“Company Technical Profile” Wajih Contracting Co. www.wajihcontracting.com “We have Built the most difficult of all…………….. ………A good reputation” Copyright © 2009 Wajih Contracting Co. Page 1 of 114 Wajih Contracting Co. is the proud winner of the Ministry of Public Works & Housing Contracting Award for the year 2008 Copyright © 2009 Wajih Contracting Co. Page 2 of 114 TECHNICAL PROPOSAL Technical Proposal CONTENTS: 1. Structure and Organization 2. Financial Data 3. Resources: Personnel 4. Resources: Equipment and Facilities 5. Resources: Nominated Sub‐ contractors & Approved Suppliers 6. Quality Assurance 7. Safety 8. Past Experience 9. Methodology and Project Understanding 10. Awards, Prizes won for Achievement. Copyright © 2009 Wajih Contracting Co. Page 3 of 114 TECHNICAL PROPOSAL Introduction History: Established in 1995, Wajih Contracting is a limited liability company founded by the entrepreneurial vision of engineer Elias W. Khoury. Mission statement: Our company is specialized in building construction, rehabilitation, renovation, internal works and decorations. We are committed to providing reliable, amicable, and professional service to our valuable clients. Our appreciation of our clients' interests is evidenced by meeting their requirements and insuring high quality work which is the prime directive of our management. Our growth and profitability are maintained through innovation, technical enhancement, and adaptability to all our projects. Vision: To be one of the best contracting companies in the market. This could be measured by our top quality/on time products which became our trademark reputation and is also highly valued by our clients. Copyright © 2009 Wajih Contracting Co. Page 4 of 114 TECHNICAL PROPOSAL 1. STRUCTURE AND ORGANAZATION 1.1 General Company Information: Name of company: Wajih Contracting Co. (Ltd) City: Amman Country: Jordan Telephone: 582 9250 Mobile 079‐ 5534913, 079‐6666517 Telefax: + 962 6 588 5120 PTT: 1962 * 253 * 1‐ 35 P.O. Box: 940404, Amman 11194 E‐mail : info@wajihcontracting.com Web Site: www.wajihcontracting.com 1.2 Description of Work Categories Normally Performed with Our Own Resources: Engineering Civil Structural Mechanical Waterproofing Painting Electrical Finishing works Scaffolding Post Tensioning works Joinery Works Piping Decorations HVAC False Ceilings Namely: In addition to all Civil Works, we carry out with our own resources, Planning and All Finishing works, which includes but not limited to: Joinery; Gypsum plaster; Gypsum Board Cladding, Ceilings and Partitions; All types of Floorings; All types of wall coverings in addition to all related Internal and decorations works. Mechanical and Sanitary Works are also carried out by the company since Jan. 2005 1.3 Approximate Number of Years Experience as a Contractor. <1 <5 <10 >10 1.4 Organization Chart of Our Company Including Names of Key Personnel Attached Overleaf 1.5 Proof of Registration with Ministry of Public Works and Housing and the Jordanian Contractors Association. Attached Overleaf Copyright © 2009 Wajih Contracting Co. Page 5 of 114 TECHNICAL PROPOSAL 1.6 Our Company is Pre‐qualified as Nominated Contractors by the Following International Bodies:‐ USAID (United States Agency for International Development). UNRWA (United Nations Relief of Works Agency). Abt Associates PHCI (Primary Health Care Initiative). MWH (Montgomery Watson Harza)| Tier “A” Sub‐contractor. Ster Century Cinemas, Middle East. Apostolic Nunciature, Amman. British Embassy. Embassy of Switzerland Australian Embassy 1.7 Notes: Our Company is specialized in Building Construction, Rehabilitation, Renovation and Internal Works & Decorations. Our commitment to deliver top quality product on time through our highly trained staff has gained us an excellent reputation in the market in addition to a long list of reputable clients (Listed elsewhere) which is considered a remarkable achievement related to number of years in business. Our company is currently specialized in post tensioning works including the design & implementation processes in association with our associate partner M/S. Freyssinet. 1.8 Joint Ventures & Sister Companies Joint Venture with RAJA SAMAWI CONTRACTING EST. since April 2004 All Projects since are being executed as JV. Sister Companies Tawfiq Kayyal & Partners Co. for JOINERY WORKS. Technical Housing and Real Estate Co. Ltd. Associate partner: Freyssinet. List of Projects executed using the Post Tension method: Abu Tawileh Project Rawashdeh Complex Building Sara Office Building Metal Sheet Printing Factory Green Oasis Commercial Building Estimated value of projects using the PT method = 6,000,000.00 JDs Copyright © 2009 Wajih Contracting Co. Page 6 of 114 TECHNICAL PROPOSAL 1.4 COMPANY ORGANIZATION CHART Copyright © 2009 Wajih Contracting Co. Page 7 of 114 Company Organization Chart Chairman Board of Directors – General Manager Elias W. Khoury Office Manager (Rowan Haddad) Deputy Chairman Board of Directors – Executive Manager Raja Samawi External Auditor (Ahmad Alami) Accounting Dept. Financial Manager Chief Accountant (Mahmoud Hamida) Accountant # 1 (Loai Hijazi) Accountant # 2 HR & Administration Dept. HR & Administration Manager HR Officer (Raji Qandah) Purchasing Officer (Odeh Imseeh) (Abd El Kareem Mohsin) (Ibrahim Abu Yehia) Building Construction Dept. ID, Renovation & Decorations Dept. Manufacturing Dept. Projects Manager (Mohammad Ashkar) Project Manager (Fathi Sarhan) Project Manager (Farouk Jouhari) Site Engineer (Khali Basiouni) Site Engineer (Salah Hadadin) General Foreman (Mahmoud Hajeer) General Foreman (Salameh Qaisi) General Foreman Architect (Walid Chami) Architect (Shawki Samawi) Construction Dept. Projects Manager (Mazen Numeir) Foreman (Mohd Hijazi) Architect (Elisse Sawalha) Foreman (Rami Omran) Electrical Dept. Manager (Ala Issa) Mech. Dept. Manager (Saber Qandah) HVAC Site Engineer (Ez Sharif) Foreman (Falah Musa) Foreman Foreman (Basam Dawaseh) Engineering Dept. Contracts Dept. Planning/ Estimation Manager (Ala Omair) Contracts Manager (Shadi Bajjali) Estimator (Manar Naber) Engineering Manager Foreman Architect (Maisaa Mohsen) Site Engineer (Fadi Abu Lawi) Site Engineer (Elia Khoury) Factory Manager (Shadi Matari) Design Dept. ElectroMechanical Dept. Foreman (Ammar Ahmad) CAD Dept. Plumbing Site Engineer (Saed Abu Ali) Foreman Foreman (Abd Hamid Ibrahim) Foreman (Amin Abdel Qader)) E/M Draftsman Draftsman # 1 (Imad Qaisieh) Draftsman # 2 (Eng. Samer Razzak) Draftsman # 3 Page 8 of 114 Copyright © 2009 Wajih Contracting Co. www.wajihcontracting.com TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 9 of 114 TECHNICAL PROPOSAL 1.5.1 REGISTRATION WITH THE MINISTRY OF PUBLIC WORKS AND HOUSING Copyright © 2009 Wajih Contracting Co. Page 10 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 11 of 114 TECHNICAL PROPOSAL 1.5.2 REGISTRATION WITH THE JORDANIAN CONTRACTORS ASSOCIATION Copyright © 2009 Wajih Contracting Co. Page 12 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 13 of 114 TECHNICAL PROPOSAL 1.5.3 REGISTRATION WITH MUNICIPALITY OF GREATER AMMAN Copyright © 2009 Wajih Contracting Co. Page 14 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 15 of 114 TECHNICAL PROPOSAL 1.5.4 REGISTRATION WITH MINISTRY OF TRADE & INDUSTRY Copyright © 2009 Wajih Contracting Co. Page 16 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 17 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 18 of 114 TECHNICAL PROPOSAL 1.5.5 Membership with the Jordanian Interior Design Association (JIDA) Copyright © 2009 Wajih Contracting Co. Page 19 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 20 of 114 TECHNICAL PROPOSAL 2. FINANCIAL DATA 2.1 Registration Number at Chamber of Commerce Place of Registration Not Registered 2.2 Yearly Turnover and Net result of Last 10 Years (in Thousands. JDs). Year 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1994 ‐1996 Turnover 16,000,000 8,000,000 6,265,205 2,767,675 2,797,835 1,342,788 1,450,930 1,777,465 915,212 1,010,785 474,895 510,350 1,126,676 2.3 Bank References. Bank name Housing Bank For Trade and Finance Jordan Kuwait Bank Banque Audi Jordan National Bank Location Abdoun Branch Sweifieh Branch Mecca Mall Branch Mecca Street Branch Telephone 5931122 5851027 5518736 5852511 Notes: 2.4 Banker’s Statements on Financial Position of company attached overleaf (Above declarations were endorsed on classification application form submitted to MOPWH & other bodies). Bankers never received any claim what so ever on issued guarantees, whether Bid, Performance or Maintenance. Bankers never refused to issue, increase or renew any credit facilities requested by the company. No bounced cheques were ever registered against the company or any of its clients. NAME & ADDRESS OF THE PROPOSED SURETY for the PERFORMANCE SECURITY THE HOUSING BANK for TRADE & FINANCE Tel: 593 1122 Fax: 593 0465 ABDOUN BRANCH OR JORDAN KUWAIT BANK Tel: 585 1027 Fax: 585 1028 SWEFIEH BRANCH OR JORDAN NATIONAL BANK Tel: 585 2511 Fax: 586 6097 MECCA ST. BRANCH Copyright © 2009 Wajih Contracting Co. Page 21 of 114 TECHNICAL PROPOSAL 2.4 BANKERS DECLARATION Copyright © 2009 Wajih Contracting Co. Page 22 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 23 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 24 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 25 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 26 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 27 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 28 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 29 of 114 TECHNICAL PROPOSAL 3. PERSONNEL Copyright © 2009 Wajih Contracting Co. Page 30 of 114 TECHNICAL PROPOSAL 3 RESOURCES: PERSONNEL 3.1 Number of Employees: Position Management No. Position No. 5 Construction Supervisor 4 Project Managers 6 Foreman 7 Site Engineer 5 Welder S/c Skilled Worker 309 140 Design Calculation Part Time CAD Operator 3 Unskilled Worker Quantity Surveyor 1 Crane operator 3 Procurement 2 Field Safety Supervisor 2 Planning & Cost Control 4 Field Quality Control Supervisor ‐ Administration 2 Field Office M ‐ Safety 1 Electrical Engineer 2 Mechanical Engineer 3 Quality Assurance Third Party 3.2 Information will be provided about the technical staff who will be working on this project include. Project Manager, site engineers & inspectors. 3.3 Notes: Attached sheet includes permanent staff and can always be increased according to any new contract needs. PERSONNEL: ADMINISTRATIVE STAFF POSITION General Manager Auditor NAME REMARKS Elias W. Khoury 23 years experience B.Sc., C. Eng.