PowerPoint 演示文稿

advertisement
Honghua Offshore
Introduction
Oct. 2012
Disclaimer
This presentation is for reference purposes only. This presentation is prepared by Honghua
Group Limited (“Honghua” or “the Group”) for business communications and general
reference of the Group and shall not constitute in whole or in part any offer to purchase or
subscription for shares in Honghua or any of its subsidiaries. The presentation shall not
form any basis for any offer or commitment of any person(s) receiving it. Please consult a
professional advisor prior to use or reliance on any relevant data. The presentation is an
introduction only and shall not form a full description of the business, and current or past
performance of the Group. The information and data presented or contained in these
materials is subject to change without notice and its accuracy is not guaranteed.
No representation or warranty, expressed or implied, is made on this presentation. The
Group accepts no liability arising from the use of or reliance on any information (whether
financial or other data) presented or contained in this presentation.
No one shall in any way modify, copy, publicly display, publish or distribute such materials or
otherwise use the materials for any public or commercial purposes without the prior
written consent of the Group.
2
Contents
About us
Core Business
Capacity &Facilities
Historical Achievements
3
About Us
HH Offshore Introduction
Onshore to Offshore, Fulfilling Our Strategic Vision…
Honghua Offshore Oil & Gas (Jiangsu) Equipment Co., Ltd (hereafter referred to Honghua Offhsore)
invested by Honghua Group (HK listed Company, Code:HK0196), is a comprehensive offshore
solution provider capable of R&D, design, construction and commissioning for large offshore
products and special vessels.
Shanghai Honghua Offshore Oil & Gas Equipment Co., Ltd is R&D, Design and Marketing Center for
Honghua Offshore.
The Construction yard locates in Qidong Marine & Offshore Industrial Park, the ex-mouth of Yangzi
River to sea. With total area up to 1.4 Million m2, a coast line of 1.77km and average water depth
up to 9 m. In 1st phase, with heavy fabrication workshop up to 110,000 m2 equipped with various
advanced equipments, with slipway erection area up to 48,000 m2, and configuration of 2 sets of
400 t gantry crane and a 792m material & outfitting quay.
HH Offshore Strategic Shipyard
Facilities
Yard Size :
1.4million ㎡
Material Storage:
28008 ㎡
Coastal Line: 1770m
Plates & Profiles Shop Blasting:
1386 ㎡
Basin:
150m x 110m
Fabrication Workshop:
107038 ㎡
(Equip Crane: 2 x 11,000T )
Block Erection Workshop:
29232 ㎡
Slipway
Slips Erection Area:
47160 ㎡
46.5m x 160m
Blasting & Painting Workshop:
8944 ㎡
Quay
Gantry Crane :
Electric-Magnetic Crane
Length:
792m
1 x 400T
1 x 45T ; 2 x 25T
HH Offshore Shipyard Location
 Area: 1.5million ㎡
 Costal Line: 1770m
 Water Depth: -9m
 Basin : 150m x 110m
Core Business
HH Offshore Conceptual Design & Manufacture
Jack Up Drilling
Rig HHJ400
Semi-submersible Rig
HHS3000
Drilling Barge
HHB1
DES
Drilling Module
Offshore Drilling Package Application
Honghua Offshore
Drilling Package Application
Jack up
Semi Submersible
DES
Drillship
Tender Barge
Fixed Platform
Offshore Equipment Application
Honghua Offshore
Drilling Rig Components
Drawworks
Derrick & Mast
Mud Pump
Swivel & Hook
Manifold
Rotary Table
Top Drive
Motor
Offshore Equipment Application
Pipe
Handling
Implement
Iron Roughneck
(3-1/2”-8-1/2”)
Pipe Deck Crane
2 7/8″~30″
Power Catwalk
2 7/8″~30″
Pipe Racking Machine
(PRM-100)
Mud Bucket
3 1/2″~7″
Horizon/Vertic Arm
2 7/8″~9 5/8″
Mouse-hole
2 7/8 ″ ~10
Work Basket
(AB300x10)
Pipe
Handling
Implement
Jacking & Fixation System
Honghua Offshore technology
Center has Researched Jacking &
Locking system
which is suitable for harshenvironment jack-up rigs.
The Jacking & Locking systems are
designed and to be fabricated in
accordance with the relevant rules
and regulations of ABS and the
highest HSE standard.
Engineering & Capacity
Engineering
We have over 100 skilled engineers and
3000 production employees from all over
the world.
