Coal Storage and Blending Facilities
Serial No.:CSMO2013.1.1
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
Background
Back by Beijing Coal Designing Institute, FavorSea provide the designing and EPC contracting service of coal storage
and blending facilities.
The Sell-One-Store-One strategic mode is adopted in designing coal storage and blending facilities, thus dynamic
security of coal strategic reserve is achieved. We provide intensive and environmentally-friendly integrated coal supply
value chain to the customer by adoption of digitizing coal blending design idea, reasonably and scientificly allocating coal
from different source, adoption of following management model: refinement of coal products, chain operation of buying
and selling, integration of logistic,diversification of subject of investment, environment protection and low carbon energy
saving, optimization of operation cost, adoption of high tech of coal blending, networking of coal supply, strategic
approach of operation management.
Office Building of Beiijing Coal Designing & Research Institute
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
1
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
Profiles of main design project
1. Ground Production System for Shenhua Group Huanghua Port Co.,Ltd
A:Investor: It's jointed invested by Shenhua Group and Hebei
Province
B:Address: Development Zone of Huanghua Port, Cangzhou
City, Hebei Province
The position and role of the project: Key project of National
"Eleventh Five-Year plan"; Sea outlet of China second largest
coal transportion channel by which coal is ship from west to
east and north to south;China second largest mordern coal
transportation port.
C:Capacity: First stage: Annual handling capacity is 35
million ton. The static storage capacity of coal storage area
is 1.2 million ton.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
D:Planed second stage: Annual handling capacity reach 35
million ton. The static storage capacity of coal storage area is
2.4 million ton.
Long-time Planning: Coal handling capacity reach 150
million tons.
E:the mode of transport: Inbound: Train; Outbound: Ship.
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer.
G:The progress of the project: The first and second stage has
been in operation, Preparations were started in 2008 for the
construction of third stage project. After the completion of the
third-phase project, the total coal handling capacity will reach
150 million tons.
2
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
2 Coal storage and blending center in Wuhu Port
A :Investor: It's jointed invested by Huainan mining group and
Wuhu Port Storage & Transportation Co.,Ltd.
B: Address: North of Yangtze River, Wuhu City Suburb,
Anhui Province
C:The position and role of the project: National key
construction projects.
D:Capacity: The project are in two phases:
First phase: the coal blending and transportation volume of
departing vessel amount to 20 million tons, the stockpile
static reserves is 1.8 million tons.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
Second phase: the coal blending and transportation volume
of departing vessel amount to 50 million tons, t the stockpile
static reserves is 5 million tons.
E:the mode of transport: Inbound: Train; Outbound: Ship.
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer.
G:the progress of the project: Phrase one has been put into
operation, the second phase are being designed.
3
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
3. Coal storage and blending project of Shandong Longhai Coal Reserve & Delivery Co.,Ltd
A:Investor: It's jointed invested by Shandong Energy
Longkou Mining Group Co.,Ltd and Longkou port authority
B:Address: South of Honggang Port Berth, Yantai
City,Shandong Province
C:The position and role of the project: Key construction
projects of Shandong Province.
D:Capacity
First phase: the coal blending and port inbound delivery
volume amount to 10 million tons, the stockpile static
reserves is 300 thousand tons. The project covers an area of
about 15 hectares.
Second phase: the coal blending and port inbound delivery
volume reach 30 million tons , the stockpile static reserves
reach 1 million tons.
E: the mode of transport: Inbound: ship; Outbound: Train and
Truck
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer.
G:The progress of the project: Phrase one has been put into
operation in 2009.
4. Zone A logistics center of Ningxia Baofeng Energy Group Co., Ltd
A: Investor: Ningxia Baofeng Energy Group Co.,Ltd
B: Address: Ninghe comprehensive industrial park, Lingwu
City, Ningxia Hui Autonomous Region.
C:The position and role of the project: Key construction
projects of Ningxia Hui Autonomous Region.
D:Capacity: Design capacity is 16 million tons.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
Stockpile static reserves is 1 million tons, the project covers
an area of about 100 hectares。
E: the mode of transport: Inbound:belt conveyor;
Outbound: Train and Truck
F:coal storage facilities: Round drop tower-type capping
stockpile.
G:the progress of the project: under construction.
4
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
5. Coal separation and blending center of Jiangxi Ganxi coal Logistics Co Ltd
A: Investor: Jiangxi Tianyu Fuel Group Co., Ltd
B: Address: Gaokang town, Anyuan district, Pingxiang City,
Jiangxi Province.
C:The position and role of the project: Key construction
projects of Jiangxi Province; Strategy loading and unloading
point of Ministry of Railways
D:Capacity: First phrase: Static coal handling capacity of coal
storage area is 300 thousand tons, Dynamic handling
capacity is 3 million tons.
