SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Contact Number Dept. COA Connie Willis 748-2211 Gym floor FLOORING COA Connie Willis 748-2211 FLOORING COA Connie Willis 748-2211 Dance floor G111 Gym FLOORING COA Connie Willis 748-2211 G130 FLOORING COA Connie Willis 748-2211 D215 office FLOORING COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 Loc Dept. Contact PROJECT COA Connie Willis 748-2211 COA Connie Willis 748-2211 Project Name FLOORING D208 classroom FLOORING FLOORING L237 FLOORING FLOORING G118, G119 FLOORING FLOORING B201, 202, 203, corridor FLOORING FLOORING D202, D203 FLOORING FLOORING Project Manager Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha NIGHT & WEEKEND WORK ONLY Weight/Fitnes RECONFIGURE Olivia Rocha Men's Locker RECONFIGURE Contact Number Time Frame Scope of Work Categories Resurface, restrip and seal Suspended dance floor Health/Safety 1 Health/Safety 1 529-5409 Basketball hoists Health/Safety 1 529-5409 Health/Safety 1 Modernization 4 529-5409 Currently concrete floor Recarpet in outer area Asbestos removal Health/Safety 1 529-5409 Lino Modernization 4 529-5409 Asbestos removal Health/Safety 1 529-5409 new flooring in kitchenette Modernization 4 529-5409 Asbestos removal Health/Safety 1 529-5409 3 529-5409 New carpet in music Modernization rooms Asbestos removal Health/Safety 529-5409 Replace flooring Modernization 4 529-5409 Asbestos removal Health/Safety 1 529-5409 Carpet Refurbishment 4 529-5409 Asbestos removal Health/Safety 1 529-5409 529-5409 529-5409 529-5409 Olivia Rocha 529-5409 B,C,D,E,G and DUCT CLEANING Olivia LRC Rocha DUCT CLEANING Olivia Rocha 529-5409 Enlarge the weight/fitness and improve ventilatiion Reconfigure *RNKG Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments $ 46,602.93 $ 74,684.18 $ 8,535.33 hoist $ 7,249.34 Rubber flooring $ 4,694.43 $ 2,304.54 $ 10,484.24 $ 5,163.88 $ 398.32 $ 85.35 $ 17,212.92 $ 8,415.84 $ 98,483.53 $ 21,103.61 $ 9,388.87 $ 4,609.08 $ 79,854.10 $ 281,668.04 $ 199,157.81 $ 120,205.96 $ 462,330.62 $ 71,127.79 1 Health/Safety 1 Health/Safety 1 NIGHT & WEEKEND WORK ONLY @25% COA Connie Willis 748-2211 COA Connie Willis 748-2211 *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services 529-5409 Replacement of dampers Health/Safety 1 Health/Safety 1 Page 1 of 6 Udated 10/2/2007 SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Loc Dept. Contact Contact Number PROJECT Dept. Project Name Project Manager Contact Number Time Frame Scope of Work Categories Health/Safety 1 Health/Safety 1 Health/Safety 1 Health/Safety 1 Health/Safety 1 529-5409 Improve ventilation system Improve ventilation system categorize chemicals and recommend storag probable storage cabinets probable storage cabinets Disposal of chem Health/Safety 1 529-5409 Needs new lights Health/Safety 1 Bio Lab C112 DUCT CLEANING Olivia Rocha C103 DUCT CLEANING Olivia Rocha C111 and DUCT CLEANING Olivia C103 lab Rocha 529-5409 Bio Lab C112 DUCT CLEANING Olivia Rocha C103 DUCT CLEANING Olivia Rocha C103 and DUCT CLEANING Olivia C112 Rocha G105 - Gym LIGHTING Olivia Rocha 529-5409 *RNKG COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 G105 - Gym LIGHTING Olivia Rocha 529-5409 light tracking skylights Health/Safety 1 COA Connie Willis 748-2211 G111 - Dance LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 G124 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 G129 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 