner to facilitate of permitting process related.
Jakarta, 16th July 2013
PT. BRANTAS ABIPRAYA (Persero)
IR. HERMAN DWI HARYANTO
Regional II Manager
Dredging and Embankment of River