(Leeds) Ahmad Al‐Alami License No. (337) Class “A” Part Time Chief Accountant Mahmoud Hamida 14 years experience Accountant Loai Hijazi 5 years experience HR & Personnel Raji Qandah Office Manager & Administrator assistant Rowan Hadad 7 years experience Purchase & Public Relations Monther Al‐Adawie Ibrahiem Sulaiman 18 years experience Copyright © 2009 Wajih Contracting Co. Page 31 of 114 TECHNICAL PROPOSAL TECHNICAL STAFF POSITION Executive Manager, Technical Manager & Projects Coordinator Projects Manager & Head of Civil Engineering Dept. Project Manager & Head of Architectural Dept. Architect Projects Manager & Head Of renovation & interior decoration Head Of Mechanical Engineering Dept. Chief Quantity Surveyor Planning Engineer & Contracts Manager Planning Engineer Site Engineer Project Manager Project Manager Project Manager Site Engineer Site Engineer Mechanical Engineer Electrical Engineer Surveyor NAME REMARKS Raja Samawi Civil Engineer 23 years experience Mohamad Naji Al‐Ashqar Civil Engineer Walid Al Chami Architect Shawki Samawi Architect Mazen Numeir Civil Engineer Saber Qandah Mechanical Engineer 20 years experience 23 years experience 3 years experience 26 years experience 11 years experience Yehia Sweis 30 years experience Shadi Bajjali Civil Engineer, MSc Ala Omair Civil Engineer Marwan Abu Shkara Civil Engineer Fathi Al‐Sarhan Civil Engineer Farouq Al‐ Jawhery Civil Engineer Shadi Matari Civil Engineer Fadi Abu Lawi Civil Engineer Salah Haddadin Civil Engineer Ezz Al Sharif Mechanical Engineer Ala Ahmad Issa Electrical Engineer 7 years experience 6 years experience 22 years experience 20 years experience 16 years experience 6 years experience 1 years experience 9 years experience 2 Year 9 years experience Mohammad Shehadeh 21 years experience AutoCAD Drafting / IT Manager Imad Quisieh 11 years experience Architect Samer Razzak 15 years experience Architect Elisse Sawalha 7 Years experience General Foreman Basem Al ‐ Lozi 27 years experience Civil Works Foreman Ahmad Al‐ Sakani 25 years experience Civil Works Foreman Bassam Dawawsa 15 years experience Civil Works Foreman Rami Omran 10 years experience Finishing Works Forman Amin Abd‐ Alqader 32 years experience Finishing Works Forman Falah Mousa 27 years experience Finishing Works Forman Mohammad Hijazi 15 years experience Finishing Works Forman Abdel Hameed Hashem 12 years experience Finishing Works Forman Amar Mahmoud 16 years experience Copyright © 2009 Wajih Contracting Co. Page 32 of 114 TECHNICAL PROPOSAL LABOR TRADE NUMBER Skilled Civil Works Labors, Mason, Carpenter, Steel Fixers.... etc. 125 Semi‐ Skilled Labor, Civil Works & Finishing Works 75 Skilled Electromechanical Labor, Electrician, Plumber, Welder ... etc. 28 Skilled 1st Class Finishing Works Labor, Plastering, Tiling, Cladders, Painters.... etc 80 Above Labor Numbers as of Jan. 2009 time sheet and are permanent and can be increased according to contract needs. Pie Charts showing General Personnel Breakdown Copyright © 2009 Wajih Contracting Co. Page 33 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 34 of 114 TECHNICAL PROPOSAL 4.1 EQUIPMENT LIST Copyright © 2009 Wajih Contracting Co. Page 35 of 114 TECHNICAL PROPOSAL EQUIPMENT: OWNED AVAILABLE EQUIPMENT: Type of Equipment Quantity Estimated Value JD Cranes & Lifting Equipment 4.5 Ton Tower Crane 32m ( H ) x 42 m ( Boom ) / Libher 6 Ton Tower Crane 48m ( H ) x 55 m ( Boom ) 1.0 Ton Tower Crane 18m(H)x32m(Boom) / San Marco 1.5 Ton Tower Crane 37m(H)x42m(Boom) / Ferro 1 Ton Lifting Crane ( Electrical Operated ) 0.75 Ton Lifting Crane ( Diesel Operated ) 0.75 Ton Lifting Hoist (60 m) High TOTAL 1 No. 1 No. 1No. 1 No. 2 No. 2 No. 1 No. 45,000.000 100,000.00 22,000.000 40,000.000 3,000.000 3,000.000 12,000.000 225,000.0000 Vehicles, Transport & Construction Equipments 4.0 Ton Dump Truck ( Mercedes 1996 Model ) 2.5 Ton Dump Truck (Mitsubishi) 2005 Model 0.5 Ton Double Cabin 4x4 Truck (Mitsubishi) ( 2006 ) 0.5 Ton Double Cabin Truck (TOYOTA ) ( 2004 ) 4x4 Vehicle KIA Sportage (2005) Model Bobcat Wheel Loader Loader (Toyota 1986 Model) 4x4 Vehicle GMC 4200cc (2006 Model) 4x4 Mitsubishi Pajero 3800cc (2006 Model) Daihatsu Sirion 2007 Model Chevrolet 2005 Model TOTAL 1 No. 1 No. 1 No. 1 No. 2 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 18,000.000 18,000.000 14,000.000 14,000.000 42,000.000 8,000.000 8,000.000 32,000.000 30,000.000 11,400.000 6,500.000 201,900.000 1No. 5 No. 7 No. 1 No. 5,000.000 4,000.000 2,100.000 600.000 11,700.000 1 No. 2 No. 12,000.000 4,000.000 2 No. 2,000.000 6 No. 1,800.000 2 No. 1,300.000 Batching Plants & Casting 1/2m3 Concrete Central Batching Plant Concrete Mixers Concrete Vibrators Mortar Electrical Mixer TOTAL Cutting & Fabricating Equipment Stone Cutting Mill / 3 Discs / Sahab Industrial Estate Stone Cutting & Grooving Mill ( Site Located Type ), 3 Phase – Electrically Operated Electrical Marble & Ceramic Tiles Cutting Saw / Wet cutting, 1 Phase – Electrically Operated Hand Operated Ceramic & Porcelain Tiles Cutters (Different Size up to60x60 ) Fair Face Panel & Timber Electrical Saw & Cutting Machines – 1 Phase – Electrically Operated TOTAL 21,100.000 Factories & Warehouses Owned by the Company Jordanian Company for the Manufacturing of European Furniture ‐ Madaba Company Main Warehouses 1 No. 1 No. 640,000.000 140,000.000 780,000.000 Copyright © 2009 Wajih Contracting Co. Page 36 of 114 TECHNICAL PROPOSAL Slab Decking Systems " A " Lock Scaffolding System , SGB Cuplock Scaffolding / Shoring System No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Type Qty. Standard 2.50 m High Standard 2.30 m High Standard 2.00 m High Standard 1.50 m High Standard 1.00 m High Standard 050 m High Ledger 1.80 m Length Ledger 1.30 m Length Universal Jack Fixed Fork head Base Plate Loose Spigot Swivel Coupler Scaffold Tube 4.0 m Scaffold Tube 3.0 m IPN 140 For Decking ( Main Runners ) 360 No. 874 No. 700 No. 700 No. 200 No. 874 No. 3902 No. 4630 No. 1594 No. 1734 No. 1234 No. 3634 No. 216 No. 48 No. 60 No. 2000 m.r Shoring Plan Area of 5000 m2 For a Height of 2.60 – 3.75m or 2400 m2 For a Height of 3.75 – 7.50m 135,000.000 Trough Molds ( Waffle ) 60cm x 32 cm Height 850 L.M 23,800.000 Single Props for Slabs 3000 No. 32,000.000 Fair Face Sheets for slab decking (1.22 x 2.44 ) 3000 No. 35,000.000 TOTAL 225,800.000 Shuttering & Re‐ bar Equipment Electrical 32 mm Re‐ bar Cutting Machine / 3 Phase 4 No. 7,800.000 Electrical 32 mm Re‐ bar Bending Machine / 3 Phase 4 No. 9,000.000 Hand Operated 32 mm Steel Cutters 10 No. 1,750.000 Steel Benders 18No. 1,750.000 Shuttering Timber 10 x 5 cm 180 m3 30,000.000 Shuttering Timber 10 x 2.5 cm 110 m3 13,000.000 Area of Slab 507 m2 with a max height of 3.5m 15’800.000 Quick Strike System Shuttering System No. 1 2 3 4 5 6 7 8 Type Qty. Standard 3.0 m high Ledger 1.8m length Ledger 1.60 m length Universal Jack – 70 cm Drop Head – 30 cm Base Plate Decking Plates – 1.55 m Extendable Beam – 1.75 m 216 612 594 432 216 216 935 204 Copyright © 2009 Wajih Contracting Co. Page 37 of 114 TECHNICAL PROPOSAL Plywood panels for Fair Face Concrete Walls (Steel Panels) 3.60 (H) x 2.40 / 2.50 m (L). 38 No. Panels Consisting of the Following Equipments: No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Type Qty. Soldier 3.60 m (H) Soldier 3.15 (H) Soldier 2.7 m High Soldier 1.5 m High Soldier 1.125 (H) Soldier Clamp Steel Walers 2.50 m (L) Steel Walers 2.40 (L) Lifting Bracket Hop Up Bracket Form Jack Stabilizer Props (2") / Set Push Pull Props (3") 3.50/2.00 m (Set) 15 mm Tie Rods 1.50 m Tie Washer Tie Nut Wall Base Support U. Channels (5x10 cm) 32 No. 58 No. 40 No. 90 No. 58 No. 2526 No. 288 No. 492 No. 64 No. 48 No. 9 No. 9 No. 48 No. 3500 No. 3000 No. 3000 No. 84 m.r Panels Cover Wall Area of 450 m2 60,396.000 Panels Cover Wall / Columns Area of 225 m2 11,150.000 Plywood Panels For Fair Face Concrete Walls + Columns ( Timber Panels ) No. Type Qty. 1 Wall Panel 2.44 x 1.22 m Angel Panel for Walls & Columns 61 x 61 m 15 mm Tie Rods 1.33 m (L) 15 mm Tie Rods 2.00 m (L) Tie Washer Tie Nut 34 No. 2 3 4 5 6 18 No. 418 No. 360 No. 1556 No. 1556 No. Steel Formwork for Circular Columns (Diameter 40 up to 105 cm) TOTAL 20 No. 15,000.000 165,646.000 Site Mobilization Pre‐ Fabricated Site Office ( 9 m x 3.6 m ) Size Pre‐Fabricated Site Office (5 m x 3.6 m) Size Site Offices Furniture & Appliances Pre‐ Fabricated Labor Camp (240 m2 ) Steel Fencing Water Pumps ( Electrical & Diesel Operated ) Water Tanks 10 m3 Capacity Water Tanks 2 m3 Capacity Generators ( 4,10 KVA ) Level Instrument, Tripod and Staff ( Nikon ) Theodolite, Tripod and Poles ( Nikon ) Flood Lights Road Barriers Air Conditioning Units TOTAL 4 No. 5 No. Accommodate 25 engineer & Sub. Staff 1 No. 120 m.r 6 No. 4 No. 20 No. 2 No. 6 No. 1 No. 10 No. LS 5 No. 7,500.000 8,000.000 15,000.000 7,500.000 1,800.000 500.000 1,500.000 3,500.000 2,800.000 3,200.000 800.000 900.000 1,500.000 2,000.000 56,500.000 Hand Tools , Finishing Works & Cladding Equipments Electrical Hammers ( 2‐12 kg ) Hilti. Grinders ( 6‐“9 " ) Electrical Drills ( 6 mm – 32 mm ) Hilti PVC Welding Machines, Groovers, Cutters/ For PVC Floorings 3 No. 15 No. 8 No. Complete Set for PVC Tiles & Sheets 3,000.000 1,500.000 3,000.000 1,800.000 Copyright © 2009 Wajih Contracting Co. Page 38 of 114 TECHNICAL PROPOSAL Fixing Guns, Special Drills & Tools for all Types of Suspended Ceilings Light Weight Scaffolds, 1.80 x 0.90 x 1.70 m (H) for High Ceilings & Cladding Elevations Diesel Operated Welding Machines Air Compressor with tools Floor Polishing Machine TOTAL Complete Set 2,500.000 150 No. 9,500.000 2 No. 2 No. 1 No. 3,600.000 9,000.000 2,500.000 36,400.000 Mechanical & Sanitary Works Equipment Welding Machines Electrical Threading Machines Hand Tools Electrical Hammer Grinder 6" Electrical Drill 6cm‐45mm Hilti TOTAL 3 No. 2 No. Complete Set 1 No. 2 No. 2 No. 3,900.000 1,100.000 1,200.000 6,50.000 6,50.000 9,00.000 8,400.000 1’723’446.000 Value Total Of Owned Equipments EQUIPMENT TO BE LEASED ON DEMAND Mobile Cranes Concrete Pump Concrete Transit Mixers. MAINTENANCE CAPABILITIES Maintenance to our Equipment is carried out by Third Parties. Copyright © 2009 Wajih Contracting Co. Page 39 of 114 TECHNICAL PROPOSAL 5.0 RECOURCES SUB – CONTRACTORS: 5.1 List of Normally Used and Qualified Sub‐ Contractors. Please Refer to Table Below 5.2 List and Details of Normally Used Approved Suppliers. Please Refer to Table Below 5.3 Notes: All other works not sub‐ contracted according to the attached list are executed by our own trained staff. 