G130 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services 529-5409 529-5409 529-5409 Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. $ 28,451.12 $ 28,451.12 $ 7,112.78 $ 5,690.22 $ 2,845.11 $ 56,902.23 $ 35,906.73 $ 54,626.14 $ 15,249.80 $ 15,249.80 $ 2,048.48 $ 7,848.24 Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments 2 X 4 6 lamp T5HO lamping batwing distribution with wireguard, hookk cord, & plug, quick disconnect ballast assembly; replace existing lights Ciralight Skylights/daylight/energy savings Delete wall fixtures and replace with 20 2 X 4 6 lamp T8 lay-in troffer with clear acrylic lens with quick disconnet ballast assembly fixtures Fail-safe Linear Harmony 8" stem Mount 2-lamp T8 with clar polycarbonate lens, UL Wet Location listed, Vandal Resistant; replace existing lights Metalux-WB Series WB-2-32A-UNV-EB8 surface mount acrylic wrap 2 lam T8; replace existing lights Fail-safe Linear Harmony 12" stem Mount 4-lamp T8 with clar polycarbonate lens, UL Wet Location listed, Vandal Resistant; replace existing lights Page 2 of 6 Udated 10/2/2007 SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Loc Dept. Contact Contact Number PROJECT Dept. Project Name Project Manager Contact Number Scope of Work Time Frame Categories *RNKG COA Connie Willis 748-2211 G131 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 G132 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 D207 LIGHTING Olivia Rocha 529-5409 Corridor lighting Health/Safety 1 COA Connie Willis 748-2211 D222 LIGHTING Olivia Rocha 529-5409 Corridor lighting Health/Safety 1 COA Connie Willis 748-2211 B114A LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 B114, B120 Parts room LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 COA Connie Willis 748-2211 B113 LIGHTING Olivia Rocha 529-5409 Needs new lights Health/Safety 1 Olivia Rocha 529-5409 Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha 529-5409 Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. $ $ COA Connie Willis 748-2211 Bldg B LIGHTING Stairwells Health/Safety Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments 3,192.22 Fail-safe Linear Harmony surface Mount 2-lamp T8 with clear polycarbonate lens, UL Wet Location Listed, Vandal Resistant; replace existing lights 3,990.27 Fail-safe Linear Harmony surface Mount 2-lamp T8 with clear polycarbonate lens, UL Wet Location Listed, Vandal Resistant; replace existing lights $ 1,596.11 $ 1,596.11 $ 2,617.50 $ 19,511.77 Fail-safe Linear Harmony flush mount 2-lamp T8 with clear polycarbonate lens, UL Wet location Listed, Vandal Fail-safe Linear Harmony flush mount 2-lamp T8 with clear polycarbonate lens, UL Wet location Listed, Vandal Axis Lighting Close Fixture 2 lamp T8 ; replace existing lights Metalux- W Series 4 lamp T8 stem Mount Dual Level Switched; replace exiting lights $ 29,165.25 2 X 4 6-lamp T5HO lamping batwing distribution with clear acrylic lens, hook, cord, & plug, quick disconnedt ballast assembly; replace existing lights $ 7,556.62 $ 200,155.02 $ 6,401.50 $ 15,790.37 $ 4,978.95 $ 64,015.01 1 Surelite-Star Lite 2 NIGHT & WEEKEND WORK ONLY @25% COA Connie Willis 748-2211 PAINTING COA Connie Willis 748-2211 B 2nd floor PAINTING COA Connie Willis 748-2211 B Stairwells PAINTING COA Connie Willis 748-2211 PAINTING COA Connie Willis 748-2211 D229 Classroom Additional areas *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services PAINTING