Report run on: March 21, 2013 2:36 PM
Morinville - Morinville Community High School (B3806A)
Facility Details
Building Name:
Address:
Location:
Morinville Community High Sc
9506 - 100 Avenue
Morinville
Evaluation Details
Evaluation Company: Grant Moore Architect Ltd.
Evaluation Date: October 16 2012
Evaluator Name: Grant Moore
Building Id:
Gross Area (sq. m):
Replacement Cost:
Construction Year:
B3806A
7,397.00
$24,901,000
1993 Total Maintenance Events Next 5 years:
5 year Facility Condition Index (FCI):
$840,997
3.38%
General Summary:
The original 6400 m2 school was constructed in 1993.
A 996 m2 addition was constructed in 1998.
The current gross area of the building is 7397 m2.
The total student capacity is 780.
Structural Summary:
The 1993 building and 1998 addition's foundations are concrete piles and grade beams, with a main floor concrete slab.
The second floor is a OWSJ steel frame with metal deck and concrete topping.
The structure of the building is in acceptable condition.
Envelope Summary:
The exterior walls consist of textured concrete block and pre-finished metal siding. The windows are aluminum. The main entrance doors are aluminum and the remaining exterior doors are painted metal.
The roof is a combination of metal standing seam for the pitched portion and modified bituminous for the flat area.
The exterior building envelope is in acceptable condition.
Interior Summary:
Floors in the corridors and common area are linoleum. The Administration areas and library have carpet. Some classrooms in the 1993 building have carpet but the school board has an ongoing program to replace all carpet in classrooms. The classrooms in the 1998 addition have linoleum.
Ceilings in in general throughout the school are exposed painted metal trusses and decking. Administration/staff area and classrooms on the Main Floor have suspended acoustic tile. The washrooms/changerooms have painted drywall ceilings.
Walls in the corridor are lined with lockers and painted concrete block. Classrooms wall are a mixture of painted concrete block and drywall. Washroom walls are a combination of ceramic tile and painted concrete block.
All interior finishes in the building are in acceptable condition.
Mechanical Summary:
School consists of original 1993 section and 1998 addition. Building is heated via perimeter radiation. Entrances heated via fan coil units. Total of six systems with glycol heating coil ventilate the school. One direct fired make up air unit provides make up air for kitchen range hood. Plumbing fixtures are flush valve water closets, flush valve urinals, stainless steel lavatories, stainless steel counter sinks. Fire protection consists of wet sprinkler system and fire extinguishers.
Items which should be addressed are humidification, server room air conditioning, computer room air conditioning.
Mechanical systems and components are in good condition.
Electrical Summary:
The school has been provided with an 800A, 347/600V, 3 phase, 4 wire service obtained from an on-site pad mounted transformer. A main distribution centre has been provided in the electrical room, with branch circuit breaker panels located throughout the school. Dry type step down transformers have been provided. Interior lighting is provided by fluorescent fixtures which are primarily with T8 lamps and electronic ballasts. In the gym, high bay suspended fixtures have been provided with T5 lamps.
The electrical systems in the school are in acceptable condition.
Report run on: March 21, 2013 2:36 PM
Page 2 of 45
Morinville - Morinville Community High School (B3806A)
Rating Guide
Condition Rating Performance
1 - Critical
2 - Poor
Unsafe, high risk of injury or critical system failure.
Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
5 - Good
6 - Excellent
Meets all present requirements. No deficiencies.
As new/state of the art, meets present and foreseeable requirements.
Report run on: March 21, 2013 2:36 PM
Page 3 of 45
Morinville - Morinville Community High School (B3806A)
A1010 Standard Foundations* - 1993 Section
Reinforced concrete spread footings (perimeter and interior) supporting 1500 mm min. high reinforced concrete foundation walls. Reinforced concrete pads supporting interior steel columns.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
A1010 Standard Foundations* - 1998 Section
Reinforced concrete spread footings (perimeter and interior) supporting 1500 mm min. high reinforced concrete foundation walls. Reinforced concrete pads supporting interior steel columns.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
A1030 Slab on Grade* - 1993 Section
100 mm reinforced concrete slab on grade with poly vapour barrier on compacted fill. Recessed slab on grade in the gymnasium. Recessed slab and pit at elevator.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
A1030 Slab on Grade* - 1998 Section
Main Floor is concrete slab on grade.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
B1010.01 Floor Structural Frame (Building Frame)* - 1993 Section
Steel columns and beams with metal deck supporting the Second Floor in the classroom and CTS Areas. 200 mm reinforced concrete structural slab over the changerooms and kitchen.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B1010.03 Floor Decks, Slabs, and Toppings* - 1993 Section
38 mm metal deck and 87 mm concrete topping for Second Floor Classroom Area and Storage Mezzanines in the CTS area.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 4 of 45
Morinville - Morinville Community High School (B3806A)
B1020.01 Roof Structural Frame* - 1993 Section
Roof structure is open web steel joists with metal deck supported by steel beams and columns.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B1020.01 Roof Structural Frame* - 1998 Section
Roof structure is open web steel joists with metal deck supported by steel beams and columns.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
B1020.02 Structural Interior Walls Supporting Roofs* - 1993 Section
Interior structural walls supporting roof are concrete block of various thickness.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B1020.02 Structural Interior Walls Supporting Roofs* - 1998 Section
Interior structural walls supporting roof are concrete block of various thickness.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
B1020.05 Roof Construction Vapor Retarders, Air Barriers, and Insulation* - 1993 Section
Typical Roof Construction - SBS Membrane:
- SBS membrane
- 12.7 mm fibreboard
- 100 mm rigid insulation - RSI 3.5
- Air/vapour barrier
- 12.7 mm exterior gypsum sheathing
- Metal roof deck
Typical Roof Construction - Metal roofing:
- Prefinished metal roofing
- Membrane roofing
- 15.9 mm exterior gypsum sheathing
- 100 mm rigid insulation (RSI 3.5) between Z-bars @ 600 oc
- Air/vapour membrane
- 12.7 mm exterior gypsum sheathing
- Metal roof decking
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 5 of 45
Morinville - Morinville Community High School (B3806A)
B1020.05 Roof Construction Vapor Retarders, Air Barriers, and Insulation* - 1998 Section
Typical Roof Construction - SBS Membrane:
- SBS membrane
- 25 mm fibreboard
- 115 mm polystyrene insulation
- Felt vapour barrier
- 12.7 mm exterior gypsum sheating
- Metal roof deck
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 6 of 45
Morinville - Morinville Community High School (B3806A)
B2010.01.02.02 Concrete Block: Ext. Wall Skin* - 1993 Section
Concrete block exterior finish around Main Floor and Gymnasium.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B2010.01.02.02 Concrete Block: Ext. Wall Skin* - 1998 Section
Concrete block exterior finish around Main Floor. Cracked and broken block observed at roof parapet on the north side.
