Member of Al Manara Holding Contents: Who We Are Our Strategy Projects Execution and Management Our commitment to Health, Safety and Environment Our Global Presence Qatar Offices Smart Village Branch Work References Company Structure 1 Member of Al Manara Holding Who we are…… Athar Building and Development is a local construction company founded in 2002 based in Doha-Qatar. It is Part of Al Manara Holding. It has grown from a firm serving only the local Qatari market into one of the top engineering and construction contractors with huge projects and investments in the MENA region. We strive to deliver excellence and create value in every aspect of our operations for our clients and partners. 2 Expand market presence in our core market in Qatar and MENA Region. Operational Excellence by continuous commitment to quality, safety, environment and business practice. Establish strategic Partnerships and Joint Ventures with industry leaders to increase success rate in obtaining new projects. Provide high quality turnkey solutions on complex projects in several core of competencies, on time and on budget, to secure repeat business from the clients. 3 g Projects Execution and Management The Project Manager is the single point of accountability in the project; Plans are implemented to manage and execute each project: Engineering Plan relying on Safe Design criteria, Codes& Standards. Construction and Start-up Plan comprises Site Organization, Safety Policy and Sub-Contracting Strategy. HSE Plan Quality Plan Procurement Plan The Project Controls Department to monitor, adjust and update the cost plan and cash flows. 4 Member of Al Manara Holding Commitment to Health, Safety and Environment We are committed to continuously improving our Health, Safety and Environment performance through ISO-14001& OHSAS-18001. We continually promote employees’ safety on and off the job. We believe all occupational injuries and illnesses are preventable. Our Message: “The Health and Safety of our people is a core value and an absolute commitment.” 5 Member of Al Manara Holding Our Global Presence Qatar Oman UAE Egypt London Paris Geneva 6 Member of Al Manara Holding Qatar Offices Head Office: Al Manara Building Marketing Office: The Palm Tower Office Engineering Office: New Marqab 7 Member of Al Manara Holding New Branch- Smart Village- Egypt Because we believe in creating opportunities and not to wait for them to knock our doors; we had established our new branch in the Smart Village – the most prestigious Business Services Centre in Cairo, Egypt. A well nominated Business Development team and Engineers had been hired by our Central Human Resources Department to start the operation in September 1st, 2015. 8 Member of Al Manara Holding Why the Egyptian market…… Expanding a business in Egypt may be highly remunerative in the following sectors: Education: The sector is in robust expansion. The Egyptian government aims to add 2,200 private schools for kindergarten through high school over the next four years. The government has plans to build more than 1,800 public schools throughout Egypt over the coming 15 years. Ports and railways: Despite a developed coverage of road and rail networks and significant development of port facilities, investment opportunities in Egypt abound. Renewable Energy (Solar and wind): The renewable energy is a relatively virgin market in Egypt, the country’s strategic location makes it an attractive investment opportunity. Healthcare Refurbishment of Governmental Health Care Centers and Hospitals is planned by the Ministry of Health and population. Water & Wastewater Treatment Expansion of The Sewage Treatment Plants to improve the living standards of citizens. Work References Closing Deals Awarded Projects Projects In Operation Completed Projects 10 . Closing Deals Halmore Power Plant Lahore- Pakistan 11 Closing Deals Halmore Power Plant In Brief Client: EPC Contractor: Sub-Contractor: Our scope: Location: Project Value: Land use: Halmore Power Generation Company limited Descon Engineering