Refurbishment 4 Refurbishment 4 529-5409 Refurbishment 4 529-5409 Refurbishment 4 Refurbishment 4 529-5409 529-5409 Paint corridor Paint Page 3 of 6 Udated 10/2/2007 SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Loc Dept. Contact Contact Number PROJECT Dept. Project Name Project Manager Contact Number Scope of Work Time Frame Categories *RNKG Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments NIGHT & WEEKEND WORK ONLY @25% COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA COA Olivia Rocha NIGHT & Olivia WEEKEND WORK Rocha ONLY @25% 529-5409 permanent repair Health/Safety 1&2 529-5409 Design & night and Health/Safety weekend 1&2 Cafeteria L MISCELLANEOUS Olivia Bldg Rocha Automatic MISCELLANEOUS Olivia door Rocha Panic buttons MISCELLANEOUS Olivia Rocha 529-5409 Connie Willis 748-2211 Gym 529-5409 Connie Willis 748-2211 L237 Repair kitchen equipment Install second auto door Cashiers office, F Bldg, Receptionish F214, Cal Works Receptionist G230, C204, D224 and Presidents Office L228 Scoring table - score board Replace doors to kitchenette; new refrigerator, stove and sink. 9 total tennis courts COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 Repair decks on C&D Repair decks on C&D DECK REPAIR MISCELLANEOUS Olivia Rocha MISCELLANEOUS Olivia Rocha Tennis Court 529-5409 529-5409 529-5409 MISCELLANEOUS Olivia Rocha Stairs C,D(2nd MISCELLANEOUS Olivia & 3rd) Rocha 529-5409 Railings G,C and D DSPS 529-5409 COA Connie Willis 748-2211 One stop career MISCELLANEOUS Olivia Rocha MISCELLANEOUS Olivia Rocha MISCELLANEOUS Olivia Rocha COA Connie Willis 748-2211 One stop career MISCELLANEOUS Olivia Rocha *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services 529-5409 529-5409 529-5409 529-5409 There is uneven pavement and tripping hazard Replace with metal railings D117 door swings out Power actuated door ADA compliant; best locks need to be installed Security alarm installed Health/Safety 2 Health/Safety 1 Health/Safety 1 Modernization 4 Refurbishment 4 Health/Safety 3 Health/Safety 1 Refurbishment 4 Health/Safety 1 Health/Safety 1 Health/Safety 1 $ 91,185.82 $ 569,000.00 $ 142,000.00 $ 56,902.23 $ 17,070.67 $ 9,000.00 $ 2,845.11 $ 8,535.33 $ 393,308.21 $ 46,090.81 $ 14,083.30 $ 2,845.11 $ 8,535.33 $ 8,710.00 Furniture Consider swinging or bifold doors 3 with cracks, 3 usable, 3 with low spots Stairtreads Reverse in swing in and add window Page 4 of 6 Udated 10/2/2007 SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Loc Dept. Contact PROJECT Contact Number Dept. Project Name Project Manager Contact Number Time Frame Scope of Work Categories *RNKG COA Connie Willis 748-2211 One stop MISCELLANEOUS Olivia career fire Rocha alarm and connection to the District system for Cougar Village portables and One Stop Portable 529-5409 Fire alarm and connect to District system Health/Safety 1 COA Connie Willis 748-2211 MISCELLANEOUS Olivia Rocha 529-5409 Health/Safety 1 COA Connie Willis 748-2211 Library 529-5409 Refurbishment 2 COA Connie Willis 748-2211 Library Refurbishment 3 COA Connie Willis 748-2211 G231, G224, 223 corridor MISCELLANEOUS Olivia Rocha MISCELLANEOUS Olivia Rocha MISCELLANEOUS Olivia Rocha Refurbishment 3 COA Connie Willis 748-2211 E 529-5409 Health/Safety 1 COA Connie Willis 748-2211 B103 MISCELLANEOUS Olivia Rocha MISCELLANEOUS Install conduit for fire alarm above and fiber Replace filthy ceiling tiles Studyroom - replace acoustics Replace filthy