Apparently snow/ice are sliding down the metal roof and damaging the concrete block.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
Event: Repair Concrete Block.(385m2)
Concern:
Damaged and missing concrete block can allow moisture to penetrate to building envelope at the roof and wall causing interior damage and further decay.
Recommendation:
Repair concrete block wall and metal roof and install snow/ice retention guards on the metal roof to inhibit the movement of snow and ice.
Type
Repair
Year
2013
Cost
$30,000
Priority
Low
PA160227
Updated: MAR-13
B2010.01.06.03 Metal Siding** - 1993 Section
Prefinished metal siding for Main Circulation element and upper portion of Gymnasium and CTS area.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Metal Siding - (1420 m2)
Type
Lifecycle Replacement
Year
2033
Cost
$186,000
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 7 of 45
Morinville - Morinville Community High School (B3806A)
B2010.01.06.03 Metal Siding** - 1998 Section
Prefinished metal siding for Main Circulation element.
Rating
4 - Acceptable
Installed
1998
Design Life
40
Updated
MAR-13
Event: Replace Metal Siding - (385 m2)
Type
Lifecycle Replacement
Year
2038
Cost
$50,500
Priority
Unassigned
Updated: MAR-13
B2010.01.09 Expansion Control: Ext. Wall*
All sections have expansion joints as specified.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B2010.01.11 Joint Sealers (caulking): Ext. Wall** - 1993 Section
Caulking at all exterior doors, louvres and windows.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Joint Sealers - (2475 lineal meters)
Type
Lifecycle Replacement
Year
2016
Cost
$72,100
Priority
Unassigned
Updated: MAR-13
B2010.01.11 Joint Sealers (caulking): Ext. Wall** - 1998 Section
Caulking at all exterior doors, louvres and windows.
Rating
4 - Acceptable
Installed
1998
Design Life
20
Updated
MAR-13
Event: Replace Joint Sealers - (305 lineal metres)
Type
Lifecycle Replacement
Year
2018
Cost
$8,900
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 8 of 45
Morinville - Morinville Community High School (B3806A)
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1993 Section
Exterior Wall Construction concrete block veneer:
- Concrete block veneer
- Air space
- 50 mm rigid insulation
- Air/vapour membrane as specified
- 200/250 mm concrete block
Exterior Wall Construction metal siding finish:
- metal siding
- 75 mm Z - bar
- 50 mm rigid insulation
- Air/vapour membrane as specified
- concrete block or steel stud framing
- drywall finish
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1998 Section
Exterior Wall Construction concrete block veneer:
- Concrete block veneer
- Air space
- 50 mm rigid insulation
- Air/vapour membrane as specified
- 200/250 mm concrete block
Exterior Wall Construction metal siding finish:
- metal siding
- 75 mm Z - bar
- 50 mm rigid insulation
- Air/vapour membrane as specified
- Concrete block or steel stud framing
- Drywall finish
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
B2010.06 Exterior Louvers, Grilles, and Screens* - 1993 Section
Prefinished metal louvers throughout the building.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B2010.06 Exterior Louvers, Grilles, and Screens* - 1998 Section
Prefinished metal louvers throughout the building.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 9 of 45
Morinville - Morinville Community High School (B3806A)
B2010.09 Exterior Soffits* - 1993 Section
Pre-finished metal soffits at CTS portion of the school on the west and north sides.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
B2010.09 Exterior Soffits* - 1998 Section
Pre-finished metal soffits on the north-east classroom side of the building.
Rating
4 - Acceptable
Installed
1998
Design Life
0
Updated
MAR-13
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1993 Section
Clear anodized aluminum windows throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Aluminum Windows - (380 m2)
Type
Lifecycle Replacement
Year
2033
Cost
$364,900
Priority
Unassigned
Updated: MAR-13
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1998 Section
Clear anodized aluminum windows throughout the school.
Rating
4 - Acceptable
Installed
1998
Design Life
40
Updated
MAR-13
Event: Replace Aluminum Windows - (75 m2)
Type
Lifecycle Replacement
Year
2038
Cost
$72,100
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 10 of 45
Morinville - Morinville Community High School (B3806A)
B2030.01.01 Aluminum-Framed Storefronts: Doors** - 1993 Section
Clear anondized aluminum entrance doors throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Aluminum Exterior Entrance Doors - (8
Doors)
Type
Lifecycle Replacement
Year
2023
Cost
$73,100
Priority
Unassigned
Updated: MAR-13
B2030.01.02 Steel-Framed Storefronts: Doors** - 1998 Section
Painted metal entrance doors throughout the section.
Rating
4 - Acceptable
Installed
1998
Design Life
30
Updated
MAR-13
Event: Replace Steel Exterior Entrance Doors - (2 sets of
Double Doors)
Type
Lifecycle Replacement
Year
2028
Cost
$9,700
Priority
Unassigned
Updated: MAR-13
B2030.02 Exterior Utility Doors** - 1993 Section
Painted metal exterior utility doors throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Exterior Utility Doors - (12 door)
Type
Lifecycle Replacement
Year
2033
Cost
$10,200
Priority
Unassigned
Updated: MAR-13
B2030.03 Large Exterior Special Doors (Overhead)*
Insulated prefinished overhead door connecting Wood shop to Outdoor Storage Area.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 11 of 45
Morinville - Morinville Community High School (B3806A)
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1993 Section
Modified Bituminous Roofing System.
Rating
4 - Acceptable
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace SBS Membrane Roofing - (5000 m2)
Type
Lifecycle Replacement
Year
2018
Cost
$872,900
Priority
Unassigned
Updated: MAR-13
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1998 Section
Modified Bituminous SBS Roofing System.