Feeding coal of coal preparation plant amount to 2 million
tons.
.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
Second phrase: Static coal handling capacity of coal storage
area is 1 million tons, Dynamic handling capacity is 3 million
tons.
The project covers an area of about 42 hectares.
E:the mode of transport: Inbound: Truck and Train;
Outbound: Train.
F:coal storage facilities: First phrase: trestle type capping
stockpile.
Second phrase: Round drop tower-type capping stockpile.
G:the progress of the project: Phrase one has been put into
operation, the second phrase are being designed.
5
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
6. New street coal logistics center of Erdos City
A:Investor: Inner Mongolia Erdos Group
B:Address: New Street Town, Ejin Horo Banner,Erdos City,
Inner Mongolia.
C:The position and role of the project: Key construction
projects of Inner Mongolia Autonomous Region.
D:Capacity: Annaual raw coal handling capacity amount to 50
million ton.
First Stage:10 million tons, the stockpile static reserves is
300 thousand tons.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
Second Stage:20 million tons, the stockpile static reserves is
1 million tons.
Third Stage:20 million tons, the stockpile static reserves is 2
million tons.
E:the mode of transport: Inbound: Truck; Outbound: Train.
F:coal storage facilities: Round drop tower-type capping
stockpile.
G:the progress of the project: under designing
6
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
7 Coal separation and blending center of Yangchang Bay, Province
A:Investor: Shenhua Ningxia Coal Industry Group Co., Ltd
B: Address: Lingwu City, Ningxia Hui Autonomous Region.
C:The position and role of the project: Key construction
projects of Ningxia Hui Autonomous Region.
D:Capacity: Annual coal separation and blending capacity is
10 million tons. The static storage capacity is 200 thousand
ton.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
E:the mode of transport: Inbound:belt conveyor; Outbound:
Train
F:coal storage facilities: Round drop tower-type capping
stockpile.
G:The progress of the project: The project has been put into
operation in 2005.
This project won the 2008 Luban Award of China
Construction project(National Quality Project)
7
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
8 Coal blending center of China Pingmei Shenma Energy & Chemical Group Co., Ltd
A:Investor: China Pingmei Energy and Chemical Group.
B:Address: Sishan Village, Xinji township, Lushan County,
Pingdingshan City
C:The position and role of the project: Major investment
project in non-core business of China Pingmei Energy and
Chemical Group.
D:Capacity
First Stage: the coal blending capacity reach 6 million
tdons which include 3 million tons outsourcing coal.
Static coal reserves reach 125,000 tons.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
Second Stage: The capacity reach 10 million tons.
The project covers an area of 20.3 heactares.
E:the mode of transport: Inbound: Truck and Train;
Outbound: conveyor belt to power plant
F:Coal storage facilities: large diameter coal silo
G:the progress of the project: under designing
8
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
9 Luoqi coal storage and transportation base of Chongqing Thermal Coal Storage and Transportation
A:Investor: Chongqing Thermal Coal Storage and
Transportation Group
B:Address: Luoqi town, Yubei District, Chongqing City
C:The position and role of the project: Key project of
Chongqing City and eastward shipment of coal from Xinjiang
Province
D:Capacity: Annual coal blending capacity is 15
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
million tons, the static storage capacity is 2 million tons. The
project covers an area of 70 hectares.
Static coal reserves reach 125,000 tons.
E:the mode of transport: Inbound: Ship and Train; Outbound:
ship and train.
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer.
G:the progress of the project: under designing
9
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
10 Jingjiang digitized coal storage and blending center of Shanxi Coal International Energy Co., Ltd
A:Investor: Shanxi Coal Import & Export Group
B:Address: New port campus, Jingjiang City, Jiangsu
Province.
C:The position and role of the project: National strategic coal
reserve base
D:Capacity: Annual coal separation and blending capacity is
30 million tons, the static storage capacity is 2 million tons.
The project covers an area of 100 hectares.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
E:the mode of transport: Inbound: Ship and Train; Outbound:
ship
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer and circular wheel stacker reclaimer
G: the progress of the project: under designing
10
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
11 Zhungeer convened loading station of Inner Mongolia Yitai Group Zhundong Railway Company
A:Investor: Zhundong Railway Co.,Ltd of Inner Mongolia Yitai
Group
B:Address: Dongsheng District, ,Erdos City, Inner Mongolia.
C:The position and role of the project: Shipping stationof Yitai
Group
D:Capacity: Annual storage, loading and shipping capacity is
25 million tons, the static storage
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
capacity is 1.2 million tons. The project covers an area of 93.4
hectares.
E:the mode of transport: Inbound: Truck; Outbound: Train.
F:Coal storage facilities: bucket wheel reclaimer
G:The progress of the project: The project has been put into
operation in 2010.