ceiling tiles; and light lenses Motorize roll up doors Roll up doors Health/Safety 1 COA Connie Willis 748-2211 F Bldg Modernization 4 COA Connie Willis 748-2211 Refurbishment 4 COA Connie Willis 748-2211 Health/Safety 1 COA Connie Willis 748-2211 Health/Safety 1 COA Connie Willis 748-2211 Refurbishment 4 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 COA Connie Willis 748-2211 529-5409 529-5409 529-5409 MISCELLANEOUS Olivia Rocha DSPS Counter MISCELLANEOUS Olivia Rocha Bldg B MISCELLANEOUS Olivia Rocha Bldg AMT MISCELLANEOUS Olivia Rocha Rubber base MISCELLANEOUS Olivia Rocha F122 MISCELLANEOUS Olivia Rocha DSPS MISCELLANEOUS Olivia Rocha Bldg G MISCELLANEOUS Olivia Rocha Bldg F MISCELLANEOUS Olivia Rocha 529-5409 Campus Loop MISCELLANEOUS Olivia Rocha 529-5409 *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services 1st and 2nd floor sunshades 529-5409 529-5409 529-5409 Pigeon Abatement Bldg B Pigeon Abatement at AMT 529-5409 529-5409 Cashiers' door Health/Safety 1 529-5409 Reverse D117 door Health/Safety 1 529-5409 Replace and supply Refurbishment door Refurbishment Restriping only of outside area - no repaving Make Street 2-way Health/Safety by Bldg C & D 2 529-5409 Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. $ 38,775.00 $ 14,225.56 $ 97,302.81 $ 11,949.47 $ 2,702.86 $ 12,803.00 $ 42,676.67 $ 64,726.00 $ 35,564.00 $ 44,000.00 $ 120,000.00 $ 11,380.00 $ 5,690.00 $ 1,707.00 $ 2,845.00 $ 2,845.00 $ 35,563.89 Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments 4 2 Page 5 of 6 Udated 10/2/2007 SHORT-TERM CONSTRUCTION PROJECTS PHASE II CONTACT INFORMATION Loc Dept. Contact PROJECT Contact Number Dept. Project Name Project Manager Contact Number Scope of Work Time Frame Categories *RNKG Date of Board Approval 30-120 Days 120-365 Days COST INFO 365+ Days Engineering Cost Est. Bid Amount Change Total Cost of Order Amount Construction STATUS Start Finish Schedule % Completion Comments NIGHT & WEEKEND WORK ONLY @25% $ COA Connie Willis 748-2211 CLOCKS COA Connie Willis 748-2211 B,C,D,L,E,F CLOCKS COA Connie Willis 748-2211 LRC2NDMW;B1S TMW B 2NDM, GMW;GYMM W;C1MW C2MW; RESTROOM UPGRADE COA Connie Willis 748-2211 RESTROOM UPGRADE Olivia Rocha Olivia Rocha Olivia Rocha Olivia Rocha 529-5409 Refurbishment 2 529-5409 New clocks required Refurbishment throughout Select painting, Refurbishment lights, partitions, mirrior, sinks faucets, flush valves, lavatories and surface repair - not a complete upgrade 2 529-5409 529-5409 Lead removal for above 278,170.88 $ - $ - 1 $ 608,142.58 SUBTOTAL CONSTRUCTION COST SUBTOTAL SOFT COST SHORT-TERM CONSTRUCTION TOTAL COST $ $ $ $ 32,434.27 4,988,325.09 857,678.55 5,846,003.64 Contingency at 7% Olive Construction Services for Phase II Projects Reimbursable Expenses Architectual Fees Engineering Fees Environmental Abasement Moving Coordinator Actual Moving Contractors DSA Fees SUBTOTAL SOFT COST $ $ $ $ $ $ $ $ $ $ 149,649.75 368,960.00 11,068.80 69,000.00 69,000.00 30,000.00 50,000.00 95,000.00 15,000.00 857,678.55 Refurbishment 1 Approved By: Dr. Cecilia Cervantes College of Alameda President 8/31/2007 Date 8/31/2007 Dr. Sadiq Ikharo Vice Chancellor of General Services Elihu Harris Chancellor *Legend for Ranking (RNKG) 1- Imminent danger to the life or safety 2- Immediate infrastructure failure 3- To modernize instructional failure 4- To modernize institutional support services Date 8/31/2007 Date Page 6 of 6 Udated 10/2/2007