Rating
4 - Acceptable
Installed
1998
Design Life
25
Updated
MAR-13
Event: Replace SBS Membrane Roofing - (910 m2)
Type
Lifecycle Replacement
Year
2023
Cost
$158,900
Priority
Unassigned
Updated: MAR-13
B3010.07 Sheet Metal Roofing**
Prefinished pitched/sloped roof area standing seam metal roof.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Sheet Metal Roofing - (950 m2)
Type
Lifecycle Replacement
Year
2033
Cost
$228,100
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 12 of 45
Morinville - Morinville Community High School (B3806A)
B3010.08.02 Metal Gutters and Downspouts** - 1993 Section
Prefinished metal downspouts from connecting link roof to sloped metal roof.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Metal Gutters - (20 lineal metres)
Type
Lifecycle Replacement
Year
2023
Cost
$600
Priority
Unassigned
Updated: MAR-13
B3010.08.02 Metal Gutters and Downspouts** - 1998 Section
Prefinished metal downspouts and gutters on connecting vestibule between 1993 and 1998 Ssections.
Rating
4 - Acceptable
Installed
1998
Design Life
30
Updated
MAR-13
Event: Replace Metal Gutters - (9 lineal metres)
Type
Lifecycle Replacement
Year
2028
Cost
$300
Priority
Unassigned
Updated: MAR-13
B3020.01 Skylights** - 1993 Section
Sloped curved aluminum framed clear glazed skylight over central gathering area.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Event: Replace Aluminum Skylights - (190m2)
Type
Lifecycle Replacement
Year
2018
Cost
$435,400
Priority
Unassigned
Updated: MAR-13
B3020.02 Other Roofing Openings (Hatch, Vent, etc)* - 1993 Section
Prefinished metal roof access hatches providing access to various flat roof sections of the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 13 of 45
Morinville - Morinville Community High School (B3806A)
C1010.01 Interior Fixed Partitions* - All Sections
Painted concrete block partitions throughout the school. Painted drywall steel studs partitions used throughout the school in classrooms, office and administration areas.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1010.02 Interior Demountable Partitions*
Interior demountable partitions located in the Counselling Office Area
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1010.03 Interior Operable Folding Panel Partitions**
Interior Operable Folding partitions located between the classrooms on the Second Floor.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Interior Operable Folding Panel
Partitions - (145m2 )
Type
Lifecycle Replacement
Year Cost
2023 $165,600
Priority
Unassigned
Updated: MAR-13
C1010.04 Interior Balustrades and Screens, Interior Railings*
Painted metal balustrades throughout the building.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1010.05 Interior Windows*
Painted steel window frames throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1020.01 Interior Swinging Doors (& Hardware)*
Interior doors to classrooms, offices and administration areas are solid core clear finish wood veneer in painted metal frames. Doors to washrooms, utility and storage rooms are either painted wood or metal in painted metal frames. All doors have institutional quality hardware.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 14 of 45
Morinville - Morinville Community High School (B3806A)
C1020.03 Interior Fire Doors*
Interior fire doors are painted steel doors and frames.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1020.04 Interior Sliding and Folding Doors*
Interior folding doors between some classrooms in both the 1993 and 1998 buildings.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1020.05 Interior Large Doors*
Large vertically motorized retractable door located at Stage/Ancillary Room opening to Public Seating and Corridor.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1030.01 Visual Display Boards** - 1993 Section
Chalkboards, whiteboards and tackboards located through out the school.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Visual Display Boards - (170 Boards)
Type
Lifecycle Replacement
Year
2016
Cost
$111,300
Priority
Unassigned
Updated: MAR-13
C1030.01 Visual Display Boards** - 1998 Section
Whiteboards and tackboards located through out the school.
Rating
6 - Excellent
Installed
2011
Design Life
20
Updated
MAR-13
Event: Replace Visual Display Boards - ( 60 Boards)
Type
Lifecycle Replacement
Year
2031
Cost
$39,300
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 15 of 45
Morinville - Morinville Community High School (B3806A)
C1030.02 Fabricated Compartments (Toilets/Showers)**
Prefinished metal shower compartments in the changerooms.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Fabricated Shower& Toilet Compartments
- (6 shower & 6 toilet compartments)
Type
Lifecycle Replacement
Year
2023
Cost
$20,400
Priority
Unassigned
Updated: MAR-13
C1030.06 Handrails*
Painted metal handrails throughout the building.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1030.08 Interior Identifying Devices*
Engraved and embossed plastic signage typical throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C1030.10 Lockers**
Prefinished metal lockers located in the throughout the corridors of the school.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Lockers - (708 lockers)
Type
Lifecycle Replacement
Year
2023
Cost
$339,900
Priority
Unassigned
Updated: MAR-13
C1030.12 Storage Shelving*
Metal storage shelving and plywood shelving located throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 16 of 45
Morinville - Morinville Community High School (B3806A)
C1030.14 Toilet, Bath, and Laundry Accessories*
Institutional quality washroom accessories located in all washrooms.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C2010 Stair Construction*
Painted metal stairs with concrete filled pans throughout school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C2020.05 Resilient Stair Finishes**
Linoleum stairs treads throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Resilient Stair Finishes - (40 m2)
Type
Lifecycle Replacement
Year
2016
Cost
$3,500
Priority
Unassigned
Updated: MAR-13
C2020.08 Stair Railings and Balustrades*
Painted metal stair railing and balustrades throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C3010.06 Tile Wall Finishes**
Ceramic tile wall finishes in the washrooms, changerooms and shower areas and in the kitchen.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Tile Wall Finishes - (505 m2)
Type
Lifecycle Replacement
Year
2033
Cost
$124,900
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 17 of 45
Morinville - Morinville Community High School (B3806A)
C3010.09 Acoustical Wall Treatment**
Cloth covered acoustical wall treatment in the CTS Areas and Music Room.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Acoustical Wall Treatment - (60 m2)
Type
Lifecycle Replacement
Year
2016
Cost
$13,600
Priority
Unassigned
Updated: MAR-13
C3010.11 Interior Wall Painting*
Interior concrete block and gypsum board wall surfaces painted.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C3020.01.02 Painted Concrete Floor Finishes*
Painted concrete floor finishes located in mechanical rooms.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C3020.02 Tile Floor Finishes**
Ceramic tile floor finishes in the kitchen , changerooms and washrooms throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
50
Updated
MAR-13
Event: Replace Tile Floor Finishes - (350 m2)
Type
Lifecycle Replacement
Year
2043
Cost
$58,600
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 18 of 45
Morinville - Morinville Community High School (B3806A)
C3020.04 Wood Flooring**
Floating wood flooring in the Gymnasium. Refinished in 2012
Rating
5 - Good
Installed
2012
Design Life
30
Updated
MAR-13
Event: Replace Wood Flooring - (715 m2)
Type
Lifecycle Replacement
Year
2042
Cost
$182,100
Priority
Unassigned
Updated: MAR-13
C3020.07 Resilient Flooring** - 1993 Section
Resilient sheet flooring (linoleum) in corridors, classrooms throughout the 1993 Section.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Resilient Sheet Flooring - (2000 m2)
Type
Lifecycle Replacement
Year
2016
Cost
$160,100
Priority
Unassigned
Updated: MAR-13
C3020.07 Resilient Flooring** - 1998 Section
Resilient tile flooring in classrooms and corridors throughout the 1998 Section.
