Rico Auto Manufacturing Engineering Department RICO TURTLE DIAGRAM - PROJECT MANAGEMENT (NEW PRODUCT DEVELOPMENT) Doc.Number RICO 14 DOC 03 Rev.No. Rev. Date 2 19.10.11 SKILLS Management Skill ¤ ¤ Leadership Skill Communication Skill ¤ ¤ ¤ ¤ ¤ ¤ ¤ Technical Skill Product & Process Knowledge Knowledge of relevant standards Change management Skill Knowledge of Core Tools Engineering design Skill Costing Skill Project Management Skill PROCESS OWNER PROCESS Name : PRODUCT DESIGN & DEVELOPMENT : HEAD - DEVELOPMENT : Project Management (New Product Development) ¤ Procedure - ¤ RICO18 QSP 01 (APQP / Product Realization / Proj. Mgmt.) ¤ RICO12 QSP 03 (Process for PPAP) TS Standards ¤ RICO 12 QSP 02 (Process for Process FMEA) TS 16949:2009 ¤ RICO 12 QSP 01( Procedure for control plan) ¤ RICO 12 QSP 04( Procedure for Process Flow Diagram) INPUT VARIABLE INPUT WORK INSTRUCTION/ STANDARDS - Customer Specific Standard PROCESS CONTROL PROCEDURE PROCESS Product Desgin & Development COMMON INPUT EMS / OHSAS Standards ISO 14001:2004 / OHSAS 18001:2007 OUTPUT Plan & Define ¤ ¤ Customer Target Dates ¤ ¤ ¤ ¤ AIAG Manual ¤ ¤ ¤ Packing Standards / Norms ¤ QEHS Policy - On time Development of Part as per Customer Requirement ¤ ¤ Business Plan -On time Completion of RFQ as per Marketing Requirement Objectives Customer specific requirements including Government regulatory requirement Timely Implementation of ECN On Time Development of Part Special Product characteristics TGW / TGR Reports / PFMEA Process Design & Development Engineering Drawings & Standards ECN Management ¤ PROJECT MANAGEMENT (NEW PRODUCT DEVELOPMENT) -On time Implementation of ECN as per Customer Requirement Targets for Productivity , Process capability, Cost ¤ Customer complaints / Feed back Bill of Material Quality rating APQP Timing Chart Warranty rating Lot Rejection PPM / Line Rejection PPM Feedback & Submission PPAP Submission Plant Head PROCESS OBJECTIVES PROCESS INTERFACE ¤ ¤ Marketing Customer Drawings / Customer Specific requirements / Kick-off Dates Purchase ¤ Vendor registration / Parts as per BOM Stores Issues of Material ¤ Mainteneance ¤ ¤ ¤ EFFECTIVENESS TOOL ROOM VENDOR DEVELOPMENT ¤ Project under taken Plan Vs Timely completed ¤ Capability Proveout Data (Cpk / Ppk) ENGINEE R Master List of Machines / Machine Installation , Machining Capability Quality & Lab Test as per control plan/ Inspection Standard Lab Test Schedules Performance / Layout reports / MSA Master List of IMTE / Calibration record Lab Matrix PPC Daily Production Plan as per customer requirement / Capacity utilization Human Resources Training / Motivational schemes / Competency / OJT Project Group Leader- 1 (NPD,RFQ & ECN) PROJECT LEADER ENGINEER Project Group Leader-2 (NPD,RFQ & ECN) ¤ No. of mistake proofing Plan Vs Implemented ¤ No. of ECN received Vs Timely implementation ¤ No. of RFQ received Vs Timely Completion EFFICIENCY ¤ Continuous improvement Projects PROJECT LEADER ENGINEER Govt. / Legal regulation ¤ Manufacturing Process ASSOCIATES Similar Line OEE / Rejection PPM / Rework PPm / Poke Yoke Tool Room Tool Maintenance / Master List 19.10.2011 01.07.2011 25.06.2003 ASSOCIATES ¤ 2 1 0 Sl.No Rev.No / Rev. date Reviewed & revised Reviewed & revised Initial Revision Details Prepared By Checked by Remarks Approved By Turtle Diagram Vendor Development INTERFACE COMPETENCE AND SKILL - QUALITY ASSURANCE DEPTT. - STORES - ACCOUNTS DEPTT. - PRODUCTION, PLANNING & CONTROL - TRAINING - MARKETING DEPTT. - ENGINEERING DEPTT. - MANAGERIAL SKILL - COMMUNICATION SKILLS - PROCESS KNOWLEDGE - DECISION MAKING - SUPPLIER DEVELOPMENT SKILL SUPPLIER SELECTION CRITERIA PART / SUPPLIER DEVELOPMENT PLAN TO MEET CUSTOMER REQUIREMENT SUPPLIER DEVELOPMENT & UPGRADATION TO REQUIRED INTERNATIONAL STANDARDS AS PER CUSTOMER REQUIREMENT CUSTOMER APPROVED SOURCES SUPPLIER DEVELOPMENT PLAN TIMELY DEVELOPMENT OF PART / MATERIAL CONFORMING TO CUSTOMER SPECIFIED REQUIREMENT, USER SPECIFICATION, AT OPTIMUM COST EHS SPECIFIC REQUIREMENT PROCEDURES RICO 08 QSP 01 / QSP/RICO GGN/ 06.1 RICO 08 QSP 02 / QSP/RICO GGN/ 06.2 RICO 08 QSP 03 / QSP/RICO GGN/ 06.2 RICO 06 QSP 09 / QSP/RICO GGN/ 16.1 RICO 02 QSP 04 RICO 18 QSP 01 PROCEDURE FOR PURCHASING PROCEDURE FOR ASSESSMENT & SELECTION OF SUPPLIER PROCEDURE FOR SUPPLIER DEVELOPMENT PROCEDURE FOR QUALITY / EHS RECORDS PROCEDURE FOR RESOURCE MANAGEMENT PROCEDURE FOR PRODUCT REALIZATION PERFORMANCE EFFECTIVENESS (1) PART DEVELOPMENT COST PLANNED V/S ACTUAL (2) PART DEVELOPMENT TIME PLANNED V/S ACTUAL (3) NO OF PARTS DEVELOPED MONTHLY (4) FAILURE IN PART SUBMISSION TO CUSTOMER DUE PART NOT DEVELOPED ON TIME EFFICIENCY (1) PART DEVELOPED EFFECTIVELY INTERMS OF COST, TIME & REQUIREMENT PROCESS OWNER : VENDOR DEVELOPMENT HEAD Department Functions ►REQUEST FOR QUOTATION ►TECHNICAL REVIEW ►NEW WITH CUSTOMER PRODUCT DEVELOPMENT ►APQP ACTIVITIES & DOCUMENTS ►PPAP ACTIVITIES & DOCUMENTS ►ENGINEERING ►DESIGN CHANGE MANAGEMENT OF FIXTURES,SPL TOOLS AND SPL GAUGES. ►MANUFACTURING ►VENDOR OF FIXTURES & GAUGES. DEVELOPMENT FOR BOP & CASTINGS ►CAPITAL PROCUREMENT Department Objectives ►MEET CUSTOMER REQUIREMENTS ►REDUCE ►LEAN LEAD TIME FOR NEW PRODUCT DEVELOPMENTS MANUFACTURING ►ELIMINATE MANUAL OPERATIONS ►REDUCE CYCLE TIME ►REDUCE CONSUMABLE TOOL COST ►IMPLEMENT POKA YOKE. Schematic of Process flow Marketing Received dwg submit to Customer Cost Estimation Feasible Feasibility study Not feasible Negotiation/Tech.Review Vendor Development Dwg Freeze BOP Parts APQP Timing plan & Activities Sample Dev Not OK. PILOT LOT Customer Feed Mark Submit to customer OK. Tech.Reveiw APQP Issues L.O.I/P.O.Release SPC STUDY PPAP SOP Key Customer and Products (Domestic) Differential Case,Fly Wheel Assy Rotor Oil Filter,Front &Rear Panel, Alloy Wheel,Crank Case,Front Panel Forks,Steering Knuckle, Brake DiscCover Cylinder Head, Engine Brackets,Case oil Pump Assy. Brake Drum,Oil Pan. Crank Case,Clutch Assy,Grip Rear Panel,Grip Cylinder Block,Cylinder Head, Bed Plate,Cover Cyl Head FiamMinda Connection Water Out let Plate EGR,ACG Braket Stay Front,Cover Cam Thrust Jerico Body, Housing Regulator Cap MainBearing,Head Lube Oil Filter Connection Water Inlet,Head Fuel Filter Connection Water Out Let Housing Thermostat,Cover intake mnfoldCover Rear,Housing Gear. FCC RICO(JV) Face Movable Drive,Face Fix Drive Bracket Rad Lwr Pressure Plste,Outer Clutch Engine Bracket Center Clutch Turbine Housing, Center Housing Brace Transmission FORKS Bracket Alternator Balance shaft,Bracket comp p/s pump Water Pump(Casting) Tandum Master Cylinder (Casting) Brake Drum, Brake Disc Key Customer and Products (Export) Differential Case Support ASM FRNT DIFF Trsfr DRV(6F) Bracket alternator Bracket Fly wheel Sensor Plate Adaptor Stay Front,Support Bracket Oil Filter Head,Timing Gear Case Base as fuel filter Pipe Intake,Pipe angle Manifold,Housing regulator Base as fuel Head Manifold,Container cat Housing Pump,Housing RR Axle. Cover side,Base rocker arm Cap Main Bearing,Exhaust Manifold Retainer bearing bracket Piston bearing break Bearing Caps Support Seal RING,Housing Pump Pressure plate,Intermediate Plate Engine support brACKET Rear case,Front Case. Housing Connection water Inlet Connection water outlet Turbine Housing,Center Housing Support Alternator Housing thermostat Connection Fuel Block