Athar& GE- France Supply, O&M 70km west of Lahore, Pakistan 223,992,060 US$ Power Plant Project Elements Halmore Power Plant is a state of the art, Eco-friendly project that complies with all international standards for liquid and gaseous emissions, the project is under commercial operations since June, 2011and it is supplying electricity to Pakistan national Grid. The second Phase of the project consists of :The upgrade of the existing Halmore Power Plant, operating with 225 MW capacity, by additional 1200 MW to be working in a total capacity of 1445MW. 12 Member of Al Manara Holding Awarded Projects Oman Oasis Al-Barsha Hotel El Massah Village Oman Dubai Al Fujaira 13 Oman Oasis Awarded Projects 14 Awarded Projects Oman Oasis In Brief Client: Sebaa Ben Hemdan Ben Sebaa Al Saade Main Contractor: Athar Building& Development Client Representative: Primatic International Location: Sultanate of Oman, Shinas State Project Value: 6 Billion US$(Estimated) Plot area: 834,267SQM Total covered area: 141,000 SQM % of covered area: 16.5 % Land use: Residential& Recreational Development Timeline Project Duration: 15 60 months Member of Al Manara Holding Project Elements: 1. 2. 3. 4. 5. Hospitality a. “5 Hotels” -7 Stars b. Chalets Commercial Shopping Mall Indoor & Outdoor: Retail Spaces, Catering Outlets, Children’s Entertainment Area, Cinema, Ice Skating Ring. Residential a. Palaces & Grand Villas “17 Units” b. Residential Buildings “10 Units” Sports Area a. Sports Club: Swimming Complex With an All-Weather Olympic-Sized Pool, Synthetic Rubber Running Track, Synthetic Football Field, Strength & Conditioning Center, Indoor Multisport Auditorium, Lecture Halls, Seminar/Meeting Rooms. b. Indoor Sports: Olympic-Sized Pool, Gymnasium, Indoor Multisport Auditorium Synthetic Football Field. c. Outdoor Sports: Olympic-Sized Pool, Football Pitch, Basketball Court, Handball Court, Tennis Courts, Beach Volley. d. Water Sports: Sailing, Diving, Synchronized Swimming, Water Polo, Jet Skiing, Kite Surfing, Parasailing, Wakeboarding, and Yachting. e. Equestrian Club: Large Outdoor Arenas, Lighted Indoor Arena, Conditioning Track, Pro Shop And Clubhouse. Health Care a. VIP Spa b. Health Facilities (Male & Female): Sauna, Steam Rooms, Massage & Relaxation Facilities, Hydrotherapy Spa Pool, Cold Drench Showers, Grooming Lounge, Pool Bar And Lounge With A Specially Formulated Menu To Provide Great Tasting Food With Healthy Benefits, Gymnasium Including A Power Plate And Personal Training Available, Physiotherapy. 16 Member of Al Manara Holding 4. 5. 6. 7. 8. 9. Aqua Park Dancing Fountains Theme Parks Aquarium Yachts Marine Hospital Medical Center Athletic (100 Bed) 10. Water Treatment Station 17 Member of Al Manara Holding Awarded Projects Al Barsha Hotel In Brief Client: His Excellency Sheikh Hamad Khamis Juma Al-Suwaidi Main Contractor: Athar Building& Development Client Representative: Primatic International Location: Al Barsha First Project Value: 150,000,000 US$ (Estimated) Plot area: 2,603.79 SQM Total built up area: 39,479.80 SQM Land use: Hospitality Development Timeline Project Duration: Project Elements 30 months Construction of 5 Star Hotel that consists of 4 Basement, Ground Floor and 19 Floors above. Total number of rooms is 312 rooms. 18 Member of Al Manara Holding Awarded Projects 19 Member of Al Manara Holding Awarded Projects Al Massah Village In Brief Client: Main Contractor: Location: Project Value: Plot area: Land use: Al Massah Investment Company Athar Building & Development Al Fujairah- UAE 350,000,000 DHS 23,225.76 SQM Recreational Development Project Elements Construction of a Commercial and Entertainment Village in Al Fujairah- UAE; the project consists of Reclamation way, Indoor& outdoor Restaurants, Cafes, Shops, Kids area, GYM, Beach, Swimming pool and Healthy club. 20 Member of Al Manara Holding Projects in Operation Riviera Gardens Barzan Camp El Ebaib Park Al Duhail Al Wajbah Doha Qatar Iron Factory New Industrial Area District Cooling Plants Al Duhail 21 Storm Water Tanks