Rating
5 - Good
Installed
2009
Design Life
20
Updated
MAR-13
Event: Replace ResilientTile Flooring - (800 m2)
Type
Lifecycle Replacement
Year
2029
Cost
$40,800
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 19 of 45
Morinville - Morinville Community High School (B3806A)
C3020.08 Carpet Flooring**
Carpet floor finishes found in the administration areas, library, staff room, some CTS areas and some classrooms in the
1993 Building. Some fraying along some edges and seams was observed during site review.
Rating
4 - Acceptable
Installed
1993
Design Life
15
Updated
MAR-13
Event: Replace Carpet Flooring - (1150 m2)
Type
Lifecycle Replacement
Year
2016
Cost
$106,465
Priority
Unassigned
Updated: MAR-13
C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*
Gypsum wall board finishes in washrooms, changerooms and storage rooms throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1993 Section
Suspended T-bar and acoustic tile in Main Floor Classrooms, Administration areas, library and staff room.
Rating
4 - Acceptable
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace Acoustic Ceiling Tile - (2350 m2)
Type
Lifecycle Replacement
Year
2018
Cost
$109,400
Priority
Unassigned
Updated: MAR-13
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1998 Section
Suspended acoustic ceiling tile and grid in west classrooms.
Rating
4 - Acceptable
Installed
1998
Design Life
25
Updated
MAR-13
Event: Replace Acoustic Ceiling Treatment (Susp. T-Bar) -
(450 m2)
Type
Lifecycle Replacement
Year
2023
Cost
$21,000
Priority
Unassigned
Updated: MAR-13
Report run on: March 21, 2013 2:36 PM
Page 20 of 45
Morinville - Morinville Community High School (B3806A)
C3030.07 Interior Ceiling Painting*
Painted steel trusses and roof deck in Gymnasium, Second Floor Classrooms and CTS Areas. Painted drywall ceilings located in washrooms, changerooms and storage rooms throughout the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
D1010.02 Lifts**
One wheel chair lift servicing the Main and Second Floor.
Rating
4 - Acceptable
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace Wheel Chair Lift. (1)
Type
Lifecycle Replacement
Year Cost
2018 $75,700
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 21 of 45
Morinville - Morinville Community High School (B3806A)
D2010.04 Sinks**
15 Stainless steel countertop.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace 15 Sinks
Type
Lifecycle Replacement
Year
2023
Cost
$22,260
Priority
Unassigned
Updated: MAR-13
D2010.05 Showers**
Central mix valve for 9 boys shower heads. Central mix valve for 9 girl shower heads. Male and female staff complete with mix valve and shower head.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace 4 mix valve, 20 shower heads
Type
Lifecycle Replacement
Year
2023
Cost
$16,000
Priority
Unassigned
Updated: MAR-13
D2010.08 Drinking Fountains/Coolers**
(2) refrigerated. (4) non refrigerated drinking fountains.
Rating
5 - Good
Installed
1993
Design Life
35
Updated
MAR-13
Event: Replace six drinking fountains
Type
Lifecycle Replacement
Year
2028
Cost
$20,730
Priority
Unassigned
Updated: MAR-13
D2010.09 Other Plumbing Fixtures*
Kitchen grease interceptor, beauty salon sink (2), darkroom sink and mix valve, floor mount janitor sinks.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
Report run on: March 21, 2013 2:36 PM
Page 22 of 45
Morinville - Morinville Community High School (B3806A)
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
43 flush valve water closets, 3 wall urinals, 36 lavs. Combination of infrared and single-handle faucets.
Rating
5 - Good
Installed
1993
Design Life
35
Updated
MAR-13
Event: Replace 43 WC, 3 UR, 36 Lav
Type
Lifecycle Replacement
Year
2023
Cost
$128,497
Priority
Unassigned
Updated: MAR-13
D2020.01.01 Pipes and Tubes: Domestic Water*
Copper tube and fittings.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-10
D2020.01.02 Valves: Domestic Water**
Isolation valves.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace 20 main isolation valves
Type
Lifecycle Replacement
Year
2033
Cost
$22,000
Priority
Unassigned
Updated: MAR-13
D2020.01.03 Piping Specialties (Backflow Preventers)**
Installed on heating system make up line, wet sprinkler system, domestic water supply. Latest inspection tag from 2007.
Rating
5 - Good
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace three backflow preventers
Type
Lifecycle Replacement
Year
2016
Cost
$16,389
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 23 of 45
Morinville - Morinville Community High School (B3806A)
D2020.02.02 Plumbing Pumps: Domestic Water**
Grundfos UP26-15 fractional hp in-line circulator.
Rating
5 - Good
Installed
2006
Design Life
20
Updated
MAR-13
Event: Replace circulator pump. (1)
Type
Lifecycle Replacement
Year
2026
Cost
$1,186
Priority
Unassigned
Updated: MAR-13
D2020.02.06 Domestic Water Heaters**
Two gas-fired hot water storage tanks in mechanical room. AO Smith BTRC500A-110, 450 mbh input, 85 gal storage, 440 gal/hr recovery, atmospheric draft w/ damper. Disconnected tank State SBT500 NE7 DF, 30 gal storage, 500 mbh input.
Rating
4 - Acceptable
Installed
2007
Design Life
20
Updated
MAR-13
Event: Replace one hot water tank
Type
Lifecycle Replacement
Year
2027
Cost
$8,000
Priority
Unassigned
Updated: MAR-13
D2020.03 Water Supply Insulation: Domestic*
Majority of domestic hot cold and recirculation lines insulated.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D2030.01 Waste and Vent Piping*
PVC and copper.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D2030.03 Waste Piping Equipment*
Weeping tile lift pump installed in service tunnel.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
Report run on: March 21, 2013 2:36 PM
Page 24 of 45
Morinville - Morinville Community High School (B3806A)
D2040.01 Rain Water Drainage Piping Systems*
Piped to underground storm sewer (original and addition).
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D2040.02.04 Roof Drains*
Full flow, cast iron dome. (original and addition).
