Installation and Construction of Offshore Wind Farms SMM Offshore Wind Dialogue Hans Kahle, CTO RWE OLC Hamburg, 06.09.2012 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Agenda HSSE & Quality Strategy, Scope of Work & Personnel Project preparation Seabreeze programme Technical equipment and vessels Project execution RWE OLC, Hans Kahle PAGE 2 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH HSSE & Quality Policies Consider the safety of staff, contractors and clients, and the protection of the environment as part of core values Believe that good HSSE management is an essential contribution to success Integrate standards and regulations in the company’s Total Management System (TMS) based on ISO 9001, ISO 18001 and ISO 14001 RWE OLC, Hans Kahle PAGE 3 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Company strategy • Concentration of marine logistics, construction and civil engineering know-how • Support and coordination of offshore wind projects through entire life cycle: development - construction - operation & maintenance Increase of experience and continuous improvement of logistics and construction methods Scope of Work Main Equipment Development JackJack-up (small) small) Service Vessel Construction Survey Vessel Soil Investigation & Permits Met Soil Investigation & Mast Survey JackJack-up (big) big) Service Vessel Guard Vessel Operation & Maintenance Cable Vessel Heavy Lift Vessel Construction Wind Farm Foundation Turbine Cable Substation JackJack-up (medium) medium) Service Vessel Supply Vessel Decommissioning • Operation & Maintenance Turbine, Balance OF Plant RWE OLC, Hans Kahle PAGE 4 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Scope of Work • Development of logistics and installation concepts/methods for offshore wind projects: Harbour study, analysis of transport routes, installation methods for foundations, wind turbines, cables and substations • Development/Engineering of equipment/special tools e.g. seafastening, lifting+handling tools, pile gripper etc. • Preparation and mobilisation: Base port, site, vessels, equipment • Execution of all logistics and construction activities: Port operation, Management of vessels, coordination of marine and air traffic, leadership, supervision and execution of offshore works • • Optimisation of logistics and installation concepts Logistics services for operation & maintenance RWE OLC, Hans Kahle RWE Innogy PAGE 5 RWE Innogy RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Know-How & Personnel • Interdisciplinary setup: Personnel with various professions in the construction industry, marine technologies and logistics • Experience and development: Personnel structure with experience specialists and young professionals • Commercial processes: Entire planning and construction processes accompanied by controllers, procurement officers and legal advisors • Planning and execution: Ability to execute offshore wind projects from development through construction until commissioning RWE OLC, Hans Kahle PAGE 6 RWE 9 OLC RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH ESRa (R&D) Project overview Gwynt y Môr Capacity: 576MW WTG number: 160 WTG type: Siemens 3.6MW Foundation type: Monopiles Pile diameter: up to 6 m Foundation weight: up to 750 to Distance to shore: 13km Water depth: 12-28 m Nordsee Ost Capacity: 296MW WTG number: 48 WTG type: Repower 6.15MW Foundation type: Jackets Foundation weight: 550 to Distance to shore: 32-45 km Water depth: 22-26 m „Evaluation of noise reducing systems during piling at an offshore testing pile“ Test location: Baltic Sea Tested systems: 6 Joint partners: E.ON, Vattenfall, EnBW, DONG, EWE, Stadtwerke München, BARD NSO IN1 ESRa Hamburg GyM Innogy Nordsee 1 Swindon Capacity: 1000MW WTG number: 162 WTG type: Repower 6.15MW Foundation type: Jackets Distance to shore: 40-50 km Water depth: 26-34 m RWE OLC, Hans Kahle PAGE 7 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Preparation of project base ports Cammell Laird Base port GyM foundation installation NSO Hamburg GyM Swindon • Charter contract with port operator • Preparation of storage areas • Procurement of cranes, SPMTs and personnel for transport and handling • Installation of Marine Coordination Centre Containerterminal I Bremerhaven Base port NSO installation phase RWE OLC, Hans Kahle PAGE 8 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Preparation