5.1 LIST OF NORMALLY USED QUALIFIED SUB‐ CONTRACTORS Name and address of Sub‐ contractor 1 Jordan Electrical & Mechanical Engineering Amman Tel: 5658703 Srougi for Mechanical and Electrical Works Amman Tel: 4614709 Nino Engineers and Contractors 2 Trade Electromechanical Works Electromechanical Works Electromechanical Works Amman Tel: 5539521 Notes Company Profile Available Upon Request Company Profile Available Upon Request Company Profile Available Upon Request Wafiq Mohamad Aboudeh 3 Excavation Works Petra Aluminium 4 Amman Tel: 4200629 Kurdieh and Hakim Co. 5 6 7 8 9 Amman Tel: 4201135 Mansour Industrial Complex Amman Tel: 5823788 Higeh Bros Co. Amman Tel: 4783432 Al‐ Armani Co. Amman Tel: 077‐5856131 Al‐ Wahj for Flooring Amman Tel: 5337858 Turath for Architecture 10 Equipment List Available Upon Request Amman Tel: 079‐ 5544655 Aluminum Stainless Steel Works and Aluminum Cladding Aluminum works Glass works Securite, Laminated, Stained …etc. Non‐ structural Steel Works. Powder Coatings. Trerrazo and Marble Polishing. Mosaic and Art Work. Amman Tel: 5526440 Copyright © 2009 Wajih Contracting Co. Page 40 of 114 TECHNICAL PROPOSAL 5.2 LIST OF APPROVED SUPPLIERS FOR MAIN ITEMS Name and Address of Supplier No. Material 1 Jordanian Company for Marble and Granite ( Zamar ) Tel: 4207080 2 Al‐ Tanqib for Construction Industries. Tel: 5861398 Italian Marble and Granite Italian Marble, Local Granite and Terrazo Tiles. 3 Jordan Technical Co. Tel: 5655782 Industrial Marble and Granite ( Corian) 4 5 6 7 Ahmad Mohammad Ahmed, Tel: 079‐ 542360 Nassar Co. Jerusalem Stone, Tel: 5536316 Al‐ Farouk, Tel: 4659100 Hammad for Electrical Supplies, Tel: 4743499 Ma’an Stone Naqab Stone. Italian and European Lighting Fixtures. Gulf and local Electrical Fixture. 8 JES, Tel: 4644914 Electrical Doors and Security Systems 9 Cooling Industries, Tel: 4206063 Ventilation Grilles 10 Al – Muna Co. Tel: 5675851 Ideal Standard / Sanitary Fixtures Twyford Gulf 11 Seasons Co. Tel: 5512770 12 Nabulsi and Ammad Co. Tel: 5519812 13 Dulux, Tel: 4658832 Paints 14 Unichem, Tel: 4203366 Specialized Paints and Epoxy. 15 Fosroc, Tel: 5359562 Admixtures and Engineering Materials 16 Qasr Al – Amman, Tel: 5539494 Security and Fire Resistance Doors. 17 Glass Fiber Reinforced Concrete Co. Tel: 4022081 GRC 18 KNAUF Suspend ceilings, Tel: 5521721 KNAUF gypsum board and accessories. 19 Transpacific, Tel: 420275 Sandi gypsum board. 20 Arab Marketing, Tel: 5669785 La‐ Farge gypsum board. 21 Ghattas Co. Tel: 5861468 Venetian Blinds. 22 Zannaniri Co. Tel: 5665506 PVC Tiles and Industrial Parquet 23 Al‐ Rae’d for Trading, Tel:4641824 3 M Matts and Anti – slip. 24 Sabbanekh Co., Tel: 4625649 Plexi – glass and Art supplies. 25 Union for Trading, Tel: 4648043 Ironmongery 26 Muhsen and Shiha, Tel:4621467 Ironmongery Copyright © 2009 Wajih Contracting Co. Page 41 of 114 TECHNICAL PROPOSAL 6.0 QUALITY ASSURANCE 6.1 Quality Certificate? Yes No 6.2 Certifying Institute N/A 6.3 Name (s) of QA Officer Structural & Civil Eng. Division: Eng. Raja Samawi Mechanical Eng. Division: Eng. Saber Qandah Electrical Eng. Division: Eng. Nader Laham PLANNING, PROGRESS MONITORING AND REPORTING PROCEDURE: QUALITY CONTROL PROCEDURE: Quality Control on the Works and Testing of Materials are usually carried out on our sites by Third Party which will be an independent and Licensed Body approved by the Consultant and the Client. Our approved and nominated Quality Controller is: ARAB CENTER FOR ENGINEERING STUDIES Amman – Jordan * Quality control on workmanship of Architectural and Structural Works is usually carried out by the Site Engineer / Project Manager whom are very well trained to deal with all types of materials involved in such works and it’s application. Our staff are trained and committed to excellence and their target is a “State of Art” product. * Quality control on Electromechanical works if executed by Sub – contractors is carried out by the regular site visits of our E/M consultant and Electrical Engineer who are also responsible for approving the Shop Drawings prepared by Sub – contractor and the As – Built Drawing after completion of the works. * Prior to commencement of works, a joint site visit is arranged by the Projects Manger, Site Engineers, Office Engineer and Planning Engineer to collect data and site survey needed to start the Engineering phase which will include the preparation of: ‐ a) As – built measurements and dimensions compared to design drawings, and reporting any conflict or discrepancies b) Preparations of co‐ordination drawing of different trades. c) Preparation of necessary shop drawing for approval to consultants. d) Preparation of " Programmer of Works " and allocation of resource and cost accounts, in addition to " Cash Flow Sheets" e) Preparation of material Procurement and flow sheets. f) Preparation of materials and samples of approval. * Once all the submittals are revised and approved by the Engineer/ Consultants Parameters and guidelines of the project are all set and work is started accordingly. Monitoring of progress, cost and quality is guaranteed by Head Office on daily basis through the continuous flow of Time Sheets, Daily Reports, Inspection Reports, Site Memo’s, Testing Reports, Material Delivery and orders, which guarantees monitoring of Progress, Cost and Quality. We make sure that CPM is accurately translated on site and strictly followed day by day specially resource allocation in Copyright © 2009 Wajih Contracting Co. Page 42 of 114 TECHNICAL PROPOSAL order to maintain activity duration according to the master CPM mainly activities with zero float. Updating is carried out weekly and various types of Progress Reports either Tabular or Graphical can be presented according to Clients request. These reports allows to organize and summarize data based on 74 parameters including Activity Resource Cost Accounts, Codes, Activity Identifiers, Float (Total or Free) Remaining Duration Percent Complete, Early and Late Start and finish. If a delay in any activity is monitored or a possible delay is foreseen, a warning note will be issued by the Planning Engineer to the concerned site to increase effort / resource to overcome the delay. Same applies if cost fluctuates considerably from theoretical No material is delivered to site unless it was approved by the Engineer at submittal stage and tested according to specification or certificate as tested / approved by supplier against proper documentation. Inspection reports are revised daily by the Project Manager, and if the rejected reports exceed 10% of total submittal, the issue is transferred to the GM for immediate action. The “Approved as Noted” and the “Not approved” inspection reports have to be rectified and re‐ Submitted within 24‐hour period. * * * 7.0 SAFETY MEASURES 7.1 Our Company has a General Safety Program? Yes NO 7.2 Describe the Safety Considerations Specific to This Project. Discuss the Firm’s Overall Approach to Safety. Discuss Accident Prevention Programs Planned for This Project. 7.1 SAFETY PROCEDURE: Safety of the works and employees are on the top priorities during execution of works for any contract. Therefore we strictly adhere to safety regulations and it is considered one of the site engineer’s duties unless otherwise requested by the contract or deemed necessary by nature of works, in which case we will recruit a full time safety officer. 7.2 For Accident Prevention Program the Following Measures are Taken on Site: ‐ All staff members and workers have to wear safety helmets on site at all times, no one person is allowed to enter the work site without a helmet. ‐ In general, workers complained about wearing safety boots at all times, which they all possess. They claim that it prevents easy and quick maneuvering in addition to causing feet sweating. A compromise was reached to wear safety boots when site conditions requires so and never allowed to wear any light foot wear on site. ‐ Each scaffold above 1.5m high has to be checked and approved by the Site Engineer , Project Manager , or the Safety Officer before it can be put in use. ‐ No electrical hand tools specially Grinders are allowed to be used on site without the Safety covers and accessories ‐ Workers using the electrical hand tools or cutting & welding machines have to wear eye protection and protective gloves. Other wise, will not allowed to operate. ‐ Work site is completely sealed against alien entry. Site is closed by means of borders clearly marked on “Work site, No Entry” and no third party is allowed in without prior permission. Copyright © 2009 Wajih Contracting Co. Page 43 of 114 TECHNICAL PROPOSAL Doors and openings of service and elevator shafts in addition to any un‐ covered opening in walls are closed by banners clearly marked “Dangerous or Approach with care”. ‐ No loose ended electrical wires are allowed on site what so ever even if power is disconnected. A temporary electrical distribution board is fixed on site for use to execute the works, use of other power outlets is prohibited and connection to panel board has to be done by means of a socket and not exposed wires. ‐ ‐ No one allowed to work neither underneath finishing works scaffold nor within an area of 2m around it. Working above 4m height requires wearing of safety belt tithed to a rigid surface or roof. ‐ ‐ ‐ If working on external elevations at any floor above Ground Floor, a safety platform is fixed at slab level around working area to prevent any falling items from reaching the floor or colliding with pedestrian or other premises ‐ Temporary supports are always utilized when working on modifying existing structural elements. When demolishing existing structures or walls, no workers are allowed in the area except the demolishers and their tools and no debris are allowed to be cleared out unless demolishing process is stopped ‐ Measures and Precautions Taken if an Accident Occurs Each work site is provided with a complete set of First Aid, for small injuries. Project is provided with a transport vehicle to evacuate injured to the nearest emergency facility if the case requires so. Our company is registered at the Social Security Directorate under the Registration No: 01439900 and all our staff members and workers are covered. The company is regularly paying the required rates to cover Work Accidents and Trade Diseases. Therefore, the Directorate is informed directly about any accident within 24 hours to take legal actions towards treatment fees of injured. Our Company’s Policy is to Insure All Our Contracts for “Contractors All Risk “and “Workmen’s Compensation Policy“ which covers: a) The Value of Works Involved in Contract Plus 15%. b) Existing Property c) Third Party Liability. d) Workmen against Accidents. Our Nominated Insurers are: a) Arab German Insurance Co. b) General Arab Insurance Co. Copyright © 2009 Wajih Contracting Co. Page 44 of 114 TECHNICAL PROPOSAL 8.0 PAST EXPERIENCE 8.1 List of major construction projects our organization has in process, Including: Name, location of project, Employer, Engineer, Contract amount and the anticipated date for completion. 