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-10
D3010.02 Gas Supply Systems*
Distribution piping to boilers, domestic hot water heaters, kitchen make up unit and appliances. Science lab gas capped off. Meter in mechanical room.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
D3020.02.01 Heating Boilers and Accessories: H.W.**
Three atmospheric boilers, Raypak H3-2100, 2100 mbh input, Honeywell gas valve control. Low-water cutoff, pressure relief valve. 14" B-vent from each boiler.
Rating
6 - Excellent
Installed
2012
Design Life
35
Updated
MAR-13
Event: Replace three heating boilers
Type
Lifecycle Replacement
Year
2047
Cost
$136,275
Priority
Unassigned
Updated: MAR-13
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
Class B chimney, insulated combustion air trap. Evidence of condensation in main vent stack due to staining of insulation.
Rating
4 - Acceptable
Installed
1993
Design Life
35
Updated
MAR-13
Event: Replace 30 m chimney
Type
Lifecycle Replacement
Updated: MAR-13
Year
2028
Cost
$19,650
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 25 of 45
Morinville - Morinville Community High School (B3806A)
D3020.02.03 Water Treatment: H. W. Boiler*
Chemical pot feeder and side stream filter.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D3030.06.02 Refrigerant Condensing Units**
Studio Dx cooling coil and condensing unit system. R-22.
Rating
4 - Acceptable
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace studio condensing unit.(1)
Type
Lifecycle Replacement
Year
2018
Cost
$8,000
Priority
Unassigned
Updated: MAR-13
D3030.08 Other Refrigeration Systems*
Kitchen freezer and cooler evaporator and condensing unit systems. Temperature in freezer -20C during inspection, TXV and bulb show ice buildup.
Rating
3 - Marginal
Installed
1993
Design Life
0
Updated
MAR-13
Event: Repair freezer control.(1)
Concern:
Freezer control is over-cooling space.
Recommendation:
Replace thermostat, review TXV and sensing bulb installation.
Consequences of Deferral:
Poor storage conditions for food, shortened freezer system lifespan.
Type
Repair
Updated: MAR-13
Year
2013
Cost
$2,500
Priority
Low
Report run on: March 21, 2013 2:36 PM
Page 26 of 45
Morinville - Morinville Community High School (B3806A)
D3040.01.01 Air Handling Units: Air Distribution**
AH-2 Gymnasium and support area unit complete with supply fan, motorized dampers, glycol heating coil, filter section, relief, with backdraft damper. Low velocity ductwork distribution. EngA LM-15-CO, 13,650 cfm. 7.5 hp supply fan, 5 hp return fan.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace AH-2.(1)
Type
Lifecycle Replacement
Year
2023
Cost
$146,438
Priority
Unassigned
Updated: MAR-13
D3040.01.01 Air Handling Units: Air Distribution**
AH-1 Classroom unit complete with supply fan, return fan, motorized dampers, glycol heating coil, filter section. Medium velocity ductwork to terminal boxes. EngA LM-32-CO, 23,000 cfm. 30 hp SF, 10 hp RF.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace AH-1.(1)
Type
Lifecycle Replacement
Updated: MAR-13
Year
2023
Cost
$256,267
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 27 of 45
Morinville - Morinville Community High School (B3806A)
D3040.01.01 Air Handling Units: Air Distribution**
RTU-1, 1998 Addition classroom complete with supply fan, return fan, motorized dampers, glycol heating coil, filter section.
Constant volume. Low velocity ductwork distribution. Outdoor rooftup unit, SystemAire T-M-265RECF. 12000 cfm S/A, 10 hp fan. 10,000 cfm R/A, 3 hp fan. Maintenance reports minor water leaks into ductwork through unit.
Rating
4 - Acceptable
Installed
1998
Design Life
30
Updated
MAR-13
Event: Repair water leakage on RTU-1. (1)
Concern:
Water leaking into ductwork from outdoor unit above.
Recommendation:
Re-caullk and replace seals on unit.
Consequences of Deferral:
Continued water leak, potential for damage and mold growth.
Type
Repair
Updated: MAR-13
Year
2013
Cost
$4,000
Priority
Low
Event: Replace RTU-1.(1)
Type
Lifecycle Replacement
Year
2028
Cost
$146,438
Priority
Unassigned
Updated: MAR-13
D3040.01.01 Air Handling Units: Air Distribution**
AH-3 CTS business technology unit complete with supply fan, return fan, motorized dampers, glycol heating coil, filter section. Medium velocity ductwork to terminal boxes. EngA LM-21-C, 20,400 cfm. 25 hp SF, 7.5 hp RF w/ silencer. Return fan in mechanical mezzanine.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace AH-3.(1)
Type
Lifecycle Replacement
Updated: MAR-13
Year
2023
Cost
$256,267
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 28 of 45
Morinville - Morinville Community High School (B3806A)
D3040.01.01 Air Handling Units: Air Distribution**
AH-4 Music, drama unit complete with supply fan, motorized dampers, glycol heating coil, filter section, relief with backdraft damper. Low velocity ductwork distribution. EngA LM-8-C, 7100 cfm, 7.5 hp SF. Humidification section removed.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace AH-4.(1)
Type
Lifecycle Replacement
Year
2023
Cost
$164,743
Priority
Unassigned
Updated: MAR-13
D3040.01.01 Air Handling Units: Air Distribution**
AH-5 C.T.S. Make up unit complete with supply fan, motorized dampers, glycol heating coil, filter section. Low velocity ductwork distribution. EngA LM-4-C, 5000 cfm, 3 hp SF.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace AH-5.(1)
Type
Lifecycle Replacement
Year
2023
Cost
$73,219
Priority
Unassigned
Updated: MAR-13
D3040.01.03 Air Cleaning Devices: Air Distribution*
Throw away filters, generally 2" pleated on all air systems. 3-month change frequency.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
D3040.01.04 Ducts: Air Distribution*
Low and medium velocity ductwork. Ceiling space return air plenum. Welded ductwork serving kitchen exhaust hoods.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
D3040.01.07 Air Outlets & Inlets: Air Distribution*
Fixed pattern square diffusers, round diffusers, adjustable and linear bar grilles, egg crate.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
Report run on: March 21, 2013 2:36 PM
Page 29 of 45
Morinville - Morinville Community High School (B3806A)
D3040.03.01 Hot Water Distribution Systems**
Two inline pumps circulate heated water via black iron piping, Armstrong 4x4x10 4380. 12 l/s @ 19.8 m head. 7.5 hp. Both pumps operate on lead/lag. Propylene glycol system for air handler coils, two heat exchanger circulator pumps, two main glycol pumps Armstrong 2x2x8, 4.7 l/s @ 2.2 m head. 3 hp.
