Frontline Leadership Job/Task Analysis: Installing see-saw in local playground ACC5759 Agreed control PPE required Special instructions/ Information required Equipment required Materials/ Parts required Betta Business Ltd Job/ Task step Risks Labour required Time Costs allowed for step Getting to and from the job: • Load tools into van night before. • Load see-saw and jig on truck. • Transport to site. • Weight of structure. • Manual handling. • Traffic conditions. • Off-loading. • Hire HIAB equipped truck. • Load van night before and check as per list. • Check strops for wear and tear prior to use. • Ensure driver has HT license and is trained to use HIAB hoist. • Load onto 100x100 packers. • Securely strop down. • Safety boots. • Gloves. • Equipment checklist. • Location map. • 5 tonne truck (hire half day $250). • Strops. • Packers. • HIAB truck driver – 2hrs @ $30/hr. • Fitter/Welder – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. 1 hr $400 Preparing the work area: • Truck access to be kept clear. • Council plans to be received indicating position of underground services. • Cones, barriers and tape to be positioned before job. • Underground services. • Playground users. • Access to unloading area. • Positioning see-saw. • Cones and barriers to be placed. • Footings to be marked and council to check for underground services prior to day of job. • Commence work at 6am to dig footing. • See-saw to arrive at 9am. • Safety boots. • Gloves. • Hi-vis vests. • Council permits for park closure and excavation permit. • Site plan. • 10 road cones (hire $50). • 110 solid barriers (hire $300). • Fitter – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. • Truck driver – 2 hrs @ $30/hr 1 hr each $500 Job Step 1: Dig footings • Manual handling. • Unload wheel barrow and digging equipment. • Get 2 people to lift. • Council officer to check footing size and sign off. • Gloves. • Boots. • Hi-vis vests. • Location plan. • Spade. • Wheel barrow. • Fitter – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. 1 hr each $90 Frontline Leadership Job/Task Analysis: Installing see-saw in local playground Job/ Task step ACC5759 Risks Agreed control PPE required Special instructions/ Information required Equipment required Job Step 2: Unload jig and see-saw • Manual handling. • Overhead load. • Keep public outside of coned area. • Keep clear of lift. • Trained HIAB operator to perform lift. • • • • Boots. Gloves. Hi-vis vests. Hard hats. • Position jig. • Lower see-saw onto jig and position correctly using HIAB to manipulate. • Keep hands away from pinch points. Job Step 3: Grout footing in place • See-saw secured. • Grout chemical properties. • Dust. • Manual handling when mixing grout compound. • See-saw locked to jig. • PPE for mixing grout. • Safety glasses. • Dust masks. • Boots. • Gloves. • Hi-vis vests. • Material Safety Data Sheet for grout product. • Wheel barrow. • Spade. • Water supply. Job Step 4: Clean up • Members of public interfering with job. • Lock see-saw to jig. • Chain and lock barriers together. • Boots. • Hi-vis vests. • Leave site secure. • Return 8am next morning to disassemble barriers and jig. • 2 x 19mm spanners to disassemble jig. • • • • Materials/ Parts required HIAB. Jig. Small crow bar. Level. • Grout compound $100. • Dust masks $5 Betta Business Ltd Labour required Time Costs allowed for step • Fitter – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. 1 hr $90 • Fitter – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. 1 hr each $195 • Fitter – 1 hr @ $60/hr. • TA – 1 hr @ $30/hr. 2 hrs each $180 Frontline Leadership Job/Task Analysis: Installing see-saw in local playground Job/ Task step Risks Emergency planning: Accident or incident • Accident or injury to worker. • Damage to equipment. • Carry First Aid kit. • Carry mobile phone. • If equipment is damaged, immediately contact workshop. • Details and directions to nearest Medical Centre. • Contact details for workshop. Job issue: Equipment failure • HIAB failure. • Truck late or breakdown. • Van breakdown. • Check HIAB fully functional when delivered. • Hire company contact details. Job issue: Wrong or lack of parts or equipment • Jig is accurate to position equipment. • Check jig in workshop before loading. • Notify Foreman if there is a problem. Job issue: Time overrun ACC5759 Agreed control • Notify workshop. PPE required Special instructions/ Information required Equipment required Materials/ Parts required • First Aid kit. • Mobile phone. • Level • Contact details for workshop. • Mobile phone. Betta Business Ltd Labour required Time Costs allowed for step