Al Duhail Projects in Operation Riviera Gardens In Brief Client: Main Contractor: Main Consultant: Location: Plot area: Total built up area: Land use: Al Deera Real Estate Company Athar Building& Development Al-Jazeera Consulting Engineering Al Duhail, Doha 146,295.68 SQM 53,781.92 SQM Residential & Recreational Development Timeline Project Duration: Project Elements 20 months Construction of 4 residential buildings (2B + G + 2) and large recreational area that consists of club house (2B + G + 1), swimming pool and tennis court. Total number of residential units 101 and total number of car parking is 339. 22 Member of Al Manara Holding Projects in Operation 23 Projects in Operation District Cooling Plants (North & South) In Brief Client: Location: Internal Security Forces ISF Camp – Al Duhail Timeline Contractor appointed: April 2015 Construction start: May 2015 Completion: March 2016 Project Elements Civil works for two District Cooling Plants (North & South) including steel structure and precast fence. 24 Member of Al Manara Holding Projects in Operation Storm Water Tanks In Brief Client: Location: Internal Security Forces ISF Camp – Al Duhail Timeline Contractor appointed: April 2015 Construction start: May 2015 Completion: September 2015 Project Elements Structural works for 3 Storm Water Tanks. 25 Member of Al Manara Holding Projects in Operation El Ebaib Park In Brief Client: Main Contractor: Location: Land use: Ministry of Municipality & Urban Planning, Qatar Arc De Triomphe (sister company) El Ebaib Recreational Facilities Timeline Contractor appointed: January 2015 Construction start: 2015 Completion: 2016 Project Elements The scope of work entails renovation of El Ebaib Park. 26 Member of Al Manara Holding Projects in Operation 27 Member of Al Manara Holding Projects in Operation Qatar Iron Welding Factory In Brief Client : Al Manara Holding Main contractor : Arc De Triomphe (sister company) Location : New Industrial Area Total built up area : 2,418 sqm Land use: Industrial Timeline Contractor appointed: Construction start: Completion: October 2014 2014 2016 Project Elements Construction of a new Iron Welding Factory with all required facilities. Workshop (G+M) + Administration building (G+2) + Guard room. 28 Member of Al Manara Holding Projects in Operation 29 Member of Al Manara Holding Projects in Operation Barzan Camp In Brief Client: Consultant: Location: Land use: Emiri Guard PEO Al Wajba Residential Development Timeline Contractor appointed: August 2013 Construction start: 2013 Completion: Early 2015 Project Elements Supply, Delivery, Installation, Testing and Commissioning of mechanical works (HVAC, Fire Fighting and Fire Alarm works) for four Residential Buildings. 30 Member of Al Manara Holding Completed Projects Al Reem Complex The Lavender Sheikha Gardens Al Kaas Complex Residential Building Mehaiser Gharafa Al Rayyan Al Sadd Area Bin Mahmoud Al Ain Hotel Golden Ocean Hotel Copthorne Hotel Al Salata Area MKT Administration Building Old Salata Naseem Al Rabeeh Medical Centre Quality Hypermarket C Ring Road C Ring Road Al Hilal Area Old Airport Completed Projects Al Reem Complex In Brief Client: Location: Land Use: Kholoud Mohammad Al Dossary Mahaiser Residential Development Timeline Completion: November 2010 Project Description Construction of 22 Villas Compound (G+1+Penthouse) and Club House. 32 Member of Al Manara Holding Completed Projects 33 Member of Al Manara Holding Completed Projects In Brief The Lavender Village Client: Consultant: Location: Land Use: Sheikh Fahed Bin Abdulla Al Thani South West Architecture (SWA) Al Gharafa Residential Development Timeline Contractor appointed: November 2006 Construction start: 2007 Completion: 2009 Project Description Project entails construction of 240 villas (Ground + 1st floor + Penthouse) and 10 apartment buildings (2 storied) at Al Gharafa (in front of the Gharafa Sports Club). The project will cover an area of 65,000 sq.m and will feature a Mosque, a club, shops, a kindergarten, several swimming pools and playgrounds in addition to open green areas. 