Rating
4 - Acceptable
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace hot water system (7397 sq m gfa)
Type
Lifecycle Replacement
Year
2033
Cost
$699,460
Priority
Unassigned
Updated: MAR-13
D3040.04.01 Fans: Exhaust**
Dome roof exhaust fans. Total of 14.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace 14 rooftop fans
Type
Lifecycle Replacement
Year
2023
Cost
$21,000
Priority
Unassigned
Updated: MAR-13
D3040.04.03 Ducts: Exhaust*
Low velocity ductwork to air outlets and fans.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D3040.04.05 Air Outlets and Inlets: Exhaust*
Linear bar and egg crate grilles.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
Report run on: March 21, 2013 2:36 PM
Page 30 of 45
Morinville - Morinville Community High School (B3806A)
D3040.05 Heat Exchangers**
Armstrong glycol shell and tube heat exchanger.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Heat Exchanger.(1)
Type
Lifecycle Replacement
Year
2023
Cost
$22,500
Priority
Unassigned
Updated: MAR-13
D3050.01.03 Packaged Terminal Air Conditioning Units*
Split system AC for server room, Mitsubishi Mr Slim 2-ton, -40C rated condenser.
Rating
6 - Excellent
Installed
2011
Design Life
30
Updated
MAR-13
D3050.02 Air Coils** -1993
(6) Duct mounted reheat coils.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace 8 reheat coils
Type
Lifecycle Replacement
Year
2023
Cost
$21,966
Priority
Unassigned
Updated: MAR-13
D3050.02 Air Coils** -1998
Two (2) duct mounted heating coils.
Rating
5 - Good
Installed
1998
Design Life
30
Updated
MAR-13
Event: Replace two air coils
Type
Lifecycle Replacement
Updated: MAR-13
Year
2028
Cost
$5,491
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 31 of 45
Morinville - Morinville Community High School (B3806A)
D3050.05.02 Fan Coil Units**
Installed at entrances.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace ten vestibule heaters
Type
Lifecycle Replacement
Year
2023
Cost
$52,730
Priority
Unassigned
Updated: MAR-13
D3050.05.03 Finned Tube Radiation**
Perimeter finned tube radiation.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Finned Tube Radiation (7397 sq m gfa)
Type
Lifecycle Replacement
Year
2033
Cost
$344,330
Priority
Unassigned
Updated: MAR-13
D3060.02.02 Pneumatic Controls**
Pneumatic control valves, air compressor, 10 scfm dryer. P/E interface with DDC system. 2x2 hp control air compressors.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace pneumatic controls (7397 sq m gfa)
Type
Lifecycle Replacement
Year
2033
Cost
$107,626
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 32 of 45
Morinville - Morinville Community High School (B3806A)
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
Barber Colman Network 8000 DDC, P/E transducers to pneumatic system. Invensys DDC room thermostats. Remote access enabled.
Rating
5 - Good
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replacement DDC System (7397 sq m gfa)
Type
Lifecycle Replacement
Year
2016
Cost
$193,727
Priority
Unassigned
Updated: MAR-13
D3090 Other Special HVAC Systems and Equipment*
CTS lab dust collector, fan motor bearings sounding of wear.
Four welding booths in CTS lab, common exhaust fan. Industrial arts air compressor in mechanical room. Science prep room fumehood.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
D4010 Sprinklers: Fire Protection*
Wet sprinkler system.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D4030.01 Fire Extinguisher, Cabinets and Accessories*
ABC extinguishers on wall hooks and cabinets. Kitchen fire extinguisher not Purple K.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-10
D4090.04 Dry Chemical Fire Extinguishing Systems (Kitchen Hood)**
Kitchen range hood dry chemical suppression.
Flammable storage cabinets.
Replace one dry chemical fire suppression unit.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Kitchen Hood Fire Suppression.(1)
Type
Lifecycle Replacement
Year
2033
Cost
$12,905
Updated: MAR-13
Report run on: March 21, 2013 2:36 PM
Priority
Unassigned
Page 33 of 45
Morinville - Morinville Community High School (B3806A)
D5010.02 Secondary Electrical Transformers (Interior)**
Two dry type step down transformers have been provided in the electrical room and outside the gymnasium that step the voltage down to 120/208V, 3 phase 4 wire, from the incoming 600V system. Each transformer is rated at 150kVA. The secondaries of the transformer feed 208V, 3 phase, 4 wire CDP's.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Secondary Transformers (Interior). (2)
Type
Lifecycle Replacement
Year
2033
Cost
$50,392
Priority
Unassigned
Updated: MAR-13
D5010.03 Main Electrical Switchboards (Main Distribution)**
A Federal Pioneer 2 cell main distribution centre is located in the electrical room. It is fed from an on-site pad-mounted outdoor transformer located near the loading dock. The distribution centre is rated at 800A, 347/600V, 3 phase, 4 wire and is complete with an 800A main breaker. The distribution section is complete with feeder breakers that feed the various loads within the school, which includes the 600V 400A MCC, two 600V 100A and two 208V 250A distribution panelboards. All feeder breakers are identified and there is ample spare breaker capacity.
Rating
5 - Good
Installed
1993
Design Life
40
Updated
MAR-13
Event: Replace Main Electrical Switchboard. (1)
Type
Lifecycle Replacement
Year
2033
Cost
$44,283
Priority
Unassigned
Updated: MAR-13
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
Federal Pioneer Electric make central distribution and branch circuit breaker panel boards have been provided. The central distribution panels (CDP's) are located in the electrical room and gymnasium, this includes two 208V CDPs 2D1 & 2D2 and two 600V CDPs 6A & 6B. The branch circuit panel boards are located strategically throughout the school including classroom wings and service rooms. These are found in either 100 or 225 amp ratings. Available capacity for additional circuits varies considerably from area to area - on average panels are 70% although many are also full.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Electrical Branch Circuit Panelboards (23)
Type
Lifecycle Replacement
Year
2023
Cost
$108,742
Priority
Unassigned
Updated: MAR-13
Report run on: March 21, 2013 2:36 PM
Page 34 of 45
Morinville - Morinville Community High School (B3806A)
D5010.07.02 Motor Starters and Accessories**
A Square D motor control centre (MCC) has been provided in the mechanical room for motor control. The MCC is complete with combination type magnetic motor starters, pilot lights and hand-off-auto selector switches. A controls section has been provided in the MCC. Spare starter capacity is available in the MCC.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Motor Starters and Accessories.(1)
Type
Lifecycle Replacement
Year
2023
Cost
$14,562
Priority
Unassigned
Updated: MAR-13
D5020.01 Electrical Branch Wiring*
All branch wiring is copper and is in conduit.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-08
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
Interior lighting is controlled by a Douglas low voltage switching system. Relay cabinets are located adjacent to the breaker panels. Local switches have been provided for each room and area. One unit had a new controller installed in 2007. There is capacity for additional relays.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
D5020.02.02.02 Interior Fluorescent Fixtures**
Lighting is primarily provided by fluorescent fixtures. Fixtures are either surface mounted or recessed mounted depending on the ceiling system. Fixtures at lower ceiling heights were retrofit approximately 2002 with T8 linear or TT8 bi-axle lamps and electronic ballasts. Gymnasium fixtures are of the high bay suspended type with T5HO lamps, electronic ballasts, acrylic lenses and wireguards.