11
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
12 Coal storage yard of Jiangxi province coal storage center
A:Investor: Jiangxi Province Coal Group Co., Ltd
B:Address: Industrial park along the Yangtze river, Jiujiang
City
C:The position and role of the project: Strategic coal reserve
base of Jiangxi Province
D:Capacity: Annual storage, loading and shipping capacity
is 7 million tons, the static storage capacity is 1 million tons.
The project covers an area of 40 hectares.
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
E:the mode of transport: Inbound: Ship and Train; Outbound:
ship, truck and train
F:Coal storage facilities: large-scale bucket wheel stacker
reclaimer.
G:the progress of the project: under designing
12
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
13 Coal storage and transportation facility of Shenhua Ningxia Coal Group 4million ton indirect coal
liqufaction project.
A:Investor: Shenhua Ningxia Province Coal Group
B:Address: East ningxia province energy and chemical base,
Ningxia Province
C:The position and role of the project: National key project of
the "12th Five-Year Plan"
D:Capacity: Annual storage, loading and shipping capacity is
26 million tons, the static storage
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
capacity is 500 thousand tons. The project covers an area of
26.7 hectares.
E:the mode of transport: Inbound: Train; Outbound: Belt
Conveyor
F:Coal storage facilities: large-scale circular stacker
reclaimer
G:the progress of the project: under designing
13
http//www.FavorSea.com 3
info@favorsea.com
I
N
D
U
S
T
R
I
A
L
C
H A
N
N E
L
14 10 million ton coal comprehensive handling project for Henan Long Cheng Group
A:Investor: Henan Long Cheng Group
B:Address: No.3 harbor basin of Caofeidian Industrial Park
C:The position and role of the project: Key low-temperature
dry distillation project of Henan Long Cheng Group
D:Capacity: (First Stage): Annual coal separation covers an
area of 14.7 hectares.
and blending capacity is 10 million tons, the static storage
capacity is 220 thousand tons. The project
E:the mode of transport: Inbound: Truck and Train;
Outbound: ship, truck and train
F:coal storage facilities: Round drop tower-type capping
stockpile.
G:the progress of the project: under designing
Construction, Structures Schedule
Sequence Number
Name
1
The Car Dumper
2
The Car Dumper reproduced by the No. 1 point to belt conveyor trestle of the raw coal bunker
3
The Car by coal system
4
Car by coal system to the belt conveyor trestle of the NO.1 transfer point
5
NO.1 transfer point
6
The raw coal bunker
7
The raw coal bunker to the belt conveyor trestle of the raw coal off the the coal tower coal yard
8
The raw coal off the the coal tower coal yard
9
The raw coal off the the coal tower coal yard to the belt conveyor trestle of the raw coal bunker
10
The raw coal bunker to the belt conveyor trestle of the clean coal off the the coal tower coal yard
11
The clean coal off the the coal tower coal yard
12
The clean coal off the the coal tower coal yard to the belt conveyor trestle of the clean coal bunker
13
The clean coal bunker
14
The raw coal bunker to the belt conveyor trestle of the Preparation workshop
15
The beamhouse
16
The beamhouse to the belt conveyor trestle of the main workshop
17
The main workshop
18
The main workshop to the belt conveyor trestle of the clean coal bunker
19
The clean coal bunker to the belt conveyor trestle of The clean coal off the the coal tower coal yard
20
The clean coal off the the coal tower coal yard to the belt conveyor trestle of the clean coal bunker
21
The main workshop to the belt conveyor trestle of the Dagan blanking point
22
The king-rod blanking point
23
The main workshop to the belt conveyor trestle of the slime blanking point
24
The slime blanking point
25
The concentration workshop
26
Fire-fighting pool and pump room
27
Machine repair shop
28
Comprehensive office building
29
NO.2 transfer point
30
No. 2 transfer point to the belt conveyor trestle of the semi-coal stock
31
The semi-coal stock
32
33
The semi-coal stock to the belt conveyor trestle of the car fast loading station
The car fast loading station
34
2No. 2 transfer point to the belt conveyor trestle of the semi-coal blanking point
35
The semi-coal blanking point
36
The semi-coal storage shed
37
The semi-coal storage shed to the belt conveyor trestle of the NO.2
38
No. 2 transfer point to the belt conveyor trestle of the NO.3
39
NO.3 transfer point
40
The semi-coalstock to the belt conveyor trestle of the NO.3
41
No. 3 transfer point to the belt conveyor trestle of the NO.4
42
NO.4 transfer point
FavorSea Industrial Channel Limited
2307 First Building No.6 Dacheng Street,Beijing China
Tel: +86 10 8817 7742 Fax: +86 10 8817 7443
14
http//www.FavorSea.com 3