Job/Task Analysis: Installing see-saw in local playground
ACC5759
Agreed
control
PPE
required
Special instructions/
Information
required
Equipment
required
Materials/
Parts
required
Betta Business Ltd
Job/
Task
step
Risks
Labour
required
Time
Costs
allowed for
step
Getting to and from
the job:
• Load tools into
van night before.
• Load see-saw
and jig on truck.
• Transport to site.
• Weight of
structure.
• Manual handling.
• Traffic conditions.
• Off-loading.
• Hire HIAB equipped truck.
• Load van night before and
check as per list.
• Check strops for wear and
tear prior to use.
• Ensure driver has HT
license and is trained to
use HIAB hoist.
• Load onto 100x100
packers.
• Securely strop down.
• Safety
boots.
• Gloves.
• Equipment checklist.
• Location map.
• 5 tonne truck
(hire half day
$250).
• Strops.
• Packers.
• HIAB truck
driver – 2hrs @
$30/hr.
• Fitter/Welder –
1 hr @ $60/hr.
• TA – 1 hr @
$30/hr.
1 hr
$400
Preparing the work
area:
• Truck access to be
kept clear.
• Council plans
to be received
indicating position
of underground
services.
• Cones, barriers
and tape to be
positioned before
job.
• Underground
services.
• Playground
users.
• Access to unloading area.
• Positioning
see-saw.
• Cones and barriers to be
placed.
• Footings to be marked
and council to check for
underground services
prior to day of job.
• Commence work at 6am
to dig footing.
• See-saw to arrive at 9am.
• Safety boots.
• Gloves.
• Hi-vis vests.
• Council permits for park
closure and excavation
permit.
• Site plan.
• 10 road cones
(hire $50).
• 110 solid barriers
(hire $300).
• Fitter – 1 hr @
$60/hr.
• TA – 1 hr @
$30/hr.
• Truck driver –
2 hrs @ $30/hr
1 hr each
$500
Job Step 1: Dig
footings
• Manual
handling.
• Unload wheel barrow and
digging equipment.
• Get 2 people to lift.
• Council officer to check
footing size and sign off.
• Gloves.
• Boots.
• Hi-vis vests.
• Location plan.
• Spade.
• Wheel
barrow.
• Fitter – 1 hr @
$60/hr.
• TA – 1 hr @
$30/hr.
1 hr each
$90
Frontline Leadership
Job/Task Analysis: Installing see-saw in local playground
Job/
Task
step
ACC5759
Risks
Agreed
control
PPE
required
Special instructions/
Information
required
Equipment
required
Job Step 2: Unload
jig and see-saw
• Manual
handling.
• Overhead load.
• Keep public outside of
coned area.
• Keep clear of lift.
• Trained HIAB operator
to perform lift.
•
•
•
•
Boots.
Gloves.
Hi-vis vests.
Hard hats.
• Position jig.
• Lower see-saw onto jig and
position correctly using
HIAB to manipulate.
• Keep hands away from
pinch points.
Job Step 3: Grout
footing in place
• See-saw
secured.
• Grout chemical
properties.
• Dust.
• Manual
handling when
mixing grout
compound.
• See-saw locked to jig.
• PPE for mixing grout.
• Safety
glasses.
• Dust masks.
• Boots.
• Gloves.
• Hi-vis vests.
• Material Safety Data Sheet
for grout product.
• Wheel
barrow.
• Spade.
• Water
supply.
Job Step 4: Clean up
• Members
of public
interfering
with job.
• Lock see-saw to jig.
• Chain and lock barriers
together.
• Boots.
• Hi-vis vests.
• Leave site secure.
• Return 8am next morning to
disassemble barriers and jig.
• 2 x 19mm
spanners to
disassemble jig.
•
•
•
•
Materials/
Parts
required
HIAB.
Jig.
Small crow bar.
Level.
• Grout
compound
$100.
• Dust masks $5
Betta Business Ltd
Labour
required
Time
Costs
allowed for
step
• Fitter – 1 hr @
$60/hr.
• TA – 1 hr @
$30/hr.
1 hr
$90
• Fitter – 1 hr @
$60/hr.
• TA – 1 hr @
$30/hr.
1 hr each
$195
• Fitter – 1 hr @
$60/hr.
• TA – 1 hr @
$30/hr.
2 hrs each
$180
Frontline Leadership
Job/Task Analysis: Installing see-saw in local playground
Job/
Task
step
Risks
Emergency planning:
Accident or incident
• Accident
or injury to
worker.
• Damage to
equipment.
• Carry First Aid kit.
• Carry mobile phone.
• If equipment is
damaged, immediately
contact workshop.
• Details and directions to
nearest Medical Centre.
• Contact details for
workshop.
Job issue:
Equipment failure
• HIAB failure.
• Truck late or
breakdown.
• Van
breakdown.
• Check HIAB fully
functional when
delivered.
• Hire company contact
details.
Job issue:
Wrong or lack of parts
or equipment
• Jig is accurate
to position
equipment.
• Check jig in workshop
before loading.
• Notify Foreman if there
is a problem.
Job issue:
Time overrun
ACC5759
Agreed
control
• Notify workshop.
PPE
required
Special instructions/
Information
required
Equipment
required
Materials/
Parts
required
• First Aid kit.
• Mobile
phone.
• Level
• Contact details for
workshop.
• Mobile
phone.
Betta Business Ltd
Labour
required
Time
Costs
allowed for
step