Rating
5 - Good
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Interior Florescent Fixtures (approx 900)
Type
Lifecycle Replacement
Year
2023
Cost
$197,702
Priority
Unassigned
Updated: MAR-13
Report run on: March 21, 2013 2:36 PM
Page 35 of 45
Morinville - Morinville Community High School (B3806A)
D5020.02.02.03 Interior Metal Halide Fixtures*
The foyer has been provided with suspended metal halide fixtures complete with 175 Watt lamps.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
Event: Remove metal halide lighting in foyer.
Concern:
Metal halide lighting in foyer is predominantly decorative, provides little illumination at night and are left on during the day. These are difficult to access, must be maintained and consume a considerable amount of energy.
Recommendation:
Remove existing luminaires and install supplemental wall mount lighting at a lower level and put on day light harvesting photo sensor control.
Type Year
Operating Efficiency Upgrade 2015
Cost
$15,990
Priority
Low
Updated: MAR-13
D5020.02.03.02 Emergency Lighting Battery Packs**
Emergency lighting is provided by Lumacell battery packs and remote heads, all strategically located to illuminate paths and points of egress in the event of a utility power failure. All paths and points of egress are well covered.
Rating
4 - Acceptable
Installed
1993
Design Life
20
Updated
MAR-13
Event: Replace Emergency Lighting Battery Packs
(approx 25)
Type
Lifecycle Replacement
Year
2016
Cost
$28,916
Priority
Unassigned
Updated: MAR-13
D5020.02.03.03 Exit Signs*
LED type Lumacell exit lights have been over each required point of egress.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 36 of 45
Morinville - Morinville Community High School (B3806A)
D5020.02.05 Special Purpose Lighting: (Stage)*
Track mounted incandescent lighting has been provided on the stage and is controlled by a dimming system..
Rating
3 - Marginal
Installed
1993
Design Life
0
Updated
MAR-13
Event: Replace dimming controllers (3)
Concern:
The existing Qty. 3 x Strand CD80 dimming controllers are having components fail and replacement parts are not available.
Maintenance has been able to rewire the units in order to repair.
Recommendation:
Replace unit with new of same type and capacity.
Consequences of Deferral:
Loss of lighting controls
Type
Failure Replacement
Year Cost
2013 $22,550
Priority
Low
Updated: MAR-13
D5020.02.05 Special Purpose Lighting: (Studio)*
Low voltage halogen MR16 track lighting has been provided in the drama/music room and is controlled by a Strand Lighting
MX dimming system.
Rating
6 - Excellent
Installed
2010
Design Life
0
Updated
MAR-13
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
Wall mounted fixtures have been provided around the building perimeter complete with 175 Watt metal halide lamps. All entrances are well illuminated. Some areas have 175W metal halide downlights recessed in the canopy, but these have been disconnected.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
All exterior lighting is controlled by either integral or group photo cells on a time clock with manual override.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 37 of 45
Morinville - Morinville Community High School (B3806A)
D5030.01 Detection and Fire Alarm**
A Simplex 4100U addressable fire alarm system was provided. The system is complete with heat and smoke detectors, manual pulls stations, audible/visual signal appliances. The main control panel is located in the custodian's office with a remote annunciator located in the principal entrance of the building. The system is externally monitored and tested annually for Alarm, Trouble and Supervisory conditions.
Rating
6 - Excellent
Installed
2006
Design Life
25
Updated
MAR-13
Event: Replace Fire Alarm System
Type
Lifecycle Replacement
Year
2031
Cost
$44,406
Priority
Unassigned
Updated: MAR-13
D5030.02.02 Intrusion Detection**
A Gemini P3200 intrusion alarm system has been provided. The system is complete with motion detectors and door contacts. The main control panel is located in the custodian's office with keypads at the entrances used by the staff.
Rating
5 - Good
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace Intrusion Detection
Type
Lifecycle Replacement
Year
2018
Cost
$40,645
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 38 of 45
Morinville - Morinville Community High School (B3806A)
D5030.02.04 Video Surveillance**
A CCTV system consisting of Model 420 2.5-9.5mm colour cameras, monitor and and DVR recording system on APC UPS backup has been provided. A total of 27 cameras have been provided, 16 which were installed before 200 and the remainder in 2010. The monitor and the recording system is located in the general office. A digital recording system (IGB) has been provided. Remote access of the system is possible. Wiring to cameras is unshielded telephone twisted two pair, which is insufficient for the cameras communication needs.
A side entrance has a FOB scanner.
Rating
6 - Excellent
Installed
2007
Design Life
25
Updated
MAR-13
Event: Repair power and data wiring backbone.
Concern:
Although new hardware has been purchased for the surveillance system, the existing twisted pair telephone wires were re-used to provide power and communications to the cameras. These cables do not have adequate ampacity for power loads and also result in considerable signal noise from the lack of bandwidth provided by the wiring.
Recommendation:
Pull new power and data wiring backbone for the surveillance system.
Consequences of Deferral:
Continued poor visual quality with intermittent loss of communications with cameras. Wiring could fail prematurely due to non-rated usage, resulting in permanent loss of communication with a camera.
Type
Repair
Updated: MAR-13
Year
2014
Cost
$75,850
Priority
High
Event: Replace Video Surveillance System
Type
Lifecycle Replacement
Year
2032
Cost
$24,898
Priority
Unassigned
Updated: MAR-08
D5030.04.01 Telephone Systems*
The Nortel telephone service to the school is underground and terminates in the server room located on the second floor. A telephone terminal board has been provided. Telephone sets have been provide in the administration area including the offices.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 39 of 45
Morinville - Morinville Community High School (B3806A)
D5030.04.03 Call Systems**
The call system is the product of Rauland Telecenter System 21. The head end equipment is located in the server room on the second floor. The call system is interfaced with the telephone system. Telephone sets have been provided in each classroom. Ceiling mounted speakers have been provided throughout the school including each classroom, corridors, and the wash rooms.