8.2 List of major construction projects our organization has executed during the past five years giving details of the projects. Which will include but not limited to. 8.3 a. Location, b. Employer, c. Engineer, d. Contract amount. e. Time for completion according to the contract. f. Actual time for completion Details of tenders recently submitted that still await resolution, Indicating the Value of the tender, the duration of the contract and the anticipated award date. 8.4 Letters of performance, recommendation from previous employers. Copyright © 2009 Wajih Contracting Co. Page 45 of 114 TECHNICAL PROPOSAL CURRENT ONGOING PROJECTS Copyright © 2009 Wajih Contracting Co. Page 46 of 114 TECHNICAL PROPOSAL CURRENT ONGOING PROJECTS PROJECT NAME TYPE CLIENT CONSULTANT JOB DESCRIPTION CONTRACT SUM Over Seas Co. Headquarters Rehabilitation and Decorations Works Iwan – CM Al Nasser Architects Complete rehabilitation & decorations for an existing building 454’832.60 JD 95% Complete Edgo Building – Abdali development Project Commercial SM&E – CM Arabtech Jardaneh – Maisam (JV) Skeleton & E/M 1 fix Works 4’750’009.00 JD 60% Complete Al Taher Building ‐ Abdali development Project Commercial SM&E – CM Arabtech Jardaneh – Maisam (JV) Skeleton & E/M 1st fix Works 3’885’004.00 JD 45% Complete Union Bank – Jabal Amman Rehabilitation & Internal Decorations Maisam architects & engineers Rehabilitation & decorations 360’000.00 JD 90% Complete Petra Food Industries Industrial Arabtech Jardaneh Skeleton & E/M 1st fix Works 2’600’000.00 JD 35% Complete Al Hamshari Group Main Showroom & Offices Building Commercial Tahan & Bushnaq Engineers Finishing Works 1’500’000.00 JD 40% Complete Union Bank – Abdoun Amman Rehabilitation & Internal Decorations Maisam architects & engineers Rehabilitation & decorations 890’000.00 JD 30% Complete st Copyright © 2009 Wajih Contracting Co. Page 47 of 114 TECHNICAL PROPOSAL Al Hamshari Showroom and Office Building Petra Food Industries Copyright © 2009 Wajih Contracting Co. Page 48 of 114 TECHNICAL PROPOSAL Edgo & Al Taher Buildings – Al Abdali District Copyright © 2009 Wajih Contracting Co. Page 49 of 114 TECHNICAL PROPOSAL Union Bank ‐ Abdoun Branch Copyright © 2009 Wajih Contracting Co. Page 50 of 114 TECHNICAL PROPOSAL Building Construction Projects Commercial, Residential & Other uses Copyright © 2009 Wajih Contracting Co. Page 51 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 001|01|1995 Al‐Sanable Housing Complex Geroge Nuqul & Sons Co. Nassar Eng. Office 229,500 Mr. Nabil Abu‐Khader Villa Mr. Nabil Abu‐Khader Abaa'd Architects 105,000 Mr. Suleiman Far Dumiati & Shasha'a 72,000 WAJ 002|01|1996 WAJ 003|01|1996 Mr.Suleman Far Villa WAJ 004|01|1998 Swimming Pool & Landscape Mr. Geroge Nuqul Associated Engineers 110,000 WAJ 005|01|1996 CAPT.Fawzi Abu‐Nawar Building CAPT.Fawzi Abu‐Nawar Building Mawshoor 52,000 WAJ 006|01|2000 Bajjali Building Dumiati & Shasha’a 240,000 WAJ 007|01|1998 Mr.Labib Zabaneh Building Zabaneh Eng. 120,000 WAJ 008|01|1999 Mr.George Nuqul Villa Geroge Nuqul Eng. Mazin Abd Salam 175,000 WAJ 009|01|2001 Mr. Najwan Fasheh Villa Mr. Najwan Fasheh Kayali & Fasheh Consortium 175,000 WAJ 010|01|2001 Private Villa Eng. Omar Saleh WAJ 011|01|2002 House Tec.1 Residential Apartment Building House Tec.1 Residential Apartment Building WAJ 012|01|2003 Private Villa Eng.Ahmad Al‐Qthah WAJ 013|01|2003 House Tec.2 Residential Apartment Building House Tec.2 Residential Apartment Building WAJ 014|01|2003 Private Villa Goerge Khoury Mr.Emile Bajjali & Partners. Geroge Nuqul & Sons Co. Development Consortium Consortium Development Consulting Consortium Faris & faris Architect & Consulting Eng. Development Consulting Consortium Grassella Gatas Architect & Consulting Eng. 118,000 328,000 Cost Plus Tender 380,000 95,000 Copyright © 2009 Wajih Contracting Co. Page 52 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 015|02|2003 Al‐Far Office Building Mr.Suleman Al‐Far D & S Architest Consulting Eng. 110,000 Jordan Duty Free Shops Co. Ruqun Al‐Handasa 300, 000 WAJ 016|02|2003 WAJ 017|02|2003 Duty Free Shops Building Jaber Border Wahbeh Tamari Kindergaten Circular Room Ext. Orthodox Educational Society Ruqun Al‐Handasa 22,000 WAJ 018|02|2003 Elena’s Boutiqe Elena Nuqul & Partners Amar Nabulsi 154,000 WAJ 019|02|2003 Al‐Kalouti Office Building / Sweifieh Al‐ Kalouti Co. Tahan & Bushnaq Architects 145,000 WAJ 020|02|2003 Sahawneh Villa Abdoun Mr. Ghada Sahawneh OMB Architects Eng. Bisher Zureikat 270,000 WAJ 021|02|2003 Mr. Nabil Khoury Villa /Deir Ghbar Mr. Nabil Khoury Faris & Faris Architects 170,000 WAJ 022|02|2003 Abu‐ Khadra Villa Abdoun Mr. & Mrs. Abu‐ Khadra Jamal Naber Cost Plus WAJ 023|02|2003 Basem Farraj Villa Abdoun Mr. Basem Farraj Amar Khamash & DARB 160,000 WAJ 024|02|2003 Haddad Villa Deir ‐ Ghbar Mr. Muthib Haddad Faris & Faris Architects 270,000 Princess Sumayah University Tahan & Bushnaq Architects 1,200,000 Mr. George Khoury Eng. Faris Baqaeen 700,000 WAJ 026|02|2005 Extension and Renovation of Main Buildings Princess Sumaymh University Medica Company Office Building WAJ 027|02|2005 Zananiry Show Room and Stores Building Mr. Samir Zananiry Eng. Faris Baqaeen 376,000 WAJ 028/02/2006 HM King Abdullah School of Electrical Engineering Building Princess Sumaya University of Technology Tahan & Bushnaq 1,140,740 WAJ 029/02/2007 Al‐Sara Offices & Exhibition Building Al‐Sara for Real State Dev. Eng. Muneer Hageer & Partners 420,000 WAJ 030/02/2007 Abu Tawileh Plaza Qais Abu Tawileh ASAS Project Management & Symbiosis Design 3,094,000 JD WAJ 031/02/2007 Private Villa Mr. Ibrahim Al Sayegh Tahan & Bushnaq 790,000 JD WAJ 032/02/2008 Al Rawashdeh Building Complex Mr. Sharif Rawashdeh Faris Baqaeen 700,000 JD WAJ 025|02|2003 Copyright © 2009 Wajih Contracting Co. Page 53 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 033/02/2008 Al Hamshari Group Main Showroom & Offices Building Al Hamshari Group Tahan & Bushnaq Engineers 1’340’000.00 JD WAJ 034/02/2008 Green Oasis Building Complex Mr. Shaher Rawashdeh Faris Baqaeen 678’000.00 JD WAJ 035/02/2008 Abdoun Forum Mall Mr. Odai Kurdi Symbiosis Design 575’000.00 JD Copyright © 2009 Wajih Contracting Co. Page 54 of 114 TECHNICAL PROPOSAL Project Name: Al‐SANABLE HOUSING COMPLEX / YADODDAH Client (Name & Address): GEROGE NUQUL & SONS CO. Consultant (Name & Address): NASSAR ENGINEERING OFFICE Tel: 5814047 Contract Amount: 229,500 JD Completion Date: 1995 Job Description: 1700 m2 Five Storey Building Consisting 12 Apartments & Car Parks. Remarks: Turn‐Key Project Completed 2 Months Ahead of Schedule Project Name: MR. NABIL ABU‐KHADER VILLA / ABDOUN. Client (Name & Address): MR. NABIL ABU‐KHADER Consultant (Name & Address): AB'AAD ARCHITECTS & ENGINEERS. Contract Amount: 105, 000 JD Completion Date: 1996 Job Description: 750m2 Villa, Consisted of Sophisticated Design of Stone Walls & 6.5m High Stone Columns Remarks: Skeleton Works Project Name: MR. SULEIMAN FAR VILLA / SWEFIEH Client (Name & Address): MR. SULEIMAN FAR Consultant (Name & Address): DUMIATI & SHASHA'A ARCHITECTS & ENGINEERS. _ Tel: 4652191 Contract Amount: 72,000 JD Completion Date: 1996 Job Description: 690m2 Villa Remarks: Skeleton Works Project Name: CAPT. FAWZI ABU‐NAWAR BUILDING / SHMESANI Client (Name & Address): CAPT. FAWZI ABU‐NAWAR Consultant (Name & Address): MAWSHOOR, ARCHITECTS & ENGINEERS Eng.: Mohamad Kahaleh Tel: 5661395 Contract Amount: 52,000 JD Completion Date: 1996 Job Description: 600 m2 Two Storey Building on Existing Ground Floor, Outstanding Architectural Details. Remarks: Skeleton Works. Copyright © 2009 Wajih Contracting Co. Page 55 of 114 TECHNICAL PROPOSAL Project Name: Swimming Pool & Landscape Client (Name & Address): MR. GEORGE NUQUL Villa. Consultant (Name & Address): ASSOCIATED ENGINEERS Eng.: Saliba Shqair Tel: 079‐5527954 Contract Amount: 110,000 JD Completion Date: 1998 Job Description: A Complete Landscape of900m2 Land, involving 14x7 Swimming Pool, Terraces, Gardens , Outdoor Kitchenette & Bar, Stone Fences & Wooden Ceilings. ‐ Project Name: BAJALI Building / WADI SAQRA Client (Name & Address): MR. EMILE BAJALI & PARTNERS. Consultant (Name & Address): DUMIATI & SHASHA'A ARCHITECTS & ENGINEERING ‐ Tel: 4652191 Contract Amount: 240,000 JD Completion Date: 2000 Job Description: Five Storey Building, 320m2 Flat Each Level, Internal& External Works. Remarks: Skeleton & Finishing Works. Project Name: MR. LABIB ZABANEH BUILDING/ SHMESANI Client (Name & Address): MR. LABIB ZABANEH Consultant (Name & Address): ZABANEH ENGINEERING OFFICE Tel: 5693125 Contract Amount: 120,000 JD Completion Date: 1998 Job Description: 330m2 Flat & Roof, Super Deluxe Finishing Works. Remarks: Turn‐key Project. Copyright © 2009 Wajih Contracting Co. Page 56 of 114 TECHNICAL PROPOSAL Project Name: MR. GEORGE NUQUL VILLA Client (Name & Address): MR. GEORGE NUQUL Consultant (Name & Address): ENG. MAZIN ABD SALAM Tel: 5533562 Contract Amount: 175,000 JD Completion Date: 1999 Job Description: A 530 m2 Villa / Old Cultural Design in addition to Landscape of farm Remarks: ‐ None Project Name: MR. NAJWAN FASHEH VILLA Client (Name & Address): MR. NAJWAN FASHEH Consultant (Name & Address): KAYALI & FASHEH ARCHITECTS & ENGINEERS Tel: 5671401 Contract Amount: 175,000 JD Completion Date: 2001 Job Description: A 900m2 Villa including indoor Swimming Pool & External Works. Remarks: ‐ Skeleton Works Project Name: House Tec 1 Residential Apartment Building Client (Name & Address): Technical Housing & Real Estate Development Co. Ltd. Consultant (Name & Address): DEVELOPMENT CONSULTING CONSORTIUM Tel: 5814047 Contract Amount: 328,000 JD Completion Date: 2002 Job Description: A Turnkey Project of 2500m2 building consisting of 10 apartments. Remarks: Completed in 9 months Copyright © 2009 Wajih Contracting Co. Page 57 of 114 TECHNICAL PROPOSAL Project Name: Private Villa Client (Name & Address): Eng. OMAR SALEH Consultant (Name & Address): DEVELOPMENT CONSULTING CONSORTIUM Tel: 5814047 Contract Amount: 118,000 JD Completion Date: 2001 Job Description: A 884m2 Villa Skeleton Works. Remarks: ‐ Project Name: House Tec 2 Residential Apartment Building Client (Name & Address): Technical Housing & Real Estate Development Co. Ltd. Consultant (Name & Address): DEVELOPMENT CONSULTING CONSORTIUM Tel: 5814047 Contract Amount: 328,000 JD Completion Date: 2003 Job Description: A Turnkey Project of 2500m2 building consisting of 10 apartments. Remarks: Completed in 12 months Project Name: Private Villa Client (Name & Address): Mr. Goerge Khoury Consultant (Name & Address): Grassella Gatas Tel: 5814047 Contract Amount: 95,000 JD Completion Date: 2003 Job Description: Renovation & External Works. Remarks: ‐ Copyright © 2009 Wajih Contracting Co. Page 58 of 114 TECHNICAL PROPOSAL Project Name: Al‐ Far Office Building Client (Name & Address): Mr. Suleiman Al‐ Far Consultant (Name & Address): D & S Architest Consulting Eng. Tel: 4652191 Contract Amount: 110.000 JD Completion Date: 2004 Job Description: Skeleton Works of 1000 m2 Office Building including Strengthening of existing ground floor foundations. Remarks: ‐ Project Name: DUTY FREE SHOPS BULIDING IN JABER BORDER Client: JORDAN DUTY FREE SHOPS CO. Consultant: RUQUN AL‐HANDASA Contract Amount: 304,000 JD Job Description: A turn key project for 1000 m2 facility including internal decorations & landscape Remarks: Completed in 9 Months. Project Name: Wahbeh Tamari Kindergaten Client: Orthodox Educational Society Consultant: RUQUN AL‐HANDASA Contract Amount: 22,000 JD Job Description: Steel Structure works and Finishing to Circular Room of 120 m2 Area at the premises Remarks: Copyright © 2009 Wajih Contracting Co. Page 59 of 114 TECHNICAL PROPOSAL Project Name: ELENA'S BOUTIQE/ JABAL‐AL WEBEDAH Client (Name & Address): ELENA NUQUL & PARTNERS CO. Consultant (Name & Address): AMAR NABULSI Contract Amount: 154,000 JD Completion Date: 1997 Job Description: Renovation of Existing Villa, Addition of 1st Floor, Strengthening Of Existing Foundations & Stat‐ Of‐Art Interior Decorations. Remarks: Delays Due To Continuous change of interior Design. Project Name: Al‐ Kalouti Commercial & Office Building./ Sweifieh Client (Name & Address): Mr. Kalouti. Consultant (Name & Address): Tahan & Bushnaq , Architects & Engineers Tel : 5861867 Contract Amount: 154,000 JD Completion Date: 2001 Job Description: Skeleton and wet Finishes Works for a 1350 m2 Building. Remarks: JV ( Raja Samawi Contracting Est. ) Project Name: Sahawneh Villa / Abdoun Client (Name & Address): Mr. Ghada Sahawneh Consultant (Name & Address): OMB Architects, Eng. Bisher Zureikat Tel : 5694739 Contract Amount: 270 000 JD Completion Date: 2002 Job Description: Skeleton and wet Finishes for a 1100 m2 Villa Remarks: JV ( Raja Samawi Contracting Est. ) Project Name: Mr. Nabil Khoury Villa / Deir Ghbar Client (Name & Address): Mr. Nabil Khoury Consultant (Name & Address): Faris & Faris Architects Tel : 4644799 Contract Amount: 170 000 JD Completion Date: 2002 Job Description: Skeleton works for 850 m2 Villa Remarks: JV ( Raja Samawi Contracting Est. ) Copyright © 2009 Wajih Contracting Co. Page 60 of 114 TECHNICAL PROPOSAL Project Name: Abu – Khadra Villa / Abdoun Client (Name & Address): Mr& Mrs.Abu-Khadra Consultant (Name & Address): Jamal Naber Architect Tel : 079-316566 Contract Amount: Cost plus Tender Completion Date: 2001 Job Description: Skeleton Works for 800 m2 Villa Remarks: JV ( Raja Samawi Contracting Est. ) Project Name: Farraj Villa / Abdone Client (Name & Address): Mr. Basem Farraj Consultant (Name & Address): Arch. Amar Khamash & DARB for Structural Design Tel : 5694793 Contract Amount: 160000 JD Completion Date: 2002 Job Description: Skeleton and wet Finisher for 800m2 Villa m2 Villa Remarks: JV ( Raja Samawi Contracting Est. ) Project Name: Haddad Villa / Deir Ghbar Client (Name & Address): Mr. Muthib Haddad Consultant (Name & Address): Faris & Faris Architects. Tel : 4644799 Contract Amount: 270000 JD Completion Date: 2004 Job Description: Skeleton and wet Finishes for 1200m2 Villa Remarks: JV ( Raja Samawi Contracting Est. ) Copyright © 2009 Wajih Contracting Co. Page 61 of 114 TECHNICAL PROPOSAL Project Name: Extension and Renovation of Main Building / PMUT Client (Name & Address): Princess Sumayah University of Technology Consultant (Name & Address): Tahan and Bushnag, Architect & Engineers. Tel : 581867 Contract Amount: 1,200,000 JD Completion Date: 12/ 2004 Job Description: Skeleton and Finishes Works for 1800 m2 of vertical extension for main buildings. Remarks: Completed in 7 month without interrupting student courses. Project Name: Medica Company Office Building. Client (Name & Address): Mr. George Khoury. Consultant (Name & Address): Eng. Faris Baqaeen. Tel : 5660967 Contract Amount: 700,000 JD Completion Date: 12/2005 Job Description: Skeleton and finishing works for 4000 m2 Building consisting of 8 floors. Remarks: Completed on time. Copyright © 2009 Wajih Contracting Co. Page 62 of 114 TECHNICAL PROPOSAL Project Name: Zananiry Show Room & Stores Building. Client (Name & Address): Mr. Samir Zananiry Consultant (Name & Address): Eng. Faris Baqaeen. Tel : 5660967 Contract Amount: 376,000 JD Completion Date: 12/2005 Job Description: Skeleton, mechanical & finishing works for 2352 m2 Building consisting of 3 floors. Remarks: Completed on time. Project Name: HM King Abdullah School of Electrical Engineering Building Client (Name & Address): Princess Sumaya University of Technology Consultant (Name & Address): Tahan & Bushnaq. Contract Amount: 1,140,740 JD Completion Date: 6/2006 Job Description: Turn – key Project State of Art Design Remarks: Completed on time. Copyright © 2009 Wajih Contracting Co. Page 63 of 114 TECHNICAL PROPOSAL Project Name: Al‐Sara Offices & Exhibition Building. Client (Name & Address): Al‐Sara for Real State Dev. Consultant (Name & Address): Eng. Muneer Hageer &Partners. Contract Amount: 420,000 JD Completion Date: 2007 Job Description: 3500m2 Skeleton works for show room & office building. Remarks: Completed on time. Project Name: Abu Tawileh Plaza Client (Name & Address): Mr. Qais Abu Tawileh Consultant (Name & Address): ASAS Project Management & Symbiosis Design Contract Amount: 3,094,000 JD Completion Date: June 2007 Job Description: Sk. Works, External Stone Cladding & Finishing Works for 21500.‐m² Building Remarks: Completed on time. Copyright © 2009 Wajih Contracting Co. Page 64 of 114 TECHNICAL PROPOSAL Project Name: Private Villa Client (Name & Address): Mr. Ibrahim Al Sayegh Consultant (Name & Address): Tahan & Bushnaq Contract Amount: 790,000 JD Completion Date: 2007 Job Description: Sk. Works, External Stone Cladding. Remarks: Project Name: Al Rawashdeh Complex Client (Name & Address): Mr. Sharif Rawashdeh Consultant (Name & Address): Faris Baqaeen Contract Amount: 700’000 JD Completion Date: 2008 Job Description: Sk. Works & Finishing. Remarks: Copyright © 2009 Wajih Contracting Co. Page 65 of 114 TECHNICAL PROPOSAL Project Name: Green Oasis Complex Client (Name & Address): Mr. Shaher Rawashdeh Consultant (Name & Address): Faris Baqaeen Contract Amount: 700’000 JD Completion Date: 2008 Job Description: Sk. Works & Finishing. Remarks: Project Name: Al Hamshari Group Main Showroom & Offices Building Client (Name & Address): Al Hamshari Group Consultant (Name & Address): Tahan & Bushnaq Engineers Contract Amount: 1’340’000.00 JD Completion Date: 2008 Job Description: Skeleton Works Copyright © 2009 Wajih Contracting Co. Page 66 of 114 TECHNICAL PROPOSAL Project Name: Abdoun Forum Mall Client (Name & Address): Mr. Odai Kurdi Consultant (Name & Address): Symbiosis Design Contract Amount: 575’000.00 JD Completion Date: 8/2008 Job Description: Sk. Works. Remarks: Copyright © 2009 Wajih Contracting Co. Page 67 of 114 TECHNICAL PROPOSAL Industrial Projects Copyright © 2009 Wajih Contracting Co. Page 68 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum| JD WAJ 026|02|1994 Telecommunication Building / Mafraq Telecommunication Building Company JTC 301,000 WAJ 027|02|1999 LGP Station & Power Supply Dr. Farouk Yaghmour 95,000 WAJ 028|02|1999 Water Treatment Plant Dr.Farouk Yaghmour 85,000 WAJ 029|02|2000 Omar & Khaled Zumot Co. Stores / Sahab Omar & Khaled Zumot Karim Bawab 90,000 WAJ 030|02|2001 Extension Of Syrup Room Amman Factory Jordan Ice & Areated Water Co. Pepsico Karim Bawab 194,000 WAJ 031|02|2002 Office Building & External work for Kasha Co. Stores / Qastal Kasha Co. Kayali & Fasheh 130,000 WAJ 032|02|2002 Philadephia Metal Forming Factory Extension Philadephia Metal Forming Factory Karim Bawab 33,000 WAJ 033|02|2002 Under pinning & Foundation Strengthening De Lasalle College Karim Bawab 62,000 WAJ 034/02/2007 Metal Sheet Printing Factory Mr. Michael Al ‐ Sayegh Miras for Eng. Consult. 1,130,695 Shaheen Business & Investment Group Shaheen Business & Investment Group Copyright © 2009 Wajih Contracting Co. Page 69 of 114 TECHNICAL PROPOSAL Project Name: Telecommunication Building / Mafraq Client (Name & Address): Jordan Telecommunication Company Consultant (Name & Address): JTC Contract Amount: 301,000 JD Completion Date: 1994 Job Description: 1000 m2 Building with Heavily RC Wall to House Telec. Equip. All Internal & External Works Electromechanical Works. Remarks: Turn‐Key Project Completed 11 Days Ahead of Schedule Project Name: LGP Station & Power supply Civil Works Modern Packing System Co. Factory (SAHAB) Client (Name & Address): Shaheen Business & Investment Group Consultant (Name & Address):Dr.Farouk Yaghmour Architects & Engineers Contract Amount: 95,000 JD Completion Date: 1999 Job Description: Civil Works for Power Supply, MDB Room, Steel Structures for Cable Trays & Supports Trenches….etc, and for Liquid Peyrolium Gas (LGP Station) Including Tanks Foundations, Piping Supports, Drainage Fences , Gates…etc. Remarks: State Of Art Job According To Client's Evaluation, Also Completed On Time & Approved By Jordan Petroleum Refinery Co. Project Name: Water Treatment Plant Client (Name & Address): Shaheen Business & Investment Group Consultant (Name & Address): Dr.Farouk Yaghmour Architects & Engineers Contract Amount: 85,000 JD Completion Date: 1999 Job Description: Civil Works for Water Treatment plant, Cooling Towers, Fuel Tanks, Chillers & Other Equipment Foundation, Internal Drainage. Remarks: Completed On Time. Copyright © 2009 Wajih Contracting Co. Page 70 of 114 TECHNICAL PROPOSAL Project Name: OMAR & KHALED ZUMOT CO. Stores / Sahab . Client (Name & Address): OMAR & KHALED ZUMOT CO. Consultant (Name & Address): KARIM BAWAB & CO. CONSULTANTS‐ ARCHITECTS & ENGINEERS Contract Amount: 90,000 JD Completion Date: 2000 Job Description: A Two Storey R.C Structure Insulated Thermally, 4.5 m High Ceiling, 20 m Troweled led Slab with Hardener, External Works. Remarks: Completed On Time. Project Name: Extension of Syrup Room, Amman