34 Member of Al Manara Holding Completed Projects 35 Member of Al Manara Holding Completed Projects Sheikha Gardens In Brief Client: Location: Land Use: Sheikha Munira Abdullah Al Thani Al Rayyan Residential Development Timeline Completion: March 2010 Project Description Construction of 163 villas Compound + Club House + Mosque + Administration Building. 36 Member of Al Manara Holding Completed Projects 37 Member of Al Manara Holding Completed Projects Al Kaas Complex In Brief Client: Main Contractor Location: Land Use: Sheikha Mounira Abdullah Al Thani Athar Building & Development Al Sadd Area Residential Complex Timeline Completion: June 2010 Project Description Construction of a Residential Complex Including 5 Buildings (B+G+3) in Al Sadd Area. 38 Member of Al Manara Holding Completed Projects Al Ain Hotel In Brief Client: MEP Contractor Location: Al Ain Hotel Athar Building & development Al Salata Area Timeline Completion: January 2010 Project Description Construction of (2B+G+14+P) Hotel at Al Salata Area. Scope of work includes: Supply and Installation of Electrical, Plumbing, Drainage, Fire Alarm, Fire Fighting and HVAC Systems. 39 Member of Al Manara Holding Completed Projects Golden Ocean Hotel In Brief Client: Location: Land Use: Mohamed Ali Khaldary Old Salata Hotel Timeline Completion: February 2012 Project Description Construction of Hotel Flats (2B+ G + 11) in Old Salata Area 40 Member of Al Manara Holding Completed Projects 41 Member of Al Manara Holding Completed Projects Copthorne Hotel In Brief Client: Location: Land Use: QIB Old Airport Hotel Timeline Completion: 2012 Project Description Hotel(2B+G+M+7+Roof Floor) Supply, Delivery, Installation, Testing and Commissioning of MEP Works. 42 Member of Al Manara Holding Completed Projects 43 Member of Al Manara Holding Completed Projects Quality Hypermarket In Brief Client: MEP Contractor Location: Land Use: Quality Hypermarket Athar Building & development AL Hilal Area Commercial Market Timeline Completion: June 2014 Project Description Construction of Hypermarket at AL Hilal area. Scope of work includes: Supply and Installation of Electrical, Plumping, Drainage, Fire Alarm, Fire fighting and HVAC. 44 Member of Al Manara Holding Completed Projects 45 Member of Al Manara Holding Completed Projects MKT Administration Building In Brief Client: MEP Contractor Location: Land Use: Shannon Engineering Athar Building & development C Ring Road Administration Building Timeline Completion: May 2012 Project Description Construction of Administration Building (2B+G+M+2+Roof floor). Scope of work includes: Supply and Installation of Electrical, Plumbing, Drainage, Fire Alarm, Fire Fighting and HVAC systems. 46 Member of Al Manara Holding Completed Projects 47 Member of Al Manara Holding Completed Projects Naseem Al Rabeeh Medical Centre In Brief Client: Location: Land Use: Shannon Engineering C Ring Road Health Care Timeline Completion: 2012 Project Description Supply, Delivery, Installation, Testing and Commissioning of mechanical works (HVAC, Fire Fighting and Fire Alarm works). 48 Member of Al Manara Holding Completed Projects 49 Member of Al Manara Holding Completed Projects Residential Building In Brief Client: Main Contractor: Location: Land Use: Mr. Ali Abdul Rahman Al Muftah Athar Building & Development Bin Mahmoud Residential Development Timeline Completion: August 2015 Project Description Construction of proposed Residential Flats Building (2B+G+8) – 24 Flats. 50 Member of Al Manara Holding Company Structure CEO HSE Technical Project Control QA/QC 51 Commercial Operational MEP Arc de Triomphe Member of Al Manara Holding With our Talented team, Solid reputation and Strong client relationships we are poised for continuous growth 52 Member of Al Manara Holding Thank You Visit us on www.athar.qa Tel: +974 4437 0707 | Fax: +974 4437 0770 | E-mail: info@athar.qa Al Manara Building, 207 Ahmed Bin Ali Street, Dist.35 Fereej Kulaib P.O. Box: 23654 Doha. Qatar 53 Member of Al Manara Holding