Rating
5 - Good
Installed
1993
Design Life
25
Updated
MAR-13
Event: Replace Call System. (1)
Type
Lifecycle Replacement
Year
2018
Cost
$45,065
Priority
Unassigned
Updated: MAR-13
D5030.04.04 Data Systems*
Cat 5 data cabling has been provided throughout the school with outlets in each classroom and the administrative area.
Circa 2100s fiber switches installed in the server room provide an internal fiber network. A transmission antenna is installed on the roof to provide a link to another nearby school without SuperNet interface. Network hubs are located by a classroom on the 2nd floor, a classroom by the gym and in the copy room in the CTS area.
Rating
5 - Good
Installed
2000
Design Life
0
Updated
MAR-13
D5030.04.05 Local Area Network Systems*
Local area network is located in a dedicated room and is complete with a rack and backed by an APC 1500 UPS. The
SuperNet interface was installed in 2007.
Rating
5 - Good
Installed
2000
Design Life
0
Updated
MAR-13
D5030.05 Public Address and Music Systems: (Gymnasium)**
The Gymnasium has a Crown LPS 2500 audio amplifier, Alessis iMultiMix 9R mixer and AudioTrak AT-PB108 receiver. The original TOA 900 Series public address system is still installed but has been abandoned.
Rating
6 - Excellent
Installed
2011
Design Life
20
Updated
MAR-13
Event: Replace Sound System (1)
Type
Lifecycle Replacement
Year
2031
Cost
$5,193
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 40 of 45
Morinville - Morinville Community High School (B3806A)
D5030.05 Public Address and Music Systems: (Studio)**
A MPM 20/2 audio mixer and amplifier is provided.
Rating
6 - Excellent
Installed
2012
Design Life
20
Updated
MAR-13
Event: Replace Sound System (1)
Type
Lifecycle Replacement
Year Cost
2032 $5,193
Priority
Unassigned
Updated: MAR-13
D5030.06 Television Systems*
The television system is powered by a Motorolla amplifier located in the server room. Outlets are located in classrooms and libary.
Rating
5 - Good
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 41 of 45
Morinville - Morinville Community High School (B3806A)
E1020.03 Theatre and Stage Equipment*
Stage curtain and rigging, lighting grid and tracks located in Stage/Drama ancillary classroom.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
E1020.07 Laboratory Equipment*
Fume hoods located in the science rooms.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
E1090.03 Food Service Equipment*
Commercial quality food service equipment; ranges, fryer, mixers, freezers, washers and sterilizers located in the Home
Economics Lab.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
E2010.02 Fixed Casework** - 1993 Section
All millwork throughout the classrooms and office areas is plastic laminate tops with plastic laminate fronts and gable ends with varnished birch trim. The kitchen has stainless steel counters and work surfaces.
Rating
4 - Acceptable
Installed
1993
Design Life
35
Updated
MAR-13
Event: Replace Fixed Casework - (375 lineal metres)
Type
Lifecycle Replacement
Year
2028
Cost
$333,000
Priority
Unassigned
Updated: MAR-13
E2010.02 Fixed Casework** - 1998 Section
Plastic laminate computer desks and upper shelving in two computer classrooms.
Rating
4 - Acceptable
Installed
1998
Design Life
35
Updated
MAR-13
Event: Replace Fixed Casework - (35 lineal meres)
Type
Lifecycle Replacement
Year
2033
Cost
$27,800
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 42 of 45
Morinville - Morinville Community High School (B3806A)
E2010.03.01 Blinds** - 1993 Section
Vinyl vertical blinds typical throughout the section at windows that are reachable from the floor. Upper windows in the CTS
Areas do not have blinds.
Rating
4 - Acceptable
Installed
1993
Design Life
30
Updated
MAR-13
Event: Replace Vertical Blinds - (155 m2)
Type
Lifecycle Replacement
Year
2023
Cost
$17,000
Priority
Unassigned
Updated: MAR-13
E2010.03.01 Blinds** - 1998 Section
Roller blinds at exterior windows.
Rating
5 - Good
Installed
2009
Design Life
30
Updated
MAR-13
Event: Replace Roller Blinds - (40 m2)
Type
Lifecycle Replacement
Year
2039
Cost
$4,400
Priority
Unassigned
Updated: MAR-13
E2010.05 Fixed Multiple Seating**
Folding movable wood bleachers located in the gymnasium.
Rating
4 - Acceptable
Installed
1993
Design Life
35
Updated
MAR-13
Event: Replace Fixed Seating - (300 Seats)
Type
Lifecycle Replacement
Year
2028
Cost
$109,200
Updated: MAR-13
Priority
Unassigned
Report run on: March 21, 2013 2:36 PM
Page 43 of 45
Morinville - Morinville Community High School (B3806A)
K4010.01 Barrier Free Route: Parking to Entrance*
Access from Barrier Free Accessible (BFA) parking stalls to main entrance meets current BFA Code Requirements.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4010.02 Barrier Free Entrances*
Main entrance doors are equipped with power assisted door operator meeting Barrier Free Accessibility Code
Requirements.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4010.03 Barrier Free Interior Circulation*
Interior circulation paths meet current Barrier Free Accessibility Code Requirements.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4010.04 Barrier Free Washrooms*
A washroom meeting current Barrier Free Accessibility Requirements is available in the school.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4030.01 Asbestos*
None observed or reported during inspection.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4030.04 Mould*
None observed or reported during inspection.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
K4030.09 Other Hazardous Materials*
None observed or reported during inspection.
Rating
4 - Acceptable
Installed
1993
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM
Page 44 of 45
Morinville - Morinville Community High School (B3806A)
K5010.01 Site Documentation*
Prime Consultant: Grant Moore Architect Ltd.
Year of Evaluation: 2012
Date of Visit: October 16, 2012
Rating
4 - Acceptable
Installed
2012
Design Life
0
Updated
MAR-13
K5010.02 Building Documentation*
Prime Consultant: Grant Moore Architect Ltd.
Year of Evaluation: 2012
Building Area Evaluated: 7397 m2
Date of Visit: October 16, 2012
Rating
4 - Acceptable
Installed
2012
Design Life
0
Updated
MAR-13
Report run on: March 21, 2013 2:36 PM