Factory / New Cooling & Chemical Stores, and Miscellaneous Civil Works / Amman Factory. Client (Name & Address): Jordan Ice & Aerated Water Co. / Pepsi.co Consultant (Name & Address): KARIM BAWAB & CO. CONSULTANTS‐ ARCHITECTS & ENGINEERS Tel: 5672783 Contract Amount: 194,000 JD Completion Date: 2000 – 2001 Job Description: Various works in different locations Remarks: Completed On Time & Client's Evaluation Excellent. Project Name: Civil Works 1st Extension of Philadelphia Metal Forming Factory Client (Name & Address): Philadelphia Metal Forming Factory Co.Ltd Consultant (Name & Address): KARIM BAWAB & CO. Tel: 5672783 Contract Amount: 33,000 JD Completion Date: 2002 Job Description: Project consisted of a 600m2 extension of existing factory which involved civil works for steel structure, foundations, column necks, vibration resistant foundations for machines, trowel led finish ground slab in addition to all finishing works. Remarks: Completed On Time Up to the client's & consultant's satisfaction Copyright © 2009 Wajih Contracting Co. Page 71 of 114 TECHNICAL PROPOSAL Project Name: Office Building & External work for kasha Co. Stores / Qastal Client (Name & Address): KASHA CO. Consultant (Name & Address): KAYALI & FASHEH Tel: 5671401 Contract Amount: 130,000 JD Completion Date: 2002 Job Description: Granolithic flooring (5000m2), Skeleton& Finishing works for office Building, 500 M.R boundary walls, base‐ course & asphalt for roads & Parking. Remarks Completed On Time. Project Name: Under Pinning & Foundation Strengthening of Existing Buildings & an Overhead Bridge Client (Name & Address): De LaSalle College‐ Jabal Hussein Consultant (Name & Address): KARIM BAWAB & CO. Tel: 5672783 Contract Amount: 62,000 JD Completion Date: 2002 Job Description: Work consisted of under pinning for existing building foundations which involved excavations up to 5.5 m & all related concrete works. An overhead bridge connecting two adjacent buildings in addition to all related Finishing & Electromechanical works. Remarks: Completed in 48 days. During summary vacation. Copyright © 2009 Wajih Contracting Co. Page 72 of 114 TECHNICAL PROPOSAL Project Name: Metal Sheet Printing Factory Client (Name & Address): Mr. Micheal Al‐Sayegh Consultant (Name & Address): Miras for Eng. Consult. Tel: 5825179 Contract Amount: 1,130,695 JD Completion Date: 2007 Job Description: Skeleton works for an industrial factory 7000m2 (fair‐face concrete). Remarks: Completed On Time. Copyright © 2009 Wajih Contracting Co. Page 73 of 114 TECHNICAL PROPOSAL Renovation, Rehabilitation and Interior Decoration Projects 1. Hotels, Commercial & Recreational 2. Public Services, Educational, Health Care & Other 3. Banks 4. Embassies Copyright © 2009 Wajih Contracting Co. Page 74 of 114 TECHNICAL PROPOSAL 1. Hotels Commercial and Recreational Copyright © 2009 Wajih Contracting Co. Page 75 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 034|03|1996 Amman Bookshop Mr.Osama Shasha’a D & S Architects 45,000 WAJ 035|03|1998 Moven‐pick Dead Sea Resort Hotel Zara Counsultancy & Projects Management Sigma Consulting 120,000 WAJ 036|03|1999 Power Hut Gym Power Hut Gym Interior Designer Rania Boban Cost Plus Tender WAJ 037|03|1999 Upgrading Of Four Star Petra Fourm hotel Petra Fourm Hotel Petra Fourm Hotel 584,000 WAJ 038|03|2001 Ren. & Fur, Of VIP & CIP lounge Royal Jordanian Royal Jordanian 172,000 WAJ 039|03|2001 Finishing & Decorations of Century Cinemas Ster Century Cinemas FTZ Ster Century Cinemas FTZ 292,000 WAJ 040|03|2001 Renovation Of Head Office Building Lema Company Tahan & Bushnaq 243,000 WAJ 041|03|2002 The Food Court Zara Center Amman Tourism Investment Zara Consultancy & Projects Management 75,000 WAJ 042|03|2002 Hyatt Tower Zara Consultancy & Projects Management Zara Consultancy & Projects Management 75,000 Jordan Post Office Diran,Sarrar & Masri 180,000 WAJ 043|03|2003 Central Amman Post Office WAJ 044|03|2003 Ministry of Planning Ministry of Planning Ministry of Planning 92,000 WAJ 045|03|2004 Fit – out & Decoration of Guy Laroche Shop Swefieh Morex International Trading Co. El‐ Bana Design Egypt 70,000 WAJ 046/03/2006 Smalto & Scherer Stores Morex International Trading Co. El‐ Bana Design Egypt 95,000 WAJ 047/03/2006 AMC New Offices / Zahran Street Fawwaz Al‐Zu'bi ‐‐ 115,000 WAJ 048/03/2007 Abu Tawileh Villa Restaurant Qais Abu Tawileh Asas Project Management & Symbiosis Design 85,000 WAJ 049/03/2007 Emaar Jordan Corporate Offices M/S. Emaar Jordan Arabtech Jardaneh 320,000 WAJ 050/03/2007 DAR Consult ‐ Jordan M/S. DAR Consult Dubai DAR consult 90,000 WAJ 051/03/2007 Block “C” Refurbishment Works – Intercontinental Hotel Amman Jordan Tourism Co. Ayla Consultancy 610’000.00 WAJ 052/03/2007 Renovation & Decorations of Mitsubishi, Ford & Suzuki Showrooms & Offices TJ & CIC Co. SAYA for Architecture WAJ 053/03/2008 Samara Hills – Mock Up Apartments Emaar Jordan 2K 250’000.00 Copyright © 2009 Wajih Contracting Co. Page 76 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 054/03/2008 FM Radio Station Studios ARBC Design Build Project 275’000.00 JD WAJ 055/03/2008 Private Offices Qais Abu Tawileh Co. MADD 795’000.00 JD WAJ 056/02/2009 Crowne Plaza Hotel – Ground Floor Works National Tourism Co. Al Nasser Architects 2’560’000.00 JD Copyright © 2009 Wajih Contracting Co. Page 77 of 114 TECHNICAL PROPOSAL Project Name: AMMAN BOOKSHOP RENOVATION PROJECT Client (Name & Address): MR. OSAMA SHASHA'A Consultant (Name & Address): D & S ARCHITECTS & ENGINEERS Tel: 4652191 Contract Amount: 45,000 JD Completion Date: 1996 Job Description: Rehabilitation of Existing Bookshelves, Marble Flooring, False Ceiling, Lightening, Air Conditioning, Security & all Joinery Works. Remarks: Mentioned As Best Bookshop in a Number Of Articles Project Name: MOVENPICK DEAD SEA RESORT HOTEL Client (Name & Address): ZARA CONSULTANCY & PROJECTS MANAGEMENT CO. Consultant: SIGMA CONSULTING ENGINEERS Tel: 5661031 Contract Amount: 120,000 JD Completion Date: 1998 Job Description: Ferro Cement Suspended Ceiling, Ceramic Tiling, Plastering. Remarks: Completed On Time. Project Name: Renovation of Interior Design for POWER HUT GYM Client (Name & Address): POWER HUT GYM Consultant: INTERIOR DESIGNER RANIA BOBAN Mr.TAREQ KHORMA Tel: 5686349 | 079‐5545678 Contract Amount: COST PLUS TENDER Completion Date: 1999 Job Description: Renovation Of Sports Hall & Changing Rooms. Remarks: Works Were Done Without Interrupting Club Service Copyright © 2009 Wajih Contracting Co. Page 78 of 114 TECHNICAL PROPOSAL Project Name: Renovation, Decorations & Architectural Works for THE UPGRADING OF FOUR STAR Client PETRA FORUM HOTEL TO BECOME FIVE STAR CROWNE PLAZA. (Name & Address): PERTA FORUM HOTEL Consultant (Name & Address): A‐ PERTA FORUM HOTEL Eng.MOHAMAD MASRI, Eng.GHASSAN KAMAL Tel: 079‐604075 B‐MAHADIN CONSULTING ENGINEERS Eng.HASSAN MAHADIN, Tel: 5332166 | 079‐5583331 C‐ RETOUCHE INTERIOR DESIGN SPECIALISTS Eng.REENA, Tel: 5697327 | 079‐5556462 D‐DUMIATI & SHASHAA ARCHITECTS & ENGINEERS Eng.DEEB DUMIATI, Eng.SULTAN SHASHAH Tel: 4652191 | 4640222 E‐DIRAN & MASRI CONSULTING ENGINEERS Eng.ALLAH MASRI, Tel: 4641843 Contract Amount: 584,000 JD Completion Date: 1999 – 2000 Job Description: Renovation and Interiors Decoration of Basin Restaurant Re‐habilitation and Renovation of Guest Rooms Toils (144 No.) Reception Counter. Lobby bar. Pool bar. Hotel Museum. Children's Play around. Marble with Mosaics Inlays for various tops in Guest Rooms Wooden Pergolas . Remarks: Completed On Time & according to occupancy schedule of Hotel, No interruptions Occurred to the booking list during the whole period of works. Copyright © 2009 Wajih Contracting Co. Page 79 of 114 TECHNICAL PROPOSAL Project Name: Renovation and Furnishing of VIP & CIP Lounges @ Queen Ali International Airport Client (Name & Address): ROYAL JORDANIAN Consultant (Name & Address): ROYAL JORDANIAN Contract Amount: 172,000 JD Completion Date: 2001 Job Description: Work Consists of Industrial Granite Flooring With Patterns, Cherry Wood Consoles & Front Counter In Addition To Wood Partitions, Security Glass Walls & Displays, Lounge Seats & Coaches, Coffee Tables, Oriental Mashrabias Curtains In addition to all Accessories. Remarks: Completed On Time Copyright © 2009 Wajih Contracting Co. Page 80 of 114 TECHNICAL PROPOSAL Project Name: Fit‐Out, Finishing & Decorations Of CENTURY CINEMAS ZARA CENTER / AMMAN Client (Name & Address): STER CENTURY CINEMAS FTZ. Dubai Tel: +971 4 299 4224 Consultant (Name & Address): STER CENTURY CINEMAS FTZ. Contract Amount: 292,000 JD Completion Date: 2001 Job Description: Complete Fit‐Out, Finishing Works & Decorations for 5No. Cinemas including Foyer, Concession, Box Office & all Public areas, in addition to all decoration works. Remarks: Completed On Time to Client's up most Satisfaction Project Name: Renovation of Head Office Client (Name & Address): LEMA COMPANY Tel: 5666112 Consultant (Name & Address): TAHAN & BUSHNAQ CONSULTING ENGINEERS Tel: 5861867 Contract Amount: 243,000 JD Completion Date: 2001 Job Description: Complete Renovation of Head Office Building, Remarks: ‐ Copyright © 2009 Wajih Contracting Co. Page 81 of 114 TECHNICAL PROPOSAL Project Name: Finishing Works for the Food Court Zara Center Client (Name & Address): Amman Tourism Investment Co. Consultant (Name & Address): ZARA CONSULTANCY & PROJECTS MANAGEMENT CO. Contract Amount: 75000 JD Completion Date: 2002 Job Description: Work Consisted of Marble Cladding for Columns, Banquet Seats, bar tables, Mural displays in addition to all related finishing works. Remarks: ‐ Project Name: MODIFICATION OF HYATT AMMAN TOWER APARTMENTS. Client (Name & Address): HYATT AMMAN HOTEL Tel: +971 4 651 234 Consultant (Name & Address): ZARA CONSULTENCY AMMAN. Contract Amount: 76,000 JD Completion Date: 2003 Job Description: Apartment modification of T11‐T14 floors of the Hyatt tower to provide 4 Apartments on each Floor. Remarks: Completed On Time to Client's up most Satisfaction. Copyright © 2009 Wajih Contracting Co. Page 82 of 114 TECHNICAL PROPOSAL Project Name: Central Amman Post Office Client: Jordan Post Office Consultant: Diran ,Sarrar & Masri Contract Amount: 180,000 JD Job Description: Interial Renovation of the Ground floor & 1’st floor of the Building including All Decorations & Electromechanical work. Remarks: ‐ Project Name: Renovation & Decoration of Gr. & 4th Floors Client: Ministry of Planning & International Cooperation Consultant: Client Contract Amount: 90,000 J.D Job Description: Interial Renovation Of The Ground floor & 4’st floor of the ministry’s building including All Decorations & Electromechanical work. Remarks: ‐ Project Name: Fit – out & Decoration of Guy Laroche shop Swefieh Client: Morex international Trading Co. Consultant: El‐ Bana Design Eqypt Contract Amount: 70,000 J.D Job Description: Finishing Decoration & All Fit – out works including HVAC work Decorations Remarks: ‐ Copyright © 2009 Wajih Contracting Co. Page 83 of 114 TECHNICAL PROPOSAL Project Name: Fit – out & Decoration of Smalto & Scherer Shops‐ Swefieh Client: Morex international Trading Co. Consultant: El‐ Bana Design Eqypt Contract Amount: 95,000 J.D Job Description: Finishing Decoration & All Fit – out works including HVAC work Decorations Remarks: ‐ Project Name: AMC New Offices / Zahran Street Client: Fawwaz Al‐Zu'bi Consultant: ‐‐ Contract Amount: 115,000 Job Description: Finishing, fit‐out & Interior Decoration Remarks: ‐ Copyright © 2009 Wajih Contracting Co. Page 84 of 114 TECHNICAL PROPOSAL Project Name: ABU TAWILEH VILLA RESTAURANT Client (Name & Address): QAIS ABU TAWILEH Consultant: Asas Project Management & Symbiosis Design Tel: 5853667 Contract Amount: 85,000.