We will become global team of
competent and innovative people with
a strong passion for what we can do.
Engineering
Software Applications
 AutoCAD Mechanical
 GHS( Stability Analysis)
 Sacs (Strength & Fatigue Analysis)
 ETAP (Electrical Analysis)
 Tribon & PDMS (3D Arrangement)
 Aqwa (Hydrodynamic & Mooring Analysis) to be purchased
 Patran & Nastran, Ansys (Strength Analysis)
Honghai Crane
 Two(2) 11,000T combined Goliath Innovative technology
Reduces construction time
 Provides New Launching Method
Facilities
Quay
Dimension: L=792m
 Equipment:
1*45T Electric-magnetic Crane
2*25T Electric-magnetic Crane
Material Storage
Floor Area: 28,008㎡
 Equipment:
1*25T Electric-magnetic Crane
 Steel Storage area: 25,704 ㎡
Dimension: L=252m W=102m
 Scrap Storage area: 2304 ㎡
Dimension: L=96m W=24m
Facilities
Fabrication Workshop
Floor area:107,038 m2
 Dimension: L=447m W=222m
(5 sections 42m+45m+45m+42m+48m)
 Main Equipment:
2*Flame cutting machine (width≤4.5m
length≤18m)
3*N/C Plasma cutting machine
(width≤4.5m length≤18m)
1*100 ton crane (50t+50t, H=21m)
2*120 ton crane (60t+60t, H=21m)
1*200 ton crane (100t+100t, H=27m)
1*1000 ton hydraulic machine
1*300 ton hydraulic machine
1*3-roller plate roll machine
(4mx20mx42mm thick)
Facilities
Plates & Profiles Shop Blasting
Floor area: 1,386㎡
 Dimension: L=42m W=33m
 Equipment:
1* Steel plate & Profiles processing
Line (Max. width≤4.5m; SA2.5)
Block Storage Open Area
Floor area:84596㎡
1# block storage area
 Floor area: 16,064㎡
2#block storage area
 Floor area: 68,532㎡
Facilities
Slips Erection Area
Block Erection Workshop
 Floor area:47160㎡
(under construction):
 Equipment:
 Floor area:29,232㎡
1*400T Gantry Crane (W=100m, H=60m)
 Dimension: L=168m W=174m
Facilities
Blast & Paint Workshop
Floor area: 8,944㎡
 Blasting chamber (one)
Floor area:1728㎡
Painting chamber (two)
Floor area: 2,448㎡
Dimension: L=48m
Historical Achievements
23
Tiger Ⅰ& Ⅱ
Owner: Shanghai Shipyard
Project Name: Tiger Ⅰ& Ⅱ
Scope of Supply: Drilling Package
Water Depth: 900~1500m
Delivery: April, 2013
Class Society: ABS
NB35-2/LD4-2DCWR
Owner: CNOOC
Project Name: NB35-2/LD4-2DCWR
Location: Middle BOHAI Bay
Water Depth: 30m
Delivery: April, 2004
Class Society: DNV
Scope of Supply:
750HP Drilling module including
HZ25-3/1 DCWR
Project Name; HZ25-3/1 DCWR
Water Depth: 105m
Location: South China Sea
Delivery: August, 2008
Class Society: CCS
Owner
•
Scope of Supply:
•
2000HP Drilling module including:
PL19-3 B,C,D,E,F DCWR
Owner: CNOOC
•
Project Name: PL19-3 B,C,D,E,F DCWR
Water Depth: 18m
Location: BOHAI sea
Class Society: DNV
Scope of Supply:
•
1200HP Drilling module including
PL19-3 B,C,D,E,F DCWR
Owner:
Project Name: PL19-3
B,C,D,E,F DCWR
Water Depth: 105m
Location: South China Sea
Delivery: June, 2006
Class Society: DNV
Mast Replacement (with Max. Hook Load of 500,000 lbs)
Major Customer
Q
&
A
30
Thank you!
Contact Information:
Honghua Group Ltd.
Tel: +86 28 8601 5242
Fax: +86 28 8601 3847
Email: ir@hhcp.com.cn
Website: www.hh-gltd.com
Address: 99 East Road Information Park, Jinniu
District, Chengdu, Sichuan 610036 PRC
Porda Havas International Finance Communications Group
Tel: (852) 3150 6771
Fax: (852) 3150 6728
Email: cindy.xin@pordahavas.com
31
Download