SHORT-TERM CONSTRUCTION PROJECTS PHASE II
CONTACT INFORMATION
Loc
Dept.
Contact
Contact
Number
PROJECT
Project
Name
Dept.
Project
Manager
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Shirley
981-2840 2nd, 4th, &
Slaughter
5th fl.
ADA paddles
N/A
Shirley
981-2840 staircases
Slaughter
Safety
N/A
Shirley
981-2840 Student
Slaughter
Lounge,
A&R, 4th fl
Install Monitors
N/A
Berkeley
City
College
Shirley
981-2840 Mailroom
Slaughter
Installation
Mailboxes
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Shirley
981-2840 Computer
Slaughter
Labs
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Contact
Number
Scope of Work
Time Frame
Categories
*RNKG
ADA paddles for
Health & Safety
handicap access to
washrooms
security cameras and
Health & Safety
safety mirrors in exit
staircases
Monitors for Student
Health & Safety
Lounge, A&R, 4th fl
Conference Room /EOC
and the front entrance
1
Install additional
mailboxes in mailroom.
Refurbishment
1
Electrical redesign to
accommodate 40+
computers in lab
Tabletops for science
labs
Refurbishment
1
Refurbishment
3
Date of
Board
Approval
30-120
Days
120-365
Days
COST INFO
365+
Days
Engineering
Cost Est.
$
300,000.00
$
90,000.00
Berkeley
City
College
N/A
New Tabletops
N/A
Shirley
981-2840 CampusSlaughter
wide
Signs
N/A
Additional signage
Refurbishment
3
Shirley
981-2840 Labs
Slaughter
N/A
2
Shirley
981-2840 Art Lab
Slaughter
N/A
Install Extron and
Refurbishment
complete Audio Visual
Control Stations for two
single-image labs where
AVCS were not
installed.
Lighting contractors to
Refurbishment
finish lighting in Art Lab
Start
Finish
Schedule %
Completion
COMMENTS
60,000.00
Will be used to broadcast
student data and to
receive information in the
event of an emergency
$
80,000.00
There are 112 mailboxes
and an additional 250 are
needed
$
150,000.00
$
25,000.00
$
120,000.00
$
90,000.00
$
20,000.00
$
20,000.00
$
35,000.00
$
40,000.00
$
30,000.00
1
Shirley
981-2840 Rm 042
Slaughter
Water/Sewer
Pump
N/A
Require Ventilation
Health & Safety
1
Shirley
981-2840 Rm 043
Slaughter
Telecom
N/A
Require ventilation and
air conditioning
Health & Safety
1
N/A
Relocate power and
data outlets from inside
the ceiling to flush on
ceiling title.
Refurbishment
1
N/A
EOPS Require electrical Refurbishment
and data modifications
to accommodate
functional and furniture
changes
2
Legend for Ranking (RNKG)
1- Imminent danger to the life or safety
2- Immediate infrastructure failure
3- To modernize instructional failure
4- To modernize institutional support service space
Total Cost of
Construction
2
Shirley
981-2840 Science
Slaughter
Labs
Shirley
981-2840 Classrooms
Slaughter
014, 015,
031, 033,
034,051,
052, 053,
054,
055,057
Shirley
981-2840 Rm 125
Slaughter
STATUS
1
$
N/A
Bid
Amount
Change
Order
Amount
Page 1 of 2
Updated 10/2/2007
SHORT-TERM CONSTRUCTION PROJECTS PHASE II
CONTACT INFORMATION
Loc
Dept.
Contact
Contact
Number
PROJECT
Project
Name
Dept.
Project
Manager
Berkeley
City
College
Shirley
981-2840 Rm 131
Slaughter
N/A
Berkeley
City
College
Shirley
981-2840 Rm 213,
Slaughter
227, 312,
313, 321,
323, 324
Shirley
Rm 450
Slaughter
N/A
Berkeley
City
College
Berkeley
City
College
Berkeley
City
College
Shirley
Slaughter
Campuswide
Shirley
Slaughter
Art room
N/A
vents
N/A
N/A
Dr. Sadiq B. Ikharo
Vice Chancellor of General Services
Elihu Harris
Chancellor
Legend for Ranking (RNKG)
1- Imminent danger to the life or safety
2- Immediate infrastructure failure
3- To modernize instructional failure
4- To modernize institutional support service space
Scope of Work
Categories
*RNKG
Library require
Refurbishment
additional electrical
circuits for computers,
printers, and furniture
changes
Require additional
Refurbishment
electrical circuits for
computers and printers.
1
Cubicles Replace
Refurbishment
inadequate network
cabling to extend to
furniture
sewer/ vents/ odor issue Health & Safety
1
Blackout shades/
draperies
30-120
Days
120-365
Days
COST INFO
365+
Days
Engineering
Cost Est.
$
45,000.00
$
75,000.00
$
75,000.00
$
10,000.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
10,000.00
1,275,000.00
89,250.00
1,364,250.00
89,250.00
89,250.00
Bid
Amount
Change
Order
Amount
STATUS
Total Cost of
Construction
Start
Finish
Schedule %
Completion
COMMENTS
1
Refurbishment
SUBTOTAL CONSTRUCTION COST
SUBTOTAL SOFT COST
SHORT-TERM CONSTRUCTION TOTAL COST
7% contingency
Project Managers Fees
Reimbursable Expense
Architects Fees
Engineer Fees
Enviromental Abatement
Moving Coordinator
Actual Moving Contractors
(DSA) Department of State Architect Fees
SUBTOTAL SOFT COST
Approved By:
Dr. Wise E. Allen
Berkeley City College President
Contact
Number
Time Frame
Date of
Board
Approval
8/31/2007
Date
8/31/2007
Date
8/31/2007
Date
Page 2 of 2
Updated 10/2/2007