‐ JD Completion Date: 2007 Job Description: Finishing, fit out & Stone Cladding Remarks: Completed On Time. Project Name: EMAAR JORDAN CORPORATE OFFICES Client (Name & Address): M/S. EMAAR JORDAN Consultant: Arabtech Jardaneh Tel: 5857167 Contract Amount: 320,000.‐ JD Completion Date: 2007 Job Description: Finishing, fit out & Interior Decoration Remarks: Completed On Time. Project Name: DAR Consult OFFICES Client (Name & Address): M/S. DAR Consult Consultant: Dar Consult Contract Amount: 90,000 JD Completion Date: 5/2007 Job Description: Finishing, fit out & Interior Decoration Remarks: Completed On Time. Copyright © 2009 Wajih Contracting Co. Page 85 of 114 TECHNICAL PROPOSAL Project Name: Soft Refurbishment of Block “C” Intercontinental Amman Jordan Client (Name & Address): Jordan Tourism Co. Consultant: Ayla Consultancy Contract Amount: 610’000.00 JD Completion Date: 10/2007 Job Description: Rehabilitation, Finishing, fit out & Interior Decoration Remarks: Project Name: Mitsubishi / Ford / Suzuki Show rooms & Offices Client (Name & Address): TJ & CIC Co. Consultant: Saya for Architecture Contract Amount: 480’000.00 JD Completion Date: 5/2007 Job Description: Rehabilitation, Finishing, fit out & Interior Decoration Remarks: Copyright © 2009 Wajih Contracting Co. Page 86 of 114 TECHNICAL PROPOSAL Project Name: FM Radio Station Studios Client (Name & Address): ARBC Consultant: Design Build Project Contract Amount: 275’000.00 JD Completion Date: 7/2008 Job Description: Rehabilitation, Finishing, fit out & Interior Decoration Remarks: Project Name: Private Offices Client (Name & Address): Qais Abu Tawileh Co. Consultant: MADD Contract Amount: 795’000.00 JD Completion Date: 12/2008 Job Description: Rehabilitation, Finishing, fit out & Interior Decoration Remarks: Copyright © 2009 Wajih Contracting Co. Page 87 of 114 TECHNICAL PROPOSAL Project Name: Crowne Plaza Hotel - Ground Floor Works Client (Name & Address): National Tourism Co. Consultant: Al Nasser Architects Contract Amount: 2’560’000.00 JD Completion Date: 2/2009 Job Description: Rehabilitation, Finishing, fit out & Interior Decoration Remarks: Copyright © 2009 Wajih Contracting Co. Page 88 of 114 TECHNICAL PROPOSAL 2. Public Service, Educational, Health Care & Other Copyright © 2009 Wajih Contracting Co. Page 89 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 045|03|1997 Parliament Building Ministry Of Public Works & Housing Eng.Essam Dougan 30,000 WAJ 046|03|1997 Ministry Of Justice Building Ministry Of Public Works & Housing Eng.William Smeirat 80,000 WAJ 047|03|2002 Renovation MOH Health centers Lot3 WAJ 049|05|2004 Renovation of clinics 587,000 PHCI(Primary Health Care) USAID Arabtech Jardaneh Bitar Consultants Renovation 110 000JD WAJ 050|11|2004 Renovation MOH Health centers Lot#5 PHCI(Primary Health Care) Bitar Consultants WAJ 051|08|2005 House tech 3. for Residential Apartment Building Technical Housing & Real Estate Development Co. Ltd. Development Consulting Consortium 453, 000 JD 350,000 JD Copyright © 2009 Wajih Contracting Co. Page 90 of 114 TECHNICAL PROPOSAL Project Name: PARLIAMENT BUILDING Client (Name & Address): MINISTRY OF PUBLIC WORKS & HOUSUNG Eng.: ESSAM DOUGAN Tel: 079‐5559339 Contract Amount: 30,000 JD Completion Date: 1997 Job Description: Rehabilitation of Existing Cloak Rooms, Establishing Of Disabled Section and Toilet under Dome, Renovation of Speakers Offices, External Pathways. Remarks: Completed On Time Project Name: MINISTRY OF JUSTICE BUILDING Client (Name & Address): MINISTRY OF PUBLIC WORKS & HOUSUNG Eng.: WILLIAM SMEIRAT Tel: 079‐5548035 Contract Amount: 80,000 JD Completion Date: 1997 Job Description: Complete Renovation of Building Including All Electrical & Mechanical Works. Remarks: Completed 14 Days Ahead Of schedule, Ministry Evaluation: Very Good. Project Name: Major Renovation of MOH Health Centers Lot#3 Client (Name & Address): PHCI (Primary Health Care Initiatives) / USAID Tel: + 5866501 Consultant (Name & Address): Bitar Consultants, Architects, Engineers & Project Managers. Contract Amount: 587,000 JD Completion Date: 2003 Job Description: Renovation of eight Health Centers with Total area 3345. m2. Work consisted of internal work, external site work and electromechanical works. Remarks: Completed within 4 months period which is considered a remarkable achievement by client's evaluation Copyright © 2009 Wajih Contracting Co. Page 91 of 114 TECHNICAL PROPOSAL Project Name: Renovation of Clinics Client: MWH (Montgomery Watson) / USAID Consultant: Arabtech Jardaneh Contract Amount: 110 000 JD Job Description: Internal renovation of six Heath Centers. Remarks: ‐ Project Name: Major Renovation of MOH Health Centers Lot#5 Client (Name & Address): PHCI (Primary Health Care Initiatives) / USAID Tel: +5866501 Consultant (Name & Address): Bitar Consultants, Architects, Engineers & Project Managers. Contract Amount: 350,000 JD Completion Date: 2004 Job Description: Renovation of Seven Health Centers with Total area 2900 m2. Work consisted of internal work, external site work & electro – mechanical works. Remarks: Completed within 3 month. Copyright © 2009 Wajih Contracting Co. Page 92 of 114 TECHNICAL PROPOSAL 3. Banks Copyright © 2009 Wajih Contracting Co. Page 93 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 051|03|2000 Cairo Amman Bank Warehouse / Abu ‐ Alanda Cairo Amman Bank D & S 32,000 WAJ 0522|03|2000 Al‐ Salam Market Branch Cairo Amman Bank D & S 25,000 WAJ 053|03|2000 Cairo Amman Bank Mecca St. Branch Cairo Amman Bank D & S 56,000 WAJ 054|03|2000 Cairo Amman Bank Jerrash Branch Cairo Amman Bank D & S 40,000 WAJ 055|03|2000 Cairo Amman Bank Hussein Branch Cairo Amman Bank D & S 35,000 WAJ 056|03|2000 Decorations Of Qaser Shabib Branch / Zarqa Housing Bank For Trade & Finance Sakher Doudin & Partners 118,000 WAJ 057|03|2000 Decorations Of Shmesani Branch Housing Bank For Trade & Finance Sakher Doudin & Partners 126,000 WAJ 058|03|2000 Decorations Of Saqaf ‐Alsiel Branch Housing Bank For Trade & Finance Sakher Doudin & Partners 175,000 WAJ 059|03|2000 Renovation Of Kuwait Bank/Abdali Branch Jordan Kuwait Bank WAJ 060|03|2000 Finishing, Fit‐ out & Interior Decorations of Audi‐ Sweifieh Branch Banque Audi Faris & Faris Architects 210,000 JD WAJ 061|03|2000 Externsion of M adaba Branch Jordan Kuwait Bank Jordan Kuwait Bank Jordan Kuwait Bank 20,000 JD WAJ 062|03|2005 Finishing, Fit‐ out & Interior Decorations of Audi‐ Mecca Mall II Branch Banque Audi Faris & Faris Architects 180,000 JD WAJ 063/03/2006 Re‐ habilitation & Interior Design of Madeena Branch Arab Bank Arab Bank Arab Bank 330,000 JD WAJ 064/03/2007 Re‐ habilitation & Interior Design of City Mall Branch Arab Bank Arab Bank 2K 128,000 JD WAJ 065/03/2007 Re‐ habilitation & Interior Design of Jubeiha Branch Arab Bank Arab Bank 2K 430,000 JD WAJ 066/03/2008 Re‐ habilitation & Interior Design of Aqaba , Sweifieh & H.Q. of National Bank of Kuwait (NBK) N.B.K. ‐ 580,000 JD Jordan Kuwait Bank 45,000 Copyright © 2009 Wajih Contracting Co. Page 94 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 067/12/2008 Union Bank – Abdoun Branch “Structural Works” Union Bank Maisam 200,000 JD WAJ 068/12/2008 Bank Audi – Abdoun Branch Bank Audi Naji E. Eid – Beirut Lebanon 130,000 JD WAJ 069/1/2009 Bank Audi – Madeeneh Branch Bank Audi Naji E. Eid – Beirut Lebanon 200’000.00 JD Copyright © 2009 Wajih Contracting Co. Page 95 of 114 TECHNICAL PROPOSAL Project Name: Renovation & Interior Decorations for CAIRO AMMAN BANK Client (Name & Address): CAIRO AMMAN BANK Consultant (Name & Address): DUMIATI & SHASHA'A ARCHITECTS ENGINEERS Tel: 4652191/ 4640222 Contract Amount: 188,000 JD Completion Date: 1997‐2000 Job Description: Renovation of Existing Building to be used as Branch. Remarks: Completed On Time. Project Name: Decorations & Renovation FOR HOUSING BANK FOR TRADE & FINANCE Client (Name & Address): HOUSING BANK FOR TRADE & FINANCE Consultant (Name & Address): SAKHER DOUDIN & PARTNERS CONSULTING ENGINEERS Tel: 5601235 Contract Amount: 419,000 JD Completion Date: 2000 ‐ 2002 Job Description: Works consists of industrial marble flooring with elliptical granite in lays, cherry wood cladding to columns and elevation, etc. Remarks: Completed On Time Project Name: Finishing, Fit‐ out & Interior Decorations of Banque Audi‐ Sweifieh Branch Client (Name & Address: Banque Audi Sweifieh Consultant (Name & Address): Faris & Faris Architects Tel: 4644799/4644634 Contract Amount: 210, 0000 JD Completion Date: 2005 Copyright © 2009 Wajih Contracting Co. Page 96 of 114 TECHNICAL PROPOSAL Project Name: Renovation of Jordan Kuwait bank / Abdali branch Client: Jordan Kuwait bank Consultant: Jordan Kuwait bank Contract Amount: 45,000 JD Job Description: Interial renovation of the ground floor. Remarks: ‐ Project Name: Externsion of M adaba Branch Jordan Kuwait Bank Client (Name & Address: Jordan Kuwait Bank Consultant (Name & Address): Jordan Kuwait Bank Tel: 5695604 /* 5688814 Contract Amount: 20,000 JD Completion Date: 2005 Project Name: Finishing, Fit‐ out & Interior Decorations of Banque Audi‐ Mecca Mall II Branch Client (Name & Address: Banque Audi Consultant (Name & Address): Faris & Faris Architects Tel: 4644799/4644634 Contract Amount: 180, 0000 JD Completion Date: 12/2005 Copyright © 2009 Wajih Contracting Co. Page 97 of 114 TECHNICAL PROPOSAL Project Name: Re‐ habilitation & Interior Design of Madeena Branch Arab Bank Client (Name & Address: Arab Bank Consultant (Name & Address): Arab Bank Tel: 5607231 Contract Amount: 330, 0000 JD Completion