of Method Statements I • Development and creation of method statements for loading, heavy lifts … RWE OLC, Hans Kahle PAGE 9 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Preparation of Method Statements II • … and for detailled installation procedures • Definition of technical interfaces RWE OLC, Hans Kahle PAGE 10 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Preparation of deck layouts I • Development of deck layouts in respect of technical execution • Deck layout of „Victoria Mathias“ for OWP Nordsee Ost RWE OLC, Hans Kahle PAGE 11 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Preparation of deck layouts II • Deck layout of „Friedrich Ernestine“ for OWP Gwynt y Môr RWE OLC, Hans Kahle PAGE 12 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Seabreeze programme Construction of two purpose built DP2 jack-up installation vessel RWE OLC, Hans Kahle RWE Innogy PAGE 13 13 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Seabreeze jack-up installation vessels Classification Main dimensions • • • • • • • • • • GERMANISCHER LLOYD 100 A5 Self Elevating Unit DP2 MC-AUT, Environmental Passport, SPS German Flag Length over pontoon: 100m Breadth moulded: 40m Depth to main deck: 8m Design draught (moulded): 4.5m Max. jackable payload: up to 4.400 t Max. deck strength: 15 t/m2 Propulsion Jack-up system • • • • • • DP2 class 6 x 1,600 kW retractable thrusters Design speed: 7.5 knots Number of legs: 4 Leg length: 78m Max. significant wave height: up to 2.5m Main crane • • Max. working height: 110m above deck Max. load capacity: 1,000t @ 25m RWE OLC, Hans Kahle PAGE 14 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Technical equipment I Vibration hammer MS-240 HHF • Developed and built by Müller (ThyssenKrupp) • Used at project Nordsee Ost • Driving of foundation piles into seabed by vibration Specification • Tensile force (stat.): • Tensile force (dyn.): • Weight: • Weight (dyn.): 2.600kN 2.100kN 25,4 t 14.300 t RWE OLC, Hans Kahle PAGE 15 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Technical equipment II Hydraulic hammer IHC S-1200 • Hydraulic hammer built by IHC • Used at project Nordsee Ost for running of jacket piles into seabed Specification • Max. impact energy: • Number of impacts: • Weight: • Height: • Diameter: 1,200kNm 40 impacts/min 222.2 t 13.7m 1.83m RWE OLC, Hans Kahle RWE Innogy PAGE 16 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Technical equipment III Hydraulic hammer Menck MHU 1900S • Hydraulic hammer built by Menck • Used at project Gwynt y Môr for running of monopiles into seabed Details • Max. impact energy: • Number of impacts: • Weight: • Diameter: 190kJ – 1,900kJ 32 impacts/min 325 t 3.75m – 5.2m RWE OLC, Hans Kahle RWE Innogy PAGE 17 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Technical equipment IV Drill rig • Drill rig built by LDD with a drill diameter of 6m • Used at projekt Gwynt y Môr for difficult soil conditions such as rock or clay if pile driving is not possible RWE OLC, Hans Kahle PAGE 18 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Technical equipment V SHL Further installation and service vessels • Heavy Lift Vessel (substation installation) • (Array/Export) Cable Laying Vessel • Offshore Support Vessel Subsea World News (grouting, ROV, diving works) • Scour Protection Vessel • Crew Transfer Vessel • Helicopter • Accommodation Vessel • Barges and Tugboats • Survey Vessel • Guard Vessel Semar AS van Oord Turbine Transfer RWE OLC, Hans Kahle Offshore Wind BIZ PAGE 19 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Installation I • Mobilisation of base ports and installation/service vessels finished • Marine Coordination Centres ready for operation • • Procurement of equipment done Recruiting and training of installation personnel completed • Successful installation of first monopiles and transition pieces at Gwynt y Môr • Complete installation of first GyM substation and start of export cable laying • Successful placement of first jacket at Nordsee Ost RWE OLC, Hans Kahle RWE Innogy RWE Innogy PAGE 20 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Installation II RWE OLC, Hans Kahle RWE Innogy RWE Innogy PAGE 21 RWE Group | RWE Innogy | RWE Offshore Logistics Company GmbH Installation III RWE OLC, Hans Kahle RWE Innogy RWE Innogy PAGE 22 Thank you for your attention! RWE Innogy RWE Innogy PAGE 23