Date: 2/2006 Project Name: Re‐ habilitation & Interior Design of City Mall Branch Arab Bank Client (Name & Address: Arab Bank Consultant (Name & Address): 2K Architects, Planners, Engineers Tel: 5607231 Contract Amount: 128, 0000 JD Completion Date: 6/2007 Copyright © 2009 Wajih Contracting Co. Page 98 of 114 TECHNICAL PROPOSAL Project Name: Re‐ habilitation & Interior Design of Jubeiha Branch Arab Bank Client (Name & Address: Arab Bank Consultant (Name & Address): 2K Architects, Planners, Engineers Tel: 5607231 Contract Amount: 430,000.00 JD Completion Date: 7/2007 Project Name: Re‐ habilitation & Interior Design of Aqaba , Sweifieh & H.Q. of National Bank of Kuwait (NBK) Client (Name & Address: N.B.K. Consultant (Name & Address): Tel: Contract Amount: 580,000.00 JD Completion Date: 6/2008 Copyright © 2009 Wajih Contracting Co. Page 99 of 114 TECHNICAL PROPOSAL 4. Embassies Copyright © 2009 Wajih Contracting Co. Page 100 of 114 TECHNICAL PROPOSAL Serial No. Project Name Client Consultant Contract sum JD WAJ 026|03|2000 The Apostolic Nunciature in Jordan The Apostolic Nunciature in Jordan Karim Bawab 21,000 WAJ 023|03|2000 The Deputy Head Of Mission’s Residence British Embassy Karim Bawab 51,000 WAJ 046|03|2000 Renovation Works Of British Embassy Building British Embassy Ruqun Al‐ Handasa 38,000 WAJ 056|03|2000 Maintenance Works Embassy of Switzerland ____ 25,000 WAJ 066|03|2000 Extension of Boundar wall of the Embassador's Residence Embassy of Belgium ____ 10,000 WAJ 03/2007 Re‐ habilitation and Renovation of Mexican Consulate in Amman Mexican Embassy ____ 120,000 JD WAJ 04/2008 Refurbishment Works for the British Embassy (Amman) British Embassy Allied for Planning & Engineering 435’542.02 JD Copyright © 2009 Wajih Contracting Co. Page 101 of 114 TECHNICAL PROPOSAL Project Name: Renovation Project For The Apostolic Nunciature in Jordan Client (Name & Address): APOSTOLIC NUNCIATURE Consultant (Name & Address): KARIM BAWAB & CO. CONSULTANTS‐ ARCHITECTS & ENGINEERS Tel: 5672783 Contract Amount: 21,000 JD Completion Date: 2000 Job Description: Modifications to Basement & Roof Floors & other Renovation Works As preparations for the Popes Holy Visit to Jordan Remarks: Completed On Time Project Name: Renovation Project for the Deputy Head of Mission's Residence /Amman Client (Name & Address): BRITISH EMBASSY Consultant (Name & Address): KARIM BAWAB & CO. CONSULTANTS‐ ARCHITECTS & ENGINEERS Tel: 5672783 Contract Amount: 51,000 JD Completion Date: 2000 Job Description: Renovation of Bathrooms, Kitchen, Marble Floorings with Special Designs, Joinery, D.G Aluminum Windows & Doors, Vanities…….etc Remarks: Completed On Time. Project Name: Extension of Boundary wall at The Ambassador’s Residence Client (Name & Address): Embassy of Belgium Consultant (Name & Address): ___ Tel: Contract Amount: 10000JD Completion Date: 2003 Job Description: Vertical extension of stone claded boundary wall. Remarks: Project Name: Renovation of Toilets and British Embassy Building Client (Name & Address): British Embassy Consultant (Name & Address): Ruqun Al‐ Handassa. Tel: 5667290 Contract Amount: 38000 JD Completion Date: 2004 Job Description: Complete renovation of toilets and kitchen consists of tiling false ceiling, partition and electro‐ Mechanical works. Copyright © 2009 Wajih Contracting Co. Page 102 of 114 TECHNICAL PROPOSAL Project Name: Maintenance works of the Embassy of Switzerland Remises. Client (Name & Address): Embassy of Switzerland Consultant (Name & Address): ____ Tel: Contract Amount: 25000 JD Completion Date: 2003 Job Description: Various maintenance and renovation works. Remarks: Project Name: Re‐ habilitation and Renovation of Mexican Consulate in Amman Client (Name & Address): Embassy of Mexico Consultant (Name & Address): ____ Tel: Contract Amount: 120,000 JD Completion Date: 2007 Job Description: Re‐ habilitation of complete premises Civil, Finishing, Electrical, Mechanical & Decoration Work Remarks: Project Name: Refurbishment Works for the British Embassy (Amman) Client (Name & Address): British Embassy Consultant (Name & Address): Allied for Planning & Engineering Tel: Contract Amount: 435’542.02 JD Completion Date: 9/2008 Job Description: Re‐ habilitation of complete premises Civil, Finishing, Electrical, Mechanical & Decoration Work Remarks: Copyright © 2009 Wajih Contracting Co. Page 103 of 114 TECHNICAL PROPOSAL 9. Methodology and project understanding. This item relates to our ability to manage the day‐ to day the construction activities. This item covers as a minimum: Describing our concept of the project construction management organization and how it interrelates with the other elements of the organization for the project. Providing a brief narrative description of the proposed plan for performing construction for the project. This description will include at least the following: 1. A construction bar chart for the project, showing the relationships between functions shown on the chart and the functional relationships with subcontractors. The chart will indicate how we intend to divide the project into work segments to enable optimum construction performance. 2. A description of those categories of work which we anticipate will be performed by our own direct labor force and those categories which will be performed by subcontractors. Our plan and procedures to insure timely deliveries of materials to achieve the project schedule. 1. Bar Chart and Relationships between Functions 2. Execution of Work categories ‐ Will Be Submitted @ Tendering Stage 3. Material Procurement - During the bidding process, preliminary material lists containing initial quantity and approved suppliers will be prepared. Upon issuing the Award of Contract Notification, all material submittals, bar bending schedules are prepared and handed over to Consultant for approval purposes. A joint effort between Contractor . and Consultant has to be put in order to complete the approvals process within the first week. - During the approval process, final quantities and bar bending schedules are double checked and finalized and hence Material Flow Sheets are prepared according to the Master Plan and Program of Works. - Once submittals are approved, material procurement sheets are prepared which will include: ‐ - o Type of Material o Approved manufacturer, brand name and reference no. o Quantity required for all sites. o Name and address of local suppliers. Delivery dates of all materials are handed over to our Purchasing Officer to follow up and ensure delivery on daily basis. - Any late deliveries or no show cases are reported directly by the concerned foreman or site engineer by means of mobile phone which will be allocated to each site for immediate action. - A pick –up truck will be allocated for substituting any unexpected shortage of materials and tools. Copyright © 2009 Wajih Contracting Co. Page 104 of 114 TECHNICAL PROPOSAL 4. Addressing Problems, Risks and Conflicts - During mobilization, survey control points are comprehensively verified hence reporting any discrepancy or conflict directly to the Engineer for action. Once survey control points, datum control and bench marks are established and approved by the Engineer, they will be accurately logged, protected and dislocated points are established for future reference. Hence, ensuring accurate setting‐out of the works according to the set plans. - If a change of plane exceeding 6mm occurs for any reason, a recommendation for providing a smooth transition will be submitted to the Engineer. If the said change will in any way affect the final horizontal or vertical alignment of the finished structure, it will be immediately rectified at our own expense. - During the Engineering stage, design drawings are thoroughly revised for the proper matching of Structural drawings to the Architectural, hence reporting any conflict to the Engineer for verification and amendments. - Shop drawings for all Electro‐mechanical first fixes are prepared imposing them on the Structural and Architectural drawings for early identification of any discrepancy or conflict. Our weekly produced program of works for each site extracted from master plan will allow early Coordination with Consultant for problem handling prior to its occurrence. 5. Site Coordination Procedure Our representative will cooperate with the Engineer / Client in the following : - Allocation of mobilization areas of site. Use of site and facilities during the work. - Intra‐project communications; reports and records; schedules and recommendations; resolution of ambiguities and conflicts. - Submittals, for payments; interpretation of contract documents and instructions; requests for substitutions and change orders; review and inspection reports. - Shop drawings, product data and samples. - Locate and protect control horizontal and vertical survey points. - Organize and record periodical site meetings. Submittals of samples and testing of materials prior usage on site. Construction photographs Copyright © 2009 Wajih Contracting Co. Page 105 of 114 TECHNICAL PROPOSAL 10 AWARDS, PRIZES WON FOR ACHIEVMENTS - - Ministry of Public Works & Housing awarded the company with an achievement of contracting award in 2008 for the execution of Abu Tawileh Plaza located on Mecca Street. Amman Bookshop rated upon completion as the BEST BOOKSHOP in Amman in a number of public articles in daily newspapers. - Liquid Petroleum Gas (LPG) Station of the Modern Packaging Systems Factory – Sahab rated as Best & Safest LPG Station in the Kingdom by The Jordan Petroleum Refinery and was approved for operation without snags once completed. - Decorations and Joinery works of Qasr Shabib Branch / Housing Bank was evaluated excellent by Client and Consultant and set as Reference for other new branches. - ROYAL JORDANIAN AWARD was presented to our General Manager Elias Khoury by Royal Jordanian CEO His Excellency Eng. Nader Al‐Dhahabi for the excellent and remarkable results of the Renovation and Furnishing of the VIP & First Class Travelers Lounges at Queen Alia International Airport. Copyright © 2009 Wajih Contracting Co. Page 106 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 107 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 108 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 109 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 110 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 111 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 112 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 113 of 114 TECHNICAL PROPOSAL Copyright © 2009 Wajih Contracting Co. Page 114 of 114